About this file

This document is a set of demolition and renovation drawings for bathrooms and laundry rooms in Building 8 at the Tennessee Valley Healthcare System (TVHS) facilities in Murfreesboro and Nashville, Tennessee.

The drawings outline the scope of work, which includes removing existing fixtures, flooring, walls, and ceilings, and constructing new walls, floors, and plumbing. Key objectives are to address potential mold issues, upgrade the bathrooms and laundry rooms to comply with requirements, and ensure proper drainage and waterproofing. The drawings provide detailed specifications for the new construction, including stud wall configurations, insulation, hardware blocking, and door/threshold details.

This renovation project is part of a larger Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the TVHS medical centers in Murfreesboro and Nashville. The solicitation number is 36C24924R0004, and it is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

File Type Posted
Wage Determination TN20240178 07-26-2024 - Davidson County TN.pdf PDF
Solicitation Questions and Answers_Final.pdf PDF
36C24924R0004 0004.docx DOCX document
Wage Determination TN20240180 07-26-2024 - Hamilton County TN.pdf PDF
Pricing Schedule.xlsx XLSX spreadsheet
Wage Determination TN20240185 07-26-2024 - Montgomery County TN.pdf PDF
Wage Determination TN20240187 07-26-2024 - Rutherford County TN.pdf PDF
Seed Project Specifications 626A4-24-501_Rev 1_Final.pdf PDF
Statement of Work_Rev 1_FINAL.pdf PDF
36C24924R0004 0003.docx DOCX document
Site Visit Sign-in Sheet.pdf PDF
36C24924R0004 0002.docx DOCX document
Project Specifications_Rev 1.pdf PDF
36C24924R0004 0001.docx DOCX document
S02 ATTACHMENT D ORGANIZATION AND KEY PERSONNEL SELF PERFORMANCE TRADE AND CAPABILITY.docx DOCX document
Wage Determination TN20240151 05-31-2024 - Coffee County TN.pdf PDF
S02 ATTACHMENT E BONDING CAPACITY SURETY FORM.docx DOCX document
S02 ATTACHMENT C SUBCONTRACTOR INFORMATION AND CONSENT FORM.docx DOCX document
Wage Determination TN20240185 05-31-2024 - Montgomery County TN.pdf PDF
Wage Determination TN20240169 05-31-2024 - McMinn and Meigs County TN.pdf PDF
Wage Determination TN20240187 03-22-2024 - Rutherford County TN.pdf PDF
Wage Determination TN20240180 05-31-2024 - Hamilton County TN.pdf PDF
Wage Determination TN20240178 03-22-2024 - Davidson County TN.pdf PDF
Wage Determination TN20240158 05-31-2024 - Franklin and Giles County TN.pdf PDF
Seed Project Drawings 626A4-24-501.pdf PDF
36C24924R0004_1.docx DOCX document
Seed Project Specifications_626A4-24-501.pdf PDF
S02 ATTACHMENT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
S02 ATTACHMENT B VA PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
S02 ATTACHMENT F PROPOSAL INQUIRY FORM.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2

A

I

B

C

D

E i

F

Revisions Date

1 2

I

CV

r l

.;;; I

J

3 4

I

□ CV

SA&SB

5 6

I

I

I

I CID

..._ I

Tlv�H� s Tennessee Valley Healthcare System ������ s

NA 5 H V I L L E , , MURFREESBORO

CAM PU 5

CAMPUS

3 4 5 6

I

8 9

SHEET NOTES ®

1. Potential for mold due to leaking around showers. Assume 100 sqft of abatement.

2. Demo sink, toilet, and shower fixtures.

3. Remove door and hardware. Store for reinstallation.

4. Demo all flooring to slab: resinous flooring over tile, tile, and mudbed.

5. Demo all interior drywall and wall coverings. Remove insulation. Studs to remain.

6. Demo existing dryer exhaust ductwork and exterior vents. Cover exterior penetrations with 11" thick anodized aluminum plate, overlapping penetration by 1" on all sides.

Plate, hardware, and silicon to be bronze color, matching existing fixtures.

7. Demo floor drains back to tie in. Cap and firestop remaining penetrations.

8. Demo hard ceiling including lighting and HV AC grills.

9. Cut hole in wall to prepare for new door.

See drawing on page 7.

PcoJectT,,ea Ren ovate 8A and 85 Bathrooms I D t<

I :c==== an=d =Lau=nd ry =Ro=om=s ===a 8/7/2023

.,__0 -�I D caw,o, T,tle , 1 · . �

Demolition �ProJe-ct No-,' --- � � la=='App,===ao,ed;;==By , ========a 626A4-24-501 E � .µ (\l L L !Approved By : 11

Loc�tion •

I � � , :;!AMC: MURfREE5BRO, TN I DRAWING NO I � "t5 IEloi,d,og Ncmbec , 8 I ICheckcd

By

I

I D ca �By

CEK I ,

b Of 20 Q >

8 9

A f--

B f--

C

D f--

E f--

F

B

4 II

C

D

E

F

Revisions Date

2 3

,-----------611 ______ �

II @ �--4411--�

4 5

�----73111----�

18 �II

14 �II

8A&8B

.; I

3 4 5

19 �II

6 7

84111

76 1

6 7

SHEET NOTES @

1. Level floors to ensure proper slope toward drains. Prepare floors according to manufacturer with waterproofing underlayment.

