This document appears to be the "ATTACHMENT II - Drawings.pdf" file related to Solicitation Number 36C25024B0065, which is for the replacement of the SPS Air Handler and installation of a Humidification System at the VA's Veterans Integrated Service Network 10 facilities.
The Drawings attachment provides technical specifications and diagrams for the required work, including details on the air handler and humidification system to be installed. This appears to be a supporting document for the overall solicitation, providing additional details on the scope of work and requirements for offerors to consider in their proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25024B0065 0001.docx | DOCX document | |
| RFI Questions and Answers.pdf | ||
| Attachment VII - Limitations on Subcontracting - Certificate of Compliance.pdf | ||
| ATTACHMENT III - DBA Wage Determination.pdf | ||
| Attachment IV - EMR.pdf | ||
| ATTACHMENT I - Specs.pdf | ||
| ATTACHMENT V - RFI Template.pdf | ||
| Attachment VI - VHA Directive 1192-01.pdf | ||
| 36C25024B0065.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G E N E R A L N O T E S A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
THE CONTRACT DRAWINGS AND SPECIFICATIONS (INDICATED BY THE SAME PROJECT NUMBER)
ARE COMPLEMENTARY. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S
REPRESENTATIVE (C.O.R.) OF ANY DISCREPANCIES FOUND DURING BIDDING AND THROUGH
CONSTRUCTION.
DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN.
THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO
DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE CONTRACTOR SHALL EXAMINE EXISTING
BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE
IMMEDIATE ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE.
THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN
DURING DEMOLITION AND CONSTRUCTION.
THE CONTRACTOR SHALL MAINTAIN ACCESSIBLE EGRESS FOR THE DURATION OF THE PROJECT.
THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES
BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR ORIGINAL
CONDITION AT THE END OF THE PROJECT.
PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED
AND FIRE SAFE’D TO ACHIEVE THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION
OPERATIONS FOR EACH DAY.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL
AUTHORITIES' RULES AND REGULATIONS.
THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND
MINIMUM QUALITY OF WORK EXPECTED. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS,
METHODS AND TECHNIQUES FOR CONSTRUCTION AND EXPECTED QUALITY.
ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE
SALVAGED AND REFURBISHED. MATERIAL QUALITY SHALL MEET OR EXCEED APPLICABLE
INDUSTRY STANDARDS.
COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES. EXACT SIZE AND LOCATION OF ROOF,
WALL, AND FLOOR OPENINGS SHALL BE VERIFIED WITH CORRESPONDING CONTRACTING TRADES
PRIOR TO CONSTRUCTION.
ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND
VERIFYING ALL REQUIRED ROUGH OPENINGS AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT
MANUFACTURER AND CONTRACTING OFFICER REPRESENTATIVE PRIOR TO CONSTRUCTION.
WHERE EXISTING SURFACES ARE TO BE RE-FINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE
ATTACHMENT OF NEW CONSTRUCTION, PREPARE EXISTING SURFACES AS NECESSARY TO
RECEIVE THE NEW MATERIALS FOR A LEVEL AND SMOOTH FINISH.
FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES APPARATUSES IMPACTING NEW
CONSTRUCTION. DETERMINE EXACT SIZE AND LOCATION OF PENETRATION WITHIN NEW
CONSTRUCTION, TIGHTLY SEAL AND CAULK.
CONTRACTOR SHALL HOST ONLINE CONSTRUCTION MANAGEMENT PLATFORM FOR THE
DURATION OF THE PROJECT.
CAMPUS LOCATION
PROJECT LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk D oc s:
//M ar io n
VA
R ep la ce S
PS
A H U /F
FE
_M ar io n
- R ep la ce S
PS
A H U _B (2 3) .rv t
3/ /2 5:
:4
PM
GI000
COVER SHEET
03/27/2024 PQ MP
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 1 OF 29
REPLACE SPS AIR HANDLER AND HUMIDIFICATION
PROJECT NUMBER: 610-23-501
VA NORTHERN INDIANA HEALTHCARE SYSTEM
MARION CAMPUS
DEPARTMENT OF VETERANS AFFAIRS
MARION, INDIANA 46953
1700 E 38TH STREET
L O C A T I O N M A P N
NTS
V I C I N I T Y M A P
N
NTS
SHEET INDEX
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET 1
GI001 OVERALL BASEMENT PLAN 2
GI002 ICRA CLASS V REQUIREMENTS 3
GI003 ARCHITECTURAL ABBREVIATIONS 4
GI101 PROJECT ACCESS PLAN 5
ARCHITECTURE
AD140 ARCHITECTURAL BASEMENT DEMOLITION RCP 6
AE100 ARCHITECTURAL BASEMENT FLOOR PLAN 7
AE101 ARCHITECTURAL FIRST FLOOR PLAN AND ROOF PLAN 8
AC140 ARCHITECTURAL BASEMENT RCP 9
MECHANICAL
M001 MECHANICAL LEGENDS AND ABBREVIATIONS 10
MD100 MECHANICAL BASEMENT DEMOLITION PLAN 11
MD101 MECHANICAL PARTIAL DEMOLITION PLAN 12
MH100 MECHANICAL BASEMENT HVAC PLAN 13
MH101 MECHANICAL PARTIAL PLANS 14
MP100 MECHANICAL BASEMENT PIPING PLAN 15
M400 MECHANICAL SECTIONS 16
M500 MECHANICAL DETAILS 17
M501 MECHANICAL DETAILS 18
M600 MECHANICAL SCHEDULES 19
M601 MECHANICAL SCHEDULES 20
M700 MECHANICAL CONTROLS 21
M701 MECHANICAL CONTROLS 22
M800 MECHANICAL BASEMENT AIR FLOW DIAGRAM 23
ELECTRICAL
E001 ELECTRICAL LEGEND AND ABBREVIATIONS 24
E100 ELECTRICAL CONDUIT ROUTING PLAN 25
ED100 ELECTRICAL BASEMENT DEMOLITION PLAN 26
EL100 ELECTRICAL BASEMENT LIGHTING PLAN 27
EP100 ELECTRICAL BASEMENT POWER PLAN 28
EP101 ELECTRICAL ROOF PLANS 29
No. Revisions: Date:
0 ISSUED FOR CONSTRUCTION 03/27/2024
SPS
005C
TR ROOM
005B
CLEAN STERILE SUPPLY
005D
DECONTAMINATION
EMS
007B
OFFICE
VEST
SPS ALCOVE
005E
EQUIPMENT STORAGE
003C
RECEIVING
G E N E R A L N O T E S A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
CONTRACTOR SHALL PROVIDE DUST SEPARATION FOR THE CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT. AT THE END OF EACH SHIFT, CONTRACTOR IS TO REMOVE DUST SEPARATION AND CLEAN AREA AS REQUIRED. PROVIDE STICKY WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA AND PROVIDE CONSTRUCTION SIGNAGE STATING "DANGER -CONSTRUCTION AREA, AUTHORIZED PERSONNEL ONLY".
PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS.
MAINTAIN ALL EGRESS PATHS. NO EXITS TO BE BLOCKED.
PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL TRADES AS TO HOW THEY
RELATE TO THE OVERALL PROJECT.
ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD DOOR HARDWARE AND KEYED ALIKE WITH VA
STANDARD LOCKSETS.
ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAIN LOCKED AT ALL TIMES.
AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM, MONDAY - FRIDAY, ALL DAY SATURDAY AND SUNDAY. CONTRACTOR SHALL COORDINATE BUILDING ACCESS WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD OPERATING HOURS.
ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED IN SPECIFICATIONS SHALL BE DONE AFTER
HOURS AND COORDINATED WITH THE COR.
IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING WALLS AND/OR AREAS NOT VISIBLE PRIOR TO
DEMOLITION, CONTRACTOR SHALL CONTACT COR FOR ABATEMENT.
IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO ENSURE ALL BUILDING AND CONSTRUCTION CODES
ARE MET FOR EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE ARCHITECT AND COR OF ALL APPARENT DISCREPANCIES OR OMISSIONS PRIOR TO BIDDING AND CONSTRUCTION OF THE WORK.
EACH ZONE CAN BE COMPLETED CONCURRENTLY WITH OTHER ZONES.
BUILDING 138
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//M ar io n
VA
R ep la ce S
PS
A
H U
/F
FE
_M ar io n
- R ep la ce
S
PS
A H
U _B
(2
3) .rv t 3/
/2
5:
:4
PM
GI001
OVERALL BASEMENT PLAN
03/27/2024 PQ MP
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 2 OF 29
Scale: 1" = 30'-0"
OVERALL BASEMENT PLAN
N.T.S.Scale:
KEY PLANN
A
A
BLUE CORE LOCKSET
LOCKED AT ALL TIMES
KEYS ISSUED TO C.O.R.
PROVIDE STICKY MATS
(CHANGED HOURLY)
TEMPORARY ANTE ROOM
HARD BARRIER
FL
EX
D
UC
T
POST ICRA, ILSM, FIRE INSPECTION SHEETS
VISIBLE TO PUBLIC
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY DAILY).
IF NOT, VERIFY ALL OPENINGS, SUCH AS DOORS, ARE
CLOSED AND / OR CHANGE OUT NEGATIVE AIR PRE-FILTER
(TYPICAL REGULATOR INSTALLATION)
LOUVER
PROVIDE FIRE RATED LOUVERS
THROUGH FIRE RATED WALLS
HEPA NEGATIVE AIR UNIT
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN NOT
RUNNING TO KEEP DUST OUT
COVER ALL RETURNS AT THE
GRATE / DIFFUSERS
OUTSIDE OF BUILDING
PRE-FILTER
CHANGED WEEKLY
AT A MINIMUM
HEPA FILTER
CHANGED MONTHLY
AT A MINIMUM
PROVIDE A 6'-0" x 4'-0" WALK OFF MAT
INSIDE THE TEMPORARY ANTE ROOM
(CHANGE WHEN NECESSARY TO
MAINTAIN CLEANLINESS)
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
TAPE ALL SERVICES TO PROTECT
AGAINST CONTAMINATION
OPTIONAL EXHAUST DUCTS (COVER
THE GRATES AND THE DIFFUSERS) E
A O V
EXHAUST TO EXTERIOR
TEMPORARY ANTE ROOM
HEPA NEGATIVE AIR UNIT
COMPLETELY SEALED WALL
OPENING OR WINDOW OPENING
FLEX DUCT
GRATE / DIFFUSER (DOWNWARD
DEFLECTION
DUCTWORK / FRAME /
DIFFUSER @ 12" A.F.F.
FINISHED FLOORING TO BE KEPT CLEAN. FLOORS NOT
BEING REPLACED TO BE PROTECTED OR COVERED
WITH ROSEN PAPER / FIRE RATED PLYWOOD.
EXISTING WALLEXISTING WALL
FIRE / U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
(INSTALL PRIOR TO
CONSTRUCTION)
FIRE / U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
(INSTALL PRIOR TO
CONSTRUCTION)
EXISTING FIRE
SPRINKLER SYSTEM
EXISTING CONCRETE SLAB ABOVE
HARD BARRIER
EXISTING CONCRETE SLAB ABOVE
FLEX DUCT
HEPA NEGATIVE AIR UNITFLEX DUCT
PLASTIC WINDOW (ON
ALL SIDES
ZIPPER SIDE ENTRY
MOBILE CONTAINMENT CART WITH
CANVAS / 1-1/4" SQUARE STEEL
TUBULAR FRAME
SWIVEL CASTERS TWO WITH
LOCKING OUTER BRAKES
AD
JU
ST
AB
LE
HE
IG
HT
AD
JU
ST
AB
LE
HE
IG
HT
FIRE / U.L. RATED PLASTIC TO
PREVENT DUST INFILTRATION
(INSTALL PRIOR TO
CONSTRUCTION)
POST ICRA, ILSM, FIRE INSPECTION
SHEETS VISIBLE TO PUBLIC
AP
PR
OX
. 4 8" A .F .F
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY
DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,
ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-
FILTER.
PAPER CADDY
ICRA, ILSM, FIRE WATCH,
MISC. FORMS
PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES
AND PROPER I.D.
THIS IS A
RESTRICTED AREA
AREA UNDER CONSTRUCTION
C.O.R. NAME AND
CONTACT INFO
CONST. SUPERVISOR
NAME AND CONTACT
INFO
INDICATOR (REFER TO PLAN
& ELEVATION)
17" MIN
" M
IN
ON FLOOR PLAN.
STRUCTURAL DECK ABOVE
2' x 4' SUSPENDED ACOUSTICAL CEILING AS
SCHEDULED ON FLOOR PLAN
3 5/8" INSULATED WALL WITH 16 GA. METAL
STUD AT 16" O.C. WITH 5/8" GYPSUM BOARD
EACH SIDE. WALL TO EXTEND TO ROOF
METAL DECKING
4 7/8"
4" RUBBER COVE TO MATCH EXISTING
AREA BASE @ BOTH SIDES
ATYPE BTYPE
C
EI
LI
N G H
EI
G H T 8' -0
W
AL
L H
EI
G H T
VA
R
IE
S
FI
EL
D V
ER
IF
Y
C
EI
LI
N G H
EI
G H T 8' -0
W
AL
L H
EI
G H T
VA
R
IE
S
FI
EL
D V
ER
IF
Y
3 5/8" INSULATED WALL WITH 16 GA. METAL
STUD AT 16" O.C. WITH 5/8" GYPSUM BOARD
EACH SIDE.
2' x 4' SUSPENDED ACOUSTICAL CEILING AS
SCHEDULED ON FLOOR PLAN
4 7/8"
4" RUBBER COVE TO MATCH EXISTING
AREA BASE @ BOTH SIDES
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED
GROUP TYPE A TYPE B TYPE C TYPE D
I II II III
II
III IV
V
III
IV
IV
V
V
I
I
III
CONSTRUCTION PROJECT BY PATIENT RISK
IC MATRIX - CLASS OF PRECAUTIONS:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISKNOTE:
LEVEL INDICATE THAT CLASS III, IV, OR V CONTROL PROCEDURES ARE NECESSARY.
