36C25020B0010-003.pdf
PDF Posted
- Attached to
- 552-19-106: Replace Elevator Controls (VA-20-00011217) Federal contract opportunity
- Solicitation number
- 36C25020B0010
About this file
This document is a pre-solicitation notice for project 552-19-107 to replace elevator controls in Building 330 at the Dayton VA Medical Center. The VA Network Contracting Office 10 is seeking to award a contract to a Service-Disabled Veteran-Owned Small Business to provide all labor, materials, equipment, supervision and coordination to replace outdated elevator controls. The work must be completed within 360 calendar days of the contractor receiving notice to proceed. The solicitation documents will be posted on January 15, 2020 with proposals due approximately 30 days later. The North American Industry Classification System code is 238290 with a small business size standard of $15 million. The selected SDVOSB must perform a minimum of 25% of the construction work. Bid, payment and performance bonds will be required. A one-time site visit will be scheduled. Amendments will be posted on FBO.gov and questions can be emailed to the point of contact by the specified deadline.
36C25020B0010 Attachment 2 - Project Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0010-0003000.docx | DOCX document | |
| 36C25020B0010-0003002.pdf | ||
| 36C25020B0010-0003003.pdf | ||
| 36C25020B0010-0003001.docx | DOCX document | |
| 36C25020B0010-0002000.docx | DOCX document | |
| 36C25020B0010-0001000.docx | DOCX document | |
| 36C25020B0010-002.pdf | ||
| 36C25020B0010-001.docx | DOCX document | |
| 36C25020B0010-004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:5
P M
GI000
COVER SHEET
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG ELB
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SHEET LIST
SHEET
NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 LIFE SAFETY PLANS
GI102 LIFE SAFETY PLANS
GI103 LIFE SAFETY PLANS
GI104 LIFE SAFETY PLANS
GI105 INFECTION CONTROL/PHASING PLANS
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AS100 BASEMENT FLOOR PLAN
AS111 ELEVATOR MACHINE ROOM FLOOR PLAN
AS401 ENLARGED PLANS
MECHANICAL
M001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
M002 SCHEDULES AND DETAILS
M110 TENTH FLOOR AND ELEVATOR MACHINE ROOM PLAN
ELECTRICAL
E001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
E002 SINGLE LINE DIAGRAM - EMERGENCY
E003 LUMINAIRE AND MOTOR SCHEDULE
ED110 TENTH FLOOR AND ELEVATOR MACHINE ROOM PLAN - DEMO
EL110 TENTH FLOOR AND ELEVATOR MACHINE ROOM PLAN - LIGHTING
EP110 TENTH FLOOR AND ELEVATOR MACHINE ROOM PLAN - POWER
FIRE PROTECTION
FX001 LEGEND, ABBREVIATIONS & INDEX OF DRAWINGS
FX110 ELEVATOR MACHINE ROOM PLAN
Contact:Contact: Contact:
HEAPY ENGINEERING
Matthew Graham
Principal
MECHANICAL,
ELECTRICAL &
PLUMBING
PROJECT CLIENT COMPANY
Phil West
COR
4100 W Third Street Dayton, Ohio 45428 p: 937-268-6511 e:Phillip.West@va.gov
OWNER
GUIDON DESIGN INC.
James Gooden
Project Manager
1221 Pennsylvania St.
Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x145 e: jgooden@guidondesign.com
ARCHITECT
1400 W. Dorothy Lane Dayton, OH 45409 p: 937.224.0861 e: MSGraham@heapy.com
AREA MAP
VICINITY MAP
LOCATION
LOCATION
REPLACE ELEVATOR CONTROLS (HOSPITAL COMPLEX)
DAYTON, OH VAMC
4100 W Third St., Dayton, OH 45428
100% CONSTRUCTION DOCUMENTS
LIST OF ALTERNATES:
• ALTERNATE NO.1: EXISTING HOISTWAY DOOR
PANELS TO REMAIN
• ALTERNATE NO. 2: EXISTING CAB INTERIORS
INCLUDING, BUT NOT LIMITED TO FLOORING,WALL
PANELS, HANDRAILS, CEILING, LIGHTING TO
REMAIN
• ALTERNATE NO. 3: REPLACE ALL CONTROLS WITH
NON-PROPRIETARY CONTROLS.
