This is an Interim Life Safety Measures (ILSM) Check Sheet from the Department of Veterans Affairs for facility construction projects.
The check sheet is a pre-project assessment tool that the Contracting Officer's Technical Representative (COTR) must complete prior to project initiation to identify and implement necessary life safety measures. The COTR is responsible for ensuring ILSM are in place before work begins and for conducting daily work site inspections. The form evaluates eight specific areas: potential exit obstructions requiring alternative exit training; obstruction of emergency service access; impairment of fire alarm, detection, or suppression systems requiring temporary equivalent systems with daily inspections; necessity of smoke-tight, non-combustible temporary construction partitions; adequacy of fire-fighting equipment and employee training; reduction of Life Safety Code compliance requiring two fire drills per shift per quarter; compromise of structural or fire compartmentation features requiring alternate safety procedure training; and overall ILSM implementation requiring Director notification memorandum to all employees. For each item, the COTR must indicate "Yes" or "No" and document completion dates and responsible personnel. This specific form is for an AHU Refurbish Fan Room project (15/6/12) with COTR Clint Roberts, with all work to be performed inside the actual air handling unit. The memorandum initiation date is 4/29/2026, and all eight ILSM assessment questions were marked "No," indicating no life safety measures were required for this particular project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications - AHU Refurb - Nash Eng.pdf | ||
| AHU Refurbishment PCRA Fan Room 15 2.pdf | ||
| AHU Refurbishment PCRA Fan Room 6 4.pdf | ||
| AHU Refurbishment PCRA Fan Room 12 1.pdf | ||
| 36C24926Q0177 0003.pdf | ||
| AHU Refurbishment ICRA Fan Room 6 - AHU 24 5.pdf | ||
| Consolidated Questions and Answers.docx | DOCX document | |
| AHU Refurbishment ICRA Fan Room 12 - AHU 4 6.pdf | ||
| AHU Refurbishment ICRA Fan Room 15 - AHU 39_40_41 3.pdf | ||
| 36C24926Q0177 0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs ATTACHMENT A Memorandum 626-01-EC5-01
INTERIM LIFE SAFETY MEASURES
(ILSM) CHECK SHEET
PROJECT NO. COTR
The COTR for each and every project will complete this ILSM Check Sheet prior to the start of the project. When project work makes it necessary to implement ILSM, the Safety Officer will be informed. The Safety Officer will assist in initiating those ILSM necessary to maintain life safety before the project starts. The COTR is responsible for assuring that the project does not start before ILSM are in place. The COTR is responsible for conducting daily inspections of the work site.
1. Will any exits be obstructed during construction such that alternative exits will have to be established? If yes, then the Safety Officer must provide training to all concerned staff on alternative exiting arrangements. Yes No
Training completed:
Date By
2. Will access to emergency services be obstructed so that emergency forces cannot gain access?
If yes, then alternate means of access or proper direction for emergency service personnel must be provided. Yes No
Corrections completed:
Date By
3. Will any fire alarm, detection, or suppression system be impaired during this project? If yes, then a temporary but equivalent system must be provided. The temporary system must be inspected every day. Yes No
Temporary in place:
Date By
4. Will temporary construction partitions be necessary? If yes, then the temporary partitions must be smoke tight and built of non-combustible or limited-combustible materials that will not contribute to the development or spread of fire.
Yes No
5. Will additional fire fighting equipment be necessary? If yes, then the COTR will assure that the contractor provides construction employees with adequate fire extinguishers and assure that these employees are properly trained in the use of the fire fighting equipment.
Yes No
6. Will the level of fire safety that is required by the Life Safety Code be reduced because of exiting deficiencies or other activities due to the construction? If yes then the Safety Officer will initiate a program of conducting two fire drills per shift per quarter in the areas affected by the construction for the duration of the project.
Yes No
7. Will structural or compartmentation features of fire safety be compromised? If yes, then the Safety Officer will provide training on alternate fire safety procedures to the personnel of all smoke zones that will be affected. Yes No
Training completed:
Date By
8. Will any of the above ILSM need to be implemented? If yes, then In addition to the training and education initiatives, the Safety Officer will initiate a memorandum for the Director’s signature addressed to all employees that clarifies the ILSM taken to address any Life Safety Code deficiencies and/or construction hazards that will exist during this project. Yes No
Memorandum initiated:
Date By
Remarks:
AHU Refurbish Fan Room 15/6/12 Clint Roberts
4/29/2026 All work will be performed in the fan room inside the actual air handling unit.