About this file

This document contains information regarding a federal solicitation for demolition services. The Department of Veterans Affairs is seeking bids for the Demolish Buildings 25, 42, 122 project at the Northern Indiana HealthCare System VA Medical Center. Bids are due by June 10, 2020 at 2:00 PM Eastern Time and must be submitted electronically. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses who must be verified in the Vendor Information Pages and SAM.gov databases. The NAICS code is 236220 with a size standard of $39.5 million. The contractor must perform a minimum of 15% of the construction work. The project completion period is 365 calendar days from notice to proceed. Payment and performance bonds are required.

View the file

Other files

File Type Posted
Wage Determination.pdf PDF
BID SCHEDULE.pdf PDF
36C25020B0011-006.pdf PDF
36C25020B0011-009.docx DOCX document
36C25020B0011-004.pdf PDF
36C25020B0011-005.pdf PDF
36C25020B0011-007.pdf PDF
36C25020B0011-010.docx DOCX document
36C25020B0011-003.docx DOCX document
36C25020B0011-008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

610-20-1-6901-0008

610-18-101

Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240

Department of Veterans Affairs Network Contracting Office 10 8888 Keystone Crossing Suite 1100 Indianapolis IN 46240

To all Offerors/Bidders

36C25020B0011

05-06-2020

X

X X

Due June 10, 2020 - 14:00

610-3600162-6901-854200-3254 23NRNR001

This solicitation is hereby amended as follows:

1) Adding Bid Schedule - See Attachment 1

2) Bids can be emailed. Bid Bonds are to be originals and are due by the bid due date and time.

3) Bid Submission Instructions: Requires a Self-Performancecalculation. Please disregard.

4) Davis Bacon Wages were updated May 1. See Attachment 2 for new rates.

5) NO IN-PERSON BID OPENING. If want to HEAR the bid opening, call 800/767-1750, code is 36086#. Call opens at 1:45pm.

See Page 2 for continuation.

Julie A. Stout Contracting Officer

Question: Is the construction fence to match existing per the drawings, or comply with 01 00 00, 1.6 I. Do the posts need to be concreted or can they be driven?

Answer: The construction fencing needs to comply with the Specifications section 01 00 00, 1.6 I and drawings. The post can be driven.

Question: RE Bldg 122: Is temporary Chain link fencing to be installed around entire disturbed area, in addition to the existing Chain Link fencing around the building?

Answer: The construction fencing needs to comply with the Specifications section 01 00 00, 1.6 I and drawings.

Question: Does Bid Item III include Deduct Alternate A-1?

Answer: A-1 Bid item, II has removal of contaminated soil (ending at negative 10’), 5 more feet than Bid item III. A-2. Bid item III has removal of contaminated soil ending at 5’, it does not include Deduct Alternate A-1.

See attached document: BID SCHEDULE.

See attached document: Wage Determination.

File details come from the government source that posted it. Updated .