36C25019B0031-003.pdf
PDF 17 MB Posted
- Attached to
- 552-19-202: Repair Chapel (Bldg. 118)
- Solicitation number
- 36C25019B0031
About this file
36C25019B0031 P09. Project Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019B0031-0002000.docx | DOCX document | |
| 36C25019B0031-0001000.docx | DOCX document | |
| 36C25019B0031-001.docx | DOCX document | |
| 36C25019B0031-002.pdf | ||
| 36C25019B0031-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WISCONSIN
IOWA
CEMETERY
K A N S A S
CEMETERY
A V E
McMAHON
CEMETERY
AVE.
KENTUCKY
C O L O R A D O
A V E
BROWN
IN
D
IA
N A
A V E
AV
E
MONUMENT
McMA
HON
AVE.
AVE.
IL
L
IN
O
IS
A V E
AVE.
NEW
O H
IO
YORK
KENTUCKY
S O U T H
AVE.
P E N N S Y L V A N
IA
AVE.
A V E
O H
IO
WEST VIR
GIN
IA
AVE
AV
E.
AVE.
A V E
G E T T Y S B U R G
A V E
WEST
THIR
D
ST
CEMETERY
MICHIGAN AVE
C O N N E C T
IC
U T A V E
M A
IN
E
A V E
DAKOTA AVE.
LAKE
LAKE-
V E R M O N T A V E
O R E G O N
A V E
E
A
B
C
D
118 400
CITY OF DAYTON
FIRE HOUSE NO. 17
131 26
34139
RETENTION
POND
NE
W
ME
XI
CO
P
LA
CE
A V E
AVE.
A V E
B R O W N
AVE.
S E R V I C E
R D
R D
E
I C E
R V
S
MICHIGAN AV
E
E
D R
R
C I V
S E
KENTUCKYAVE.
AVE.
WISCONSIN AVE.
TEN
N
ESSEE
P E N N S Y L V A N
IA
HAWAII
PLACE
Liscum Dr.
Secondary
Supply
AVE.
4100 WEST THIRD STREET
U.S. ROUTE 35
U .S
. R O
U
TE 3
S E R V
IC
E
R D
N HAMPSH
IRE
DELAWARE
DELAWARE
N
J E R S E Y
CIRCLE
R H O D E
IS
L A N D
A V E
MISSOURI AVE
M
IN
N E S O T A
A V E
MASSACHUSETTS BLVD.
M A R Y L A N D
A V E
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
M
IN
N E S O T A
A V E
TEXAS AVE.
Dayton, Ohio 45428
EXTERIOR ELEVATION
INTERIOR ELEVATION
SEE 700 SERIES SHEETS
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
SEE SHEET A001
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
X
X
1/A101
X
XXXX
X
SIM
BUILDING SITE
FLOOR SLAB
FIN. CEILING
9'-0"
STRUCTURE ABOVE
15'-6"
9.80
9.21
9.02
7.82
9.21
S1.0
9.21
4 7/8"
9.02
9.80
T1.0
FLOOR SLAB
TOP OF OPENING
STRUCTURE ABOVE
9.21
9.02
9.80
9.21
2.03
4 7/8"
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Department of Veterans Affairs Medical Center
ARCHITECTURE PLANNING INTERIOR DESIGN
3131 NEWMARK DRIVE, SUITE 200
MIAMISBURG, OHIO 45342
937.461.3290 P
JOHN POE ARCHITECTS
THP LIMITED INC.
STRUCTURAL ENGINEER
100 E. EIGHTH STREET
CINCINNATI, OH 45202
513.241.3222 P
513.241.2981 F
Dwg. of
TERRACON CONSULTANTS, INC.
GEOTECHNICAL ENGINEER
611 LUNKEN PARK DRIVE
CINCINNATI, OH 45226
513.321.5816 P
CULTURAL RESOURCE ANALYSTS, INC.
HISTORIC PRESERVATION
201 NW 4th STREET
SUITE 204
EVANSVILLE, IN 47708
812.253.3009 P
812.253.3010 F
VAMC Dayton Repair Protestant Chapel
03-09-2018
COVER SHEET
G001
LPTH
17003.00
552-19-202
Dayton, OH
VAMC Dayton Repair Protestant Chapel
4100 West 3rd Street Dayton, Oh 45428 PROJECT #: 552-19-202
G001 COVER SHEET
A101 DEMOLITION PLANS
A102 NEW FLOOR PLANS, DETAILS
A103 REFLECTED CEILING PLAN, FINISH PLAN, ELEVATIONS
S100 GENERAL NOTES
S101 FRAMING PLANS
S201 EXTERIOR ELEVATIONS
S202 EXTERIOR ELEVATIONS
S301 INTERIOR ELEVATIONS
S401 REPAIR DETAILS
S402 REPAIR DETAILS
GENERAL CONSTRUCTION NOTES
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,
HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS
AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL
WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS SPECIFICALLY
NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A PARTICULAR SURFACE,
CONTRACTOR SHALL PROVIDE FINISH(S) AS INDICATED AT SIMILAR
CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL SYSTEMS
WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE THE
OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF THE
WALL.
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE.
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING ONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
DRAWING INDEX
GRAPHIC SYMBOLS
N
PROJECT
Vincinity Map N
PROJECT
Dayton Campus map
N.T.S.Scale:
Wall Types
Revisions Date
2.03 Existing wall to remain.
7.82 Continuous acoustic sealant @ non-rated walls, each side.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.21 5/8" Type X gypsum board.
9.80 Acoustic insulation
DETAIL NOTES
UP
2.08
2.09
Housekeeping
Toilet
Office
T1.0
2.11
2.10
2.12
2.12
2.06
2.13
2.14
2.16
1.03
2.19
2.20
2.172.17
2.172.17
2.18
2.18
2.21
2.22
1.01
2.23
2.24
2.05
2.04
Stair
S01
Basement
Electrical
Storage
1.04
1.01
1.01
1.01
A101
1.04
A101
1.03
2.052.22
2.222.22
2.05
2.04
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
VAMC Dayton Repair Protestant Chapel
03-09-2018
DEMOLITION PLANS
A101
LPTH
17003.00
552-19-202
Dayton, OH
GENERAL DEMOLITION NOTES
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to Owner.
Box hardware before giving to Owner.
C. Remove wall-hung toilet room accessories as required and turn over to Owner.
D. Wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.T.R.
E. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
F. Prepare walls and floor slabs as required to receive new finish materials where existing finish is indicated to be removed.
PLAN NOTES
N Scale:
PROJECT
1/2" = 1'-0"
First Floor Demolition Plan 1N
Scale:
PROJECT
1/4" = 1'-0"
Basement Existing/New Work Plan
1.01 No work this area.
1.03 Contractor's building access, first floor.
1.04 Contractor's building access, basement.
2.04 Remove approximately 150 s.f. of loose/damaged cement plaster parge coat over existing stone foundation wall and install new cement parge coat to match existing. See Photo 4 this page.
2.05 Remove approximately 50 s.f. of loose/damaged cement plaster parge coat over existing stone foundation wall and install new cement parge coat to match existing. See Photo 3 this page.
2.06 Remove existing paper towel dispenser and reinstall in new location. Refer to new work plans.
2.08 Remove existing floor set tank type water closet and reinstall in same location. Sanitary lines to remain and be incorporated into new work. Protect and maintain sanitary lines. Refer to new work plans.
2.09 Remove existing soap dispenser and reinstall in new location.
Refer to new work plans.
2.10 Remove existing exhaust fan and associated ductwork and
supports for relocation in new work. Refer to new work plans.
2.11 Remove existing wall-mounted light fixture and reinstall to accommodate restroom replacement. Refer to new work plans.
2.12 Protect and maintain existing floor drains and sanitary lines to remain and be incorporated into new work. Field verify exact locations.
2.13 Remove existing toilet paper dispenser and reinstall in new location. Refer to new work plans.
2.14 Remove existing light switch to reinstall in same location.
2.16 Remove existing stainless steel sink and replace with new fixture.
Plumbing lines to remain and be incorporated into new work.
Protect and maintain plumbing lines. Refer to new work plans.
2.17 Remove existing casework.
2.18 Existing wall see Structural drawings for repairs.
2.19 Existing window to remain. Protect window and sill during construction.
2.20 Existing door to remain. Protect door and frame during
construction.
2.21 Remove existing wood stair to accommodate slab demolition annd installation of new slab.
2.22 Remove and salvage stone treads and cheek walls of existing exterior stair. See Photos 1 & 2 on this page. See details on sheet A102 and structual drawings for reinstallation.
