P400--Demolish Buildings 25, 42, 122 610-18-101
Solicitation number
36C25020B0011
Issued by

About this file

This document package includes mechanical demolition plans and specifications for buildings 25 and 42 at the Northern Indiana HealthCare System VA Medical Center, along with the related federal contract opportunity notice.

The mechanical demolition plans detail the required removal of all mechanical equipment, plumbing fixtures, piping, and utilities from buildings 25 and 42. Contractors must coordinate demolition with all trades, properly dispose of hazardous materials, and ensure no debris remains on site. The opportunity notice is a 100% service-disabled veteran-owned small business set-aside to demolish buildings 25, 42, and 122 per project 610-18-101. The solicitation will be posted on April 28, 2020, with a proposal due date approximately 30 days later. The project magnitude is between $2,000,000 to $5,000,000, and the duration must not exceed 365 calendar days from the notice to proceed. Payment and performance bonds are required.

36C25020B0011 Drawing Set 2.pdf

View the file

Other files

File Type Posted
Wage Determination.pdf PDF
36C25020B0011 0001.pdf PDF
BID SCHEDULE.pdf PDF
36C25020B0011-009.docx DOCX document
36C25020B0011-004.pdf PDF
36C25020B0011-005.pdf PDF
36C25020B0011-007.pdf PDF
36C25020B0011-010.docx DOCX document
36C25020B0011-003.docx DOCX document
36C25020B0011-008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COND

STEAM

COND

STEAM

COND

STEAM

SHWH

SHWH TMV

RHRHRHRHRHRH

RH

RH

UH

UH

COND

STEAM

INCOMING SANITARY

INCOMING FIRE PROTECTION

INCOMING

DOMESTIC

WATER

STEAM ENTRANCE

2 31

SCALE: 1/8" = 1'-0"

MECHANICAL/PLUMBING - DEMOLITION PLAN - LOWER LEVEL

25.MPD100

(TYP)

(TYP)

(TYP)

(TYP)

CONTRACTOR SHALL DISCONNECT AND REMOVE ALL MECHANICAL EQUIPMENT,

INCLUDING BUT NOT LIMITED TO; BOILERS, PUMPS, FANS, COILS, EXPANSION TANKS.

CONTRACTOR SHALL COORDINATE THE DEMOLITION OF ALL MECHANICAL EQUIPMENT

AND ANY ASSOCIATED ACCESSORIES WITH ALL TRADES.

CONTRACTOR SHALL CAREFULLY REMOVE HIGH PRESSURE STEAM AND HOT WATER

SUPPLY PIPING CLEAR OF BUILDING 25. REFER TO SITE PLANS FOR CONTINUATION.

REMOVE ALL MECHANICAL EQUIPMENT, INCLUDING BUT NOT LIMITED TO, RADIANT

HEATERS, PACKAGED AIR CONDITIONING UNITS, DUCTWORK, DIFFUSER, UNIT

HEATERS, AND ALL HYDRONIC / STEAM PIPING.

REMOVE RADIANT HEATER COMPLETE.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE

SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR

ADDITIONAL INFORMATION

NOTE:

CONTRACTOR TO REMOVE ENTIRE BUILDING AND ALL ASSOCIATED SITE UTILITIES

AND BACKFILL SITE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

100% FINAL BID DOCUMENT SUBMISSION

CONTRACTOR SHALL CAREFULLY REMOVE ALL UTILITY LINES, BOTH ABANDONED AND

THOSE CURRENTLY IN SERVICE, BACK TO THE NEAREST TRUNK / LOOP OR MAIN LINE.

REFER TO SITE PLANS FOR CONTINUATION. SEE CIVIL SHEETS FOR ADDITIONAL

INFORMATION.

ALL UNDERGROUND PIPING SHALL BE REMOVED BACK TO THE NEAREST TRUNK / LOOP

OR MAIN LINE. REFER TO SITE PLANS FOR CONTINUATION AND EXTENT OF

DEMOLITION. SEE CIVIL SHEETS FOR ADDITIONAL INFORMATION.

ALL PLUMBING EQUIPMENT AND PIPING WITHIN THE BUILDING SHALL BE REMOVED

COMPLETELY.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE

SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR

ADDITIONAL INFORMATION

BUILDING

NOT TO SCALE

KEY PLAN

RH

AC

RH

AC

RH

AC

RH

AC

RH

AC

RH

AC

RH AC

RHRH

AC

RH

AC

RHRHRH

AC

RHRHRHRH

AC

RH

AC

RH

RH

AC

RHAC

RH

RH

RH

RHAC

RHAC

RH

RH

RH

RH

RH

RH RH RH RH

AC

RH

RH

RH

RH

RH

RH

RH

RH

RH

RH

RHRH

RH

RH

RH

EF

RH AC

RHRHRH

1 1

SCALE: 1/8" = 1'-0"

MECHANICAL/PLUMBING - DEMOLITION PLAN - FIRST FLOOR

25.MPD101

AC

AC

AC

(TYP)

(TYP)

(TYP)

(TYP)

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

100% FINAL BID DOCUMENT SUBMISSION

BUILDING

NOT TO SCALE

KEY PLAN

CONTRACTOR SHALL DISCONNECT AND REMOVE ALL MECHANICAL EQUIPMENT,

INCLUDING BUT NOT LIMITED TO; BOILERS, PUMPS, FANS, COILS, EXPANSION TANKS.

REMOVE RADIANT HEATER COMPLETE.

