RFI Response 1.pdf
PDF 20 MB Posted
- Attached to
- Renovate Building 16
- Solicitation number
- 36C25024B0052
About this file
This document is an RFI (Request for Information) response related to the federal contract opportunity to renovate Building 16 at the Marion VA Medical Center. The solicitation, Solicitation Number 36C25024B0052, is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The purpose of the renovation is to house the VA Northern Indiana Health Care System, Marion Campus, Director, Executive Leadership Team, and other major administrative and operational departments. The project will be phased to allow circulation between the connected Buildings 15 and 17, as Building 16 will not be occupied during the renovation. The RFI response likely provides information to the government regarding the respondent's capabilities, experience, and potential approach to completing the renovation work.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
REQUEST FOR INFORMATION (RFI)
PROJECT NUMBER: 610-20-103 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Building 16 PROJECT LOCATION: Department of Veterans Affairs
1700 E 38th St Marion, IN 46953
TO:
Christopher C. Lee, Contracting Officer Department of Veterans Affairs 8888 Keystone Dr.
Indianapolis, IN 46202-2884
RFI NO.: 45 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AS100
REPLY NEEDED BY: 5/8/2024
INFORMATION NEEDED:
AS100 detail 4 shows gravel for bedding/shading of plumbing pipes. Please clarify if sand and/or onsite soils can be used to backfill existing plumbing trenches.
REPLY:
REPLY FROM:
DATE:
ATTACHMENTS:
COPY TO:
SUBMITTED BY: Valiant Construction, LLC City/State: Louisville, KY
PHONE NO.:
CONTRACTOR SHALL PROVIDE CLEAN COMPACTED GRAVEL FILL FOR UNDERSLAB BASE. SAND AND / OR ONSITE SPOILS SHALL BE
USED.
VIRIDIAN ARCHITECTURAL DESIGN, INC. MAY 8, 2024
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.:03 DATE:4/24/24 SPEC/DWG. REFERENCE: Drawing AD100
REPLY NEEDED BY:
The majority of rooms with ACT have plaster & lath ceiling above them with numerous conduits run on the underside of plaster.
Is lead paint present on plaster ceilings? Will plaster ceilings require removal? Some areas have a 2nd ACT ceiling above the existing ceiling with plaster & lath above that. Will all ACT and plaster ceiling require removal? Will a lead and asbestos inspection report be provided?
SUBMITTED BY: IMS Contracting City/State: Escanaba MI
PHONE NO.: 906 789 9021
- ALL EXISTING ACT, PLASTER AND SECONDARY CEILINGS SHALL BE REMOVED IN THEIR ENTIREY UNLESS OTHERWISE NOTED.
- SEE HAZARDOUS MATERIALS REPORT AS PROVIDED BY THE VA.
- REFER TO ALL "GI" AND "AD" SHEETS FOR ADDITIONAL INFORMATION.
VIRIDIAN ARCHITECTURAL DESIGN, INC. APRIL 30, 2024
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 47 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AS100.1
AS100.1 wall type P-10 (masonry wall infill) is shown as an infill of existing four windows at rooms 007A and
007. Wall type P-10 shows waterproofing 8” beyond the edges of the new masonry infill. Please clarify if waterproofing is required at these four locations considering that existing windows and the subsequent window infill will be above ground.
WATERPROOFING IS NOT NECESSARY FOR THE INFILL OF THE (4) EXISTING WINDOWS AT ROOMS 007 AND 007A AS LONG AS WINDOW INFILL IS ABOVE THE GRADE OF THE CRAWL SPACE. IF WORK REQUIRES MASONRY PATCH / INFILL BELOW GRADE LEVEL, CONTRACTOR SHALL PROVIDE AND INSTALL WATERPROOFING SUCH TO ELIMINATE INFILTRATION.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 48 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AS100.1
AS100.1 shows new wall infill at room 012 and next to doors 009A and C002A, but no wall type is specified.
Please clarify the wall type to use for new walls in these areas.
CONTRACTOR SHALL PROVIDE AND INSTALL WALL INFILL THAT MATCHES EXISTING CONDITION AT DOOR 009A AND C002A. IF EXISTING WALL CONDITION IS CAST CONCRETE, THEN CONCRETE MASONRY IS REQUIRED FOR PATCH AND INFILL.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 49 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AS101
AS101 detail 2 shows ¾” plywood sheathing below the pass-through counter on the customer’s side. However, AS101.1 shows wall type P-1 adjacent to the pass-through window and wall type P-1 shows 5/8” drywall sheathing on the customer’s side. If detail 2/AS101 is accurate, then there will be 1/8” of difference between the face of sheathing below counter and the face of sheathing of drywall adjacent to the pass-through counter. Please clarify if you want us to install ¾” plywood as per detail 2/AS101 or substitute ¾” plywood with 5/8” drywall.