2.23 Existing door frame to remain. Protect frame during construction.
2.24 Remove existing wood base throughout. Prepare existing wall to receive new wood base.
Scale: 1/16" = 1'-0"
Key Plan
PHOTO 2
PHOTO 3
PHOTO 4
PHOTO 1
Photo 1
Photo 2
Photo 3
Photo 4
Revisions Date
UP
Housekeeping
Toilet
6.09
22.07
10.03
Office
2.12
2.12
10.04
10.08
22.10
26.04
26.02
A102
A102
2.07
9.13
2.19
2.18
2.18
A102
S1.0
S1.0
T1.0
2.152.15
4.04
4.04
3.04
2.27
5.01
4.03
4.024.02
1.03
6.10
6.11
9'-0 5/8"
/8
/8
3' - 0 3/4" 3' - 0" 4 7/8" 2' - 7"
Housekeeping
Toilet
Office
A102
A102
A102
10 1/2" 7'-2" 10 1/2"
V A
R
IE
S
4"
1"
VARIES
1"
4"
S C
H E
D U
L E
S E
E
SCHEDULE
SEE
4"
SCHEDULE
SEE 4"
J1
6.01
S C
H E
D U
L E
S E
E
A102
1 1.03
First Floor 100' - 0"
/2
/2
/2
/2
1'-1 1/2" 1'-1 1/2" 1'-1 1/2" 1'-1 1/2" 7"
B.O. Footing
93'-4"
2.152.15
2.26
3.01
3.03
3.01
2.27
3.04
4.04
4.03
0' - 0 1/4" / 1' - 0"
5.01
3.02
4.05
First Floor 100' - 0"
10 1/2"
7 3/4"
B.O. Footing
93'-4"
1 1/2"
3.03
3.013.01
4.03
4.024.02
2.152.15
5.01
8.12
9.09
9.21
9.80
7.82
9.21
/4
/8
/4
3 3/4"
/4
/4
6.01
/8
11 1/2" 11 1/2" 11 1/2"
/4
/8
/8
A .F
.F
6.09
6.11
2.23
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
VAMC Dayton Repair Protestant Chapel
03-09-2018
NEW FLOOR PLANS, DETAILS
A102
LPTH
17003.00
552-19-202
Dayton, OH
GENERAL NOTES
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. First floor level 100'-0" equals 728'-0".
E. All partitions shall be type 'S1.0' unless noted otherwise.
PLAN NOTES
N Scale:
PROJECT
1/2" = 1'-0"
First Floor Note Plan 1N
Scale:
PROJECT
1/2" = 1'-0"
First Floor Dimension Plan
1.03 Contractor's building access, first floor.
2.07 Existing wood stair to remain. Support as needed during slab demolition and installation of new slab.
2.12 Protect and maintain existing floor drains and sanitary lines to remain and be incorporated into new work. Field verify exact locations.
2.15 Existing stone treads to remain.
2.18 Existing wall see Structural drawings for repairs.
2.19 Existing window to remain. Protect window and sill during construction.
2.23 Existing door frame to remain. Protect frame during construction.
2.26 Existing stone foundation wall to remain.
2.27 Existing concrete sidewalk to remain.
3.01 New concrete foundation wall. See Structual drawings.
3.02 24" of backfill above footing.
3.03 New concrete footing. See Structual drawings.
3.04 New 4" thick concrete sidewalk to align with existing.
4.02 Reinstall salvaged stone treads.
4.03 Reinstall salvaged stone cheek walls.
4.04 Patch stone to match adjacent stone.
4.05 Core 2" diameter x 6" deep hole in existing stone cheek wall for mounting of new hardware.
5.01 New pre-engineered, OBC Compliant, ornamental handrail.
6.01 New wood casing.
6.09 Install new wood stair. Paint and apply safety abrasive strips to treads.
6.10 2" wide solid wood hand rail, stained ST-1. AWI profile # HRL-5017.
Mount to wall with brackets.
6.11 2" wide solid wood hand rail, stained ST-1, with 1" dia. round wood baluster, painted P-3. AWI profile # HRL-5017.
7.82 Continuous acoustic sealant @ non-rated walls, each side.
8.12 Wood door frame.
9.09 Double metal framing at jambs, typ.
9.13 Provide 5/8" gypsum wallboard over 3/4" plywood at underside of existing stair.
9.21 5/8" Type X gypsum board.
9.80 Acoustic insulation
10.03 Reinstall existing soap dispenser.
10.04 Reinstall existing paper towel dispenser to side of wall casework.
Provide blocking as needed.
10.08 Reinstall existing toilet paper dispenser.
22.07 Reinstall existing toilet at the same location. Extend piping from fixture and connect to existing DCW, and sanitary waste and vent piping, as required to accommodate toilet as indicated.
22.10 Install new integral solid surface sink. Extend new piping from fixture and connect to existing DCW, DHW, and sanitary waste and vent piping, as required to accommodate new sink as indicated.
26.02 Clean, re-lamp, and reinstall existing wall mounted light fixture to accommodate restroom replacement.
26.04 Reinstall bell tower light switch and reconnect to switchleg.
DOOR SCHEDULE
DOOR
BETWEEN DOOR DESCRIPTION FRAME DESCRIPTION
FIRE
RATING
HDWE
SET REMARKSRM RM TYPE MAT'L
SIZE
TYPE MAT'L HEAD JAMB# W H T
112 112 111 F WD 1 2' - 6" 7' - 0" 1 3/4" 1 WD J1 J1 01
N.T.S.Scale:
F Door Type N.T.S.Scale:
A Frame Type
GENERAL DOOR NOTES
A. All wood blocking shall be fire retardant.
B. See Finish Plans for typical sill conditions at unlike floor finishes.
C. Seal joints between finish material and bottom of door frames.
D. Paint window frames to match door frame.
Scale: 1/16" = 1'-0"
New Work Key Plan Scale: 3/4" = 1'-0"5 Exterior Stair Section
Scale: 3/4" = 1'-0"4 Exterior Stair Section
N.T.S.Scale:
J1 Head/Jamb Detail
Scale: 3/4" = 1'-0"3 Interior Stair Section
REFLECTED CEILING PLAN LEGEND
Gypsum board / soffit Chain-hung light fixture
Ceiling mounted exhaust fan
15' - 6"
9' - 0"
16' - 0"
23.04
26.03
P-1
P-1
PT-1
Housekeeping
Toilet
PT-1
Office
ST-1
ST-1
ST-1
P-1
2.20
P-36.12
9.16
2'-3" 2"2" 2'-0"
10.03
ST-1
SS-1
W1 W1
P-1
4 3/4" 2' - 9" 2' - 6" 3' - 0" 5 3/8"
10.03
B1B2B3
ST-1
9.17
ST-1
6.12P-3
ST-1
6.11
9.13
P-1
P-1 T1.0
9.19
P-3 6.12
9.20
P-3P-3
6.11
6.10
P-1
P-1
P-36.12
9.24
9.19
2.25
ST-1
P-3
6.10
22.07
9.13
P-1
P-1
26.02
PT-4
PT-3
PT-2
8"
PTB-1
10.08
3"
1/2"
VARIES
1/2"
3"
/2
/2
/4
/4
3/4"
VARIES
1/2" 1/2"
VARIES
B1, B2
W1
B3
/2
/2
/2
/2
8" VARIES
1/2"
8"
1/2"
VARIES
12.09
12.08
2"3/4" 1 1/4"
1 1/2"
12.20
12.19
12.07
12.21
12.04
12.08
12.19
12.20
12.07
12.21
12.04
12.08
12.07
12.21
12.06
2'-1"
12.31
12.22
12.20
12.19
Drawer
B1
12.31
12.19
Sink
B2B3
12.20
12.19
W1
12.22
12.31
12.1612.16
12.17
12.15
12.2112.21
2'-1"
12.20
22.06
12.05
3"
/2
1"
2'-1"
/2
1"
3"
/2
1"
3"
12.21
12.08 12.08
12.09
12.08
12.08
12.04
12.04 12.04
12.07
12.07 12.07
12.07
12.06
12.07
9.13
PTB-1
P-1
PT-2
PT-4
P-1
JOHN
A.
POE
IO
HO
FOET
A T
S
R E G
IS
E T
R
ED RA
C H
TI
E C T
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number o n e-ei g h th in ch o n e fo o t o n e-q u a rt er in ch o n e fo o t th re e-e ig h th s in c h o n e fo o t o n e-h a lf in c h o n e fo o t th re e-q u a rt er s in ch o n e fo o t o n e in c h o n e fo o t o n e a n d o n e-h a lf in ch e s o n e fo o t th re e in ch es o n e fo o t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
Dwg. of
VAMC Dayton Repair Protestant Chapel
03-09-2018
REFLECTED CEILING PLAN,
FINISH PLAN, ELEVATIONS
A103
LPTH
17003.00
552-19-202
Dayton, OH
GENERAL NOTES
A. All wood blocking shall be fire retardant.
B. All ceilings to be painted P-2 unless noted otherwise.
PLAN NOTES
N Scale:
PROJECT
1/2" = 1'-0"
First Floor Reflected Ceiling Plan
2.20 Existing door to remain. Protect door and frame during
construction.