Revisions: Date: 12/16/2019
Phillip West, COR
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND
REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
NFPA 13, 220, 780
AISC
ACI 318-11
AISC 341-10
AISC 360-10
Ventilation - Per VA guidelines, ICC International Mechanical Code, and ASHRAE 62.1 -2007 Energy Efficiency - Per VA guidelines, all new mechanical equipment installed per the project shall meet the minimum requirements of ASHRAE 90.1-2007.
Building Automation System Control - The selected system will offer temperature monitorig with the ability to connect to the campus network. It is expected that the current system will have sufficient capacity to accommodate the required controls.
Electrical Codes NFPA 70 2011 NEC (National Electric Code) NFPA 70E Standard for Electrical Safety in the Workplace 2012 NFPA 72 2013 National Fire Alarm and Signaling Code NFPA 780 Standard for the Installation of Lightning Protection Systems 2011 Edition Maintenance - Equipment layouts will be reviewed for access and ease of maintenance.
ASME - A17.1 Safety Code for Elevators and Escalators NFPA 101, Life Safety Code, 2012 edition (LSC) NFPA 13, Standard for the Installation of Sprinkler Systems, 2013 edition NFPA 14, Standard for the INstallation of Standpipe and Hose System, 2013 edition NFPS 10, Standard for Portable Fire Extinguishers, 2013 edition NFPA 24, Standard for the Installation of Private Fire Service Mains and their Appurtenance, 2013 edition NFPA 80, Standard for Fire Doors and Other Opening Protectives, 2013 edition NFPA 90A, Standard for the Installation of Air-Conditioning and Ventilating Systems, 2012 edition ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace, 2009b edition NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems, 2013 edition ASTM E2072-04, Specification for Photoluminescent (Phosphorescent) Safety Markings, 2004 edition IASME A17.1 Elevator Code
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD
STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
EQUIPMENT, JUNE 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR
PROJECTS SEPTEMBER 30, 2010
ELEVATOR DESIGN MANUAL, AUGUST 2016
EPA GUIDELINES CHECKLIST
VA DESIGN MANUALS PG-18-10:
GOVERNING CODES:
P-2
P-5
P-1
P-6 P-4
P-3
SE-1
SE-2
SE-4
SE-3
ELEV. LOBBY
STERILE NON
STERILE STORAGE
BD-110
STERILE NON
STERILE STORAGE
BD-110
STERILE NON
STERILE STORAGE
BD-110
STAIRS
MECHANICAL
EQUIPMENT
Room
Room
Room
Room
EXIT
LF
LF
ELEV. LOBBY
KEY PLAN
N
BLDG 330
PROJECT BOUNDARY
P-1 P-2 P-3
P-4P-5P-6
S2 S3
S4 S1
EXIT
LF
LF
Room
Room
Room
STAIRS
P-3P-2P-1
P-4P-5P-6
SE-4
SE-3
SE-1
SE-2
EXIT
LF
LF
Room
Room
Room
STAIR
Room
CONFERENCE
PROS. CLERK
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD
PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
CODE REVIEW
THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.
FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN
USED.
PROJECT SCOPE
THE PROJECT SCOPE INCLUDES THE REPLACEMENT OF ELEVATOR CONTROLS AND LIGHTING IN ELEVATOR PITS AND CABS AND THE REPLACEMENT OF EXISTING CAB
INTERIORS.
CODE ANALYSIS
THE SCOPE OF THE SIGNAL AND FINISH UPGRADES TO ELEVATORS OF THIS PROJECT WILL NOT EFFECT OR CHANGE THE EXISTING CONDITIONS OF THE PROJECT. THE
CODE COMPLIANCE OF THE EXISTING BUILDING WILL REMAIN UNCHANGED.