LOW RISK
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
CLASS V WORK ITEMS NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
Personnel will be required to wear coveralls at all times during Class V work activities. Coveralls must be removed before leaving the anteroom.
Remove or isolate return air diffusers to avoid dust entering the HVAC system.
Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
Contain all trash and debris in the work area.
Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
In the event that there is a deviation in place to discharge the exhaust air into occupied space (and not outside), then consider particulate sampling to help identify contaminants that may enter patient care areas.
1.
2.
1.
2.
1.
2.
3.
4.
5.
1.
2.
3.
1.
2.
Class III (Type C Activities only), IV, and V precautions require inspection and documentation for downgraded ICRA precautions.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
Carefully remove screws and painter tape.
If dust will be generated during screw removal, use hand-held HEPA vacuum.
Drywall cutting is prohibited during removal process.
Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
The use of negative air must be designed to remove contaminates from the work area.
Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
Maintain minimum negative air pressure, 0.01 inches of water gauge within work site utilizing HEPA equipped air filtration units and continuously monitored with a digital display, recording and alarm instrument, which must be calibrated on installation, maintained with periodic calibration, and monitored.
HVAC systems:
Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
Verify that HVAC systems are clean and operational.
Verify the HVAC systems meets original airflow and air exchange design specifications.
GENERAL NOTES:
ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT AND SAFETY GLASSES ALONG
WITH ANY OTHER PPE REQUIRED IN THAT AREA.
ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
PERMITS TO INCLUDE:
ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES, UTILITY SHUT-DOWN, FIRE / SMOKE
WALL, FIRE ALARM SYSTEM.
THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION. NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS. WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY. CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT.
MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.
CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.
DURING CONSTRUCTION BE CERTAIN THAT:
BARRIER ARE INTACT AND MAINTAINED.
PRACTICAL COUNT METER IS AVAILABLE.
NEGATIVE INDICATOR IS AVAILABLE
INSPECTED / DATED FIRE EXTINGUISHER(S) ARE AVAILABLE & MOUNTED PROPERLY.
ICRA REQUIREMENTS ARE INTACT AND VERIFY ARE BEING MAINTAINED.
WALK-OFF MATS AND STICKY MATS ARE MAINTAINED PROPERLY.
Public hallways and gathering areas not on clinical units.
Office areas not on clinical units.
Breakrooms not on clinical units.
Bathrooms or locker rooms not on clinical units.
Mechanical rooms not on clinical units.
EVS closets not on clinical units.
Waiting areas.
Clinical engineering.
Materials management.
Sterile processing department - dirty side.
Kitchen, cafeteria, gift shop, coffee shop, and food kiosks.
Patient care rooms and areas All acute care units Emergency department Employee health Pharmacy - general work zone Medication rooms and clean utility rooms Imaging suites:
diagnostic imaging Laboratory.
All transplant and intensive care units.
All oncology units.
OR theaters and restricted areas.
Procedural suites.
Pharmacy compounding.
Sterile processing department - clean side.
Transfusion services.
Dedicated isolation wards/units.
Imaging suites:
invasive imaging.
Non-patient care areas such as:
Patient care support areas such as:
Patient care areas such as:
Procedural, invasive, sterile support and highly compromised patient care areas such as:
NTS1 TYPICAL ALTERNATIVE CONSTRUCTION LAYOUT
NTS2 CROSS-SECTION 'A-A' CLASS V NTS3 MOBILE CONTAINMENT CART
NTS5 ANTE ROOM ELEVATION
NTS4 WALL TYPES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk D oc s:
//M ar io n
VA
R ep la ce S
PS
A H U /F
FE
_M ar io n
- R ep la ce S
PS
A H U _B (2 3) .rv t
3/ /2 5:
:5
PM
GI002
ICRA CLASS V REQUIREMENTS
03/27/2024 PQ MP
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 3 OF 29No. Revisions: Date:
P1
A101
SIM
A101
SIM
A101
SIM
A101
SIM
A B B R E V I A T I O N S
LEVEL NAME W/ ELEVATION
NEW GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER, AREA
& OCCUPANCY
BUILDING SECTION NUMBER W/ SHEET
NUMBER
WALL SECTION NUMBER W/
SHEET NUMBER
DOOR NUMBER
WALL TAG
KEYNOTE
REVISION TAG
FINISH TAG
DETAIL SECTION NUMBER W/
SHEET NUMBER
NORTH ARROW
LEVEL
ELEVATION
ROOM NAME
150 SF
S Y M B O L S
N
WINDOW TAGA
0 EXISTING GRID HEAD
10'-0" CEILING HEIGHT TAG
A.B. ANCHOR BOLT
A.C.M. ASBESTOS CONTAINING MATERIALS
A.C.P. ASPHALT CONCRETE PAVING
A/C AIR CONDITIONING