2.25 Existing exhaust duct to remain. Connect to relocated exhaust fan.
See new work plans.
6.10 2" wide solid wood hand rail, stained ST-1. AWI profile # HRL-5017. Mount to wall with brackets.
6.11 2" wide solid wood hand rail, stained ST-1, with 1" dia. round wood baluster, painted P-3. AWI profile # HRL-5017.
6.12 8" maple wood base. AWI profile # BAS-1019.
9.13 Provide 5/8" gypsum wallboard over 3/4" plywood at underside of existing stair.
9.16 Paint existing door and frame P-3. See Finish Legend.
9.17 Paint existing window frame and sill P-3. See Finish Legend.
9.19 Paint existing wood stair P-3. See FInish Legend.
9.20 Paint existing door frame P-3. See Finish Legend.
9.24 Paint new door and frame P-3. See Finish Legend.
10.03 Reinstall existing soap dispenser.
10.08 Reinstall existing toilet paper dispenser.
12.04 4" flat wood base. Stain to ST-1. See Finish Legend.
12.05 1/8" false reveal to mimic drawer front.
12.06 Solid maple crown molding. AWI profile # CRN-4015. Stain to ST-1. See Finish Legend.
12.07 3/4" solid maple wood door frame. Stain to ST-1. See Finish Legend.
12.08 1 1/2" knob pull.
12.09 4 1/2" cup pull.
12.15 Metal double U sliding door track.
12.16 Double sliding doors. 3/4" solid maple wood. Stain to ST-1. See Finish Legend.
12.17 Fixed shelf. 3/4" solid maple wood. Stain to ST-1. See Finish Legend.
12.19 Applied solid surface backsplash. Caulk along wall to hide any imperfections in existing wall surface.
12.20 Solid surface over 3/4" plywood, with 1/4" eased edge.
12.21 1/2" solid maple wood beadboard door insert. Stain to ST-1. See Finish Legend.
12.22 Adjustable shelf. 3/4" solid maple wood. Stain to ST-1. See Finish Legend.
12.31 Concealed hinge.
22.06 Undermount solid surface sink bowl.
22.07 Reinstall existing toilet at the same location. Extend piping from fixture and connect to existing DCW, and sanitary waste and vent piping, as required to accommodate toilet as indicated.
23.04 Reinstall existing exhaust fan and associated ductwork and supports to its approximate location.
26.02 Clean, re-lamp, and reinstall existing wall mounted light fixture to accommodate restroom replacement.
26.03 Clean, re-lamp, and reinstall chain mounted light fixture to accommodate restroom replacement.
N Scale:
PROJECT
1/2" = 1'-0"
First Floor Finish Plan
FINISH LEGEND
CODE FINISH TYPE MANUFACTURER PRODUCT / COLOR COMMENTS
CASEWORK FINISHES
SS-1 SOLID SURFACE FORMICA COPPER QUARTZ 772
ST-1 WOOD STAIN - MATCH STAIN TO "WILSONART MAMBO 7948K-07"
CEILING FINISHES
P-2 PAINT SHERWIN WILLIAMS SW7006 EXTRA WHITE GLOSS LEVEL 1
FLOOR FINISHES
PT-1 PORCELAIN TILE DALTILE "SALERNO" SL82 CREMONA CAFFE, 12" x 12"
WALL FINISHES
P-1 PAINT SHERWIN WILLIAMS SW6106 KILIM BEIGE GLOSS LEVEL 3
P-3 PAINT SHERWIN WILLIAMS MATCH EXISTING DOOR PAINT GLOSS LEVEL 5
PT-2 PORCELAIN TILE DALTILE "SALERNO" SL82 CREMONA CAFFE, 12" x 12"
PT-3 PORCELAIN TILE DALTILE "SALERNO" SL87 UNIVERSAL ACCENT, 3" x 12"
PT-4 PORCELAIN TILE DALTILE "SALERNO" SL82 CREMONA CAFFE, 3" x 10" BULLNOSE
PTB-1 PORCELAIN TILE BASE DALTILE "SALERNO" SL82 CREMONA CAFFE, 3" x 12" COVE
ROOM FINISH SCHEDULE
ROOM # ROOM NAME FLOOR BASE
WALLS CASEWORK
CEILINGNorth South East West Cabinet Countertop
010 Basement - - - - - - - - -
011 Electrical - - - - - - - - -
012 Storage - - - - - - - - -
111 Housekeeping PT-1 P-3 P-1 P-1 P-1 P-1 WD-1 SS-1 P-2
112 Toilet PT-1 PTB-1 P-1/PT-2,3,4 P-1/PT-2,3,4 P-1/PT-2,3,4 P-1/PT-2,3,4 - - P-2
113 Office - - - - - - - - -
S01 Stair - - - - - - - - -
Scale: 1/4" = 1'-0"5 Housekeeping
Scale: 1/4" = 1'-0"4 Housekeeping
Scale: 1/4" = 1'-0"3 Housekeeping
Scale: 1/4" = 1'-0"6 Housekeeping
Scale: 1/4" = 1'-0"7 Toilet
Scale: 1" = 1'-0"10 Casework Door Details
Scale: 1" = 1'-0"9 Casework Sections
Scale: 1/4" = 1'-0"8 Toilet
GENERAL STRUCTURAL NOTES:
A. CODES AND SPECIFICATIONS
1. 2017 OHIO BUILDING CODE.
2. ASCE/SEI 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
STRUCTURES.
3. ACI 301-16, SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS
AS MODIFIED BY THE CONSTRUCTION DOCUMENTS.
4. ANSI/AISC 303-16, CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS
AND BRIDGES AS MODIFIED BY THE CONSTRUCTION DOCUMENTS.
5. ANSI/AWS D1.1, STRUCTURAL WELDING CODE - STEEL.
6. ADDITIONAL TECHNICAL SPECIFICATIONS IN THE PROJECT MANUAL.
B. FOUNDATIONS
1. FOUNDATION ELEVATIONS SHOWN ARE ESTIMATED AND ARE FOR BIDDING
ONLY. ACTUAL ELEVATIONS MAY VARY TO SUIT SUBSURFACE SOIL
CONDITIONS.
2. SPREAD FOOTINGS ARE DESIGNED FOR A MAXIMUM ALLOWABLE BEARING
PRESSURE OF 1500 PSF ON FILL. SOILS UNSUITABLE FOR SUPPORTING
FOUNDATIONS SHALL BE REMOVED AS DIRECTED BY THE GEOTECHNICAL
ENGINEER, AND BACKFILLED TO DESIGN BEARING ELEVATION WITH LEAN
CONCRETE.
3. ALL BEARING SURFACES SHALL BE UNDISTURBED, LEVEL (WITHIN 1 IN 12),
AND APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACING
CONCRETE.
4. ALL FOOTINGS AND GRADE BEAMS ARE TO BE POURED NEAT AGAINST
EARTH BANKS (WITHOUT SIDE FORMS) UNLESS APPROVED OTHERWISE BY
BOTH THE GEOTECHNICAL AND STRUCTURAL ENGINEERS. WHERE EARTH
CUTS WILL NOT STAND, SIDES SHALL BE FORMED AND BACKFILLED WITH
COMPACTED MATERIAL, SUBJECT TO ENGINEERS' APPROVAL.
C. CONCRETE
1. CONCRETE STRENGTHS:
a. FOOTINGS: 3000 PSI.
b. EXTERIOR CONCRETE EXPOSED TO WEATHER: 4500 PSI AE.
c. TYPICAL CONCRETE UNLESS NOTED OTHERWISE: 4000 PSI.
d. BACKFILL (LEAN) CONCRETE: 1500 PSI.
2. PROVIDE 3/4" BEVELS AT CORNERS OF EXPOSED WALLS.
3. CONCRETE CONSTRUCTION TOLERANCES ARE AS SHOWN IN THE PROJECT
SPECIFICATIONS.
D. REINFORCING STEEL
1. ALL REINFORCING BARS: 60 KSI YIELD.
2. REINFORCE ALL INTERIOR SLABS ON GROUND: 6x6-W4.0xW4.0 (58#) WWF.
3. FURNISH WWF IN FLAT SHEETS. LAP SHEETS 2 WIRES (1 FULL WIRE
SPACE) PLUS 2” AT ALL EDGES. STAGGER ADJACENT SHEETS TO
AVOID 4 CORNER LAPS.
4. PROVIDE TENSION SPLICES UNLESS NOTED OTHERWISE.
5. PROVIDE MINIMUM CLEARANCES BETWEEN REINFORCING STEEL AND
CONCRETE SURFACES AS SHOWN. IF NOT SHOWN, PROVIDE CLEAR COVER
PER ACI. PLACE ALL REINFORCING AS SHOWN AND DETAILED, AND WITHIN
ACI TOLERANCE.
6. EPOXY COAT REINFORCING WHERE INDICATED.
E. POST-INSTALLED ANCHORS AND ADHESIVE ANCHORING TO CONCRETE
1. ANCHORS AND ADHESIVE ANCHORING SYSTEMS MUST BE TESTED AND
APPROVED USING ICC EVALUATION SERVICE ACCEPTANCE
CRITERIA, INCLUDING ICC-ES AC193: “MECHANICAL ANCHORS IN CONCRETE
ELEMENTS” OR ICC-ES AC308: “POST-INSTALLED ADHESIVE ANCHORS IN
CONCRETE ELEMENTS”. CONCRETE SHALL BE CONSIDERED
CRACKED. SUBMIT MANUFACTURER'S DATA AND EVALUATION REPORT
(ESR) FOR PROPOSED ANCHORS, ADHESIVES, AND ANCHORING SYSTEMS.
INDICATE SPECIFIC PROJECT LOCATIONS AND CONDITIONS WHERE
PROPOSED FOR USE.
2. MECHANICAL ANCHORS TO CONCRETE SHALL BE AS SHOWN IN THE
STRUCTURAL DETAILS. UNLESS NOTED OTHERWISE, USE ONE OF THE
FOLLOWING:
a. HILTI KWIK BOLT TZ EXPANSION ANCHORS.
b. HILTI HDA UNDERCUT ANCHORS.
c. POWERS POWER-STUD+ SD2 WEDGE EXPANSION ANCHORS.
d. SIMPSON STRONG-BOLT 2 WEDGE ANCHORS.
3. ADHESIVE ANCHORING OF RODS AND REBAR TO CONCRETE SHALL BE AS
SHOWN IN THE STRUCTURAL DETAILS. UNLESS NOTED OTHERWISE,
PROVIDE STANDARD HAS-E RODS AND USE ONE OF THE FOLLOWING:
a. HILTI HIT-HY 200 HYBRID ADHESIVE ANCHORING SYSTEM.
b. HILTI HIT-RE 500-SD EPOXY ADHESIVE ANCHORING SYSTEM.
c. POWERS PE1000+ EPOXY ADHESIVE ANCHORING SYSTEM.
d. SIMPSON SET-XP EPOXY ANCHORING ADHESIVE.
e. OTHER PRODUCTS MAY BE REQUIRED FOR TEMPERATURE AND
CONDITIONS.
4. ADHESIVE ANCHORING SHALL NOT BE USED IN OVERHEAD OR UPWARD
CONDITIONS. USE HYBRID ADHESIVE FOR HORIZONTAL CONDITIONS.
5. POST-INSTALLED ANCHORS SHALL ONLY BE USED AS SHOWN AND
APPROVED; THEY SHALL NOT BE USED WHERE CAST-IN-PLACE ANCHORS
ARE REQUIRED.
6. GALVANIZED OR STAINLESS STEEL ANCHORS, RODS AND HARDWARE,
UNLESS NOTED OTHERWISE.
7. EMBEDMENT DEPTH, EDGE DISTANCES, AND SPACING ARE CRUCIAL.
LOCATE AS SHOWN ON THE DRAWINGS. WHERE NOT SHOWN, EMBED
REBAR 24 DIAMETERS AND EMBED ANCHORS AT LEAST 8 DIAMETERS, WITH
EDGE DISTANCES AT LEAST 8 DIAMETERS, AND SPACING AT LEAST 12
DIAMETERS. USE MANUFACTURER'S DATA TO CALCULATE REDUCED
CAPACITY FOR ACTUAL CONDITIONS AND CONFIRM AN ULTIMATE SAFETY
FACTOR OF AT LEAST 4.0.
8. HOLES SHALL BE THE PROPER SIZE AND THOROUGHLY CLEANED WITH ALL
DUST REMOVED. DRILL HOLES USING A HOLLOW BIT AND FUNCTIONING
VACUUM SYSTEM, THEN BRUSH AND BLOWOUT WITH COMPRESSED AIR.
9. INSTALL CLEAN, DUST FREE HOLES USING METHOD AND PROCEDURE THAT
MEETS MANUFACTURER'S RECOMMENDATIONS INCLUDING TEMPERATURE
RANGE, HUMIDITY, INSTALLATION TIME AND CURE TIME. FOLLOW THE
MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS. INSTRUCTIONS
MUST BE INCLUDED IN THE ANCHOR PACKAGING.
10. PROVIDE STANDARD SIZE HOLES IN THE FASTENED STEEL
ELEMENT (1/16” LARGER THAN THE BOLT DIAMETER). MARK AND DRILL ALL
HOLES IN THE CONCRETE BEFORE SETTING STEEL. SOME ANCHORS MAY
BE SET AFTER STEEL IS IN PLACE TO ALLOW SOME ALIGNMENT. DO NOT
OVERSIZE HOLES.
11. THE CONTRACTOR SHALL ARRANGE FOR A REPRESENTATIVE OF THE
MANUFACTURER TO PROVIDE ONSITE INSTALLATION TRAINING FOR THEIR
PRODUCTS. ADHESIVE ANCHOR INSTALLERS SHALL ALSO BE CERTIFIED BY
A RECOGNIZED PROGRAM, SUCH AS BY ACI AND CRSI. SUBMIT
DOCUMENTATION OF TRAINING AND CERTIFICATION OF PERSONNEL PRIOR
TO PERFORMING SUCH WORK. PROVIDE COPY TO THE OWNER'S
INSPECTION AGENCY.
12. THE CONTRACTOR SHALL PROOF TEST ANCHORAGE AS PART OF HIS
QUALITY CONTROL AS WORK PROGRESSES. PROOF TEST 5% OF ALL
ANCHORS AND REBAR IN EACH CONDITION, DISTRIBUTED THROUGHOUT THE
PROJECT, AND AT LEAST (1) ANCHOR IN EACH STEEL FRAMING
CONNECTION. AMOUNT OF TESTING SHALL BE INCREASED IF FAILURES
OCCUR. OWNER'S INSPECTION AGENCY SHALL OBSERVE INSTALLATION
FOR CONFORMANCE WITH MANUFACTURER'S RECOMMENDATIONS AND
SHALL WITNESS CONTRACTOR'S PROOF TESTING.
F. STRUCTURAL STEEL
1. ALL WORK SHALL CONFORM TO AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC) STANDARDS AND THE PROJECT SPECIFICATIONS.
2. FABRICATOR SHALL MEET AISC 'STANDARD FOR STEEL BUILDING
STRUCTURES' PER THE PROJECT SPECIFICATIONS.
3. MATERIAL:
a. ROLLED SHAPES & PLATES: ASTM A36 (Fy 36 KSI).
b. STRUCTURAL TUBING, HSS SHAPES: ASTM A500, GRADE B (Fy 46 KSI).
c. BOLTS: ASTM A325, 3/4" MIN. DIA., U.N.O. SNUG-TIGHTENED.
d. ANCHOR RODS: ASTM F1554 (Fy 36 KSI), U.N.O.
4. ALL WELDING MATERIALS, WELDING PROCEDURES AND OPERATORS
PERFORMING WELDING TO BE QUALIFIED PER AWS D1.1.
5. UNLESS NOTED OTHERWISE, ALL CHANNELS, ANGLES AND OTHER
ACCESSORIES TO BE HOT DIPPED GALVANIZED.
G. COORDINATION AND CONSTRUCTION
1. THE SPECIFICATIONS AND DRAWINGS COMPLEMENT EACH OTHER. BOTH
SHALL BE THOROUGHLY REVIEWED BEFORE PROCEEDING WITH ANY WORK.
THE CONTRACTOR SHALL COMPLETE ALL WORK REQUIRED AND
NECESSARY FOR THE PROJECT IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS, DRAWINGS, AND REFERENCED STANDARDS.
2. UNLESS OTHERWISE NOTED, DETAILS, SECTIONS AND NOTES ON THE
STRUCTURAL DRAWINGS ARE INTENDED TO APPLY TO SIMILAR SITUATIONS
ELSEWHERE.
3. SEE ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ADDITIONAL
DETAILS, DIMENSIONS, EMBEDDED ITEMS, SLEEVES, FLOOR PITCHES,
DEPRESSIONS AND FILLS. OPENING SIZES AND LOCATIONS FOR PIPES,
DUCTS, ETC., WHEN SHOWN, ARE FOR GENERAL INFORMATION ONLY AND
SHALL BE VERIFIED WITH MECHANICAL, ELECTRICAL, PLUMBING AND OTHER
DRAWINGS AS APPLICABLE.