INTERIOR FINISH
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)
• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.
• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS
SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD
METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.
• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA
260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590
EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.
DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)
• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)
• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)
• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.
• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM PER 9.6.4. (LSC 18.3.4.3.2)
FIRE SUPPRESSION:
SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF
VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:
STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 250 GPM
ALL OTHER AREAS SHALL BE PROTECTED AS:
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 100 GPM
ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.
13. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241.
CODE ANALYSIS - NFPA 101, INSTITUTIONAL HEALTHCARE CHAPTER 18
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:0
P M
GI101
LIFE SAFETY PLANS
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG KH
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GI101
1 BASEMENT FLOOR LIFE SAFETY PLAN - BUILDING 330
SCALE: 3/32" = 1'-0"GI101
2 FIRST FLOOR LIFE SAFETY PLAN - BUILDING 330
SCALE: 3/32" = 1'-0"GI101
3 SECOND FLOOR LIFE SAFETY PLAN - BUILDING 330
N
N N
Room
Room
DIETICIAN
SOC. WORK
FEMALE T. W/C T.
MALE T.
Room
Room
P-5
P-1
Room
SE-4
SE-3SE- 2
SE-1
P-2 P-3
P-6 P-4
Room
STAIRS
Room
EXIT
LF
LF
KEY PLAN
N
BLDG 330
PROJECT BOUNDARYMECHANICAL
ELEV. LOBBY
ELEC.
CART LIFT
P-2
P-5
HOUSE STAFF
STR. W/C
PHARMACY
WORKROOMSTR W/C STR
Room
Room
Room
Room
Room Room
Room
Room
STAIR
ELEC
SIGNAL
P-3P-1
P-6 P-4
SE-3
SE-4SE-1
SE-2
ELEV. LOBBY
Room
EXIT
LF
LF
NURSE SUPV.
WORKROOM
Room
Room
Room
Room
SE-2
SE-3
Room
P-1
P-6
Room
Room
STAIR
STR W/C STOR. PHARMACY
HOUSE STAFF
RoomRoomRoom
Room
Room
Room
TOILET
Room
P-2 P-3
P-6P-5
SE-4SE-1
ELEV. LOBBY
ELEV. LOBBY
EXIT
LF
LF
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:0
P M
GI102
LIFE SAFETY PLANS
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG ELB
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GI102
3 THIRD FLOOR LIFE SAFETY PLAN - BUILDING 330
SCALE: 3/32" = 1'-0"GI102
4 FOURTH FLOOR LIFE SAFETY PLAN - BUILDING 330
SCALE: 3/32" = 1'-0"GI102
5 FIFTH FLOOR LIFE SAFETY PLAN - BUILDING 330
N
N N
KEY PLAN
N
BLDG 330
PROJECT BOUNDARY
ELEV. LOBBY
SE-2
Room
HOUSE STAFF
WORKROOM
STR & W/C STOR.
Room PHARMACY
Lounge
Room
HEAD NURSE
LOUNGE
VEST
EXAM
CART LIFTSE-3
X-RAY PYS. ASST.
Room
Room
STAIRS
W/C B.
Room
C-1 C-2
W/C B.
M. LOCKER
LOUNGE
Room
P-3
P-5
SE-1
SE-4
P-1
P-6
P-2
P-4
EXIT
LF
LF
ELEV. LOBBYSE-1
T & R UTILITY
SE-3
ELEC.
CART LIFT
LOUNGE
W/C T
M. LKR. INTERVIEW
CONSULT
SOCIAL WORK
HEAD NURSE
WORKROOM
Room
PHARMACY
HOUSE STAFF
LAUN.
LAUN.
PSYCHIAT
STR. & W/C
SOC WORK
PSYCHIA
SOC WORK
H.A.C.
STR W/C STOR.
STAIR
P-6
P-2
C-1 C-2
HAC
7A-101
SIGNAL
P-1 P-3
P-5 P-4
SE-4
SE-2
EXIT
LF
ELEV. LOBBY
LOUNGE
CART LIFT
P-2
P-5
SIGNAL
PHYS.