CONTRACTOR SHALL CONSTRUCTION DETAIL 2/AS101 AS SHOWN. THE PLWOOD IS MEANT TO PROVIDE SUPPORT FOR THE SOLID SURFACE COUNTER MATERIAL. IF SHIMS ARE REQUIRED, CONTRACTOR SHALL USE BEST PRACTICE MEANS AND METHODS.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 53 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AS200
AS200 does not call out any wall types. Please clarify if any walls in the attic will be new and if new, please identify which ones and what wall type to use for new walls.
WALL IN THE ATTIC ARE EXISTING. THERE IS NO NEW WALL CONSTRUCTION. PER GENERAL DEMOLITION NOTES #2, CONTRACTOR(S) SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILAR WITH THE EXISTING CONDITIONS.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 56 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AS400
AS400 Exterior Elevation North (detail 1) shows keynote 2 (solid surface sill) for two basement windows. This is in conflict with detail 2 on AS701 which shows aluminum trim at basement (W2) windows. Please confirm that exterior elevation keynote 2 is incorrect and those two windows will receive aluminum trim at sill per detail 2/AS701 instead.
CONTRACTOR SHALL PROVIDE AND INSTALL ALUMINUM TRIM AT BASEMENT (W2) WINDOW.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.:04 DATE:4/24/24 SPEC/DWG. REFERENCE: Drawing AD101, AD102
AD103
Keynote 1- Once the clay tile and CMU walls are removed will concrete floor infills be required at line of removal?
Does the building have 2” to 3” concrete topping placed on the structural slabs throughout the building that will require patch once walls are removed?
SUBMITTED BY: IMS Contracting City/State: Escanaba MI
PHONE NO.: 906 789 9021
- PLAN DEMOLITION NOTE 1 INDICATES, "PREPARE ADJACENT SERFACES FOR NEW FINISHES". THIS ALSO INCLUDES FLOORS.
- IT IS UNKNOWN WHETHER THERE IS A CONCRETE TOPPING PLACED THROUGHOUT THE BUILDING. CONTRACTOR IS TO USE BEST PRACTISE MEANS AND METHODS JUDGEMENT IN DETERMINING ADJACENT SURFACES PATCHING REQUIREMENTS DUE TO WALL
DEMOLITION.
VIRIDIAN ARCHITECTURAL DESIGN, INC. APRIL 30, 2024
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 57 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AS700
AS700 Door and Frame Schedule references door elevation FRG for doors C002A, C102A, C302A, and S301A, but there is no FRG elevation on Door Elevation detail (no number) in the top left corner of page AS700. Please clarify door elevation FRG or clarify an alternative door elevation for these doors.
- DOOR C002A SHALL BE 6'x7'x 1-3/4", H.M., 'FV' DOOR, WITH H.M., 'B' FRAME. RATING IS INDICATED ON DOOR & FRAME SCHEDULE.
- DOOR C102A SHALL BE 6'x7'x 1-3/4", H.M., 'FV' DOOR, WITH H.M., 'B' FRAME. RATING IS INDICATED ON DOOR & FRAME SCHEDULE.
- DOOR C302A SHALL BE 6'x7'x 1-3/4", H.M., 'FV' DOOR, WITH H.M., 'B' FRAME. RATING IS INDICATED ON DOOR & FRAME SCHEDULE.
- DOOR S301A SHALL BE 6'x7'x1-3/4", H.M., 'FV' DOOR, WITH H.M., 'B' FRAME. RATING IS INDICATED ON DOOR & FRAME SCHEDULE.
VIRIDIAN ARCHITECTURAL DESIGN, INC. MAY 10, 2024
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 75 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AS1100
The Room Finish Legend on AS1100 is calling for WT-1. Unfortunately, we could not find any product data on WT-1 (Wall) - Kate-Lo Tile & Stone, Smart (Gris UN.ST.GRI.MT) - 10" x 20". We’ve tried the name, the color, the size and could not find anything. Please let us know if this is an error or a custom product of some sort.