ACOUS. ACOUSTIC
A.C.T. ACOUSTICAL CEILING TILE
A.D. AREA DRAIN
ADJ. ADJUSTABLE
AFF ABOVE FINISH FLOOR
AGG. AGGREGATE
AL. ALUMINUM
ALT. ALTERNATE
APPROX. APPROXIMATE
ARCH. ARCHITECT
ASPH. ASPHALT
BD. BOARD
BITUM. BITUMINOUS
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
BM. BENCH MARK OR BEAM
BOT. BOTTOM
BRG. BEARING
BRK. BRICK
BRZ. BRONZE
BTWN. BETWEEN
B.U.R BUILT-UP ROOFING
CAB. CABINET
CARP. CARPET
C.B. CATCH BASIN
C.B.B. CEMENTITIOUS BACKER BOARD
CEM. CEMENT
CER. CERAMIC
CER.T. CERAMIC TILE
C.F.C.I. CONTRACTOR
FURNISH/CONTRACTOR INSTAL
C.F.O.I. CONTRACTOR FURNISH/OWNER
INSTALL
C.HK. COAT HOOK
C.I. CAST IRON
CIR. CIRCLE
C.J. CONSTRUCTION JOINT
CLG. CEILING
CLG.J. CEILING JOINT
CLKG. CAULKING
CLO. CLOSET
CLR. CLEAR
CLS. CLOSURE
CMU CONCRETE MASONRY UNIT
CNTR. COUNTER
C.O. CLEAN OUT
COL. COLUMN
COMB. COMBINATION
COMP. COMPOSITION
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONV.O. CONVECTION OVEN
C.O.R. CONTRACTING OFFICER'S
REPRESENTATIVE
CTR. CENTER
C.W. COLD WATER
CW. CURTAINWALL
DET. DETAIL
DF. DOUGLAS FIR
D.F. DRINKING FOUNTAIN
DIA. DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DISP. DISPOSAL
DIV. DIVISION
DN. DOWN
D.O. DOOR OPENING
DR. DOOR
D.S. DOWN SPOUT
D.T. DRAIN TILE
D.W. DISHWASHER
DWG(S). DRAWING(S)
DWR. DRAWER
(E) EXISTING
EA. EACH
E.C. ELECTRICAL CONTRACTOR
E.E. EACH END
E.F. EXHAUST FAN
E.J. EXPANSION JOINT
ELEC. ELECTRICAL
ELEV. ELEVATION
E.N. EDGE NAIL
ENCL. ENCLOSURE
EQUIV. EQUIVALENT
E.S. EACH SIDE
E.W. EACH WAY
E.W.C. ELECTRICAL WATER CLOSET
EXP. EXPANSION
EXP.B. EXPANSION BOLT
EXPO. EXPOSURE
EXT. EXTERIOR
F. FACE
F.A. FIRE ALARM
F.B. FACE BRICK
F.BD. FIRE BOARD
F.BELL FIRE BELL
F.B.O. FURNISHED BY OTHERS
F.D. FLOOR DRAIN
FDN. FOUNDATION
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
F.G. FINISH GRADE
FGL. FIBERGLASS
F.H. FIRE HYDRANT
FH.M.S. FLAT HEAD MACHINE SCREW
FIN. FINISH
FIXT. FIXTURE
F.J. FLOOR JOIST
F.L. FLOOR LINE
FLASH FLASHING
FLOUR FLUORESCENT
FLR. FLOOR
F.N. FACE NAIL
F.O.B. FACE OF BUILDING
F.O.C. FACE OF CONCRETE
F.O.F. FACE OF FINISH
F.O.M. FACE OF MASONRY
F.O.S. FACE OF STUD
F.R.T.W. FIRE RETARDANT TREATED WOOD
F.S.C. FIRE SUPPRESSION CONTRACTOR
F.S.E.C. FOOD SERVICE EQUIPMENT
CONTRACTOR
FTG. FOOTING
FUT. FUTURE
F.V.C. FIRE VAULT CABINET
GA. GAUGE
GALV. GALVANIZED
G.C. GENERAL CONTRACTOR
G.B. GRAB BAR
G.D. GARBAGE DISPOSAL
G.E. GRATE ELEVATION
G.I. GALVANIZED IRON
GL. GLASS
GLB. GLUE LAMINATED BEAM
GND. GROUND
GR. GRADE
G.S.M. GALVANIZED SHEET METAL
GYP.BD. GYPSUM BOARD
H.B. HOSE BIB
HC. HANDICAPPED
HDR. HEADER
HDWD. HARDWOOD
HDWE. HARDWARE
HGT. HEIGHT
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
H.P. HIGH POINT
HR. HOUR
H.S.S. HOLLOW STRUCTURAL STEEL
HTG. HEATING
H.V.A.C. HEATING, VENTILATION & AIR
CONDITIONING
H.W. HOT WATER
I.D. INSIDE DIAMETER
INSUL. INSULATION
INT. INTERIOR
INV. INVERT
JAN. JANITOR
J.H. JOIST HANGER
JST. JOIST HANGER
JT. JOINT
KIT. KINTCHEN
LAB LABORATORY
LAM. LAMINATE
LAV. LAVATORY
L.B. LAG BOLT
L.H. LEFT HAND
L.L. LIVE LOAD
L.P. LOW POINT
LT. LIGHT
MAT. MATERIAL
MAX. MAXIMUM
M.B. MACHINE BOLT
M.C. MEDICINE CABINET
MECH. MECHANICAL
MED. MEDIUM
MEMB. MEMBRANE
M.E.P. MECHANICAL, ELECTRICAL,
PLUMBING
MFG. MANUFACTURER
MH. MANHOLE
MIN. MINIMUM
MIR. MIRROR
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MOD. MODULAR
MP.H. MOP HOLDER
MR. FRAMED MIRROR
M.R. MOISTURE RESISTANT
M.T. METAL THRESHOLD
MTD. MOUNTED
MTL. METAL
(N) NEW
N. NORTH
NAT. NATURAL
N.I.C. NOT IN CONTRACT
(NOT PART OF OSA APPROVAL)
NO. NUMBER
NOM. NOMINAL
NON/COM NON-COMBUSTIBLE
N.T.S. NOT TO SCALE
O/ OVER
O.A. OVERALL
OBS. OBSCURE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OVERFLOW
OFF. OFFICE
O.F.S. OUTSIDE FACE OF STUD
O.H.W.S. OVAL HEAD WOOD SCREW
OPP. OPPOSITE
P. PAINT
P.C. PLUMBING CONTRACTOR
P.C.F. POUNDS PER CUBIC FOOT
P.E.N. PANEL EDGE NAILING
PERF. PERFORATED
PL. PLATE
P.LAM PLASTIC LAMINATE
PLAS. PLASTER
P.L.F. POUNDS PER LINEAR FOOT
PLYWD. PLYWOOD
P.M.F. PRESSED METAL FRAME
PR. PAIR
PROP. PROPERTY
P.S.F. POUNDS PER SQUARE FOOT
P.S.I. POUNDS PER SQUARE INCH
P.STA. PULL STATION
PTD. PAINTED
P.T.D. PAPER TOWEL DISPENSER
PT. POINT
P.T.D.F. PRESSURE TREATED DOUGLAS
FIR
PTN. PARTITION
P.T.R. PAPER TOWEL RECEPTACLE
P.V.C. POLYVINYL-CHLORIDE
Q.T. QUARRY TILE
RAD. RADIUS
R.B. RUBBER BASE
R.C.P. REFLECTED CEILING PLAN
R.D. ROOF DRAIN
RDWD. REDWOOD
REF. REFERENCE
REFR. REFRIGERATOR
REINF. REINFORCING
REQD. REQUIRED
RESIL. RESILIENT
R.H. ROOF HATCH
R.HK. ROBE HOOK
R.H.M.S. ROUND HEAD METAL SCREW
R.H.W.S. ROUND HEAD WOOD SCREW
RM. ROOM
R.O. ROUGH OPENING
R.W.L. RAIN WATER LEADER
S. SOUTH
S.A.B. SOUND ATTENUATION BATT
S.A.D. SEE ARCHITECTURAL DRAWINGS
S.A.F.F. SELF ADHERED FLEXIBLE FLASHING
S.A.S.M. SELF ADHERED FLEXIBLE MEMBRANE
S.BLKG. SOLID BLOCKING
SCWD. SOLID CORE WOOD DOOR
S.C.D. SEE CIVIL DRAWINGS
S.D. STORM DRAIN
S.DISP. SOAP DISPENSER
SEAL. SEALANT
SECT. SECTION
S.E.D. SEE ELECTRICAL DRAWINGS
SHR. SHOWER
SHT. SHEET
SHTG. SHEATHING