4. SHOP DRAWINGS PREPARED BY SUPPLIERS AND SUB CONTRACTORS SHALL
BE REVIEWED BY THE TRADE CONTRACTOR AND GENERAL CONTRACTOR
OR CONSTRUCTION MANAGER PRIOR TO SUBMITTING TO
ARCHITECT/ENGINEER.
a. FIELD VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS AND CONDITIONS
WHICH AFFECT FABRICATION AND SHOW ON SHOP DRAWINGS.
b. VERIFY AND SHOW EXACT SIZE AND LOCATION OF ALL FLOOR, WALL AND
ROOF OPENINGS, SLAB EDGES, EMBEDDED ANCHORS AND OTHER ITEMS.
c. SHOW AND LOCATE ALL MECHANICAL SLEEVES, EMBEDS, DRAINS, ETC. ON
COORDINATION DRAWINGS. ITEMS NOT REVIEWED BY THE STRUCTURAL
ENGINEER ARE NOT PERMITTED IN OR THROUGH THE STRUCTURE.
d. SUBMIT COMPLETE SHOP DRAWINGS WITH MANUFACTURERS' DATA, ETC.
SHOW ALL CONNECTIONS AND DETAILS NECESSARY TO FULLY DESCRIBE
AND PROPERLY INSTALL THE WORK.
e. STRUCTURAL ENGINEER'S REVIEW SHALL BE FOR GENERAL
ARRANGEMENT AND CONFORMANCE WITH THE STRUCTURAL INTENT
ONLY.
5. THE SPECIFICATIONS AND STRUCTURAL DRAWINGS TYPICALLY REFER TO
THE FINISHED STRUCTURE. UNLESS NOTED OTHERWISE, THEY DO NOT
PRESCRIBE THE METHOD OF CONSTRUCTION.
6. BRACE ENTIRE STRUCTURE AS REQUIRED TO MAINTAIN STABILITY UNTIL
COMPLETE AND FUNCTIONING AS THE DESIGNED UNIT.
7. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES,
CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR
CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND
PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT
SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO WORKING HOURS.
8. THE ARCHITECT'S AND ENGINEER'S OBSERVATION AND REVIEW OF
CONTRACTORS' PERFORMANCE DOES NOT INCLUDE REVIEW OF ADEQUACY
OF CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE
CONSTRUCTION SITE.
9. MECHANICAL AND OTHER ITEMS EMBEDDED IN OR SUPPORTED FROM
STRUCTURE.
10. ALL TRADE CONTRACTORS ARE TO DESIGN THEIR SYSTEMS, INCLUDING
ATTACHMENTS TO THE BUILDING'S STRUCTURE WITHIN THE FOLLOWING
LIMITATIONS:
a. LOADS ARE TO BE DISTRIBUTED TO THE STRUCTURE IN A MANNER THAT
DOES NOT EXCEED THE LOAD ALLOWANCES NOTED UNDER DESIGN
LOADS. ANCHORS ARE TO HAVE AN ULTIMATE SAFETY FACTOR OF AT
LEAST 4.0.
H. QUALITY CONTROL AND ASSURANCE
1. THE CONTRACTOR SHALL PERFORM QUALITY CONTROL, TESTING AND
INSPECTION OF ALL WORK AS REQUIRED BY THE CONTRACT DOCUMENTS,
INCLUDING REFERENCED CODES, SPECIFICATIONS AND STANDARDS.
2. THE CONTRACTOR WILL EMPLOY A TESTING AND INSPECTION AGENCY TO
PERFORM SERVICES INDICATED IN THE PROJECT SPECIFICATIONS.
3. THE STRUCTURAL ENGINEER MAY GENERALLY OBSERVE THE PROGRESS OF
THE WORK, BUT HIS OBSERVATION SHALL NOT BE CONSTRUED AS
INSPECTION.
I. UTILITIES
1. PRIOR TO EXCAVATION AND EARTHWORK, VERIFY LOCATIONS OF
UNDERGROUND UTILITIES WITH THE UTILITY COMPANIES, CONTRACTING
OFFICER'S REPRESENTATIVE (COR), AND/OR OWNER. EXCAVATE OR
SURVEY TO ESTABLISH EXACT UTILITY LOCATIONS. UTILITY LOCATIONS
SHOWN ON THE CONTRACT DRAWINGS ARE ONLY APPROXIMATE AND
CANNOT BE USED TO ASSURE THE CONTRACTOR OF ADEQUATE
CLEARANCE. COORDINATE ALL WORK WITH THE UTILITIES TO ASSURE
THEIR UNINTERRUPTED FUNCTION.
2. ACTIVE UTILITIES SHOWN ON THE CONTRACT DRAWINGS SHALL BE
ADEQUATELY PROTECTED FROM DAMAGE. WHERE ACTIVE UTILITIES ARE
ENCOUNTERED BUT NOT SHOWN ON THE DRAWINGS, CONTRACTOR SHALL
IMMEDIATELY NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE (COR),
ARCHITECT/ENGINEER, AND UTILITY OWNER BEFORE PROCEEDING. WORK
SHALL BE PROTECTED, SUPPORTED, OR RELOCATED AS DIRECTED, AND
THE CONTRACT SUM ADJUSTED ACCORDINGLY
3. INACTIVE AND ABANDONED UTILITIES ENCOUNTERED BUT NOT SHOWN ON
THE DRAWINGS SHALL BE REPORTED IMMEDIATELY TO THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR) AND ARCHITECT/ENGINEER. SUCH
UTILITIES SHALL THEN BE REMOVED, PLUGGED, OR CAPPED AS DIRECTED.
IN THE ABSENCE OF SPECIFIC REQUIREMENTS, PLUG OR CAP SUCH
UTILITIES AS REQUIRED BY THE UTILITY OWNER.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg.
on e-eig hth in ch on e f oo t on e-qu ar ter in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t thr ee -q ua rte rs inc h = on e foo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc he s = on e f oo t thr ee in ch es on e f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
Repair Protestant Chapel
(Bldg. 118)
03/09/2017
PABFJE
Revisions Date
Project Phase
VA Project No.
14416.07
552-19-202
Dayton, Ohio
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of
Construction and Facilities
Management
THP Project No.
THP Limited, Inc.
100 East Eighth Street Cincinnati, Ohio 45202 Phone: 513.241.3222 www.thpltd.com
DESIGN DEVELOPMENT SUBMISSION 10/05/2017
95% CD SUBMITTAL 12/01/2017
100% CD SUBMITTAL
100% CD SUBMITTAL 03/09/2018
GENERAL
NOTES
S100
Project Phase
115 of
4'- 0"
4'-0"
PARTIAL PLAN
S101 1/2" = 1'-0"
GROUND LEVEL
EQ.EQ.
EQ
EQ
3" C
LR
S
N
W E
1'- 3"
3" C
LR
T/SLAB = 0'-0"
T/SLAB = 0'-0"
42# MESH.
6" 1'-
0"
FACE OF MASONRY WALL.
PARTIAL PLAN
S101 1/2" = 1'-0"
FIRST LEVEL
N
W E
7"±
8"
B S101
T/STEEL = 14'-9" ABOVE GROUND FLOOR
STAIR OPENING BELOW.
L8x8x1/2 GALVANIZED (TYP.)
8x11.5 GALVANIZED (TYP.)
A S101
MODIFY WIREMOLD CONDUIT.
PARTIAL PLAN
S101 1/2" = 1'-0"
SECOND LEVEL
S
N
W E
7"±
7"
C S101
T/STEEL = 30'-4" ABOVE GROUND FLOOR
STAIR OPENING ABOVE.
L8x8x1/2 GALVANIZED (TYP.)
C8x11.5 GALVANIZED
(TYP.)
7"
PARTIAL PLAN
S101 1/2" = 1'-0"
THIRD LEVEL
S
N
W E
D S101
T/STEEL = 40'-3" ABOVE GROUND FLOOR
L8x8x1/2 GALVANIZED (TYP.)
C8x11.5 GALVANIZED (TYP.)
A S101
SIM.
STAIR OPENING ABOVE.
6" DIA. FLUE.
NOTCH TOP AND BOTTOM
FLANGE OF CHANNNEL TO
PROVIDE 1/2" CLEARANCE
FOR LADDER STRINGER.
LADDER STRINGER.
C8x11.5 GALVANIZED.
STONE MASONRY.
3/16
TOP AND BOTTOM
PROVIDE 1/4" PLATE
GROUT STOPS (TYP.).
PLAN DETAIL A
STONE MASONRY.
STONE MASONRY.
2" VENT.
FIELD VERIFY TO PROVIDE
1/2" CLEARANCE.
1/4 10"
TOP AND BOTTOM FLANGE
8x11.5 GALVANIZED.
PLAN DETAIL B
7"
8"
7"
7"
C8x11.5 GALVANIZED.
C8x11.5 GALVANIZED.
