Request for Information QA (with floorplans).pdf
PDF 116 KB Posted
- Attached to
- Y1BG--EHRM: Data Drop and Power Outlets Installation Project #552-21-706 Federal contract opportunity
- Solicitation number
- 36C25021B0069
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract Project 552-21-706 10.13.2021.pdf | ||
| 36C25021B0069 0005.docx | DOCX document | |
| Bid Opening Attendance Roster Project 552-21-706 10.13.2021.pdf | ||
| 36C25021B0069 0004.docx | DOCX document | |
| Site Visit Sign-in Sheet 09.21.2021.pdf | ||
| 36C25021B0069 0003.docx | DOCX document | |
| 36C25021B0069 0002.docx | DOCX document | |
| Dayton VA Campus Map.pdf | ||
| 36C25021B0069 0001.docx | DOCX document | |
| Statement of Work - EHRM Data Drops Power Outlets.pdf | ||
| Specifications - EHRM DDPO Installation.pdf | ||
| 36C25021B0069_1.docx | DOCX document | |
| VHA DIRECTIVE 1192.01.pdf | ||
| List of End User Devices for Installation - Dayton DDPO.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) Solicitation #36C25021B0069
1. Is FAR 52.229-3 Federal, State, and Local Taxes applicable to this project?
Yes. FAR 52.229-3 applies to all contracts over SAT, firm-fixed price, and within the US.
2. Please clarify number of drops:
a. Per the “List of End User Devices for Installation” document, it lists a number for each data/power, however it does not clarify if each number is a Single Drop, or a double drop. Please clarify this.
Double Drop
b. On statement of work, there is a link , 4.2 “Infrastructure Standards for Telecommunications Spaces Version 3.0”. This spec , page 180 of 187 shows the standard is :
• 4 category 6A 8P8C outlets for data or telephony for a typical work floor mount outlet (Detail 4 on sheet 30 of 37)
• 4 category 6A 8P8C outlets active for telephony/data for typical high density wall mounted work area (detail 2 on sheet 30 of 37)
• 2 Category 6A 8P8C outlets active for telephony/data for standard density wall mounted work area (detail 1 on sheet 30 of 37)
Follow “Infrastructure Standards for Telecommunications Spaces Version 3.0”
c. Please clarify.
3. Can we get a floor plan for each floor and each building where drops will be installed? Without a floor plan to identify the data closets and room locations we have no way of knowing how many feet each run will be. Need floor plan that shows locations and telecom closets.
Yes, see link: https://drive.max.gov/share/e3ba119ee01ffc74
4. Please clarify Color of cable required.
Follow “Infrastructure Standards for Telecommunications Spaces Version 3.0”
5. Please clarify color of outlets required.
Follow “Infrastructure Standards for Telecommunications Spaces Version 3.0”
6. Does this project require stainless steel faceplates, or standard plastic faceplates? Please clarify.
For power outlets use “stainless steel faceplates”. For data outlets use “standard plastic faceplates”.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdrive.max.gov%2Fshare%2Fe3ba119ee01ffc74&data=04%7C01%7C%7Ca843deb220a744b8669008d98348e7a6%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637685171405607090%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=5UZBC%2BODlfoW0RxmJdqrDbBlCLx7hHYwPqJbv%2Ff0r54%3D&reserved=0
7. Are we using local power circuit for power outlets or are we running new circuits from an existing panel?
Use local power circuit for power outlets
a. If new circuits please provide circuit #, panel name and location of panel (shown on floor plan)
NA
8. On location chart, please clarify what “available” means. Does that mean power and data is already there and we don’t need to add? Please verify.
Yes
9. Drawings will be needed to determine location of closets and how much cat6a cable is needed.
See https://drive.max.gov/share/e3ba119ee01ffc74 floor plans
10. Please confirm that the period of performance is 80 calendar days.
Yes
11. The List+of+End+User+Devices+for+Installation+-+Dayton+DDPO indicates certain data and electrical drops as "available". Does this indicate that these drops exist, and that no installation work is required at these locations? If the answer is and work is still required, please define what we are supposed to perform.
Yes
12. The List+of+End+User+Devices+for+Installation+-+Dayton+DDPO pages 1 & 2 have several lines with no data in the Add # Emer Power column. E. g. Page 1, 6th Line from the bottom, Emergency Department 310 1st 1G-110 CCE has no data in the Add # Emer Power column. Can you please confirm if these require or do not require drops?
Does not require a drop
13. For electrical circuits, will we be allowed to tie into the nearest accessible branch circuit or do the proposed circuits all need to be dedicated to the nearest electrical closets?
Tie into the nearest accessible branch circuit
Is there enough room on existing panels in the electrical closets to run the required extra circuits from?
Yes https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdrive.max.gov%2Fshare%2Fe3ba119ee01ffc74&data=04%7C01%7C%7Ca843deb220a744b8669008d98348e7a6%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637685171405607090%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=5UZBC%2BODlfoW0RxmJdqrDbBlCLx7hHYwPqJbv%2Ff0r54%3D&reserved=0
14. Will bridal rings and/or J hooks suffice for means of cabling support above the drop ceiling and hard ceiling areas where applicable?
Follow “Infrastructure Standards for Telecommunications Spaces Version 3.0”
15. Will PPE (coveralls, shoe boots, etc.) be provided to work in the surgical and lab spaces or should we include costs for PPE in pricing?
Coveralls, shoe covers, hair nets, and related items will be provided
16. This may have been a misunderstanding at the Site Visit but offers can be mailed/FedExed as long as they arrive before the due time. Correct?
Yes. You can mail your bids to the following:
Department of Veterans Affairs Network Contracting Office (NCO) 10 C/o Angie Carpenter 3140 Governor’s Place Blvd., Suite 100 Kettering, Ohio 45409 Please note, it is the responsibility of the Offeror to ensure your bid arrives on time and to the Contracting Officer before the start of the bid opening.
File details come from the government source that posted it. Updated .