About this file

36C25019B0039 0001 36C25019B0039 0001.docx

View the file

Other files

File Type Posted
36C25019C0274-000.docx DOCX document
36C25019B0039-003.pdf PDF
36C25019B0039-001.docx DOCX document
36C25019B0039-004.pdf PDF
36C25019B0039-005.docx DOCX document
36C25019B0039-002.pdf PDF
36C25019B0039-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-30-2019 757-20-204

701/AL

Department of Veterans Affairs Network Contracting Office (NCO) 10 VA Healthcare Sysytem 2780 Airport Drive, Suite 340 Columbus OH 43219-2292

701/AL

Department of Veterans Affairs Network Contracting Office (NCO) 10 VA Healthcare System 2780 Airport Drive, Suite 340 Columbus OH 43219-2292 To all Offerors/Bidders

36C25019B0039

X X X 11:00 AM EST on 09-16-2019 X

The purpose of this solicitation amendment is to:

1). Provide potential bidders with the answers to RFI questions received before the deadline. Plese see the continuation page s to this amendment for details.

The bid due date and time remain unchanged: 09-16-2019 at 11:00 AM EST.

Brian S. Kish Contracting Officer Amendment 1 Continuation Page

Offers/ bids for this solicitation should be sent to:

Department of Veterans Affairs ATTN: BID OFFER - 36C25019B0039, Shelton Beasley Network Contracting Office (NCO) 10 2780 Airport Drive, Suite 340 Columbus, OH 43219-2292

The opening will take place in the 3rd floor Conference Room at the above address.

The bid due date and time remain unchanged on 09-16-2019 at 11:00 AM EST

Please see the following pages for the RFI questions and answers.

Add Fall Deterrent to Parking Garage RFI Questions & Answers

1. Can you include details of the lightning protection – they will need to add cabling and attach to the top of the fence posts. Include a detail of the connection of the existing rods.

ANSWER: Lightning protection details are shown in Details 4/AS600 and 5/AS600. Minimal new cabling is required since the existing cable is attached to the base of the fence posts in similar locations to where it already exists.

0. From detail 5/AS600, the lightning rod is extended to the top of the fencing. This requires additional cabling for the system.

ANSWER: The rod attaches to the top. The fence post acts as the conductor as the cable is attached to the base. No cabling is required to go up the post.

1. Also, can you include a detail of the fencing along the stairs at the SW corner. Are they to attach the fence outside of railings, attached to the steel stair beams/bracing?

ANSWER: Per notes on Elevation 1/AS300, a new HSS12x6x1/2 column is to be placed on top of column E-3 with a HSS12x6x1/2 beam spanning from the new column over to the concrete column at E-4. The new fencing is outside of the railings and the new steel column and beam are to be braced to the existing stair structure with HSS6x6x5/16 members.

1. All cabling is to remain. The only demo/reinstall is the lightning rods. Is this correct?

ANSWER: Correct