SOW Qualus test APT Generator Switch gear.doc
DOC document 72 KB Posted
- Solicitation number
- 36C249-27-AP-1027
About this file
This is a Statement of Work (SOW) for field maintenance testing services on generator switchgear equipment at the Alvin C. York Veterans Affairs Medical Center in Murfreesboro, Tennessee. The contractor must perform comprehensive diagnostic testing on a Caterpillar G3520C natural gas-fueled combined heat and power generator set, specifically addressing faults related to under KVAR parameters that have restricted the generator's operation. The work encompasses testing three current transformers (CTs), two sets of potential transformers (PTs), and one SEL-351A microprocessor-based protective relay, including visual and mechanical inspections, electrical tests (insulation resistance, polarity, ratio verification, excitation/saturation, dielectric withstand voltage), and burden measurements. The contractor must also provide one technician for up to eight hours to investigate reverse KVAR trips and deliver a comprehensive written report with findings and recommendations.
The contract is a service repair agreement with a period of performance from award date through six months, with work to commence immediately upon contract award. Services must be completed during two site visits scheduled Monday through Friday, 7:00 a.m. to 3:30 p.m., with extended hours available upon Contracting Officer's Representative (COR) approval. The contractor is responsible for all transportation, labor, parts, materials, tools, equipment, and personal protective equipment (PPE) compliant with OSHA standards and NFPA 70E; all work must be performed by certified trained technicians wearing contractor identification badges. All contract work carries a one-year warranty against defects in material, equipment, and workmanship from date of acceptance. The COR is Steven Burton (Electrical Supervisor, 615-968-8400), and all work requires Quality Control approval before acceptance. The contractor must comply with all VA, local, state, and federal occupational safety laws and maintain project schedules as outlined in final contract documents.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Qualas to Test APT Generator Switchgear Alvin C. York VAMC Murfreesboro, TN
PART I - GENERAL
a. Introduction This requirement is to provide field services to perform maintenance testing on CTs, PTs and relay associated with APT to operate the Caterpillar Combined Heat & Power Generator Set Switchgear. Located at the boiler Plant building 1650KW emergency generator EE#.110151 at the Tennessee Valley Healthcare System (TVHS), Alvin C. York Campus, 3400 Lebanon Pike, Murfreesboro, Tennessee, 37129.
b. Background The Caterpillar G3520C, Serial # GZL00146 Generator set is a natural gas fueled engine that has very strict maintenance requirements for continuous and reliable operation. The intent of the generator set is to provide primary power and steam to the facility and reduce the cost of utilities. The operation of this CoGen has been restricted due to faults related to under KVAR parameters. To provide the proper corrective action, further diagnostics needs to be performed by providing field services to perform maintenance testing on CTs, PTs and relay associated with APT switch gear that monitors and controls the operation of the CoGen. at Alvin C. York, Murfreesboro.
I highly recommend having Qualus perform the repair work requested in this SOW.
c. Scope of work The Contractor is to provide all transportation, labor, parts, materials, tools, and equipment necessary to provide field services to perform maintenance testing on CTs, PTs and relay associated with APT Generator Switchgear as outlined in the following paragraphs:
1. Perform the following testing and inspections on equipment listed under equipment scope of this proposal.
Equipment Scope: (3) Current transformer (CT)
(2 sets) Potential Transformers (PT)
(1) SEL-351 A relay
a. Current transformer (CT)