PHYS.
HOUSE STAFF
WORKROOM
Room
PHYSICAN
AUN.
INFECT. CONTROL
DIET
ELEC
LOBBY
WORK ROOM
RECR.
C-1 C-2
CART LIFT
Room
W/C T
W/C T
VEST
AUN.
X-RAY
T & R. UTILITY
W/C T
P-1
P-6 P-4
P-3
SE-2
SE-3
SE-4SE-1
EXIT
LF
LF
STAIRS
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:1
P M
GI103
LIFE SAFETY PLANS
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG ELB
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GI103
3 SIXTH FLOOR LIFE SAFETY PLAN - BUILDING 330
SCALE: 3/32" = 1'-0"GI103
4 SEVENTH FLOOR LIFE SAFETY PLAN - BUILDING 330
SCALE: 3/32" = 1'-0"GI103
5 EIGHTH FLOOR LIFE SAFETY PLAN - BUILDING 330
N
N N
KEY PLAN
N
BLDG 330
PROJECT BOUNDARY
ELEV. LOBBY
SE-2
Room
CART LIFT
P-2
P-5
Room
Room
SIGNAL
GFRON
CLIN. SPEC.
LAUN
LAUN.
PHYSICIAN
PHARMACY
EDUCATION CONE
LOUNGE
SOC WORKER
STAIR
WORK ROOM
LOBBY
HEAD NURSE
HAC
F. LKR
W/C
W/C
W/C
P-3P-1
P-4P-6
SE-4SE-1
SE-3
EXIT
LF
LF
SERVER ROOM
Room
SE-3
Room
STAIRS
P-3
P-4
Room
Room
P-1 P-2
P-6 P-5
SE-2
SE-4SE-1
SERVER ROOM
EXIT
LF
LF
SERVER ROOM
MEZZANINE
L
F
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:1
P M
GI104
LIFE SAFETY PLANS
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG ELB
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GI104
3 NINTH FLOOR LIFE SAFETY PLAN - BUILDING 330
SCALE: 3/32" = 1'-0"GI104
4 TENTH FLOOR LIFE SAFETY PLAN - BUILDING 330
SCALE: 3/32" = 1'-0"GI104
5 ELEVATOR MACHINE ROOM LIFE SAFETY PLAN
N
N N
INFECTION CONTROL PLAN NOTES #
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: III
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER CONSTRUCTION
ON EACH FLOOR FROM BASEMENT THROUGH TENTH FLOORS. SEAL ALL SEAMS
AND PENETRATIONS AS SPECIFIED IN SECTION 01 35 26
PROVIDE TEMPORARY DUST BARRIER BETWEEN ELEVATOR CABS WITHIN
ENTIRE HOISTWAY. SEAL ALL SEAMS AND PENETRATIONS.
1.
2.
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN 5 PHASES - SEE SPEC. SECTION 01 00 00.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR
ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE FOR
WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
EACH PHASE IS SHOWN TO CONSIST OF TWO ELEVATOR CABS AT A TIME AND
THE WORK ASSOCIATED ON ALL FLOORS. CONTRACTOR TO COORDINATE
REQUIREMENTS OF PHASING WITH COR. ALL OTHER ELEVATORS TO REMAIN
OPERATIONAL DURING EACH PHASE.
KEY PLAN
N
BLDG 330
PROJECT BOUNDARY
Room
SE-2
SE-1
SE-3
SE-4
Room
P-1 P-2 P-3
P-6 P-5 P-4
ELEV LOBBY
ELEV LOBBY
PHASING SCHEDULE
1. DURING PHASE ONE, ELEVATORS P-1 AND SE-1 WILL BE
UNDER CONSTRUCTION. THE REST OF THE ELEVATORS
WILL BE OPERATIONAL.