SIM. SIMILAR
SL. SLIDING
S.L.D. SEE LANDSCAPE DRAWINGS
S.M.D. SEE MECHANICAL DRAWINGS
S.N.D. SANITARY NAPKIN DISPOSAL
S.N.V. SANITARY NAPKIN DISPENSER
S.P. SOUNDPROOF
SPEC. SPECIFICATION
SQ. SQUARE
SQ.FT. SQUARE FOOT (FEET)
S.S. SANITARY SEWER
S.S.D. SEE STRUCTURAL DRAWINGS
STA. STATION
STD. STANDARD
STL. STEEL
S.STL. STAINLESS STEEL
STO. STORAGE
STRUC. STRUCTRUAL
SUSP. SUSPENDED
T.B. TACKBOARD
T&B. TOP AND BOTTOM
TEL. TELEPHONE
TEMP. TEMPERED
TER. TERRAZZO
T&G. TOUNGE AND GROOVE
THK. THICK
T.J. TOOL JOINT
T.N. TOE NAIL
T.O.C. TOP OF CURB
T.O.P TOP OF PAVEMENT
T.O.PL. TOP OF PLATE
T.O.S. TOP OF SEAT
T.O.W. TOP OF WALL
T.P.D. TOILET PAPER DISPENSER
T.S. TUBE STEEL
T.V. TELEVISION
TYP. TYPICAL
UNF. UNFINISHED
U.N.O. UNLESS NOTED OTHERWISE
UR. URINAL
U/S. UNDERSIDE
V.C.T. VINYL COMPOSITION TILE
VERT. VERTICAL
VEST. VESTIBULE
V.G. VERTICAL GRAIN
V.I.F. VERIFY IN FIELD
V.T. VINYL TILE
V.T.R. VENT TO ROOF
V.W.C. VINYL WALL COVERING
(VC) V.A. FURNISHED / CONTRACTOR
INSTALLED
(VV) V.A. FURNISHED AND INSTALLED
W. WEST
W/ WITH
W/IN WITHIN
W.C. WATER CLOSET
WD. WOOD
WDW. WINDOW
W.F. WATER COOLER
W.H. WATER HEATER
W/O WITHOUT
W.P. WATER PROOF
W.R. WATER RESISTANT
WT. WEIGHT
W.W.F. WELDED WIRE FABRIC
YD. YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk D oc s:
//M ar io n
VA
R ep la ce S
PS
A H U /F
FE
_M ar io n
- R ep la ce S
PS
A H U _B (2 3) .rv t
3/ /2 5:
:5
PM
GI003
ARCHITECTURAL ABBREVIATIONS
03/27/2024 PQ MP
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 4 OF 29No. Revisions: Date:
EXISTING UNDERGROUND TUNNEL -
IF CONTRACTOR PROPOSES USE OF CRANE
FOR CHILLER DELIVERY, DO NOT PLACE
CRANE ABOVE TUNNEL
907' - 4 1/4"
894' - 4"
909' - 6"
894' - 4"
870' - 0"
894' - 4 1/4"
EXISTING CONCRETE
SIDEWALK
EXISTING CONCRETE
NEW CHILLER
BUILDING 172
EXISTING TREE
(TYP.)
BUILDING 138
COURTYARD
LOADING DOCK
EXTERIOR DOOR
PROPOSED CHILLER
DELIVERY LOCATION
AND ROUTE
EXISTING CONCRETE
DRIVE
GRASS
GRASS
AE101
843' - 0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//M ar io n
VA
R ep la ce S
PS
A
H U
/F
FE
_M ar io n
- R ep la ce
S
PS
A H
U _B
(2
3) .rv t 3/
/2
5:
:5
PM
GI101
PROJECT ACCESS PLAN
03/27/2024 PQ CL
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 5 OF 29
1" = 20'-0"1 PROJECT ACCESS PLAN
5s4s j i
H
F
E
C
M
N
PS 10.5
DECON
CLEAN STERILE SUPPLY
005D
OFFICE
DECON
EMS
007B
SPS
005C
TELECOM
005B
VEST
6' - 10"
7' - 6"
6' - 7"
7' - 2"
7' - 2"
8' - 0" 8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0"
CORRIDOR
C003
SPS ALCOVE
005E
8' - 1"
RECEIVING
EQUIPMENT STORAGE
003C
EXPOSED
EXPOSED
EXPOSED
REMOVE, SALVAGE, AND REINSTALL
CEILING TILES AS NEEDED FOR MECHANICAL
WORK IN THIS SPACE.
COORDINATE WITH MECHANICAL DRAWINGS.
REMOVE, SALVAGE, AND REINSTALL
CEILING TILES AS NEEDED FOR MECHANICAL
WORK IN THIS SPACE.
COORDINATE WITH MECHANICAL DRAWINGS.
BUILDING 138
DRAWING LEGEND
24" X 48" CEILING TILE SYSTEM TO BE DEMOLISHED
24" X 24" CEILING TILE SYSTEM TO BE DEMOLISHED
LIGHTING FIXTURE TO BE DEMOLISHED
MECHANICAL DIFFUSER TO BE DEMOLISHED
MECHANICAL RETURN/EXHAUST TO BE DEMOLISHED
8' - 0" TAG DENOTES APPROXIMATE CEILING HEIGHT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//M ar io n
VA
R ep la ce S
PS
A
H U
/F
FE
_M ar io n
- R ep la ce
S
PS
A H
U _B
(2
3) .rv t 3/
/2
5:
:3
PM
AD140
ARCHITECTURAL BASEMENT
DEMOLITION RCP
03/27/2024 PQ MP
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 6 OF 29
3/16" = 1'-0"
DEMOLITION - REFLECTED CEILING PLAN - BASEMENT
GENERAL DEMOLITION NOTES
A.
B.
C.
D.
E.
F.
UNLESS NOTED OTHERWISE, DRAWINGS AND NOTES REFER TO ARCHITECTURAL DEMOLITION. FIELD VERIFY LOCATION OF EXISTING MECHANICAL, ELECTRICAL, AND PLUMBING INFRASTRUCTURE TO BE REMOVED. SEE MEP DRAWINGS FOR
REMOVAL WORK ASSOCIATED WITH THOSE TRADES.
ARCHITECTURAL DEMOLITION SCOPE IS LIMITED TO THE REMOVAL OF ALL CEILINGS IN THE AFFECTED AREAS (SHOWN SHADED AND WITH DASHED LINE IN PLAN), INCLUDING SUPPORTS, ANCHORAGES, AND OTHER RELATED ELEMENTS.
CEILING CONTRACTOR IS RESPONSIBLE FOR QUANTIFYING ALL CEILING DEVICES FOR REMOVAL. REMOVE WIRELESS
ACCESS POINTS (WAP) BEFORE DEMOLITION.
REVIEW ALL ENVIRONMENTAL REPORTS AND PROVIDE REQUIRED METHODS FOR MITIGATION OF HAZARDOUS MATERIALS
WITHIN SCOPE OF PROJECT.
ALL EXISTING STRUCTURAL ELEMENTS ARE TO REMAIN. ALL EXISTING PARTITIONS (WALLS, DOORS, AND WINDOWS) ARE
TO REMAIN. PROTECT FOR THE DURATION OF THE WORK.
REPAIR WALLS AND ANY OTHER ELEMENTS DAMAGED DUE TO CEILING OR MEP SYSTEMS DEMOLITION.
PROTECT EXISTING CEILING MOUNTED ELECTRICAL DEVICES FOR REINSTALLATION IN NEW CEILING. PROVIDE TEMPORARY ADJUSTMENT TO THE FIRE ALARM SYSTEM AS NECESSARY (WITH THE APPROVAL OF THE COR) WHEN PROTECTING SMOKE
DETECTORS.
N.T.S.Scale:
KEY PLANN
j i
H
F
E
C
B
A
L
M
N
PS
OFFICE
DECON
EMS
007B
DECON
CLEAN STERILE SUPPLY
005D
EQUIP
007A
MECHANICAL CHASE
005A
SPS
005C
TELECOM
005B
VEST
CORRIDOR
C003
STERILE SUPPLY
ANTEROOM REQUIRED - EXACT
LOCATION AS PROPOSED BY
CONTRACTOR AND COORDINATED
WITH COR.
