Attachment 4 Calc. of Self Performed Work.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24927B0004_626-25-101-UpgradeCriticalEnvironmentsI
About this file
This file is a calculation template for self-performed and subcontracted work required as part of a bid submission for a Service-Disabled Veteran-Owned Small Business (SDVOSB) construction contract. The template mandates that offerors in NAICS code 236220 (Commercial and Institutional Building Construction) must provide documentation that at least 25 percent of contract performance costs for personnel will be performed by the prime contractor's employees rather than subcontractors. The form requires bidders to itemize personnel costs and material/equipment costs by specification division, clearly identifying which work will be self-performed versus subcontracted. Additionally, home office overhead, profit/fee, and bond costs must be added after calculating subtotals for personnel and material/equipment.
The calculation methodology requires bidders to compute total personnel costs across the prime contractor and all subcontractors, subtract subcontractor personnel costs, and calculate the resulting self-performed work percentage. Personnel costs include direct labor, mechanics, tradesmen, and office personnel charged to the project such as project managers, superintendents, administrative staff, and estimators. The template includes fields for identifying subcontractor small business status and provides rows for multiple specification divisions with an error-checking formula. An authorized representative must certify that all representations are true and correct, and the form serves as a compliance verification mechanism for the 25 percent self-performance threshold applicable to this SDVOSB set-aside construction solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 Request For Information Form.docx | DOCX document | |
| Attachment 8 Wage Determination - TN20260178 - Modification 1 - 05-18-2026.pdf | ||
| Attachment 6 General Condition Breakdown.docx | DOCX document | |
| Attachment 9 SF33 36C24927B0004.pdf | ||
| Attachment 3 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| Attachment 1 SPECIFCIATIONS - FINAL - 03-02-2026.pdf | ||
| Attachment 2 DRAWINGS - FINAL - 03-02-2026.pdf | ||
| 36C24927B0004.docx | DOCX document | |
| Attachment 5 Contractor EMR Certification Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | ||||||
| Offerors for All Other Specialty Trade Contractors (NAICS code 236220) must provide | ||||||
| at least 25 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | ||||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | |||
| Prime | Y | $0.00 | $0.00 | Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only. | ||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | ||||
| $ - 0 | $0.00 |
| $ | $ | ||||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | Add percentage to gray areas only. | ||
| Percentage | 0 | Profit | $ | 0.00 | |
| Percentage | 0 | Home Office Overhead | $ | 0.00 | |
| Percentage | 0 | Bond | $ | 0.00 | |
| Grand Total | $ | 0.00 | |||
| Calculation of self-performed personnel costs: | |||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | |||||
| on this contract: | $0.00 | ||||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||||
| Contract’: | $0.00 | ||||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .