Attachment IX - UPDATED SOW.docx
DOCX document 21 KB Posted
- Solicitation number
- 36C25023Q0431
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment XII - Site Walk Sign-In Sheet.pdf | ||
| Attachment X - RFI Questions and Answers.docx | DOCX document | |
| Attachment XI - TS-550 Report.pdf | ||
| 36C25023Q0431 0004.docx | DOCX document | |
| 36C25023Q0431 0003.docx | DOCX document | |
| 36C25023Q0431 0002.docx | DOCX document | |
| Site Visit Memo.docx | DOCX document | |
| 36C25023Q0431 0001.docx | DOCX document | |
| Attachment VI - UST Layout.pdf | ||
| 36C25023Q0431_1.docx | DOCX document | |
| Attachment III - DBA WD.pdf | ||
| Attachment II - EMR.pdf | ||
| Attachment VII - Monitoring Well Locations.pdf | ||
| Attachment I - RFI.pdf | ||
| Attachment IV - Limitations on Subcontracting (JAN 2023).pdf | ||
| Attachment VIII - UST Removal Specs.pdf | ||
| Attachment V - VHA Directive 1192-01.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
This project will involve updating three underground storage tanks, installing a fully functional fuel pump for the underground storage tanks (USTs), and three interstitial sensor risers. All work will be located at the VA Northern Indiana Healthcare System - Fort Wayne Campus, 2121 Lake Avenue, Fort Wayne, IN 46805. All work shall be completed within 90 days from the issuance of the Notice to Proceed. Work Shall be performed during normal business hours, 7:00 A.M. – 3:00 P.M. Monday through Friday.
Contractor shall provide all needed labor, materials, parts (to Include system components), supervision, project management, equipment, quality and safety assurance, and all other necessary resources as noted below to meet the scope objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation. The interstitial sensor risers are required for underground storage tanks and the USTs need updating to meet standards per IDEM. The current ones are either beyond their intended life or malfunctioning. The fuel dispenser is for government use to fuel government equipment.
SCOPE
A. Contractor’s work and responsibility shall include all contractor planning, programming, administration, and management necessary to provide all construction and related services as specified.
1. This project shall be conducted by the contractor in strict accordance with the contract, including all applicable federal, state, and municipal laws, codes, regulations, directives, and specifications.
2. Install shall comply with TIL.
Technical Information Library (TIL) - Office of Construction & Facilities Management (va.gov)
3. The contractor shall coordinate all shutdowns with the COR at least 2 weeks in advance of the shutdown. This shall include interior and exterior such as work involving cranes, taking parking spaces, utilities, and public spaces.
4. The Pre-Construction Conference shall be conducted by the CO or the designated COR and will consist of a formal review of project requirements and establish the Notice to Proceed (NTP).
SPECIFICS
1. Schedule Project with VA
2. Set Up fencing to make a safe work area
3. Lock out/tag out all STPs
4. Blow back all product lines to tanks
5. Sawcut a 10’ x 25’ down each DSL tank area and 10’ X 15’ over RUL tank
6. Sawcut a trench from the RUL and DSL over to the Dispenser Sump 2’ X 20’
7. Sawcut a trench from the (2) DSL sumps for the backup system 2’ X 30’
8. Break out all concrete from areas
9. Dig down and expose all piping and Sumps (stockpile stone onsite if useable)
10. Environmental company on site
11. Remove all old piping and sumps down to tank collar, old draw tubes for each DSL tank, all sensors and probes (set aside), all Spill Buckets, all old STPs and old dispenser from island.
12. Cut back all electrical conduits from sump area (power and sensors)
13. Clean up each of the STP Sump collars
14. Install (1) OPW dispenser sump for a Wayne Select Dispenser Dual product
15. Install (5) OPW STP sumps open bottom
16. Fiberglass in the bottom of each new STP sumps to existing sump collars on tank
17. Install (8) OPW REF entry fittings into each STP Sump and Dispenser Sump
18. Install (8) OPW REF conduit fittings in each STP sump
19. Install OPW 4” Access pipe form each STP over to building for backup system and (2) over to Dispenser sump
20. Install OPW 1 1 /2” primary product pipe in each 4” access pipe
21. Install OPW SBC pipe fitting on the end of each pipe run
22. Install (2) new OPW 1 1 /2” shear valves in dispenser sump
23. Install (2) new draw in each DSL tank
24. Install (5) OPW full port ball valves
25. Place all new product pipe under pressure per RP100-22
26. Install new conduits and j-boxes for power and sensors to each STP sump and Dispenser sump
27. Install upper part of STP sumps
28. Fiberglass them together
29. Hydrostatic test all sumps per RP1200-19
30. Remove any ball and cages in tank
31. Install (3) New Probe risers
32. Install (3) New Spill buckets risers into new location on tank
33. Back fill all areas with stockpile stone or backfill with pea stone
34. Reinstall all sensors and probes
35. Install (2) new FEP 3 /4 hp STP’s
36. Install (2) new FEP STP’s controllers with hook
37. Frame up island around dispenser sump
38. Install (5) 44” Manway
39. Install (3) New OPW spill buckets
40. Install (6) new OPW 18” Manways (probes & Interstitial)
41. Install (2) OPW 12” Manway M/W
42. Install (1) OPW Coax Overfill drop tube
43. Install (2) OPW overfill drop tubes
44. Install (3) OPW Swivel fill Adaptors
45. Install (3) OPW Fill Caps
46. Pour all areas with new concrete (estimated around 15 yards 600 Sqft.)
47. Install (1) Wayne Select Dispensers (2) products (2) Hose with pulse output
48. Purge or prime all product lines
49. Ensure no leaks are in any of the new system
50. Make sure Tank Monitor is online
51. Return in one week to remove all fencing
REGULATIONS AND REQUIREMENTS
1. Contractor shall provide a site-specific safety plan.
2. Contractor shall provide a construction schedule before the start of work.
3. Contractor shall provide an estimate in RS Means format to the COR before the start of work.
4. Contractor shall provide Submittals to COR prior to install.
File details come from the government source that posted it. Updated .