36C25020B0011-006.pdf
PDF Posted
- Attached to
- P400--Demolish Buildings 25, 42, 122 610-18-101
- Solicitation number
- 36C25020B0011
About this file
This document package includes mechanical demolition plans and specifications for buildings 25 and 42 at the Northern Indiana HealthCare System VA Medical Center, along with the related federal contract opportunity notice.
The mechanical demolition plans detail the required removal of all mechanical equipment, plumbing fixtures, piping, and utilities from buildings 25 and 42. Contractors must coordinate demolition with all trades, properly dispose of hazardous materials, and ensure no debris remains on site. The opportunity notice is a 100% service-disabled veteran-owned small business set-aside to demolish buildings 25, 42, and 122 per project 610-18-101. The solicitation will be posted on April 28, 2020, with a proposal due date approximately 30 days later. The project magnitude is between $2,000,000 to $5,000,000, and the duration must not exceed 365 calendar days from the notice to proceed. Payment and performance bonds are required.
36C25020B0011 Drawing Set 2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| 36C25020B0011 0001.pdf | ||
| BID SCHEDULE.pdf | ||
| 36C25020B0011-009.docx | DOCX document | |
| 36C25020B0011-004.pdf | ||
| 36C25020B0011-005.pdf | ||
| 36C25020B0011-007.pdf | ||
| 36C25020B0011-010.docx | DOCX document | |
| 36C25020B0011-003.docx | DOCX document | |
| 36C25020B0011-008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COND
STEAM
COND
STEAM
COND
STEAM
SHWH
SHWH TMV
RHRHRHRHRHRH
RH
RH
UH
UH
COND
STEAM
INCOMING SANITARY
INCOMING FIRE PROTECTION
INCOMING
DOMESTIC
WATER
STEAM ENTRANCE
2 31
SCALE: 1/8" = 1'-0"
MECHANICAL/PLUMBING - DEMOLITION PLAN - LOWER LEVEL
25.MPD100
(TYP)
(TYP)
(TYP)
(TYP)
CONTRACTOR SHALL DISCONNECT AND REMOVE ALL MECHANICAL EQUIPMENT,
INCLUDING BUT NOT LIMITED TO; BOILERS, PUMPS, FANS, COILS, EXPANSION TANKS.
CONTRACTOR SHALL COORDINATE THE DEMOLITION OF ALL MECHANICAL EQUIPMENT
AND ANY ASSOCIATED ACCESSORIES WITH ALL TRADES.
CONTRACTOR SHALL CAREFULLY REMOVE HIGH PRESSURE STEAM AND HOT WATER
SUPPLY PIPING CLEAR OF BUILDING 25. REFER TO SITE PLANS FOR CONTINUATION.
REMOVE ALL MECHANICAL EQUIPMENT, INCLUDING BUT NOT LIMITED TO, RADIANT
HEATERS, PACKAGED AIR CONDITIONING UNITS, DUCTWORK, DIFFUSER, UNIT
HEATERS, AND ALL HYDRONIC / STEAM PIPING.
REMOVE RADIANT HEATER COMPLETE.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE
SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR
ADDITIONAL INFORMATION
NOTE:
CONTRACTOR TO REMOVE ENTIRE BUILDING AND ALL ASSOCIATED SITE UTILITIES
AND BACKFILL SITE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% FINAL BID DOCUMENT SUBMISSION
CONTRACTOR SHALL CAREFULLY REMOVE ALL UTILITY LINES, BOTH ABANDONED AND
THOSE CURRENTLY IN SERVICE, BACK TO THE NEAREST TRUNK / LOOP OR MAIN LINE.
REFER TO SITE PLANS FOR CONTINUATION. SEE CIVIL SHEETS FOR ADDITIONAL
INFORMATION.
ALL UNDERGROUND PIPING SHALL BE REMOVED BACK TO THE NEAREST TRUNK / LOOP
OR MAIN LINE. REFER TO SITE PLANS FOR CONTINUATION AND EXTENT OF
DEMOLITION. SEE CIVIL SHEETS FOR ADDITIONAL INFORMATION.
ALL PLUMBING EQUIPMENT AND PIPING WITHIN THE BUILDING SHALL BE REMOVED
COMPLETELY.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE
SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR
ADDITIONAL INFORMATION
BUILDING
NOT TO SCALE
KEY PLAN
RH
AC
RH
AC
RH
AC
RH
AC
RH
AC
RH
AC
RH AC
RHRH
AC
RH
AC
RHRHRH
AC
RHRHRHRH
AC
RH
AC
RH
RH
AC
RHAC
RH
RH
RH
RHAC
RHAC
RH
RH
RH
RH
RH
RH RH RH RH
AC
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
RHRH
RH
RH
RH
EF
RH AC
RHRHRH
1 1
SCALE: 1/8" = 1'-0"
MECHANICAL/PLUMBING - DEMOLITION PLAN - FIRST FLOOR
25.MPD101
AC
AC
AC
(TYP)
(TYP)
(TYP)
(TYP)
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% FINAL BID DOCUMENT SUBMISSION
BUILDING
NOT TO SCALE
KEY PLAN
CONTRACTOR SHALL DISCONNECT AND REMOVE ALL MECHANICAL EQUIPMENT,
INCLUDING BUT NOT LIMITED TO; BOILERS, PUMPS, FANS, COILS, EXPANSION TANKS.
REMOVE RADIANT HEATER COMPLETE.