ICRA PLAN SHOWN IS FOR DESIGN
INTENT ONLY AND PROVIDES
PARAMETERS FOR CONTRACTOR-
PROPOSED PHASING PLAN. REFER
TO PHASING REQUIREMENTS WITHIN
01 00 00 GENERAL REQUIREMENTS.
ALL EXISTING WALLS BEING USED
AS ICRA BARRIERS SHALL BE
VERFIED TO EXTEND TO DECK.
WALLS NOT EXTENDING TO DECK
CANNOT BE USED AS PART OF
CONSTRUCTION BARRIER.
PHASE CONSTRUCTION TO
MINIMIZE RESTRICTION TO
EGRESS ROUTE.
SPS ALCOVE
005E
PHASE WITH RELOCATED
ANTEROOM FOR MINIMAL
DISTURBANCE TO AREA.
REFER TO INFECTION
CONTROL DETAILS ON GI002
1-HOUR TEMPORARY CONSTRUCTION
BARRIER REQUIRED. TEMPORARY
DOORS PART OF BARRIER
REQUIRED TO BE 45 MIN.
A
AE1019'
9"
5' - 4"
INFILL EXISTING OPENING IN 12" CONCRETE WALL
APPROX. DIMENSIONS 18"x12". VERIFY IN FIELD
G E N E R A L N O T E S A.
B.
C.
D.
VERIFY EXISTING CONDITIONS BEFORE BID AND CONSTRUCTION.
REFER TO SHEET GI000 FOR GENERAL NEW WORK NOTES.
REFER TO MEP DRAWINGS FOR RESPECTIVE WORK.
ARCHITECTURAL SCOPE OF WORK IS LIMITED TO CEILING WORK OF SHADED ROOMS. REFER TO
CEILING PLAN FOR MORE INFO.
BUILDING 138
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//M ar io n
VA
R ep la ce S
PS
A
H U
/F
FE
_M ar io n
- R ep la ce
S
PS
A H
U _B
(2
3) .rv t 3/
/2
5:
:3
PM
AE100
ARCHITECTURAL BASEMENT
FLOOR PLAN
03/27/2024 PQ MP
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 7 OF 29
3/16" = 1'-0"
FLOOR PLAN - BASEMENT
N.T.S.Scale:
KEY PLANN
A.
B.
C.
D.
E.
F.
a.
b.
c.
G.
a.
b.
c.
d.
e.
f.
H.
a.
b.
c.
I.
a.
J.
a.
b.
K.
a.
b.
c.
DUE TO THE LOCATION OF RENOVATION WORK INDICATED CONSTRUCTION IS WITHIN INFECTION RISK CATEGORY V.
THE INFECTION AND DUST CONTROL PLANS SHALL BE DISTRIBUTED AND APPLIED BY ALL CONTRACTORS PERFORMING WORK ON
THIS PROJECT.
REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS FOR ADDITIONAL INFECTION CONTROL INFORMATION.
COORDINATE ALL WORK ASSOCIATED WITH PROJECT FOLLOWING THE SITE-SPECIFIC INFECTION CONTROL RISK
ASSESSMENT PUBLISHED BY THE VAMC.
AREAS ADJACENT TO IMMEDIATE (PHASED) WORK AREAS WILL BE FULLY OCCUPIED AND FUNCTIONING NORMALLY
THROUGHOUT THE CONSTRUCTION PERIOD.
THERE WILL BE ZERO TOLERANCE FOR ANY DUST MIGRATION OUTSIDE OF THE IMMEDIATE WORK SITE AREAS IDENTIFIED BY
PHASING PLANS.
CONTRACTOR SHALL PROVIDE FOR PROFESSIONAL TERMINAL CLEANING OF PHASED WORK AREAS PRIOR TO TURNING
OVER TO THE VAMC FOR OCCUPANCY.
EXTERIOR DEMOLITION ACTIVITIES (INCLUDES CUTTING AND PATCHING):
EVALUATE EXISTING SITE CONDITIONS TO DETERMINE THE PRESENCE OF ANY OUTSIDE AIR INTAKES WITHIN 20' OF THE
PROPOSED EXTERIOR WORK.
IF PRESENT - DETERMINE IF THE IMPACTED EXTERIOR AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON
RECIRCULATED AIR VS. OUTSIDE AIR.
IF FEASIBLE - SEAL OFF AIR INTAKES WITHIN 20' OF DUST GENERATING WORK.
IF NOT FEASIBLE - ROUTINELY CHECK THE LOW-EFFICIENCY FILTER BANKS LOCATED IN LINE WITH ADJACENT AIR
INTAKE(S) AND REPLACE AS NEEDED TO REDUCE PARTICULATE BUILD-UP.
SEAL WINDOWS AND REDUCE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN STAIRWELLS AND CORRIDORS) THAT MAY BE IMPACTED BY CONSTRUCTION. PAY SPECIAL ATTENTION TO PROTECTIVE ENVIRONMENT (PE)
AREAS.
INTERIOR DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL:
BARRIER SYSTEMS: PHASED AREAS OF WORK SHALL BE ISOLATED FROM ADJACENT AREAS WITH 1-HR RATED DUST
PARTITIONS.
DUST PARTITIONS TO BE METAL FRAMED WITH GYPSUM WALL BOARD ON EACH SIDE. PARTITION TO BE CONSTRUCTED
EQUAL TO UL DESIGN U465.
IN LIEU OF SITE BUILT DUST PARTITIONS, CONTRACTOR MAY UTILIZE PRE-ENGINEERED (MODULAR) TEMPORARY CONSTRUCTION PARTITIONS LIKE THOSE MANUFACTURED BY EDGE GUARD PRODUCTS, 216 N. PLATT ST., BEMENT, IL 61813, TELE 217-552-5418, WEBSITE: WWW.EDGE-GUARD.COM OR APPROVED EQUAL.
DUST PARTITIONS SHALL BE INSTALLED WITH A TIGHT SEAL AT FLOOR AND CEILING OR STRUCTURE ABOVE CEILING.
WHERE DEMISING WALLS ARE SHOWN TO BE EXTENDED UP TO STRUCTURE ABOVE - PROVIDE AIR TIGHT SEAL AT BOTH
TOP OF EXISTING DEMISING WALL (TO BE EXTENDED) AND AT STRUCTURE ABOVE.
WHERE DEMISING WALL EXTENSIONS IMPACT EXISTING FIRE PROOFED STEEL STRUCTURE - CONTRACTOR SHALL CAREFULLY REMOVE THE FIREPROOFING (ONLY) IN AREA WHERE TOP WALL PLATE MEETS EXISTING STEEL. PATCH ANY FIREPROOFING DISTURBED BY CONSTRUCTION ACTIVITIES WITH NEW FIRE PROOFING MATCHING EXISTING
SYSTEM.
AN INTERIM PLASTIC DUST BARRIER (MINIMUM 6-MIL THICKNESS) SHALL BE INSTALLED TO PROTECT ADJACENT
AREAS WHILE THE IMPERVIOUS (1-HR. RATED) DUST PARTITION IS BEING CONSTRUCTED.
