This is a Standard Form 30 amendment to a solicitation for the refurbishment of nine air handling units (AHUs) at Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The amendment is issued by the Department of Veterans Affairs, Network Contracting Office 9 (90C), with solicitation number 36C24926Q0360, effective September 2, 2026, and requirement number 626-26-3-4193-0150. The document serves as an attachment containing contractor questions and government responses to clarify solicitation requirements.
The government responses address nine key areas: (1) work shall be performed during nights and weekends for all AHUs except Building 11, which requires coordination with the Contracting Officer Representative (COR) and facility personnel; (2) contractor parking is near Building 90, with material staging on the back 40 and temporary laydown areas beside the building; (3) no temporary HVAC is required during shutdowns; (4) standard facility infection-control procedures apply with no special requirements; (5) AHUs are not permit-required confined spaces and no additional asbestos or lead-paint survey data is available; (6) steel reinforcement is required only where compromised floors are found, and condensate pans must be re-sloped to comply with ASHRAE 62.1; (7) a three-layer composite coating system meeting NFPA 90A and ASTM E84 standards at 3/16-inch nominal thickness is required, extending six inches up walls with antimicrobial and fire-barrier properties; (8) coil restoration includes biofilm and debris removal using superheated water followed by probiotic sanitization; and (9) the contractor is responsible for all testing, reporting, and a ten-year warranty, with VA Engineering Service as the accepting authority. The amendment specifies that offerors must acknowledge receipt prior to the submission deadline, and the question submission period remains unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24926Q0360 0003.pdf | ||
| 36C24926Q0360 0002.pdf | ||
| 36C24926Q0360 0002.pdf | ||
| 36C24926Q0360 RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129
90C
Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 204 Murfreesboro TN 37129
To all Offerors/Bidders
36C24926Q0360
09-02-2026
X
X X
See CONTINUATION Page
1. Contractor questions and the government's response to date are found on the attached pages.
2. The question submission period in the solicitation remains unchanged.
Jennifer Harper Contracting Officer
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT
UNIT
PRICE AMOUNT
GRAND
TOTAL
A.2 DELIVERY SCHEDULE
ITEM
NUMBER SHIPPING INFORMATION QUANTITY
DELIVERY
DATE
QUESTIONS AND ANSWERS
Refurbishment of Nine Air Handling Units
Facility: Alvin C. York VA Medical Center, Murfreesboro, Tennessee
Requirement: 626-26-3-4193-0150
Document purpose: Attachment to solicitation amendment
Upon issuance through a formal amendment, the following responses clarify and supplement the solicitation. Quoters shall consider these responses when preparing quotations. All other solicitation terms and conditions remain unchanged.
1. Work Hours, Outages, and Phasing
Question: Confirm permitted work hours, critical AHUs, whether more than one AHU may be shut down at once, maximum shutdown duration, and any preferred sequence.
Government Response: Work for all AHUs except the Building 11 AHU shall be performed during nights and weekends. The schedule for Building 11 and all onsite work and shutdowns shall be coordinated with the COR and facility personnel before work begins. More than one AHU may be shut down at a time provided the shutdowns minimally affect the applicable service or facility. Each AHU shall be restarted with sufficient time to condition the served space before the first shift of the day or week.
2. Parking and Staging
Question: Identify approved contractor parking, material-staging, and laydown areas.
Government Response: Contractor parking shall be located near Building 90. Material staging shall be located on the back 40. A temporary laydown area may be located beside the building or mechanical room for the AHU being addressed during that work shift. The laydown area shall be cleared before the next service or facility work shift.
3. Temporary HVAC
Question: Will temporary heating, cooling, or ventilation be required during AHU shutdowns?
Government Response: No temporary HVAC is required. AHUs shall be restarted with sufficient time to condition the served spaces before normal operations resume.
4. Infection Control
Question: Identify any special ICRA, containment, negative-air, HEPA, dust-control, debris-control, or cleaning requirements.
Government Response: No special infection-control requirements apply beyond the standard facility procedures and the requirements already stated in the solicitation and Statement of Work.
5. Hazardous Materials and Confined Space
Question: Is the Government aware of an existing asbestos or lead-paint survey applicable to materials that may be disturbed? Are any AHUs designated as permit-required confined spaces?
Government Response: The AHUs are not designated as permit-required confined spaces. No additional asbestos or lead-paint survey information applicable to this requirement is available with this response.
6. Steel Reinforcement and Condensate Pans
Question: Confirm whether reinforcement is required only where compromised floors are found and identify any additional repair criteria.
Government Response: Steel reinforcement is required only where compromised floors are found. No engineered repair details are available beyond the Statement of Work. Condensate pans shall be re-sloped as necessary to comply with ASHRAE 62.1.
7. Coating and Sealing Requirements
Question: Clarify the required coating system, minimum thickness, application area, and performance requirements.
Government Response: Provide a three-layer composite coating system designed for extended service life and compliance with NFPA 90A, including the 25/50 flame-spread and smoke-developed requirements demonstrated under ASTM E84. The system shall be self-leveling at a nominal thickness of 3/16 inch and shall extend 6 inches up the walls throughout chamber floors and condensate pans. One layer shall provide the required NFPA 90A-compliant fire barrier. The topcoat shall be antimicrobial, provide a watertight surface, and use an EPA-registered active antimicrobial. Walls, ceilings, fan housings, and structural steel within the applicable work areas shall receive a corrosion-resistant antimicrobial coating as required by the Statement of Work.
8. Coil Restoration and Scope Boundaries
Question: Clarify the required coil-restoration work and whether additional scope clarification is available for blower work or unrelated pre-existing NFPA 90A deficiencies.
Government Response: Coil restoration for all coils includes removal of biofilm and debris.
Sanitization shall include superheated water capable of penetrating the coils and removing biofilm, followed by probiotic application and sanitization on both faces of each coil until obstructions are removed across the entire coil face. No additional clarification is provided regarding blower repair or replacement or unrelated pre-existing NFPA 90A deficiencies;
quoters shall base their quotations on the solicitation and Statement of Work as amended.
9. Testing, Acceptance, and Warranty
Question: Identify responsibility for testing and commissioning, Government acceptance, and the ten-year warranty.
Government Response: The contractor is responsible for required testing, reports, and the ten-year warranty. The contractor shall confirm proper operation of existing drains and traps before recommissioning each AHU. VA Engineering Service is the Government accepting authority. No additional Government baseline testing data or warranty-coverage terms are provided beyond the solicitation and Statement of Work.