2. DURING PHASE TWO, ELEVATORS P-2 AND SE-2 WILL BE
UNDER CONSTRUCTION. THE REST OF THE ELEVATORS
WILL REMAIN OPERATIONAL
3. DURING PHASE THREE, ELEVATORS P-3 AND SE-3 WILL BE
UNDER CONSTRUCTION. THE REST OF THE ELEVATORS
WILL REMAIN OPERATIONAL
4. DURING PHASE FOUR, ELEVATORS P-4 AND SE-4 WILL BE
UNDER CONSTRUCTION. THE REST OF THE ELEVATORS
WILL REMAIN OPERATIONAL
5. DURING THE FINAL PHASE, ELEVATORS P-5 AND P-6 WILL
BE UNDER CONSTRUCTION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:1
P M
GI105
INFECTION CONTROL/PHASING
PLANSGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG ELB
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"GI105
3 BASEMENT FLOOR IC/PHASING PLAN - BUILDING 330
N
ARCHITECTURAL ABBREVIATIONS
SECTION REFERENCE
DRAWING NUMBER
SHEET
LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
INCANDESCENT WALL MOUNTED LIGHTING
INCANDESCENT SURFACE MOUNT LIGHTING
SURFACE MOUNTED FLUORESCENT
RECESSED FLUORESCENT
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
INCANDESCENT RECESSED LIGHTING
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
REFLECTED CEILING PLAN SYMBOLS
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
GENERAL CONSTRUCTION NOTES
THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH COR AND
VARIOUS FACILITY PERSONNEL INVOLVED WITH UTILITY SHUT DOWN, INFECTION
CONTROLS, OCCUPANT/EMPLOYEE SAFETY, ACCESS CONTROL, ETC.
ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS AND
THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND COR OF ANY DISCREPANCIES OR MISSING DIMENSIONS.
DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
FLOOR ELEVATION 100’-0” IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING
SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.
ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY CALLED
OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT CONSTRUCTION,
FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE CONSTRUCTION SITE.
ANY DAMAGE OR UNACCEPTABLE WEAR BY THE CONSTRUCTION TEAM SHALL BE
REPAIRED/REPLACED BY THE CONTRACTOR AT NO COST TO THE OWNER.
IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR, SHALL BE PROVIDED.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING DOOR
HARDWARE,
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOZ DOZEN
DN DOWN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
ETS EXPOSE TO STRUCTURE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR FIBERGLASS
REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER OR HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LEFT HAND REVERSE
LATENT HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM OR MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE OR MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
ARCHITECTURAL SYMBOLS
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
NEW WALL
WALL TO BE
REMOVED
S3.A2
INDICATES STRUCTURAL MATERIAL
INDICATES NOMINAL STUD / BLOCK SIZE
INDICATES CONSTRUCTION
INDICATES TOP OF WALL CONDITION
REFER TO WALL LEGEND FOR MORE INFORMATION
EXISTING WALL TO
REMAIN
TEMPORARY IC
BARRIER WALL
CONSTRUCTION
ROOM
ROOM TAG
1 PLAN NOTE
ALTERNATE/BID DEDUCT ITEM
PT-1 FINISH INDICATION
A FRAME / WINDOW
T GLAZING
101 EQUIPMENT/FURNITURE TAG
NEW DOOR
EXISTING DOOR
DEMOLISHED DOOR
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP
DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
S SOUTH
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL STEEL
STL LNTL STEEL LINTEL
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TA TOILET ACCESSORY
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL OR TEMPERATURE
CONTROL PANEL OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
REVISION TO PLAN CALLOUT
WALLS
DOOR TAG
KEY NOTE TAGS
WALL TAG : REFER TO WALL LEGEND FOR MORE
INFORMATION
DOORS
WALL TAG LEGEND X#.X#
INDICATES STRUCTURAL
MATERIAL
S = STEEL
M = MASONRY
W = WOOD
INDICATES NOMINAL SIZE
INDICATES GYPSUM BOARD
INSTALLATION AND RATING WHERE
APPLICABLE
INDICATES TOP OF WALL
CONDITION
1 = INSULATED TO DECK
2 = NON-INSULATED TO DECK
3 = INSULATED TO 1' - 0"
ABOVE CEILING
4 = NON-INSULATED TO 1' - 0"
ABOVE CEILING
FOR EXAMPLE:
A = GWB BOTH SIDES TO DECK
B = 1 HR RATED CONSTRUCTION
C = 2 HR RATED CONSTRUCTION
F = FURRING STRIPS / GWB 1 SIDE
*SEE WALL TYPES FOR PROJECT SPECIFIC
CONSTRUCTION
WALL TYPES LEGEND AND GENERAL NOTES
REFER TO LIFE SAFETY PLAN FOR RATED WALL LOCATIONS.