i. Visual and mechanical inspections
ii. Electrical tests
1. Perform insulation resistance test of each current transformer and wiring to ground at 1000 volts dc for one minute.
2. Perform a polarity test of each current transformer
3. Perform a ratio verification test using the voltage or current method
4. Perform an excitation test (saturation test)
5. Measure current circuit burdens at transformer terminals
6. Perform dielectric withstand voltage tests on the primary winding with the secondary Grounded.
b. Potential transformer (PT)
i. Visual and mechanical inspections
ii. Electrical tests
1. Perform insulation resistance tests for one minute winding to winding and
Each winding to ground
2. Perform a polarity test on each transformer
3. Perform a turns ratio test
4. Measure voltage circuit burdens at transformer terminals
5. Perform a dielectric withstand voltage test on the primary windings with the secondary windings connected to ground
c. Relay (microprocessor based)
i. Visual and mechanical inspections
ii. Download event record log
iii. Electric tests
1. Apply voltage or current to all analog inputs and verify correct registration of the relay meter functions
2. Protection elements
3. Check functional operation of each element used in the protection scheme
4. Control verification
5. Check operation of all active digital inputs
6. Check all active output contacts or SCRs
7. Upon completion of testing, reset all min/max records and fault counters.
Delete sequence of events records and all event records
2. Provide a comprehensive report of our findings with recommendations
3. Provide (1) technician up to (8) hours to investigate reverse KVAR trip.
d. Scheduling The Contractor will be required to complete the task as soon as contract is awarded.
Work can be performed Monday through Friday during normal working hours of 7am-3:30pm and extended working hours shall be permitted with approval of the COR to expedite the repair. All work is scheduled to be completed during a (2) site visit.
e. Warranty All contract work shall be warranted against defects in material, equipment and workmanship for a period of one (1) year from date of acceptance unless otherwise noted.
Hours of Operation and Scheduling:
Schedule all normal work Monday through Friday, 7AM to 3:30PM with COR, Steven Burton 615-968-8400.
The Following Federal legal holidays are observed by this facility: Any holidays falling on Saturday will be observed on the preceding Friday; holidays falling on Sunday will be observed on the following Monday.
New Year’s Day 1 January
Martin Luther King’s birthday 3rd Monday in January
President’s Day 3rd Monday in February
Memorial Day Last Monday in May
Juneteenth June 19th
Independence Day 4 July
Labor Day 1st Monday in September
Columbus Day 2nd Monday in October
Veteran’s Day 11 November
Thanksgiving Day 4th Thursday in November
Christmas Day 25 December
CONFIRMATION OF WORK
All work to be confirmed and subject to Quality Control Methods before being approved by the COR Steven Burton.
COMPLIANCE
The contractor shall be fully responsible for compliance with all VA, local, state, and Federal occupational safety laws, rules, and regulations.
The contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of hospital personnel and patients.
The contractor is responsible for meeting all applicable OSHA and VA guidelines for safe working procedures.
All work for the duration of the contract shall be performed by certified trained technicians.
CONTRACTOR EMPLOYEES
Contractor personnel shall present a neat appearance and be easily recognized as contract employees. Example: wearing steel toe boots and safety glasses ID badges and or name tags.
CONTRACTOR EMPLOYEE IDENTIFICATION
All contractor employees must be clearly identified as contractors (not VA employees) when performing services under this contract. This includes visual (appearance), verbal (phone), and electronic (email). The contractor must provide all employees with a contractor identification (ID) badge at the contractor’s expense prior to performing work under this contract. Contractor employees are always required to display this badge when performing services under this contract.
Employees released from service by the contractor must have their badge collected by the contractor. All badges must contain an expiration date and photograph of the employee.
All contractor employees must also be required to wear VA issued badges and must always display these badges while in the performance of this contract and/or as instructed by the COR.
The contractor supervisor must ensure that all contractor employees display their VA issued badges.
The contractor supervisor must be responsible for managing all VA issued badges provided to contractor employees and immediately collect these badges from employees no longer working on the contract.
CONTRACTOR EMPLOYEE CONDUCT
· The contractor is completely responsible for all actions and conduct of their employees. Contractor employees must be well-groomed and neat in appearance.
· Contract employees must be professional in attire and must not wear any offensive clothing.
· Contractor employees must conduct themselves in a socially acceptable manner appropriate for an office work environment; Loudness, vulgarity, rudeness, smoking, or other similar offensive conduct by a contractor employee may be grounds for denying the employee further access to VA premises.
· Contractor employees must not consume alcohol or illegal drugs during working hours or at any other time the employees are performing work under this contract.