ANY DUST GENERATED FROM DEMOLITION OR CONSTRUCTION ACTIVITIES SHALL BE IMMEDIATELY CLEANED IF
TRACKED OR FOUND OUTSIDE OF THE CONSTRUCTION PHASE PERIMETER.
CONTRACTOR PERSONNEL SHALL MONITOR DUST PARTITION CONDITION AND PERFORM MAINTENANCE - DURING
PHASED DEMOLITION AND CONSTRUCTION ACTIVITIES.
UPON COMPLETION OF CONSTRUCTION ACTIVITIES, DUST PARTITIONS SHALL BE CAREFULLY REMOVED TO MINIMIZE
THE SPREAD OF DUST.
CONTRACTOR SHALL INSTALL INTERIM PLASTIC DUST BARRIERS (MINIMUM 6-MIL THICKNESS) PRIOR TO THE
REMOVAL OF DUST PARTITIONS.
TRAFFIC CONTROL:
PHASED SITE ACCESS SHALL HAVE DEFINED ENTRY AND EXIT PROCEDURES. EGRESS PATHS AND BE FREE OF DEBRIS, TOOLS, EQUIPMENT, OR CONTAINERS.
DESIGNATED ELEVATORS SHALL ONLY BE USED DURING SCHEDULED TIME PERIODS AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. COORDINATE ELEVATOR ACCESS WITH THE
VAMC THROUGH THE COR.
INSTALL SIGNAGE TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREAS.
DEMOLITION DEBRIS:
ALL DEBRIS GENERATED BY PROJECT SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTING COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE THE USE OF ELEVATORS SHARED BY PATIENTS OR STAFF. PERFORM TRANSPORT OF DEBRIS AT TIMES DIRECTED BY THE VAMC THROUGH THE COR. IF EXTERIOR TRASH CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED AND THE CHUTE OPENING SEALED WHEN NOT IN USE. USED FILTERS SHALL BE BAGGED AND SEALED BEFORE TRANSPORTING OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE VAMC.
VENTILATION AND ENVIRONMENTAL CONTROLS:
AIR SYSTEM FLOW: DETERMINE IF CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR. ADD FILTERS AND/OR COVER RETURN GRILLS WITH FILTER MATERIAL OR PLASTIC. AIR MUST (ONLY) FLOW IN THE DIRECTION OF
CLEAN AREAS TO DIRTY AREAS.
NEGATIVE AIR PRESSURE: AIR WITHIN THE CONSTRUCTION AREAS (PHASES) MUST BE MAINTAINED AT NEGATIVE PRESSURE WITH RESPECT TO SURROUNDING AREAS. NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS IS ALLOWED DURING PERIODS OF VAMC OCCUPANCY OF ADJACENT AREAS. THE NEGATIVE AIR PRESSURE SYSTEM WITHIN
THE ENCLOSED PHASES SHALL EXHAUST DIRECTLY OUTSIDE.
DUST PARTITIONS SHALL BE OUTFITTED WITH CONTINUOUS AIR PRESSURE MONITORING DEVICES WITH 24/7 READ OUT AND LOGGING. BASIS OF DESIGN FOR AIR PRESSURE MONITORING DEVICE IS PHOENIX CONTROLS APM II, OR
EQUAL.
WORK SITE CLOTHING AND CLEANING:
CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE ENTERING OR LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G. COVERALLS, FOOTGEAR, AND HEADGEAR) A HEPA- FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE PHASED CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE AS AN ANTEROOM FOR
CHANGING CLOTHING AND STORING EQUIPMENT.
ALL EQUIPMENT, TOOLS, CARS, MATERIALS, ETC. TRANSPORTED THROUGH NORMALLY OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET MOPPING BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
THE CONSTRUCTION ZONE MUST BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS. SWEEP OR HEPA-VACUUM CONSTRUCTION AREA DAILY - OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS IMPACTED BY CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING OF DIRT AND DUST FROM CONSTRUCTION AREAS.
G E N E R A L I C R A N O T E S
BUILDING 138
EXISTING CONCRETE PAD
TO REMAIN
NEW CONCRETE PAD
SEE STRUCTURAL DETAILS THIS SHEET
TRASH
1E-150
CORRIDOR
C1-33
EXISTING DOOR - 84" +/- CLEAR HEIGHT.
72" +/- CLEAR WIDTH
COORD. IN FIELD WITH SELECTED
MECHANICAL UNIT DIMENSIONS.
9'
8"
20' - 10 1/2"
REMOVE GRATING AND REPLACE WITH
1-1/4" X 3/16" GALV. GRATING
EXISTING AREA
DRAIN
B
AE101
EXISTING DOOR - 84" +/- CLEAR HEIGHT.
72" +/- CLEAR WIDTH
COORD. IN FIELD WITH SELECTED
MECHANICAL UNIT DIMENSIONS.
SLOPE 1/8" / 1'-0 TO
EXISTING AREA DRAIN
EXISTING GRAVEL
4'
8"
4' - 9" (2) #4 REENTRANT
CORNER BARS
5'
1/
8"
4' - 1 1/2"
NEW CONCRETE SLAB ON GRADE
SEE STRUCTURAL DETAILS THIS SHEET
A
AE101
SEE MECHANICAL DRAWINGS FOR
EQUIPMENT TO BE DEMOLISHED AND
INFORMATION ABOUT NEW EQUIPMENT
ISOLATION JOINT AT PERIMETER
COORDINATE DIMENSIONS W/ EQUIPMENT SUPPLIER
EQUIPMENT
3/4" CHAMFER
CONC. FLOOR
1/
2" C
LR
#4 BENT DOWELS W/ 3" EMBED
INTO FLOOR SLAB AND 12" O.C.
MAX. AROUND PERIMETER
#4 BARS @
12" O.C., E.W.
TYP.
0' - 6"
SLAB ON GRADE
0'
6"
6X6-W2.9XW2.9 WWF
SEE PLAN
1 #4 CONTINUOUS
EXISTING CONCRETE PAD
6"
PROVIDE A 1/2" EXPANSION JOINT W/ SEALANT
WHEN POURING NEXT TO EXISTING CONCRETE
SLAB OR WALL
1'
0"
6"6" j i
H
MPS
C
AE101
NEW MECHANICAL DUCT
SEE MECHANICAL DRAWINGS
NEW MECHANICAL UNIT
SEE MECHANICAL DRAWINGS
EXISTING MECHANICAL UNITS AND DUCTS TO BE REMOVED
SEE MECHANICAL DRAWINGS
REPAIR EXISTING ROOF AS NEEDED
EXISTING FALL PROTECTION TO REMAIN
G E N E R A L N O T E S A.
B.
C.
VERIFY EXISTING CONDITIONS BEFORE BID AND CONSTRUCTION.
REFER TO SHEET GI000 FOR GENERAL NEW WORK NOTES.
REFER TO MEP DRAWINGS FOR RESPECTIVE WORK.