THE WT - 1 (WALL TILE) PRODUCT WAS IDENTIFIED IN THE ROOM FINISH LEGEND, AS WALL ALL FINISH MATERIALS AND COLOR, AT THE DIRECTION OF THE VA INTERIOR DESIGN. CONTRACTORS SHOULD COORDINATE WITH THE VA COR FOR ADDITIONAL
INFORMATION.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 83 DATE: 5/9/2024 SPEC/DWG. REFERENCE:
08 71 00 / AS700
REPLY NEEDED BY: 5/13/2024
Specifications Section 08 71 00 para 3.5 Hardware Sets lists some openings (102A, 301A, 202A, 108B, 112A, 209B, 108C, 121B, 209C, 210A, 309A, 109A, 226A, 219B, S302A, 202B) that aren’t on the door schedule on page AS700. Please confirm to ignore these openings.
CONTRACTOR SHALL IGNORE DOORS 102A, 301A, 202A, 108B, 112A, 209B, 108C, 121B, 209C, 210A, 309A, 109A, 226A, 219B, S302A, 202B. THESE DOORS HAVE BEEN DELETED.
VIRIDIAN ARCHITECTURAL DESIGN, INC. MAY 14, 2024
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 84 DATE: 5/9/2024 SPEC/DWG. REFERENCE:
Openings C201A and C300A are called out as singles on door schedule on page AS700; however, the Specification Section 08 71 00 para 3.5 and plan pages AS102 and AS103 depict these openings as pairs. Please clarify which reference is correct.
THE SPECIFICATIONS ARE CORRECT. DOORS C201A AND C3001 ARE TO BE BI-SWING DOUBLE DOORS.
specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
Department of Veterans Affairs
RFI NO.: 85 DATE: 5/9/2024 SPEC/DWG. REFERENCE:
AS701
AS701 is missing head, jamb, and sill details for windows W6 and W7. Please provide these details.
REPLY FROM: DATE:
ATTACHMENTS: COPY TO:
- CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND USE BEST PRACTICE, MEANS AND METHODS TO PROVIDE AND
INSTALL 'W7' WINDOWS TO MATCH EXISTING CONDITIONS.
- SEE ATTACHED TYPICAL DETAILS RELATED TO WINDOW 'W6'.
WINDOW DETAILS 6, 7, 8
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 86 DATE: 5/9/2024 SPEC/DWG. REFERENCE:
AS701
Keynote 6 on AS101 calls out for contractor to provide flashing all around windows for a weather tight condition.
Unfortunately, details on AS701 do not depict any flashing for windows. Please clarify flashing / sheet metal scope for windows and/or update details on page AS701 as needed.
CONTRACTOR SHALL COORDINATE FLASHING AND DETAILS WITH WINDOW MANUFACTURER.
VIRIDIAN ARCHITECTURE DESIGN, INC. MAY 14, 2024
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 87 DATE: 5/9/2024 SPEC/DWG. REFERENCE:
AS101
AS101 shows a single leaf door #113A in Toilet 113. Specifications section 08 71 00 para 3.5 Hardware Sets calls out this door as a pair. Please confirm door 113A is a single-leaf and specify the appropriate hardware.
DOOR 113A IS TO BE A SINGLE-LEAF DOOR USING HARDWARE SET #007.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 88 DATE: 5/9/2024 SPEC/DWG. REFERENCE:
Openings C300A, S001A, 103A, 109B, 109C, 111A, 122B, 203A, 210B, 210C, 218B, 315A, & 330A on the door schedule (page AS700) are not listed in any hardware sets in the specification section 08 71 00. Please clarify hardware sets for these doors.
HARDWARE SET CLARIFICATION AS FOLLOWS:
C300A SHALL USE #026; S001A SHALL USE #016; 103A SHALL USE #002; 109B SHALL USE #002; 109C SHALL USE #007; 111A SHALL USE #012; 122B SHALL USE #018; 203A SHALL USE #002; 210B SHALL USE #002; 210C SHALL USE #007; 218B SHALL USE #012; 224B SHALL USE #021; 315A SHALL USE #011. 330A IS DELETED FROM THE PROJECT.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 89 DATE: 5/9/2024 SPEC/DWG. REFERENCE
Spec 09-30-13
Section 09 30 13 has TCNA #’s for both thin set (F-122) & bed set tile (F111 & F-121).
The demo drawings do not reflect, and mud being demoed.
Are you exiting mud beds at the toilet rooms?
KEYNOTE 5 OF THE PLAN DEMOLITION NOTES REFERS TO, "...REMOVE EXISTING FLOORING...IN ITS ENTIRETY...". THIS IS TO
INCLUDE EXISTING MUD BEDS.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 90 DATE: 5/9/2024 SPEC/DWG. REFERENCE
Spec 09-30-13
1. Room Finish Legend is calling for CB-1 - Kate-Lo Tile & Stone, Basaltine (1096213 Dark Grey) - 6" x 12".
Then on AS1100/3 it has perfect detail of a Schluter Dilex @ the bottom of the wall tile.
Which is the product they would like 6” x 12” cove base, or wall tile to the floor w/ a Dilex. From the installation standpoint, the Dilex callout is an unusual request for this.
VAMC INTERIOR DESIGNER DIRECTED FINISHES AND FINISHES DETAILS. CONTRACTOR SHALL COORDINATED WITH THE VA
ACCORDINGLY.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: DATE: SPEC/DWG. REFERENCE:
SUBMITTED BY: City/State:
VHANINLundyR
Typewritten Text
See attached drawings for reference.
B-16 1st floor.pdf B-127 1st. floor.pdf Bldg 127 TELECOM 1of2 drawings.pdf Marion Campus Site Plan.pdf
PROJECT NUMBER:
61020103:
PROJECT TITLE:
Renovate Building 16:
PROJECT LOCATION:
Department of Veterans Affairs 1700 E 38th St Marion IN 46953:
SUBMITTED BY: Charlie Whitlow / cwhitlow@c-cat.com
CityState: Indianapolis, IN
PHONE NO: 317-986-7687
RFI NO: 005
DATE: 4/29/2024
SPECDWG REFERENCE: EY201 Detail Note 2
REPLY NEEDED BY: ASAP
INFORMATION NEEDED: Will a drawing be issued showing where Server Room in Building 127 is located in reference to IT Room 104 in Bldg 16 to determine cable path and fiber length?
REPLY FROM: Rachel Lundy-Vetor
DATE_2: 4/30/24
ATTACHMENTS: * see above notes
COPY TO: Chris Lee
REPLYRow1:
C100
100A
TO BUILDING 174
TO BUILDING 15
BUILDING 172
101B
101A
100B
101 102
C103
104A
106 107 108
S100
C100
C101
C102
111112
114A115A
LINEN
CHUTE
UP
DN
TRASH CHUTE
117A
CR
AC
C
CR AC
LENEL ENCLOSURE (TOP)
ALTRONIX ENCLOSURE (BOTTOM)
LIMITS OF
COMPLETE
DEMOLITION
B127-T300 F6
B127-T300 F1
D
KEY PLAN
MAIN
ENTRY
BUILDING 127
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 Sheet of
BI
M
- V ar io n
EH
R
In fra st ru ct ur e
U pg ra de s es ig n/
0-
1.
B1
.T
_R
.rv t
4/
/2
6:
:4
PM
B127-T101
FIRST LEVEL FLOOR PLAN -
TELECOMMUNICATIONS - DEMO
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B127
04/15/2022 JLK SSK
16181
136 313
1/4" = 1'-0"F4 FIRST LEVEL FLOOR PLAN - TELECOMMUNICATIONS - DEMO
SHEET NOTES:
1. EXISTING ANALOG BLOCKS.
2. EXISTING ACCESS CONTROL PANELS WILL BE DEMOLISHED. THE NEW TELECOMMUNICATIONS ROOM (TR)
WILL HAVE NEW PANELS INSTALLED. COORDINATION WITH THE OWNER IS REQUIRED TO AVOID SERVICE INTERRUPTION. WORK SHALL BE COMPLETED BY THE EXISTING VENDOR AS IDENTIFIED WITHIN THE PROJECT SPECIFICATION AND COORDINATION SCHEDULE. THE VENDOR SHALL BE RESPONSIBLE FOR
IDENTIFYING EXACT SCOPE OF WORK PRIOR TO BID.
0 4' 8'2'
A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.