REMOVE ALL MECHANICAL EQUIPMENT ASSOCIATED WITH THE UTILITY LIFT. COLLECT
AND DISPOSE OF HYDRAULIC FLUID ASSOCIATED WITH THE LIFT.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE
SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR
ADDITIONAL INFORMATION
NOTE:
CONTRACTOR TO REMOVE ENTIRE BUILDING AND ALL ASSOCIATED SITE UTILITIES
AND BACKFILL SITE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
ALL PLUMBING EQUIPMENT, PLUMBING FIXTURES, AND PIPING WITHIN THE BUILDING
SHALL BE REMOVED. REFER TO SITE PLANS FOR CONTINUATION AND EXTENT OF
DEMOLITION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE
SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR
ADDITIONAL INFORMATION.
RH
AC
RH
AC
RH
AC
RH
AC
RH
AC
RH
AC
RH AC
RH
AC
RH
AC
RH
AC
RH
AC
RH
EF
RH
AC
RH
EF
RH
AC
RH
AC
RH
AC
RH
AC
RH
AC
RHAC
RH
RHAC
RH
RHAC
RH
RHAC
RH
RHAC
RH
RH
RH
RH RH RH RH
AC
RH
RH
RH
RH
RH
RH
RH
RH
RH
RH
RHRHRH
RH
RH AC
RH
RHRHRH
1 1
SCALE: 1/8" = 1'-0"
MECHANICAL/PLUMBING - DEMOLITION PLAN - SECOND FLOOR
25.MPD102
EF
AC
AC
AC
EF
EF
AC
2 (TYP)
2 (TYP)2 (TYP)2 (TYP)
2 (TYP)
2 (TYP)
(TYP) 2
2 (TYP)
(TYP)
(TYP)
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% FINAL BID DOCUMENT SUBMISSION
BUILDING
NOT TO SCALE
KEY PLAN
CONTRACTOR SHALL DISCONNECT AND REMOVE ALL MECHANICAL EQUIPMENT,
INCLUDING BUT NOT LIMITED TO; BOILERS, PUMPS, FANS, COILS, EXPANSION TANKS.
REMOVE RADIANT HEATER COMPLETE.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE
SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR
ADDITIONAL INFORMATION
NOTE:
CONTRACTOR TO REMOVE ENTIRE BUILDING AND ALL ASSOCIATED SITE UTILITIES
AND BACKFILL SITE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
ALL PLUMBING EQUIPMENT, PLUMBING FIXTURES, AND PIPING WITHIN THE BUILDING
SHALL BE REMOVED BACK TO THE NEAREST TRUNK / LOOP OR MAIN LINE. REFER TO
SITE PLANS FOR CONTINUATION AND EXTENT OF DEMOLITION.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE
SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR
ADDITIONAL INFORMATION.
SCALE: 1/8" = 1'-0"
MECHANICAL / PLUMBING - DEMOLITION PLAN - LOWER LEVEL
SCALE: 1/8" = 1'-0"
MECHANICAL / PLUMBING - DEMOLITION PLAN - FIRST FLOOR
SCALE: 1/8" = 1'-0"
MECHANICAL / PLUMBING - DEMOLITION PLAN - SECOND FLOOR
42.MPD100
42.MPD100
42.MPD100
AC
AC
FIRE
CONNECTION
EWH
WATER
ENTRANCE
FIRE
PUMP
3 3
WATER
ENTRANCE
CONTRACTOR SHALL DISCONNECT AND REMOVE ALL MECHANICAL EQUIPMENT,
INCLUDING BUT NOT LIMITED TO; BOILERS, PUMPS, FANS, COILS, EXPANSION TANKS.
CONTRACTOR SHALL COORDINATE THE DEMOLITION OF ALL MECHANICAL EQUIPMENT
AND ANY ASSOCIATED ACCESSORIES WITH ALL TRADES.
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
100% FINAL BID DOCUMENT SUBMISSION
THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /
OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.
BUILDING
NOT TO SCALE
KEY PLAN
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE
SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR
ADDITIONAL INFORMATION
1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL
FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE
INTENDED SCOPE.
2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR
WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE
CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE
HELD TO BE ALL INCLUSIVE.
3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL
SUB-CONTRACTORS.
4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO
COMPLETING ALL DEMOLITION WORK.
5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM
DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR
IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF
CONSTRUCTION.
6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE
SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR
ADDITIONAL INFORMATION
CONTRACTOR SHALL CAREFULLY REMOVE ALL UTILITY LINES, BOTH ABANDONED AND
THOSE CURRENTLY IN SERVICE, BACK TO THE NEAREST TRUNK / LOOP OR MAIN LINE.
REFER TO SITE PLANS FOR CONTINUATION. SEE CIVIL SHEETS FOR ADDITIONAL
INFORMATION.
ALL UNDERGROUND PIPING SHALL BE REMOVED BACK TO THE NEAREST TRUNK / LOOP
OR MAIN LINE. REFER TO SITE PLANS FOR CONTINUATION AND EXTENT OF
DEMOLITION. SEE CIVIL SHEETS FOR ADDITIONAL INFORMATION.
ALL PLUMBING EQUIPMENT AND PIPING WITHIN THE BUILDING SHALL BE REMOVED
COMPLETELY.
NOTE:
CONTRACTOR TO REMOVE ENTIRE BUILDING AND ALL ASSOCIATED SITE UTILITIES
AND BACKFILL SITE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 15 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 16 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 17 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 18 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 19 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 20 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 21 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 22 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 23 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 24 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 25 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 26 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 27 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 28 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 29 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 30 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 31 |
| 05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 32 |
File details come from the government source that posted it. Updated .