2. Construct 6 inch wall dividing the space.

Wall to consist of 2"x6" (nominal) metal studs and Type X drywall on each side.

3. Thicken wall section for plumbing by stacking additional 4 inch wall. Wall to consist of 2"x4" (nominal) metal studs with i" Type X drywall.

4. Stop thickened wall section short of door frame by 5" to allow for normal sized door frame.

5. Provide unfaced, acoustical insulation full height in all walls.

6. Provide 18GA sheet metal blocking for handrails, mirror, towel bar, toilet paper dispenser, and clothing hook. Coordinate locations with COR. See detail 1 on page 17.

7. Infill window in shower room with drywall.

Cover window with black insulation board with text facing inward. Insulate remaining cavity.

8. Install frame for new door with hinged side 4" from finished wall. Door finishes and hardware to match existing door to remain;

verify in field. Repair corridor wall to match existing.

9. Doorway thresholds limited to maximum height of}" with edge beveled with 1 :2 slope down to a maximum height of!".

''"J'°'T'""' Renovate Building 8 Bathrooms and Laundry for Compliance

Drawing Title

Date, 8/7/2023 <ll 4- '= 0�

Architectural: Floorplan

1 1

� �a====;, ========! F�Jert

�26A4-24-501 (l)E ifJ Approved By :

t �

IA"�=•'By=, ===

='--'=ll�-=M.:i c ": M

URF

REE=SB=RO,

TNI II DRAWlNGNo, II §-t

I Bol,d,og Nomb<e

8 11 Checked By '

II°"� By ' CE K 1. 7 Of 2 Q O >

8 9

A

B

C

D

E

F

B

C

D

E i i

F

Revisions Date

I

. ,. •• ,d'

I

J

4 :., ,4'

I

.d' , ., ·ill,_.

.;;; I ...._ I

-··"' '• . " .i .,.·. ..

8A&8B

A ., •

4 • ,4

4 A • '· 4--

I

I

•• 4 ·.,- ,tJ .

. A

,, "'· .• .. ,I!!

.., 4 4 "'., I

Tlv�H� s Tennessee Valley Healthcare System

I

IT V H 51

I I I II I II

lr,r,r,r,r'II

NA SH VILLE , , MURFREESBORO

CAMPUS CAMPUS

3 4 5 6

7 8 9

FINISHES NOTES

1. RES: Resinous ( epoxy base) flooring with integral resinous cove base. Use waterproof membrane.

2. Tile: Porcelain tile to be used for walls and shower walls. Shower walls to have tile from cove base to ceiling (Tile Pattern 1 ).

Other walls to have tile from cove base to 72" above the finished floor (Tile Pattern 2). Use Schluter strip between tile and cove base and between shower wall and other wall tile. Coordinate grout color with COR .

3. Use bullnose tile at exposed tile edges where applicable .

4. Coordinate ALL color selections with COR and VA interior designer.

5. Install ceiling mounted I-beam style curtain track for privacy curtain. Curtain will be provided by VA.

6. Install shower curtain rod at 75" from ground. Curtain will be provided by VA .

FINISHES KEY

[J RES

II Tile

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

Tile Pattern 1 Tile Pattern 2

,�,"' "''" Renovate Build mg 8 Bathrooms and Laundry for Compliance

D.ite, 8/7/2023 IDcaw,og T,tl,, I I

P·o.,-- No .. · I nter1or: Finishes

�=aa===============a 626A4-24-501 IApproveO By , :,c========;;c:==.==========:

rp•o�dlly'

I 1.:;;;::;,c: MURFREE5BRO, TN 111 DRAWING NO.

I Bulidm,aNumber, 8 II Checked By:

I

ID

r�wnBy

CEK I.· 9 Of

8 9

A

B

C

D

E

F

VHATVHKingC Oval

1 - Cover Sheet
2 - 8A Locations and Limits
3 - 8B Locations and Limits
4 - ICRA Locations
5 - ICRA Requirements
6 - Demolition
7 - Architectural - Floorplan
8 - Architectural - Ceiling Plan
9 - Interior - Finishes
10 - Interior - Finish and Equipment Legends
11 - HVAC 8A
12 - HVAC 8B
13 - Plumbing
14 - Electrical
15 - Lighting
16 - Nurse Call and Electrical Closet Locations
17 - Misc Details 1
18 - Misc Details 2
19 - Misc Details 3
20 - Misc Details 4

File details come from the government source that posted it. Updated .