NON SHRINK GROUT FORM
BOTTOM OF C8 BAND.
NON SHRINK GROUT FORM
BOTTOM OF C8 BAND.
NON SHRINK GROUT FORM
BOTTOM OF C8 BAND.
PLAN DETAILS
A & B
S101 1 1/2" = 1'-0"
PLAN DETAIL
C
S101 1 1/2" = 1'-0"
PLAN DETAIL
D
S101 1 1/2" = 1'-0"
GROUT.
PARTIAL PLAN
S101 1/2" = 1'-0"
FOURTH LEVEL
S
N
W E
T/STEEL = 55'-6" ABOVE GROUND FLOOR
L8x8x1/2
GALVANIZED (TYP.)
8x11.5 GALVANIZED (TYP.)
MODIFY WIREMOLD CONDUIT.
STAIR OPENING ABOVE.
PLAN DETAIL
E
S101 3/4" = 1'-0"
SECTION
S101 3/4" = 1'-0"
1'-6" 2'-0"
1'- 6"
2'- 0"
9'-1"±
2'-0"
9'- 1"
2'- 0"
C8x11.5 GALVANIZED.
6 S1
5"±
9'-1"±
NON-SHRINK GROUT, FORM AT BOTTOM FLANGE.
C8x11.5 GALVANIZED.
L8x8x1/2 GALVANIZED WITH (3)
3/4" DIA TENSION CONTROL
BOLTS.
EXISTING STONE MASONRY.
NON-SHRINK GROUT FORM
BOTTOM OF C8 BAND.
CONCRETE RIB BEYOND.
DN
UP
DN
STAIR OPENING BELOW.
STAIR OPENING ABOVE.
UP
UP
CLASS B
TENSION LAP.
#7 (TYP.)
DRILL AND EPOXY GROUT
HIT RE 150 EPOXY, 18"
MINIMUM EMBEDMENT
(TYP.).
(MATCH EXISTING FLOOR ELEVATION)
18" MIN.
EMBEDMENT
3"
CLR.#7 (TYP.)
NORTH
SITE PLAN
A
S101 1" = 20'
EXISTING LIGHTPOLE. (TYPICAL).
EXISTING HANDICAP RAMP
WITH GUARD RAIL.
EXISTING HVAC UNITS.
PROTECT DURNING
CONSTRUCTION.
EXISTING FIRE
HYDRANT.
EXISTING DRIVE
EXISTING DRIVE
EXISTING BELL TOWER
WITH STEEPLE.
EXISTING CHURCH
EXISTING STEPS.
UP
UP
EXISTING STEPS.
REFER TO DETAIL
8/S402.
EXISTING SIDEWALK.
UP
EXISTING STEPS.
UP
LANDSCAPING
EXISTING
LIGHTPOLE.
(TYPICAL).
1" DIA. ADHESIVE
ANCHOR WITH 12"
EMBEDMENT.
EXISTING
ROUTE.
NEW ROUTE.
CLASS B TENSION LAP.
S
DN
PROVIDE NEW CONCRETE SLAB WITH RIBS.
REFER TO SPECIFICATION SECTION 03 30 53.
E S101
TYP.
GROUT BETWEEN STONE MASONRY
AND NEW CHANNEL FRAME (TYP.).
FORM BOTTOM OF C8 FRAME.
1" DIA. ADHESIVE
ANCHOR WITH 12"
EMBEDMENT.
1" DIA. ADHESIVE
ANCHOR WITH 12"
EMBEDMENT.
GROUT BETWEEN STONE MASONRY
AND NEW CHANNEL FRAME (TYP.).
FORM BOTTOM OF C8 FRAME.
1" DIA. ADHESIVE
ANCHOR WITH 12"
EMBEDMENT.
GROUT BETWEEN STONE MASONRY
AND NEW CHANNEL FRAME (TYP.).
FORM BOTTOM OF C8 FRAME.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg.
on e-eig hth in ch on e f oo t on e-qu ar ter in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t thr ee -q ua rte rs inc h = on e foo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc he s = on e f oo t thr ee in ch es on e f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
Repair Protestant Chapel
(Bldg. 118)
03/09/2017
PABFJE
Revisions Date
Project Phase
VA Project No.
14416.07
552-19-202
Dayton, Ohio
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of
Construction and Facilities
Management
THP Project No.
THP Limited, Inc.
100 East Eighth Street Cincinnati, Ohio 45202 Phone: 513.241.3222 www.thpltd.com
DESIGN DEVELOPMENT SUBMISSION 10/05/2017
95% CD SUBMITTAL 12/01/2017
100% CD SUBMITTAL
100% CD SUBMITTAL 03/09/2018
FRAMING
PLANS
S101
116 of
EXTERIOR ELEVATION
S101 3/16" = 1'-0"
NORTH
EXTERIOR ELEVATION
S101 3/16" = 1'-0"
WEST
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
'-1
0"
GROUND FLOOR
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FORTH LEVEL
DRAWING NOTES:
1. EXISTING CLOCK, DO NOT DAMAGE. PROTECT DURING
PERFORMANCE OF WORK.
2. EXISTING WOOD FRAMED LOUVERS. DO NOT DAMAGE.
PROTECT DURING PERFORMANCE OF WORK.
3. EXISTING STEEPLE. DO NOT DAMAGE.
4. EXISTING WINDOW TO REMAIN. DO NOT DAMAGE.
PROTECT AND STABILIZE DURING PERFORMANCE OF
WORK.
5. EXISTING WOOD ENTRY DOOR. DO NOT DAMAGE.
PROTECT DURING PERFORMANCE OF WORK.
6. EXISTING CHURCH BUILDING. PERFORM REPAIRS AS
INDICATED.
7. EXISTING BELL TOWER. PERFORM WORK AS INDICATED.
8. EXISTING CRACK IN EXTERIOR WALL SURFACE TO BE
REPOINTED. REFER TO SPECIFICATION SECTION 04 01
00. QUANTITY INCLUDED IN DRAWING NOTE 13.
9. EXISTING AREA OF BULGE IN STONE WALL. REFER TO
DETAIL 2 AND PARTIAL ELEVATION 3 DRAWINGS S401
FOR REPAIRS.
10. LOCATION OF EXISTING STONE IN ARCH THAT HAS BEEN
DISPLACED. REFER TO DETAIL 1/S401 FOR REPAIRS.
11. LOCATION OF NEW CHANNEL FRAME. REFER TO
DRAWING S101 FOR ADDITIONAL INFORMATION.
12. EXISTING SLOPED STONE CAPS. RE-PARGE ALL
EXPOSED SURFACES OF STONE. REPOINT MORTAR
JOINTS BETWEEN CAP STONE AND ADJOINING STONE
MASONRY. REFER TO SPECIFICATION SECTION 09 24 00
AND 04 01 00.
13. INDICATES AREAS OF EXTERIOR STONE JOINTS TO BE
REPOINTED. REFER TO SPECIFICATION SECTION 04 01
00. INCLUDE THE FOLLOWING QUANTITIES IN BIO:
BELL TOWER: 1,500 LINEAR FEET
CHUCH: 500 LINEAR FEET
BIO QUANTITIES INDICATED INCLUDE QUANTITIES
SHOWN ON THE EXTERIOR ELEVATIONS.
14. INDICATES JOINT TO BE REPOINTED BETWEEN WALL
AND PILASTER. REFER TO SPECIFICATION 04 01 00.
15. INDICATES JOINT TO BE REPOINTED BETWEEN CAP
STONE AND STONE PILASTER.
16. EXISTING STONE REPAIR AT ABANDON COAL CHUTE.
REPLACE EXISTING STONE WITH STONE TO MATCH
EXISTING SURROUNDING STONE. AREA TO BE
REPLACED IS 10.67 SQUARE FEET. REPLACEMENT
STONES TO BE 16"H x 48"L x 12"D. REFER TO
SPECIFICATION SECTION 04 01 00.
17. REPOINT OPEN JOINT BETWEEN RAKE BOARD AND
STONE WITH MORTAR. REFER TO DETAIL 11/S402.
18. REMOVE AND REPLACE STEPS. REFER TO DRAWING
S402.
19. REMOVE AND REPLACE GROUND LEVEL CONCRETE
SLAB-ON-GRADE. REFER TO DRAWING S101.
20. EXISTING STONE REPAIR. REMOVE AND PROVIDE NEW
STONE REPAIR. REFER TO SPECIFCATION SECTION 04
01 00. AREA TO BE REPAIRED: 2'x2'x3" DEEP.
LEGEND:
PARGE SLOPED STONE CAPS (NOTE 12).
REPOINTING AREA (NOTE 13).
DRAWING NOTE.
(XX L.F.) QUANTITY OF REPAIR WITHIN SHADED AREA.
L.F. LINEAR FEET.
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(176 L.F.)
