Attachment 6 General Condition Breakdown.docx
DOCX document 13 KB Posted
- Solicitation number
- 36C24927B0004_626-25-101-UpgradeCriticalEnvironmentsI
About this file
This is a General Condition Breakdown document outlining cost categories for a construction project. The document categorizes general conditions into three primary sections: Project Management, Bonds and Insurance, and Site Conditions. The Project Management section includes personnel costs such as superintendent(s), safety manager, CPM scheduler, quality assurance/quality control staff, project manager(s), project executive, field office engineer, field office support staff, project expeditor, and assistant superintendent(s). The Bonds and Insurance section covers builder's risk insurance, general liability insurance, and security, payment, and performance bonds excluding subcontractor bonds. The Site Conditions section encompasses temporary infrastructure and site management expenses including temporary power, water, sewer, electrical, telephone and internet systems, fire protection, heating and cooling, fencing, covered walkways, stormwater pollution prevention plan (SWPPP) measures, traffic control, temporary barricades and signage, temporary roads and walkways, lighting, partitions and covered floor openings, sanitary facilities, laydown areas, security systems, documentation (pre-construction and progress photos), and temporary protection for in-place work and adjacent structures.
This breakdown is associated with a Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 construction solicitation (36C24927B0004) titled "Z2DA--FY26 NRM - 626-25-101 - Upgrade Critical Environments I." The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns under NAICS code 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45 million. Award will be made to the lowest-priced responsive, responsible bidder without negotiation under an Invitation for Bid (IFB). Bidders must be listed in the SBA's Veterans database, maintain active SAM.gov registration, and submit evidence of VETS4212 enrollment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 Calc. of Self Performed Work.xlsx | XLSX spreadsheet | |
| Attachment 7 Request For Information Form.docx | DOCX document | |
| Attachment 8 Wage Determination - TN20260178 - Modification 1 - 05-18-2026.pdf | ||
| Attachment 9 SF33 36C24927B0004.pdf | ||
| Attachment 3 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| Attachment 1 SPECIFCIATIONS - FINAL - 03-02-2026.pdf | ||
| Attachment 2 DRAWINGS - FINAL - 03-02-2026.pdf | ||
| 36C24927B0004.docx | DOCX document | |
| Attachment 5 Contractor EMR Certification Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Management:
Superintendent(s)
Safety Manager
CPM Scheduler
Quality Assurance/Quality Control
Project Manager (s)
Project Executive
Field Office Engineer
Field Office Support Staff
Project Expeditor
Assistant Superintendent (s)
Project Manager Subtotal
Bonds and Insurance (excluding any for Subcontractors):
Builder’s Risk Insurance
General Liability Insurance
Security, Payment & Performance Bonds
Bonds and Insurance Subtotal:
Site Conditions:
Temporary Power Consumption (Offices)
Temporary Power Consumption (General Site Use)
Temporary Water and Sewer Consumption
Temporary Water Hookup, Distribution & Meters
Temporary Electrical Hookup, Distribution & Meters
Temporary Telephone & Network System Installation
Temporary Telephone & Internet Consumption Fees
Temporary Fire Protection
Temporary Heating & Cooling
Temporary Fencing
Temporary Covered Walkways
SWPPP Measures
Temporary Entries and Truck Washes
Street Cleaning (by G.C.)
Traffic Control Measures
Temporary Barricades & Signage
Temporary Roads & Walkways (install & maintenance)
Temporary Lighting
Temporary Partitions & Covered Floor Openings
Temporary Toilets/Sanitary Measures
Temporary Laydown (prep and restoration)
Security System/Watchman
Pre-construction Photo Documentation
Progress Photos
Temporary Protection (in place work/adjacent structures)