GENERAL NOTES:
Revisions: Date:
CR AC
UPS ROOM
CLOSET
101B
PHONE ROOM
ELEC/UPS
ENTRANCE
FACILITY
B127-T400 F7
B127-T401 F7
D D
C4E
C4
EX
IS
TI
NG
NA
LO
G
PH
ON
RA
CK
S
EX
IS
TI
NG
NA
LO
G
PH
ON
RA
CK
SNE
W P
HO
NE
AC
KS
KEYPAD E
WAP
A. COORDINATE THE LOCATIONS AND CONTROLS OF ALL FIRE/SMOKE DAMPERS WITH MECHANICAL
CONTRACTOR PRIOR TO WORK.
(LOW VOLTAGE GENERAL NOTES SHALL APPLY TO ALL SHEETS)
LOW VOLTAGE GENERAL NOTES:
KEY PLAN
MAIN
ENTRY
BUILDING 127
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES PROJECT #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
20459 Sheet of
BI
- V ar io n
EH
In fra st ru ct ur e
U pg ra de s es ig n/
0-
1.
B1
.T
_R
.rv t
4/
/2
6:
:4
PM
B127-T201
FIRST LEVEL FLOOR PLAN -
TELECOMMUNICATIONS
EHRM INFRASTRUCTURE
UPGRADES, MARION, IN
MARION, IN
610-21-701
B127
04/15/2022 JLK SSK
16181
137 313
1/4" = 1'-0"F4 FIRST LEVEL FLOOR PLAN - TELECOMMUNICATIONS
0 4' 8'2'
SHEET NOTES:
1. PROVIDE DATA CONNECTION FOR ELECTRICAL METERING SYSTEM. COORDINATE WITH
MANUFACTURER OF METERING DEVICES FOR EXACT REQUIREMENTS.
2. PROVIDE DATA CONNECTION TO UPS FOR UPS MONITORING SYSTEM. COORDINATE WITH
MANUFACTURER OF MONITORING SYSTEM FOR EXACT REQUIREMENTS.
Revisions: Date:
Rectangle
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 1 DATE: 04-4-2024 SPEC/DWG. REFERENCE:
Please confirm that the CQC manager and the SSHO can also be the superintendent.
SUBMITTED BY: Calvary Contracting City/State: Tipp City
PHONE NO.: 937 506 7309
yes, this is acceptable.
Rachel Lundy-Vetor 4/30/24
Chris Lee
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 36 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
GI010
GI010 keynote 2 shows a stair interrupter at Stair S101, but no design and no specifications are available. Can you please provide details or specs or clarify what you want for the stair interrupter design?
CONTRACTOR TO PROVIDE AND INSTALL A STAIR INTERRUPTER SELF-CLOSE GATE, SIMILAR TO EGRESSGATE-MODEL100. SEE ATTACHED FOR ADDITIONAL INFORMATION. CONTRACTOR TO FIELD VERIFY REQUIRED GATE WIDTH.
EGRESSGATE-MODEL100 CUT SHEET
LEARN MORE AT EgressGate.com EASY ORDERING AT sales@egressgate.com
EGRESSGATE
O N E G A T E F I T S A L L
IBC AND NFPA COMPLIANT. MADE IN THE USA .
ON SITE INSTALL
1. Weld the anchor plates to the mounting bar if needed.
2. Weld the stop plate at the desired location.
3. Weld the expanison joint to lock the gates width.
4. Anchor the gate to the wall or weld to the stair rail post.
5. A stairwell.
Egress Gate Arrives with one coat of Rodda Barrier III Red Oxide Primer.
SIMPLE DESIGN
TAMPER PROOF MATERIALS
1. ASTM A36 1/4” Plate
2. ASTM A36 HSS
3. ASTM A36 Pipe
Adjustable width, adjustable swing direction, self closing, and universal mounting design.
Egress Gate provides a physical barrier to deter or impede the un-basement during the evacuation of a building.
Meets any installation requirement, with no additional parts required.
31” 50”
EGRESSGATE.COM | SALES@EGRESSGATE.COM
THE READY-NOW ALTERNATIVE
that makes barrier gate compliance a no-brainer
©2019 EgressGate. All rights reserved.
IBC AND NFPA COMPLIANT
EGRESSGATE
O N E G A T E F I T S A L L
IBC AND NFPA COMPLIANT. MADE IN THE USA .
ON SITE INSTALL
1. Weld the anchor plates to the mounting bar if needed.
2. Weld the stop plate at the desired location.
3. Weld the expanison joint to lock the gates width.
4. Anchor the gate to the wall or weld to the stair rail post.
5. A stairwell.
Egress Gate Arrives with one coat of Rodda Barrier III Red Oxide Primer.
