This document is a set of Questions and Answers (Q&A) for Request for Quote (RFQ) 36C24925Q0286 for electrical wiring installation for elevators at the Nashville VA Medical Center. The scope involves installing control wiring for emergency recall and buffering systems across multiple elevator types, including central, service, garage, and main elevator controllers. The work involves connecting to specific Automatic Transfer Switches (ATS) using AWG #14 wire, with no replacement of existing normal or emergency power feeds.
Key details include that the Nashville VA Medical Center will handle elevator testing and programming, while the contractor will install and test the wiring. KONE is the elevator maintenance subcontractor, and PowerGen holds the ATS warranty. Contractor employees will need company badges and valid photo IDs for site access, but background checks are not required for this short-term project. The solicitation allows questions to be submitted until June 26, 2025, at 11:00 am CT, with responses to be compiled and issued via amendment. The contract is managed by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24925Q0286 0001.docx | DOCX document | |
| WAGE Determination Services Contract Act WD 2015-4647.pdf | ||
| 36C24925Q0286_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS ON RFQ-Electrical Wiring (Elevators) 36C24925Q0286-36C249AP2195 Please see the list of questions below and advise.
1. In the government provided “Scope”, specifically #3b states to “Provide new electrical feeds, normal and emergency power , to the ATS’s to meet emergency shutdown requirements during ATS switching”. Is the intent to in fact replace the existing normal and emergency power feeds to the ATSs’ or only install control wiring to the elevator control cabinets as stated in 3a?
Response: This scope does not include normal and emergency feeds. It is for wiring for the emergency recall and buffering system for elevators as follows:
· From ATS-10 to (3) Central Elevator Controllers and (2) Service Elevator Controllers
· From ATS-22 to (2) Garage Elevators
· From ATS-4 to (2) Main Elevator Controllers
1. If the intent is to in fact replace the normal and emergency sides feeds, please provide wire size and panels to pull from. Emergency and Normal feeds are not being replaced. We are adding wire size AWG #14 from the Elevator control to the ATS .
1. If the intent is to provide new normal and emergency side wiring is new conduit raceways required or repull wires in existing raceways? If new is required, please specify conduit sizing. No, no new feeds or conduit.
1. Please provide contact information for the elevator company that has the service contract for these elevators. Panacea is the contractor, and KONE is the sub-contractor that does the maintenance and annual inspections.
Is contractor to include pricing for the elevator company to provide testing and programming? Or will the government carry this under their maintenance contract with the elevator contractor?
Response: Government will provide elevator testing and elevator programming. Wiring will be tested and installed properly by Contractor under this contract.
1. Please provide contact information for who has the warranty/ maintenance for the ATS’s. PowerGen has the warranty.
1. What is the VA's dust containment/ICRA policy regarding construction inside the hospital? As long as we are not doing demolition (and we are not the contractor will be adding conduit for the control wire) dust containment is not applicable to this project.
1. What will our financial responsibilities be with KONE's portion of the work? The scope says KONE will handle final testing as we finish each set of elevators. Will the VA handle scheduling and compensation? What will the EC's financial responsibility be? We will set up a date to have KONE check the Emergency functions of the testing. Contractor for this wiring installation project will not be held responsible for payment of other contractors.
1. It talks about needing company badges with photos for the employees. Will our employees need to be drug tested and/or have background checks before working on site? Badges, background checks are for contractor employees that will be doing work for more than a year, so no they will not require this before coming onsite. Your employees must have a company badge to clearly identify themselves as an employee of your company. A valid photo ID will be required for access to the facility.