S401
PARTIAL ELEVATION
4 4 4
44444
(30 L.F.)
(25 L.F.)
S401
SIM.
(150 L.F.)
(190 L.F.)
(12 L.F.)
(8 L.F.)
(12 L.F.)
(112 L.F.)
(132 L.F.)
(88 L.F.)
(65 L.F.)
(10 L.F.)
(75 L.F.)
(115 L.F.)
(120 L.F.)
(184 L.F.)
(8 L.F.)
14 (21 L.F.)
DEDUCT ALTERNATIVE 1.
DEDUCT ALTERNATIVE 1.
(5 L.F.)
(4 L.F.)
(4 L.F.)
(20 L.F.)
(8 L.F.)
INDICATES DEDUCT
ALTERNATE 2 LOCATION.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg.
on e-eig hth in ch on e f oo t on e-qu ar ter in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t thr ee -q ua rte rs inc h = on e foo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc he s = on e f oo t thr ee in ch es on e f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
Repair Protestant Chapel
(Bldg. 118)
03/09/2017
PABFJE
Revisions Date
Project Phase
VA Project No.
14416.07
552-19-202
Dayton, Ohio
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of
Construction and Facilities
Management
THP Project No.
THP Limited, Inc.
100 East Eighth Street Cincinnati, Ohio 45202 Phone: 513.241.3222 www.thpltd.com
DESIGN DEVELOPMENT SUBMISSION 10/05/2017
95% CD SUBMITTAL 12/01/2017
100% CD SUBMITTAL
100% CD SUBMITTAL 03/09/2018
EXTERIOR
ELEVATIONS
S201
117 of
EXTERIOR ELEVATION
S101 3/16" = 1'-0"
SOUTH
13'-6"±
GROUND FLOOR
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FORTH LEVEL
(TYP.)
(16 L.F.)
4 4 4 4 4
(8 L.F.)
(7 L.F.)
(TYP.)
(8 L.F.)
(21 L.F.)
(6 L.F.)
(21 L.F.)
(21 L.F.)
(7 L.F.)
DEDUCT ALTERNATIVE 1.
EXTERIOR ELEVATION
S101 3/16" = 1'-0"
EAST
GROUND FLOOR
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FORTH LEVEL
DRAWING NOTES:
1. EXISTING CLOCK, DO NOT DAMAGE. PROTECT DURING
PERFORMANCE OF WORK.
2. EXISTING WOOD FRAMED LOUVERS. DO NOT DAMAGE.
PROTECT DURING PERFORMANCE OF WORK.
3. EXISTING STEEPLE. DO NOT DAMAGE.
4. EXISTING WINDOW TO REMAIN. DO NOT DAMAGE.
PROTECT AND STABILIZE DURING PERFORMANCE OF
WORK.
5. EXISTING WOOD ENTRY DOOR. DO NOT DAMAGE.
PROTECT DURING PERFORMANCE OF WORK.
6. EXISTING CHURCH BUILDING. PERFORM REPAIRS AS
INDICATED.
7. EXISTING BELL TOWER. PERFORM WORK AS INDICATED.
8. EXISTING CRACK IN EXTERIOR WALL SURFACE TO BE
REPOINTED. REFER TO SPECIFICATION SECTION 04 01
00. QUANTITY INCLUDED IN DRAWING NOTE 13.
9. EXISTING AREA OF BULGE IN STONE WALL. REFER TO
DETAIL 2 AND PARTIAL ELEVATION 3 DRAWINGS S401
FOR REPAIRS.
10. LOCATION OF EXISTING STONE IN ARCH THAT HAS BEEN
DISPLACED. REFER TO DETAIL 1/S401 FOR REPAIRS.
11. LOCATION OF NEW CHANNEL FRAME. REFER TO
DRAWING S101 FOR ADDITIONAL INFORMATION.
12. EXISTING SLOPED STONE CAPS. RE-PARGE ALL
EXPOSED SURFACES OF STONE. REPOINT MORTAR
JOINTS BETWEEN CAP STONE AND ADJOINING STONE
MASONRY. REFER TO SPECIFICATION SECTION 09 24 00
AND 04 01 00.
13. INDICATES AREAS OF EXTERIOR STONE JOINTS TO BE
REPOINTED. REFER TO SPECIFICATION SECTION 04 01
00. INCLUDE THE FOLLOWING QUANTITIES IN BIO:
BELL TOWER: 1,500 LINEAR FEET
CHUCH: 500 LINEAR FEET
BIO QUANTITIES INDICATED INCLUDE QUANTITIES
SHOWN ON THE EXTERIOR ELEVATIONS.
14. INDICATES JOINT TO BE REPOINTED BETWEEN WALL
AND PILASTER. REFER TO SPECIFICATION 04 01 00.
15. INDICATES JOINT TO BE REPOINTED BETWEEN CAP
STONE AND STONE PILASTER.
16. EXISTING STONE REPAIR AT ABANDON COAL CHUTE.
REPLACE EXISTING STONE WITH STONE TO MATCH
EXISTING SURROUNDING STONE. AREA TO BE
REPLACED IS 10.67 SQUARE FEET. REPLACEMENT
STONES TO BE 16"H x 48"L x 12"D. REFER TO
SPECIFICATION SECTION 04 01 00.
17. REPOINT OPEN JOINT BETWEEN RAKE BOARD AND
STONE WITH MORTAR. REFER TO DETAIL 11/S402.
18. REMOVE AND REPLACE STEPS. REFER TO DRAWING
S402.
19. REMOVE AND REPLACE GROUND LEVEL CONCRETE
SLAB-ON-GRADE. REFER TO DRAWING S101.
20. EXISTING STONE REPAIR. REMOVE AND PROVIDE NEW
STONE REPAIR. REFER TO SPECIFCATION SECTION 04
01 00. AREA TO BE REPAIRED: 2'x2'x3" DEEP.
PARGE SLOPED STONE CAPS (NOTE 12).
REPOINTING AREA (NOTE 13).
QUANTITY OF REPAIR WITHIN SHADED AREA.
(TYP.)
DEDUCT ALTERNATIVE 1.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg.
on e-eig hth in ch on e f oo t on e-qu ar ter in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t thr ee -q ua rte rs inc h = on e foo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc he s = on e f oo t thr ee in ch es on e f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
Repair Protestant Chapel
(Bldg. 118)
03/09/2017
PABFJE
Revisions Date
Project Phase
VA Project No.
14416.07
552-19-202
Dayton, Ohio
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of
Construction and Facilities
Management
THP Project No.
THP Limited, Inc.
100 East Eighth Street Cincinnati, Ohio 45202 Phone: 513.241.3222 www.thpltd.com
DESIGN DEVELOPMENT SUBMISSION 10/05/2017
95% CD SUBMITTAL 12/01/2017
100% CD SUBMITTAL
100% CD SUBMITTAL 03/09/2018
EXTERIOR
ELEVATIONS
S202
118 of
INTERIOR ELEVATION
S301 3/16" = 1'-0"
NORTH
INTERIOR ELEVATION
S301 3/16" = 1'-0"
WEST
INTERIOR ELEVATION
S301 3/16" = 1'-0"
SOUTH
INTERIOR ELEVATION
S301 3/16" = 1'-0"
EAST
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FORTH LEVEL
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FORTH LEVEL
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FORTH LEVEL
FIRST LEVEL
SECOND LEVEL
THIRD LEVEL
FORTH LEVEL
GROUND FLOOR
0'-0"
T/STEEL = 55'-6"
T/STEEL = 40'-3"
T/STEEL = 30'-4"
T/STEEL = 14'-9"
T/SLAB = 0'-0"
21 TYP.
(25 L.F.)
21 TYP.
(30 L.F.)
21 TYP.
(30 L.F.)
353535
343434
DRAWING NOTES:
21. EXISTING CRACK IN INTERIOR STONE WALL. REMOVE
DEBRIS FROM CRACK, CLEAN CRACK AND REPOINT
CRACK A MINIMUM OF 2" DEEP. REFER TO
SPECIFICATION SECTION 040100.
22. EXISTING PARGED STONE WALL. REMOVE EXISTING
PARGING FROM WALLS. PREPARE, CLEAN AND
REPARGE WALLS PER SPECIFICATION SECTION
092400.
23. EXISTING WALL MOUNTED PLYWOOD FOR SUPPORT
OF ELECTRICAL PANEL, JUNCTION BOXES AND
CONDUITS. PLYWOOD AND ELECTRICAL EQUIPMENT
TO REMAIN IN-PLACE. PROTECT DURING
PERFORMANCE OF WORK. DO NOT DAMAGE.
24. REMOVE REMOVE EXISTING SLAB AND PROVIDE NEW
SLAB PER DETAIL 1/S101. AFTER 7 DAY CURE OF NEW
CONCRETE REINSTALL PARTITION, CABINETS,
PLUMBING FIXTURES AND STEPS. REFER TO ARCH.