REMOVE ALL MECHANICAL EQUIPMENT ASSOCIATED WITH THE UTILITY LIFT. COLLECT

AND DISPOSE OF HYDRAULIC FLUID ASSOCIATED WITH THE LIFT.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE

SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR

ADDITIONAL INFORMATION

NOTE:

CONTRACTOR TO REMOVE ENTIRE BUILDING AND ALL ASSOCIATED SITE UTILITIES

AND BACKFILL SITE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

ALL PLUMBING EQUIPMENT, PLUMBING FIXTURES, AND PIPING WITHIN THE BUILDING

SHALL BE REMOVED. REFER TO SITE PLANS FOR CONTINUATION AND EXTENT OF

DEMOLITION.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE

SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR

ADDITIONAL INFORMATION.

RH

AC

RH

AC

RH

AC

RH

AC

RH

AC

RH

AC

RH AC

RH

AC

RH

AC

RH

AC

RH

AC

RH

EF

RH

AC

RH

EF

RH

AC

RH

AC

RH

AC

RH

AC

RH

AC

RHAC

RH

RHAC

RH

RHAC

RH

RHAC

RH

RHAC

RH

RH

RH

RH RH RH RH

AC

RH

RH

RH

RH

RH

RH

RH

RH

RH

RH

RHRHRH

RH

RH AC

RH

RHRHRH

1 1

SCALE: 1/8" = 1'-0"

MECHANICAL/PLUMBING - DEMOLITION PLAN - SECOND FLOOR

25.MPD102

EF

AC

AC

AC

EF

EF

AC

2 (TYP)

2 (TYP)2 (TYP)2 (TYP)

2 (TYP)

2 (TYP)

(TYP) 2

2 (TYP)

(TYP)

(TYP)

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

100% FINAL BID DOCUMENT SUBMISSION

BUILDING

NOT TO SCALE

KEY PLAN

CONTRACTOR SHALL DISCONNECT AND REMOVE ALL MECHANICAL EQUIPMENT,

INCLUDING BUT NOT LIMITED TO; BOILERS, PUMPS, FANS, COILS, EXPANSION TANKS.

REMOVE RADIANT HEATER COMPLETE.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE

SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR

ADDITIONAL INFORMATION

NOTE:

CONTRACTOR TO REMOVE ENTIRE BUILDING AND ALL ASSOCIATED SITE UTILITIES

AND BACKFILL SITE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

ALL PLUMBING EQUIPMENT, PLUMBING FIXTURES, AND PIPING WITHIN THE BUILDING

SHALL BE REMOVED BACK TO THE NEAREST TRUNK / LOOP OR MAIN LINE. REFER TO

SITE PLANS FOR CONTINUATION AND EXTENT OF DEMOLITION.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE

SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR

ADDITIONAL INFORMATION.

SCALE: 1/8" = 1'-0"

MECHANICAL / PLUMBING - DEMOLITION PLAN - LOWER LEVEL

SCALE: 1/8" = 1'-0"

MECHANICAL / PLUMBING - DEMOLITION PLAN - FIRST FLOOR

SCALE: 1/8" = 1'-0"

MECHANICAL / PLUMBING - DEMOLITION PLAN - SECOND FLOOR

42.MPD100

42.MPD100

42.MPD100

AC

AC

FIRE

CONNECTION

EWH

WATER

ENTRANCE

FIRE

PUMP

3 3

WATER

ENTRANCE

CONTRACTOR SHALL DISCONNECT AND REMOVE ALL MECHANICAL EQUIPMENT,

INCLUDING BUT NOT LIMITED TO; BOILERS, PUMPS, FANS, COILS, EXPANSION TANKS.

CONTRACTOR SHALL COORDINATE THE DEMOLITION OF ALL MECHANICAL EQUIPMENT

AND ANY ASSOCIATED ACCESSORIES WITH ALL TRADES.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

100% FINAL BID DOCUMENT SUBMISSION

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

BUILDING

NOT TO SCALE

KEY PLAN

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE

SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR

ADDITIONAL INFORMATION

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

4. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

5. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

6. CONTRACTOR TO PROPERLY DISPOSE OF ALL HAZARDOUS MATERIALS PROPERLY, SEE

SPECIFICATIONS AND HAZARDOUS MATERIAL INSPECTION FINAL REPORT FOR

ADDITIONAL INFORMATION

CONTRACTOR SHALL CAREFULLY REMOVE ALL UTILITY LINES, BOTH ABANDONED AND

THOSE CURRENTLY IN SERVICE, BACK TO THE NEAREST TRUNK / LOOP OR MAIN LINE.

REFER TO SITE PLANS FOR CONTINUATION. SEE CIVIL SHEETS FOR ADDITIONAL

INFORMATION.

ALL UNDERGROUND PIPING SHALL BE REMOVED BACK TO THE NEAREST TRUNK / LOOP

OR MAIN LINE. REFER TO SITE PLANS FOR CONTINUATION AND EXTENT OF

DEMOLITION. SEE CIVIL SHEETS FOR ADDITIONAL INFORMATION.

ALL PLUMBING EQUIPMENT AND PIPING WITHIN THE BUILDING SHALL BE REMOVED

COMPLETELY.

NOTE:

CONTRACTOR TO REMOVE ENTIRE BUILDING AND ALL ASSOCIATED SITE UTILITIES

AND BACKFILL SITE. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 15
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 16
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 17
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 18
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 19
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 20
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 21
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 22
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 23
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 24
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 25
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 26
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 27
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 28
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 29
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 30
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 31
05 - 610-18-101 FBD DWGS pdf Rev 12-23-19 - Copy 32

File details come from the government source that posted it. Updated .