36C25019B0039-0001000.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C25019B0039
About this file
36C25019B0039 0001 36C25019B0039 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019C0274-000.docx | DOCX document | |
| 36C25019B0039-003.pdf | ||
| 36C25019B0039-001.docx | DOCX document | |
| 36C25019B0039-004.pdf | ||
| 36C25019B0039-005.docx | DOCX document | |
| 36C25019B0039-002.pdf | ||
| 36C25019B0039-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-30-2019 757-20-204
701/AL
Department of Veterans Affairs Network Contracting Office (NCO) 10 VA Healthcare Sysytem 2780 Airport Drive, Suite 340 Columbus OH 43219-2292
701/AL
Department of Veterans Affairs Network Contracting Office (NCO) 10 VA Healthcare System 2780 Airport Drive, Suite 340 Columbus OH 43219-2292 To all Offerors/Bidders
36C25019B0039
X X X 11:00 AM EST on 09-16-2019 X
The purpose of this solicitation amendment is to:
1). Provide potential bidders with the answers to RFI questions received before the deadline. Plese see the continuation page s to this amendment for details.
The bid due date and time remain unchanged: 09-16-2019 at 11:00 AM EST.
Brian S. Kish Contracting Officer Amendment 1 Continuation Page
Offers/ bids for this solicitation should be sent to:
Department of Veterans Affairs ATTN: BID OFFER - 36C25019B0039, Shelton Beasley Network Contracting Office (NCO) 10 2780 Airport Drive, Suite 340 Columbus, OH 43219-2292
The opening will take place in the 3rd floor Conference Room at the above address.
The bid due date and time remain unchanged on 09-16-2019 at 11:00 AM EST
Please see the following pages for the RFI questions and answers.
Add Fall Deterrent to Parking Garage RFI Questions & Answers
1. Can you include details of the lightning protection – they will need to add cabling and attach to the top of the fence posts. Include a detail of the connection of the existing rods.
ANSWER: Lightning protection details are shown in Details 4/AS600 and 5/AS600. Minimal new cabling is required since the existing cable is attached to the base of the fence posts in similar locations to where it already exists.
0. From detail 5/AS600, the lightning rod is extended to the top of the fencing. This requires additional cabling for the system.
ANSWER: The rod attaches to the top. The fence post acts as the conductor as the cable is attached to the base. No cabling is required to go up the post.
1. Also, can you include a detail of the fencing along the stairs at the SW corner. Are they to attach the fence outside of railings, attached to the steel stair beams/bracing?
ANSWER: Per notes on Elevation 1/AS300, a new HSS12x6x1/2 column is to be placed on top of column E-3 with a HSS12x6x1/2 beam spanning from the new column over to the concrete column at E-4. The new fencing is outside of the railings and the new steel column and beam are to be braced to the existing stair structure with HSS6x6x5/16 members.
1. All cabling is to remain. The only demo/reinstall is the lightning rods. Is this correct?
ANSWER: Correct