M
EXISTING ROOF
REPAIR EXISTING ROOF AS NEEDED WHERE EXISTING
MECHANICAL EQUIPMENT WAS REMOVED
MECHANICAL UNIT SUPPORT
COORDINATE DIMENSIONS WITH MECHANICAL EQUIPMENT
ADJUSTABLE HOT-DIP GALVANIZED STRUT RAILS
INJECTION MOLDED POLYCARBONATE BASES
BOD: MIRO INDUSTRIES HD MECHANICAL UNIT SUPPORT
ANCHOR DUCT TO CMU BACKUP WALL
PER MANUFACTURER'S SPECIFICATIONS
DRILL AND EPOXY W/ 4" MIN EMBED INTO CMU
USE A GALVANIZED SLEEVE THROUGH THE BRICK VENEER
TO AVOID ANY STRESSES IN THE VENEER
EXISTING CMU WALL
W/ BRICK VENEER
NEW MECHANICAL DUCT
SEE MECHANICAL DRAWINGS
EXISTING STRUCTURAL ROOF DECK
NEW MECHANICAL UNIT
SEE MECHANICAL DRAWINGS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//M ar io n
VA
R ep la ce S
PS
A
H U
/F
FE
_M ar io n
- R ep la ce
S
PS
A H
U _B
(2
3) .rv t 3/
/2
5:
:4
PM
AE101
ARCHITECTURAL FIRST FLOOR
PLAN AND ROOF PLAN
03/27/2024 PQ MP
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 8 OF 29
N.T.S.Scale:
KEY PLANN
N
1/4" = 1'-0"1 B138 - MECHANICAL COURTYARD
3/4" = 1'-0"A SECTION
NTSB SECTION
N
1/4" = 1'-0"2 ROOF PLAN
1/4" = 1'-0"C SECTION
A.
B.
C.
NOTES:
USE AIR ENTRAINED CONCRETE (6% + OR -1.5%) FOR ALL AREAS EXPOSED TO WEATHER,
FROST IN SOIL, OR FREEZE THAW CYCLES.
ALL CONCRETE SHALL DEVELOP THE COMPRESSIVE STRENGTHS AT 28 DAYS (F`c) = 4000
PSI UNLESS NOTED OTHERWISE.
ALL REINFORCING SHALL BE HIGH STRENGTH DEFORMED BARS, GRADE 60, ASTM A615,
WITH 60,000 PSI MINIMUM YIELD STRENGTH.
A.
B.
NOTES:
ALL CONCRETE SHALL DEVELOP THE COMPRESSIVE STRENGTHS AT 28 DAYS (F`c) = 4000
PSI UNLESS NOTED OTHERWISE.
ALL REINFORCING SHALL BE HIGH STRENGTH DEFORMED BARS, GRADE 60, ASTM A615,
WITH 60,000 PSI MINIMUM YIELD STRENGTH.
j i
H
F
E
C
L
M
N
PS
DECON
m:GWB f:RES-W
CLEAN STERILE SUPPLY
005D m:GWB f:RES-W
DECON
m:GWB f:RES-W
EMS
007B m:AT f:SPOFFICE m:AT f:SP
SPS
005C m:AT f:SP
TELECOM
005B
VEST
m:AT f:SP
8' - 0"
8' - 0"
8' - 0"
8' - 0"
8' - 0" 7' - 2"
8' - 1"
7' - 2"
8' - 0"
CORRIDOR
C003 m:AT f:SP
6' - 11"8' - 1" 8' - 1"
SPS ALCOVE
005E m:AT f:SP
RECEIVING
EQUIPMENT STORAGE
003C
GENERAL CEILING NOTES
A.
B.
C.
ALL CEILINGS IN THE AREAS AFFECTED BY THE REPLACEMENT OF THE HVAC SYSTEM SHALL
BE REPLACED (SHOWN SHADED IN PLAN).
SEE MEP DRAWINGS FOR RESPECTIVE SCOPE.
CONTRACTOR SHALL COORDINATE CEILING WORK WITH OTHER TRADES.
BUILDING 138
MAIN BEAM OR CROSS TEE PROFILE
GASKETGASKET
SQUARE LAY-IN
FIELD PANEL
ANGLE MOLDING
HOLD DOWN CLIP
SQUARE LAY-IN
BORDER PANEL
HANGER WIRE
ATTACHED TO STRUCTURE ABOVE
DRAWING LEGEND
LIGHTING FIXTURE
SEE ELECTRICAL DRAWINGS
MECHANICAL DIFFUSER
SEE MECHANICAL DRAWINGS
MECHANICAL EXHAUST
SEE MECHANICAL DRAWINGS
m:AT f:SP 24" X 48" MINERAL FIBER PANELS
WITH SOIL-RESISTANT POLYESTER FILM FINISH
ALUMINUM SUSPENSION SYSTEM WITH INTEGRAL GASKET
m:AT f:SP 24" X 24" MINERAL FIBER PANELS
WITH SOIL-RESISTANT POLYESTER FILM FINISH
ALUMINUM SUSPENSION SYSTEM WITH INTEGRAL GASKET
m:GWB GYPSUM BOARD CEILING f:RES-W WITH RESINOUS COATING
CEILING ACCESS PANEL
SEE MECHANICAL DRAWINGS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Au to de sk
D oc s:
//M ar io n
VA
R ep la ce S
PS
A
H U
/F
FE
_M ar io n
- R ep la ce
S
PS
A H
U _B
(2
3) .rv t 3/
/2
5:
:2
PM
AC140
ARCHITECTURAL BASEMENT RCP
03/27/2024 PQ MP
REPLACE SPS AIR HANDLER AND
HUMIDIFICATION
610-23-501
1700 E 38th Street, Marion, IN 46953
FINAL CONSTRUCTION
DOCUMENTS BID SET 138
VA NORTHERN
INDIANA
HEALTHCARE
SYSTEM Approved: Veteran's Affairs Medical Center
SHEET 9 OF 29
3/16" = 1'-0"
REFLECTED CEILING PLAN - BASEMENT
N.T.S.Scale:
KEY PLANN
6" = 1'-0"
CEILING DETAIL
A/E ARCHITECT / ENGINEER
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BR BOTTOM REGISTER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CD CONDENSATE DRAIN
CENT CENTRIFICAL
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CU CONDENSING UNIT
CV CONSTANT VOLUME
CWCC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN (TO COOLING TOWER)
CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DT DISPERSION TUBE
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGT ENTERING GLYCOL TEMPERATURE
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FC FLEXIBLE CONNECTION
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
GA GAUGE
GAL GALLONS
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
HC HEATING COIL
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
ABBREVIATIONS
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ID INSIDE DIAMETER
IN INCHES
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAX MAXIMUM
MBH 1,000 BTUH
MER MECHANICAL EQUIPMENT ROOM
MHP MOTOR HORSEPOWER
MIN MINIMUM
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MVD MANUAL VOLUME DAMPER
MW MAKE UP WATER
NA NOT APPLICABLE
NC NOISE CRITERIA
NOAA NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
Pa PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SSD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
T&PCV TEMPERATURE AND PRESSURE CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TG TRANSFER GRILLE
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UC UNIT COOLER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VSD VARIABLE SPEED DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
M
H4
H7
A
COLD WATER (CITY WATER)
HOT WATER
QUICK-COUPLE HOSE CONNECTOR
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
HOSE CONNECTOR
FLOW METER
DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY…