P01 - Drawings Combined - 553-16-101 - REV. Binder (2).pdf

PDF 8 MB Posted

Attached to
Install Electrical Switchgear - VAMC Detroit, MI
Solicitation number
36c25020b0067
Issued by

About this file

This file package contains construction drawings and specifications for an electrical switchgear installation project at the John D. Dingell VA Medical Center in Detroit, Michigan. The project involves demolishing existing electrical infrastructure on the first floor and roof, installing new switchgear enclosures and related electrical systems on the first floor and in the penthouse, and modifying the building exterior, roof, walls and stairwells. The construction documents were issued for bid on April 27, 2020.

The related federal contract opportunity is solicitation number 36c25020b0067 to install electrical switchgear at the VA Medical Center in Detroit. Bids for the project are due by the date specified in the solicitation. The selected contractor will be required to complete the switchgear installation in accordance with the specifications and drawings provided in the file package. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is listed as the contracting agency.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UPUP

UP

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c o n e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h a lf e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

KEY PLAN

PLAN

NORTH

SOUTH

PARKING

NORTH

PARKING

BLDG 103

ENERGY CENTER

BLDG 101

GEN STA

ACTUAL

NORTH

DESCRIPTION

35% DESIGN DEVELOPMENTA 11/19/18

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

GI101-SP

LIFE SAFETY PLANS, NOTES, ABBREVIATIONS

AND SYMBOLS

INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

ARCHITECT

NO. DATE

DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

NORTH

SOUTH

PARKING

NORTH

PARKING

BLDG 103

ENERGY CENTER

BLDG 101

GEN STA

ACTUAL

NORTH

DESCRIPTION

35% DESIGN DEVELOPMENTA 11/19/18

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AD101-SP

DEMOLITION PLAN - FIRST FLOOR INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

NORTH

SOUTH

PARKING

NORTH

PARKING

BLDG 103

ENERGY CENTER

BLDG 101

GEN STA

ACTUAL

NORTH

DESCRIPTION

35% DESIGN DEVELOPMENTA 11/19/18

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AD102-SP

DEMOLITION PLAN - EXISTING ROOF INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

DN

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

NORTH

SOUTH

PARKING

NORTH

PARKING

BLDG 103

ENERGY CENTER

BLDG 101

GEN STA

ACTUAL

NORTH

DESCRIPTION

35% DESIGN DEVELOPMENTA 11/19/18

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AE101-SP

NEW WORK PLAN - FIRST FLOOR INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

UP

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

NORTH

SOUTH

PARKING

NORTH

PARKING

BLDG 103

ENERGY CENTER

BLDG 101

GEN STA

ACTUAL

NORTH

DESCRIPTION

35% DESIGN DEVELOPMENTA 11/19/18

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AE102-SP

NEW WORK PLAN - PENTHOUSE INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

NORTH

SOUTH

PARKING

NORTH

PARKING

BLDG 103

ENERGY CENTER

BLDG 101

GEN STA

ACTUAL

NORTH

DESCRIPTION

35% DESIGN DEVELOPMENTA 11/19/18

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AE103-SP

ROOF PLAN INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

DESCRIPTION

35% DESIGN DEVELOPMENTA 11/19/18

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AE201-SP

EXTERIOR ELEVATIONS INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AE301-SP

BUILDING SECTIONS, WALL SECTION AND

ROOF EDGE DETAILS

INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AE302-SP

BUILDING SECTIONS, WALL SECTION AND

DETAILS

INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AE402-SP

STAIR AND DETAILS INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

JOHN D. DINGELL

VA MEDICAL

CENTER

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig e fo o t o n e q u a rt e r in c e fo o t th re e e ig th s in c e fo o t o n e h e fo o t th re e q u a rt e r in c e fo o t n e in c e fo o t n e a n d o n e h e fo o t re e in c e fo o t

NORTH

SOUTH

PARKING

NORTH

PARKING

BLDG 103

ENERGY CENTER

BLDG 101

GEN STA

ACTUAL

NORTH

DESCRIPTION

35% DESIGN DEVELOPMENTA 11/19/18

65% DESIGN DEVELOPMENTB 05/16/19

95% CONSTRUCTION DOCUMENTSC 10/18/19

ISSUED FOR BIDS - FINAL REVIEWD 02/10/20

ISSUED FOR BIDS0 04/27/20

AE601-SP

DOOR SCHEDULES, SIGNAGE, NOTES AND

DETAILS

INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURES

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27 JG MAT0499-0107

ISSUED FOR BIDS

NOT FULLY SPRINKLERED

NO.

AI

NI

GR

IV

FOHTLAEWNO

M M

O

C JOSEPH H. TROST

NORTH

SOUTH

PARKING

NORTH

PARKING

BLDG 103

ENERGY CENTER

BLDG 101

GEN STA

ACTUAL

NORTH

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27

97 8654321

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

JOHN D. DINGELL

VA MEDICAL CENTER

PhaseENGINEER OF RECORDCONSULTANT

Project Director

FULLY SPRINKLERED

INSTALLATION OF ELECTRICAL

SWITCHGEAR ENCLOSURESISSUED FOR BID

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27

97 8654321

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

JOHN D. DINGELL

VA MEDICAL CENTER

PhaseENGINEER OF RECORDCONSULTANT

Project Director

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27

97 8654321

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

JOHN D. DINGELL

VA MEDICAL CENTER

PhaseENGINEER OF RECORDCONSULTANT

Project Director

NORTH

ACTUAL

NORTH

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27

97 8654321

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

JOHN D. DINGELL

VA MEDICAL CENTER

PhaseENGINEER OF RECORDCONSULTANT

Project Director

ACTUAL

NORTH

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27

97 8654321

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

JOHN D. DINGELL

VA MEDICAL CENTER

PhaseENGINEER OF RECORDCONSULTANT

Project Director

ACTUAL

NORTH

JOHN D. DINGELL VAMC,

DETROIT, MI

553-16-101

2020-04-27

97 8654321

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

JOHN D. DINGELL

VA MEDICAL CENTER

PhaseENGINEER OF RECORDCONSULTANT

Project Director

File details come from the government source that posted it. Updated .