SIMPLE DESIGN
TAMPER PROOF MATERIALS
1. ASTM A36 1/4” Plate
2. ASTM A36 HSS
3. ASTM A36 Pipe
Adjustable width, adjustable swing direction, self closing, and universal mounting design.
Egress Gate provides a physical barrier to deter or impede the un-basement during the evacuation of a building.
Meets any installation requirement, with no additional parts required.
31” 50”
EGRESSGATE.COM | SALES@EGRESSGATE.COM
EASILY ADJUSTS
FROM 31” TO 50”
On-site install ready; no additional parts required
Single or double gate application
Adjustable width
Adjustable swing direction
Self closing
Universal mounting design
Primed and ready for finish paint
Photoluminescent “No Exit” sign included
O
EL
LEARN MORE AT EgressGate.com EASY ORDERING AT sales@egressgate.com
©2019 EgressGate. All rights reserved.
The only universal egress barrier gate ready for approval when you are.
UNIVERSAL MOUNT SATISFIES YOUR LOCAL AHJ
Flip or Mirror
Tamper Proof
Achieve swing in either direction.
Made to Last:
-SCH. 40 steel pipe -ASTM A36 Steel Plate -A500 Grade B Tube
IBC AND NFPA COMPLIANT
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 39 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AD100
AD100 keynote 13 shows to remove the existing elevator; however, AS100 does not show any work at the existing slab in the new Mechanical Chase 009. It’s very likely that the existing elevator pit slab is recessed.
Please confirm that you do not expect GC to remove and repour or infill the existing elevator slab to match the existing basement floor elevation.
THE EXISTING ELEVATOR SHAFT TO REMAIN AS IS ONCE ELEVATOR CAR AND ALL APPURTENANCES ARE REMOVED. THE IF THE PIT SLAB IS RECESSED, IT IS NOT NECESSARY TO INFILL THE PIT SLAB TO MATCH EXISTING BASEMENT FLOOR ELEVATION. REMAINING SHAFT IS TO BE USED AS A MECHANICAL CHASE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTANCE SHAFT RATING
INDICATED.
VIRIDIAN ARCHIECTURAL DESIGN, INC. MAY 8, 2024
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 40 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AD902
AD902 keynote 1 mentions the demolition of existing ceiling tile and grid “including secondary ceiling in their entirety”. Numerous pictures of existing ceilings on pages AD901 and AD902 show the secondary acoustical ceiling grid. However, the underside of the existing floor structure at every level appears to have gypsum or plaster ceiling. Please confirm that keynote 2 on AD901-AD903 does not imply to demolish existing gypsum/plaster finish at the underside of floor structure, but instead is limited to the demolition of secondary acoustical ceiling tile and grid only.
- ALL EXISTING ACT, PLASTER AND SECONDARY CEILINGS SHALL BE REMOVED IN THEIR ENTIREY UNLESS OTHERWISE NOTED.
- SEE HAZARDOUS MATERIALS REPORT AS PROVIDED BY THE VA.
- REFER TO ALL "GI" AND "AD" SHEETS FOR ADDITIONAL INFORMATION.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements
RFI NO.: 41 DATE: 5/6/2024 SPEC/DWG. REFERENCE:
AD902
During our jobwalk, we identified that the existing gypsum/plastered ceiling below floor structures has numerous damaged/unrepaired areas. This condition varies from floor to floor, but it appears that the ceiling in the basement had sheathing missing, with bare rusted metal framing only remaining. Plus, numerous areas exhibited signs of past water intrusion/damage. Please quantify the extent of repair of existing subfloor finishes, specify an allowance for all GCs to include, or confirm to exclude repairs of existing gypsum/plaster finish at the underside of floor structures.
IN COMPLIANCE WITH GENERAL DEMOLITION NOTES #1, WORK SHALL BE ACCOMPLISHED SUCH THAT FINISHED CAN BE INSTALLED AS INDICATED. IF IT IS DETERMINED THAT WATER INTRUSION DOES NOT PERMIT WORK TO BE DONE IS A PROPER MANNER TO ACCEPT NEW FINISHES, CONTRACTOR SHALL IMMEDICATELY CONTACT VA COR TO DETERMINE ACCEPTABLE COURSE OF ACTION.
ALLOWANCES ARE NOT PART OF THE PROJECT. CONTRACTOR IS TO BID WORST CASE, MEANS & METHODS SENARIOS.
File details come from the government source that posted it. Updated .