PROVIDE 5/8" TYPE "X" GYPSUM WALLBOARD FOR ALL OTHER WALL
CONSTRUCTION, UNLESS OTHERWISE NOTED.
S3.C2 TWO HOUR RATED 3 5/8" METAL STUD, INSULATED
UL DESIGN NO: U419
TWO LAYERS 5/8" TYPE X GYP
BD, BOTH SIDES
3 5/8" 25 GA STEEL STUDS @ MAX 24"
O.C.
BEAD OF CONT. SEALANT, BOTH SIDES
3 5/8" STEEL STUD TRACK
CEILING
BEAD OF CONT. SEALANT,
BOTH SIDES
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
STEEL STUD WALL BRACING @ 4'-0" O.C.
MAX
STRUCTURE
ABOVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:4
P M
AS001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONSGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG ELB
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
AS401
AS401
P-2
P-5
P-1
P-6 P-4
P-3
SE-1
SE-2
SE-4
SE-3
ELEV. LOBBY
STERILE NON
STERILE STORAGE
BD-110
STERILE NON
STERILE STORAGE
BD-110
STERILE NON
STERILE STORAGE
BD-110
STAIRS
MECHANICAL
EQUIPMENT
Room
Room
Room
Room
ELEV. LOBBY
ARCHITECTURAL GENERAL NOTES
A SEE ENLARGED PLANS ON SHEET AS401
KEY PLAN
N
BLDG 330
PROJECT BOUNDARY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:4
P M
AS100
BASEMENT FLOOR PLAN
GUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG ELB
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"AS100
1 BASEMENT FLOOR PLAN - BUILDING 330
N
AS111
SERVER ROOM
MEZZANINE
KEY PLAN
N
BLDG 330
PROJECT BOUNDARY
SERVER ROOM
S3.C2
S3.C2
A1
/2
5 1/2" 21' - 4 3/8"
1' - 5 5/8" +/-
22' - 10"
HOLLOW METAL FRAME
SEE DOOR SCHEDULE
WALL TYPE, SEE PLANS
FRAMING STUD HEADER
SEALANT BOTH SIDES
WOOD SHIM
6 3/4"
3 5/8"
HOLLOW METAL FRAME
SEE DOOR SCHEDULE
WALL TYPE, SEE PLANS
DOUBLE STUD FRAMING
SEALANT BOTH SIDES
WOOD SHIM6
/4
/8
F1
AS SCHEDULED 2" TYP
A S
S C
H E
D U
LE
D
D1
A S
S C
H E
D U
LE
D
AS SCHEDULED
DOOR AND FRAME TYPE LEGEND
AS111
TYP
AS111
TYP
A
B
C
D
E
F
G
H
I
J
K
ARCHITECTURAL GENERAL NOTES
ARCHITECTURAL PLAN NOTES
ALL DIMENSIONS SHOWN ARE TO FACE OF WALL FRAMING/ MASONRY
UNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATES AS "CLR" OR "CLEAR"
INDICATE A CLEAR DIMENSION FROM FACE OF FINISH TO FACE OF FINISH.
VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.
CONTRACTOR TO MAINTAIN/REPAIR RATING OF EXISTING PARTITIONS AS
AFFECTED BY DEMOLITION/NEW CONSTRUCTION, TYPICAL THROUGHOUT.