DRAWINGS FOR INTERIOR WORK.
25. EXISTING SLOPED STONE AROUND LOUVER/WINDOW
OPENING. REMOVE EXISTING PARGING FROM SLOPED
STONE. CLEAN, PREPARE AND PROVIDE NEW
PARGING. REFER TO SPECIFICATION SECTION 092400.
26. REMOVE EXISTING CABINETS WITH LAMINATE
COUNTERTOP, DOUBLE BOWL STAINLESS STEEL SINK
AND CHROME KITCHEN FAUCET TO ACCOMMODATE
FLOOR SLAB REPLACEMENT. REFER TO ARCH.
DRAWINGS FOR INTERIOR WORK.
27. EXISTING ARCHED OPENING TO REMAIN. PROVIDE
DUST PARTITION OVER OPENING DURING
PERFORMANCE OF WORK. REFER TO ARCH.
28. REMOVE EXISTING WOOD STEPS TO ACCOMMODATE
FLOOR SLAB REPLACEMENT. REINSTALL AFTER
COMPLETION AND CURING OF NEW FLOOR SLAB.
REFER TO ARCH.
29. EXISTING DRYWALL PARTITION WITH DOOR AND
DRYWALL CEILING TO BE REMOVED TO
ACCOMMODATE FLOOR SLAB REPLACEMENT.
PROVIDE NEW PARTITION, CEILING AND DOOR TO
MATCH EXISTING (INCLUDING HARDWARE) AFTER
COMPLETION AND CURING OF NEW FLOOR SLAB.
REFER TO ARCH.
30. EXISTING WATER CLOSET TO BE REMOVED.
REINSTALL AFTER COMPLETION AND CURING OF NEW
FLOOR SLAB. REFER TO ARCH.
31. EXISTING EXTERIOR DOOR TO REMAIN. DO NOT
DAMAGE. PROTECT DURING PERFORMANCE OF
WORK.
32. EXISTING WINDOW TO REMAIN. DO NOT DAMAGE.
PROTECT AND STABILIZE DURING PEROFMANCE OF
WORK.
33. EXISTING WINDOW SILL TO BE REMOVED. REINSTALL
LEVEL PRIOR TO RE-INSTALLATION OF WINDOW.
34. EXISTING WOOD LOUVERS TO REMAIN. DO NOT
DAMAGE. PROTECT DURING PERFORMANCE OF
WORK.
35. EXISTING CLOCK TO REMAIN. DO NOT DAMAGE.
PROTECT DURING PERFORMANCE OF WORK.
36. EXISTING CAST IRON TIE AB ANCHOR FIXTURE TO
REMAIN.
37. NEW STEEL CHANNEL FRAME. REFER TO DRAWING
S101.
S101
S101
S101
S101
GROUND FLOOR
0'-0"
GROUND FLOOR
0'-0"
GROUND FLOOR
0'-0"
T/STEEL = 55'-6"
T/STEEL = 40'-3"
T/STEEL = 30'-4"
T/STEEL = 14'-9"
T/STEEL = 55'-6"
T/STEEL = 40'-3"
T/STEEL = 30'-4"
T/STEEL = 14'-9"
T/STEEL = 55'-6"
T/STEEL = 40'-3"
T/STEEL = 30'-4"
T/STEEL = 14'-9"
LEGEND:
PARGE WALLS.
CRACK.
3621TYP.
(35 L.F.)
S101
S101
S101
S101
S101
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg.
on e-eig hth in ch on e f oo t on e-qu ar ter in ch on e f oo t thr ee -e igh ths in ch on e f oo t on e-ha lf i nc h = on e f oo t thr ee -q ua rte rs inc h = on e foo t on e i nc h = on e f oo t on e a nd on e-ha lf i nc he s = on e f oo t thr ee in ch es on e f oo t
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
Repair Protestant Chapel
(Bldg. 118)
03/09/2017
PABFJE
Revisions Date
Project Phase
VA Project No.
14416.07
552-19-202
Dayton, Ohio
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of
Construction and Facilities
Management
THP Project No.
THP Limited, Inc.
100 East Eighth Street Cincinnati, Ohio 45202 Phone: 513.241.3222 www.thpltd.com
DESIGN DEVELOPMENT SUBMISSION 10/05/2017
95% CD SUBMITTAL 12/01/2017
100% CD SUBMITTAL
100% CD SUBMITTAL 03/09/2018
INTERIOR
ELEVATIONS
S301
119 of
3"
3"
2 TYP.
3 4
1TYP.
DETAIL
S401 1 1/2" = 1'-0"
TYPICAL LOOSE BAND STONE REPAIR
DETAIL
S401 1 1/2" = 1'-0"
PARTIAL EAST ELEVATION
S401 1/2" = 1'-0"
KEY NOTES:
EXISTING WINDOW TO REMAIN. DO NOT DAMAGE. PROTECT
AND STABILIZE DURING PERFORMANCE OF WORK.
EXISTING CRACKED STONE WINDOW SILL. REPAIR CRACKS
PER NOTE 6. RE-INSTALL SILL IN WALL.
INDICATES AREA OF EXISTING STONE TO BE REMOVED AND
RE-INSTALLED. REPAIR CRACKED STONES PER NOTE 6.
RE-INSTALL STONES TO REMOVE BULDGE IN WALL SURFACE.
RE-INSTALL STONES PLUMB, LEVEL AND STRAIGHT, AND IN
ORIGINAL LOCATION.
EXISTING STONE BAND. REMOVE STONE BAND WITH STONE
TO BE REMOVED ABOVE AND BELOW. REPAIR CRACKS IN
STONE PER NOTE 6. RE-INSTALL STONE PLUMB, LEVEL,
STRAIGHT AND IN ORIGINAL LOCATION.
REMOVE AND REPLACE EXISTING STONE. NEW STONE TO
MATCH EXISTING IN COLOR, TEXTURE AND SIZE. REFER TO
DETAIL 2/S401. PROVIDE SAMPLE OF NEW STONE FOR REVIEW
BY CONTRACTING OFFICER PRIOR TO PROCURING NEW
STONE.
INDICATES CRACKS IN STONE. IF STONE IS NOT INDICATED TO
BE REPLACED AND CRACK IS FULL DEPTH OF THE STONE.
REPAIR STONE PER DETAIL 4/S401.
EXISTING STONE PILASTER EXTENDING BEYOND SURFACE OF
STONE WALL. DO NOT DAMAGE.
APPROXIMATE EXISTING GRADE. EXCAVATE GRADE AS
REQUIRED TO PERFORM WORK. AFTER COMPLETION OF
STONE REPAIRS/REPLACEMENT. BACKFILL EXCAVATION AND
RE-SEED AREA DISTURBED BY PERFORMANCE OF WORK.
EXISTING JOINT BETWEEN STONES. MAINTAIN EXISTING JOINT
PATTERN DURING RE-INSTALLATION OF STONE.
EXCAVATE TO EXPOSE 1 FULL COURSE OF STONE BELOW
GRADE FOR REVIEW BY C.O.R.
NOTE: REFER TO SPECIFICATION SECTION 01 01 00 FOR
MATERIALS AND METHODS. FACE STONES ARE ESTIMATED TO
BE 12" THICK. REPLACEMENT STONE IS LOCATED IN BASEMENT
OF CHURCH.
1 2
6 TYP.
9TYP.
6TYP.
9'-0"±
FIELD VERIFY
KEY NOTES:
EXISTING STONE ABOVE WINDOW OPENING TO REMAIN.
EXISTING MORTAR JOINT. REMOVE EXISTING MORTAR AND
TUCKPOINT. REFER TO SPECIFICATION SECTION 040100.
DRILL 3/8" DIAMETER HOLES IN STONE. OFFSET HOLES 3".
MAINTAIN 2" FROM FACE OF STONE TO FIRST HOLE. USE
ROTARY DRILL FOR HOLES. DO NOT USE HAMMER DRILL.
CLEAN HOLES OF ALL DUST AND DEBRIS.
PROVIDE 1/4" DIA. STAINLESS STEEL THREADED RODS IN
HOLES. SECURE IN HOLE WITH ADHESIVE. RECESS ROD 3/4"
INTO HOLE. AFTER COMPLETION OF ROD INSTALLATION. FILL
RECESS WITH MORTAR. REFER TO SPECIFICATION SECTION 04
01 00.
KEY NOTES:
INDICATES EXISTING STONES TO BE REPLACED. REFER TO
DETAIL 3/S401.
DETAIL
S401 1 1/2" = 1'-0"
KEY NOTES:
EXISTING CRACK STONE. PERFORM REMOVAL TO MINIMIZE
DAMAGE TO CRACK SURFACES TO BE REPAIRED.
EXISTING THROUGH…