S06 36C24926Q0076 0001 Amendment .pdf
PDF 99 KB Posted
- Solicitation number
- 36C24926Q0076
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs, Network Contracting Office 9 (NCO 9) located in Murfreesboro, Tennessee. The amendment modifies solicitation number 36C24926Q0076, originally issued on January 9, 2026, with an effective date of January 29, 2026. The quote deadline has been extended to February 4, 2026 at 4:00 PM CST. Offerors must acknowledge receipt of this amendment prior to the revised deadline by completing the form and returning it, acknowledging receipt on each copy of their offer, or by separate letter or electronic communication that references the solicitation and amendment numbers. Failure to acknowledge receipt may result in rejection of the offer.
The amendment includes contractor questions and government responses addressing six key issues: (1) product/materials equivalents are acceptable provided they adhere, resist chemicals, and are water tight; (2) equipment and furniture requiring removal must be returned to original placement by the contractor; (3) repairs are crack-to-crack, not full replacement; (4) work must be performed after business hours with full area access during normal working hours; (5) ICRA (Infection Control Risk Assessment) barriers are required; and (6) replacement materials must be close in color to existing surfaces. The question submission period remains unchanged, and all terms and conditions of the original solicitation remain in effect except as modified by this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 RFQ 36C24926Q0076_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0001 01-29-2026
None
Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129
Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 204 Murfreesboro TN 37129
To all Offerors/Bidders
36C24926Q0076
01-09-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-04-2026 16:00 CST
See CONTINUATION Page
This amendment is set forth as follows:
1. Contractor questions and the government's response to date are found on the attached pages.
2. The question submission period in the solicitation remains unchanged.
3. The quote deadline has been extended to 2/4/26 16:00 CST.
Jennifer Harper Contracting Officer
CONTINUATION PAGE
1)Can there be a Product/materials equivalent or must contractor us exact materials specified in solicitation?
As long as the product adheres and can resist chemicals and is water tight replacement is ok
2) Will there be furniture, appliance or equipment required to be removed and put back into place by contractor?
Yes there is equipment and it does have to be returned to its original placement
3)per the following: has there been a moisture test performed and a root cause analysis as to why repairs are needed? Also the solicitation mentions “joint to joint” to make suitable blend, is this understood as full replacement?
No. Repairs are for crack to crack not full replacement
4) Per the following: is it understood the area must remain open during installation and only Full access when closed with No foot traffic Friday (after hours) to Sunday. Area must be back open and accessible during normal working hours?
Yes the work will be done after business hours
5) Can you confirm whether ICRA barriers are required for this job?
Yes ICRA requirements need to be met
6) Is there a preferred color or color requirement
Must be close in color
End of amendment