PROVIDE CONTROL JOINT ON CONTINUOUS GYPSUM BOARD WALLS
GREATER THAN 30' LONG.
PROVIDE CONTROL JOINTS AT CORNERS OF DOORS OR WINDOWS.
ALL NEW PARTITIONS ARE WALL TYPE S3.C2 ON THIS SHEET ONLY. REFER TO
WALL TYPE GENERAL NOTES AS001 FOR WALL BOARD MATERIAL.
REFERENCE STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION AND
ELECTRICAL FOR COORDINATION ITEMS. COORDINATE AS REQUIRED
INCLUDING NECESSARY FRAMING, BLOCKING, ETC.
VERIFY EXISTING FIELD CONDITIONS PRIOR TO BEGINNING WORK, AND
REPORT DISCREPANCIES IMMEDIATELY TO ARCHITECT FOR CLARIFICATION.
PATCH EXISTING WALLS WHERE NEW WALLS MEET.
PROVIDE MINIMUM CLEARANCES AT ALL DOORS PER ADA REQUIREMENTS.
WHERE NO DIMENSION IS INDICATED, FINISH DOORS 6" FROM EDGE OF STUD
FRAMING AT CORNERS UNLESS OTHERWISE NOTED.
ROOF MOUNTED CONDENSING UNIT, REFER TO MECHANICAL DRAWING
REMOVE EXISTING LOUVER. INFILL WITH METAL STUDS, 2 LAYERS TYPE 'X'
GYPSUM BOARD BOTH SIDES. FIRE SEAL BOTH SIDES.
PROVIDE "ELEVATOR MACHINE ROOM" SIGNAGE AND "AUTHORIZED
PERSONNEL ONLY" SIGNAGE PER SHEET AS111 ON FACE OF DOOR.
1/
4"
1/ 4"
3/ 8"
1/
4" 3/
8"
1/ 4"
1/
4"
Elevator Machine Room
9"
9"
1/
4"
1/ 4"
3/ 8"
1/
4" 3/
8"
1/ 4"
1/
4"
Authorized Personnel
Only
9"
9"
1 1/4" TALL LETTERING
FONT: HELVETICA
COLOR: WHITE
FORMAT: VINYL OR SILK SCREEN
CAST ABS PLASTIC SIGNAGE SHEET
COLOR: BLUE
1 1/4" TALL LETTERING
FONT: HELVETICA
COLOR: WHITE
FORMAT: VINYL OR SILK SCREEN
CAST ABS PLASTIC SIGNAGE SHEET
COLOR: BLUE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
LERCH BATES
4995 BRADENTON AVE. SUITE 200
DUBLIN, OH 43017
TELE: 614-956-9337
BILL MOORE
C U s e rs
\e b ro w n
\D o c u m e n ts
\1 .1
.0
R e p la c e E le v a to r
C o n tr o ls
H o s p it a l C o m p le x e b ro w n .r v t
/6
/2
:4
:4
P M
AS111
ELEVATOR MACHINE ROOM
FLOOR PLANGUIDON DESIGN, INC.
1221 N. PENNSYLVANIA ST., SUITE 200
INDIANAPOLIS, IN 46202
TELE: 317-800-6388
JAMES GOODEN
HEAPY ENGINEERING, INC.
1400 W. DOROTHY LANE
DAYTON, OH 45409
TELE: 937-224-0861
MATTHEW GRAHAM
DAYTON, OH VAMC - REPLACE
ELEVATOR CONTROLS
(HOSPITAL COMPLEX)
4100 W Third St, Dayton, OH 45428
552-19-106
PHILLIP WEST, COR
06/07/2019 JLG ELB
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"AS111
1 ELEVATOR MACHINE ROOM
SCALE: 1/4" = 1'-0"AS111
2 ENLARGED SERVER ROOM FLOOR PLAN - TENTH FLOOR BUILDING 330
DOOR SCHEDULE
DOOR
ROOM DIMENSIONS DOOR
HEAD DETAIL JAMB DETAIL
This is the start of the file's text. The full file is on GovTribe.