CONTRACTOR RESPONSIBILITY
· The contractor shall obtain all necessary licenses and/or permits as required to perform this work.
· He/she shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.
· He/she shall be responsible for any injury to himself/herself, his/her employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her employees’ fault or negligence and shall maintain personal liability and property damage insurance having coverage for a limit as required by the laws.
· Further, it is agreed that any negligence of the Government, its officers, agents, servants and employees, shall not be the responsibility of the contractor hereunder with regard to any claims, loss, damage, injury, and liability resulting there from.
PERIOD OF PERFORMANCE:
This shall be a Service repair contract. As soon as the contract is warded, the Contractor will be required to procure all materials necessary and begin the task as soon. Period of performance will be from the date of award through the following 6 months.
CHANGES TO THE STATEMENT OF WORK (SOP):
· Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder with all other products of the project. Costs incurred by the contractor through the actions of parties other than CO shall be borne by the contractor.
Performance Requirements: Contractor shall have the following responsibilities:
· Provide all design, supervision, labor and materials to complete all requirements described in this SOW.
· Contractor shall take all precautions necessary to protect persons and property from injury and/or damage during performance of this contract.
· Contractor shall be responsible for any injury to their employees as well as for any damages to personnel or Government property that occurs during the performance of this contract that is caused by the Contractor’s fault or negligence.
· Contractor shall insure that all areas where equipment is serviced under this contract are left in a clean, neat and orderly conditions.
· Contractors shall possess and utilize all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform all work safely, effectively, and timely. Tools, equipment, and PPE shall comply with OSHA Standard 29 CFR 1910, (Subpart I), and NFPA 70E. Prior to initiating work, the Contractor shall provide documentation demonstrating that all instruments, test equipment, tools, and PPE possess current calibration and safety inspections. Dated calibration and safety inspection labels shall be visible on all equipment as applicable
· Arrange and pay for all proper disposal of waste and debris.
· Maintain project schedule agreed upon in the final contract documents.
DELIVERABLES
· The Contractor shall perform the services necessary to complete the tasks in accordance with the procedures described in a timely and professional manner, consistent with industry standards, at the location, place and time that the VA has set aside, and all in accordance with the SOW.
· As stated in the PERIOD OF PERFROMANCE, The Contractor will be required to complete the task as soon as contract is awarded. The life of this service contract shall be valid and active for 6 months in the event of any unforeseen delays due to but not limited to illness, weather, lead time of parts, or technician workload/shortages.
· The Contractor will provide field services to perform maintenance testing on CTs, PTs and relay associated with APT Generator Switchgear as described in the SOW.
· The contractor will provide a comprehensive report of their findings with recommendations.
· Contractor will provide (1) technician up to (8) hours to investigate reverse KVAR trip.
ROLES AND RESPONSIBILITIES:
· Contracting Officer (CO) - A person duly appointed with the authority to enter into, administer and terminate contracts on behalf of the Government. The CO is the only person who can legally commit the Government and only the CO, as the Government's agent, can modify the contract/order. The CO is the final authority for determining the adequacy of the Contractor's performance. CO decisions arising under or relating to the contact are final.
· Contracting Officer's Representative (COR) — An individual designated in writing by the CO to perform specific technical and administrative functions within the scope and limitations of their written appointment (e.g., surveillance of Contractor's performance, accept services). The COR is not empowered to make any contractual commitments or authorize any changes to the order/contract or in any way obligate additional funds by the Government; such authority' rests solely with the CO. The COR’s primary duty is to monitor the Contractor's performance by physically checking to see that tasks are completed, reports are submitted, and desired outcomes are achieved. When a surveillance observation results in an unacceptable evaluation, the COR will report the unacceptable performance to the CO. The COR is not authorized to direct work, offer advice on how the work should be performed, change the contract, or in any way obligate payment of funds by the Government.
TECHNICAL EXPERT/POC:
Steven Burton/COR Electrical Supervisor
615-968-8400