This document contains an amendment to a solicitation for a federal construction contract. The Department of Veterans Affairs is seeking a contractor to replace the fire alarm system at the Battle Creek VA Medical Center in Michigan. The amendment provides answers to contractor questions, changes the proposal due date to June 3, 2020, and allows experience on relevant projects from the past eight years rather than three years to be considered for past performance evaluation. The construction work includes replacing all fire alarm devices, control panels, wiring and fiber optic terminations across multiple buildings. The period of performance is 270 calendar days. The contract type will be firm-fixed price and awards are intended within 120 days of bid receipt. The solicitation is designated for service-disabled veteran-owned small businesses and has a NAICS code of 238210 with a $16.5 million size standard.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Fire Alarm System 515-14-123, newest first.
File Type Posted
36C25020R0083-001.docx DOCX document
36C25020R0083-007.pdf PDF
36C25020R0083-004.pdf PDF
36C25020R0083-008.pdf PDF
36C25020R0083-011.docx DOCX document
36C25020R0083-002.pdf PDF
36C25020R0083-006.pdf PDF
36C25020R0083-009.pdf PDF
36C25020R0083-003.pdf PDF
36C25020R0083-005.pdf PDF
36C25020R0083-010.pdf PDF
36C25020R0083-012.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25020R0083-A0001 Replace Fire Alarm – Battle Creek Mi

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

05-26-2020

515-14-123

Department of Veterans Affairs Ann Arbor Healthcare System Network Contracting Office 10 2215 Fuller Road Ann Arbor MI 48105

Y Department of Veterans Affair Ann Arbor Healthcare System Network Contracting Office 10 2215 Fuller Road Ann Arbor MI 48105 To all Offerors/Bidders

36C25020R0083 05-21-2020

X

June 3, 2020 at 11:00 am

This amendment addresses RFI's and provides the site-visit agenda and sign-in sheet.

** IMPORTANT **

The proposal due date has been changed to June 3, 2020 at 11:00 am. Proposal can be mailed FedEx or UPS only, or can be dropped off at the main entrance at 24 Frank Lloyd Wright Dr., Lobby M Entrance. Ann Arbotr, MI 48105

CONTINUATION PAGE

RFI Questions and Answers

1. Spec.

2.3 FIRE ALARM CONTROL UNIT A. ........ These existing distribution fiber optic cables shall be upgraded and tested as required from building to building. Test 8 out 12 existing fibers (12 strands) before termination. Fiber Optic cable termination shall be upgraded in termination to the New Fire Alarm Control Panel.

Question: Define “upgrade”? Is new fiber required? Or, If it is existing, are we retesting 8 strands of pre-terminated fiber and just repairing what fails?

Also, what is meant by: upgraded in termination to the New Fire Control Panel? Are we moving all the fiber termination? Running long jumpers? Splicing and running a new piece of fiber to the control panel?

Response: 2.3 FIRE ALARM CONTROL UNIT A – Per NFPA 72, Article 770, Table 14.4.2.2, 13 Conductors, (b) Fiber Optics. The signal power level cannot drop more than 2% of the value accepted for original installation. Contractor to test signal level against Original Installation Test Data. If cable cannot meet these requirements by redoing connections, the fiber cable needs to be replaced per NFPA 70 and NFPA 72 requirements and VA Specifications 28-05-13 “Conductors and Cables for Electronic Safety and Security”.

2. On print G003, in Abbreviations, symbols and General Notes there is a panel labeled:

FIRE ALARM UPGRADE – SCOPE OF WORK

Note 8: Replace all fiber optic cable termination in and out of the telephone cabinet.

Does the note mean all fibers are existing, but all connectors are being re-terminated and tested?

If so, still with ST connectors, all in 62.5 MM style?

Response: On print G003 – SC connectors are at one end of the fiber cable and ST connectors are at other end. If this connector type continues to work with the Fire Alarm panels, continue their use. If new panels are being installed, then contractor is allowed to pick compatible connectors for the application, as long as NFPA 70 and NFPA 72 requirements are followed.

3. On page 13 of 67 of the solicitation, the past performance section states contractors are to identify ongoing or completed contracts within the last three years. With this being an SDVOSB set aside limiting it to only the past three years will severely limit on qualified contractors that cannot submit a proposal. Will the Government please consider the Offeror’s experience in providing construction services as a Prime Contractor for projects completed or ongoing within eight (8) years of the posting of the solicitation/RFP?

Response: Past Performance for ongoing or completed contracts is changed from 3 years to 8 years.

4. Fire Alarm system requires design/engineering and to be submitted to the State of Michigan for approval. The schedule of (270) calendar days maybe inadequate depending on the time to design/engineer and obtain State approval. Is State approval required.

Response: State approval is not required. As a federal facility, the VA representatives are the authority having jurisdiction and do not require State approval. All submittals to go to the Engineer of record and copied to the COR.

5. Pre-Bid meeting notes NAICS code 2366220 is this correct? Or is the NAICS code on solicitation correct?

Response: The applicable NAICS code is 238210, subsequent to a $16.5 Million Small Business Standard for to this procurement.

6. Documents provide no architectural information, wall types, ceiling types, etc. Pre-Bid meeting did not include walk thru of buildings affected. How is the necessary architectural work required to accommodate the installation of new devices to be quantified and costed?

Response: Because of the COVID outbreak, it was not feasible to bring a large group of people through patient wards. It was put out during the pre-bid meeting that anyone that would like to conduct a more in depth walk around could contact the COR and schedule a one on one visit. It was also put out that all buildings have a majority of lay-in ceilings, with the exception of building 39, which has a majority of hard ceilings.

See attached document: S04 - Pre-Bid Site Visit Agenda 515-14-123.

See attached document: Pre-Bid attendance.