About this file

This document appears to be a pricing schedule template for a federal contract opportunity. The template includes a detailed breakdown of potential labor, material, and equipment costs for various construction divisions and subdivisions, such as general requirements, concrete, HVAC, and electrical work. The template requires the contractor to provide a thorough price breakdown for the specified categories, even if a particular division is not applicable to the construction requirement.

The related federal contract opportunity is a Multiple Award Task Order Contract (MATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the Tennessee Valley Healthcare System (TVHS) - VA Medical Centers (VAMC) in Murfreesboro and Nashville, Tennessee, with the solicitation number 36C24924R0004. The contract is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

File Type Posted
Wage Determination TN20240178 07-26-2024 - Davidson County TN.pdf PDF
Solicitation Questions and Answers_Final.pdf PDF
36C24924R0004 0004.docx DOCX document
Wage Determination TN20240180 07-26-2024 - Hamilton County TN.pdf PDF
Wage Determination TN20240185 07-26-2024 - Montgomery County TN.pdf PDF
Seed Project Drawings 626A4-24-501_Rev 1_Final.pdf PDF
Wage Determination TN20240187 07-26-2024 - Rutherford County TN.pdf PDF
Seed Project Specifications 626A4-24-501_Rev 1_Final.pdf PDF
Statement of Work_Rev 1_FINAL.pdf PDF
36C24924R0004 0003.docx DOCX document
Site Visit Sign-in Sheet.pdf PDF
36C24924R0004 0002.docx DOCX document
Project Specifications_Rev 1.pdf PDF
36C24924R0004 0001.docx DOCX document
S02 ATTACHMENT D ORGANIZATION AND KEY PERSONNEL SELF PERFORMANCE TRADE AND CAPABILITY.docx DOCX document
Wage Determination TN20240151 05-31-2024 - Coffee County TN.pdf PDF
S02 ATTACHMENT E BONDING CAPACITY SURETY FORM.docx DOCX document
S02 ATTACHMENT C SUBCONTRACTOR INFORMATION AND CONSENT FORM.docx DOCX document
Wage Determination TN20240185 05-31-2024 - Montgomery County TN.pdf PDF
Wage Determination TN20240169 05-31-2024 - McMinn and Meigs County TN.pdf PDF
Wage Determination TN20240187 03-22-2024 - Rutherford County TN.pdf PDF
Wage Determination TN20240180 05-31-2024 - Hamilton County TN.pdf PDF
Wage Determination TN20240178 03-22-2024 - Davidson County TN.pdf PDF
Wage Determination TN20240158 05-31-2024 - Franklin and Giles County TN.pdf PDF
Seed Project Drawings 626A4-24-501.pdf PDF
36C24924R0004_1.docx DOCX document
Seed Project Specifications_626A4-24-501.pdf PDF
S02 ATTACHMENT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
S02 ATTACHMENT B VA PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
S02 ATTACHMENT F PROPOSAL INQUIRY FORM.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown

JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900Solicitation NumberProject NumberProject TitleProposal Date
36C24924R0079596A4-19-106Upgrade Parking Garage Lighting/Gates9/2/24

SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS

DIVISION 1GENERAL REQUIREMENTS$0.00
01 32 16.15Project Schedules
01 33 23Shop Drawings, Prdt Data, Samples
01 35 26Safety Requirements
01 42 19Reference Standards
01 45 29Testing Laboratory Services
01 57 19Temporary Environment Controls
01 58 16Temporary Interior Signage
01 74 19Cosntruction Waste Management
01 81 13Sustainable Construction Requirements
01 91 00General Commissioning Requirements
DIVISION 2Existing Conditions$0.00
02 41 00Demolition
02 82 11Traditional Asbestos Abatement
DIVISION 3CONCRETE$0.00
03 30 53Cast in Place Concrete
DIVISION 4MASONRY
DIVISION 5Metals$0.00
05 50 00Metal Fabrications
DIVISION 6Wood, plastics and Composites$0.00
06 10 00Rough Carpentry
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 01 50.19Preparation fro Reroofing
07 60 00Flashing and Sheet Metal
07 71 00Roof Specialties
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
07 95 13Expansion Joint Cover Assemblies
DIVISION 8Openings$0.00
08 11 13Hollow Metal Doors & Frames
08 14 00Interior Wood Doors
08 31 13Access Doors and Frames
08 41 13Alum Framed Entrance and Storefronts
08 56 19Pass Windows (2 each)
08 71 00Door Hardware
08 80 00Glazing
08 90 00Louvers and Vents
DIVISION 9FINISHES$0.00
09 05 16Subsurface Prep for Floor Finishing
09 06 00Schedule for Finishes
09 22 16Non Struct Metal Framing
09 29 00Gypsum Board
09 51 00Acuoutical Ceiling
09 65 13Resilient Base and Accessories
09 68 00Resilient Tile Flooring
09 69 00Access Flooring
09 91 00Painting
DIVISION 10Specialties$0.00
10 11 13Chalkboards and Markerboards
10 1123Tackboards
10 14 00Signage
10 21 13Toilet Compartments
10 26 00Wall and Door protection
10 28 00Toilet, Bath, and Laundry Accessories
10 44 13Fire Extinguisher Cabinets
DIVISION 11EQUIPMENT$0.00
11 41 21Walk-in Coolers and Freezers
11 53 53Biological Safety Cabinets Laminar Airflow Stations
DIVISION 12Furnishings$0.00
12 24 00Window Shades
12 24 21Lightproof Shades
12 31 00Manufactured Metal Casework
12 32 00Manufactured Wood Casework
12 36 00Countertops
DIVISION 13Special Construction$0.00
13 05 41Seismic Restraint Requirements for Non- Structural Components
DIVISION 21Fire Suppression$0.00
21 08 00Commissioning of Fire Suppression System
21 13 13Wet-Pipe Sprinkler Systems
DIVISION 22Plumbing$0.00
22 05 11Common Work Results for Plumbing
22 05 19Meters and Gages for Plumbing piping
22 05 23General-Duty Valves for Plumbing Piping
22 07 11Plumbing Insulation
22 08 00Commissioning of Plumbing Systems
22 11 00Facility Water Distribution
22 13 00Facility Sanitary and Vent Piping
22 14 00Facility Storm Drainage
22 40 00Plumbing Fixtures
22 62 00Vacuum Systems for Laboratory and Healthcare Facilities
22 63 00Gas Systems for Laboratory and Healthcare Facilities
DIVISION 23Heating, Ventilating and Air Conditioning HVAC$0.00
23 05 11Testing, Adjusting and Balancing for HVAC
23 05 12General Motor Requriments for HVAC and Steam Generation Equipment
23 05 41Noise and Vibration Control for HVAC piping and Equipment
23 05 93Testing, Adjusting and Balancing for HVAC
23 07 11HVAC and Boiler Plant Insulation
23 08 00Commissioning of HVAC Systems
23 09 23Direct Digital Control System for HVAC
23 21 13Hydronic Piping
23 21 23Hydronic Pumps
23 22 13Steam and Condensate Heating Piping
23 25 00HVAC Water Treatment
23 31 00HVAC Ducts and Casing
23 34 00HVAC Fans
23 36 00Air Terminal Units
23 37 00Air Outlets and Inlets
23 40 00HVAC Air Cleaning Devices
23 74 13Packaged, Outdoor, Central Stating Air Handling Units
23 81 00Decentralized Unitary HVAC Equipment
23 81 23Computer Room Air Conditioners
23 82 00Convection Heating and Cooling Units
23 82 16Air Coils
23 84 00Humidity Control Equipment
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations
26 05 13Medium Voltage Cables
26 05 19Low Voltage Eelctrical Power Conductors and Cables
26 05 26Grounding and Bonding for Electrical Systems
26 05 33Raceway and Boxes for Electrical Systems
26 05 36Wireways for Radiology Equipment
26 05 73Overcurrent Protective Device Coordination Study
26 08 00Commissioning of Electrical Systems
26 09 23Lighting Controls
26 13 13Medium Voltage Circuit Breaker Switchgear
26 13 16Medium Voltage Fusible Interrupter Switches
26 20 11Isolated Power Systems
26 22 00Low Voltage Transformers
26 23 00Low Voltage Switchgear
26 24 13Distribution Switchboards
26 24 16Panelboards
26 24 19Motor Control Centers
26 25 11Busways
26 26 00Power Distribution units for Static Unterruptible Power Systems
26 27 26Wiring Devices
26 29 21Enclosed Switches and Circuit Breakers
26 33 53Static Unnterruptible Power Supply
26 35 26Harmonic Filters
26 36 23Automatic Transfer Switches
26 41 00Facility Lightning Protection
26 43 13Surge Protective Devices
26 51 00Interior lighting
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations
27 05 26Grounding and Bonding for Communications Systems
27 05 33Raceways and Boxes for Communication Systems
27 05 61Leased Space, Communication Equipment and Systems
27 08 00Commissioning of Communication Systems
27 10 00Control, Communication and Signal Wiring
27 11 00Communications Equipment Room Fittings
27 15 00Communications Structured Cabling
27 41 31Master Antenna Television Equipment and Systems
27 51 16Public Address and Mass Notification Systems
27 51 23Intercommunications and Program Systems
27 52 23Nurse Call and Code Blue Systems
27 52 41Miscellaneous Medical Systems
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 05 00Common Work Results for Electronic Safety and Security
28 05 13Conductors and Cables for Electronic Safety and Security
28 05 26Grounding and Bonding for Electronic Safety and Security
28 05 28.33Conduits and backboxes for Electonic Safety and Security
28 08 00Commissioning of Electronic Safety and Security Systems
28 13 00Physical Access Control System
28 13 16Physical Access Control Ssytem and Database Management
28 13 53Security Access Detection
28 16 00Intrusion Detection System
28 23 00Video Survelliance
28 26 00Electronic Personal Protection System
28 31 00Fire Detection and Alarm
28 52 31Emergency Call System
TOTALS
$0.00
TOTAL LABOR
$0.00
TOTAL MATERIALS
6%$0.00
TAX FOR MATERIALS
$0.00
TOTAL EQUIPMENT
DIVISION GRAND TOTALS$0.00
$0INSTRUCTIONS
DIVISION GRAND TOTALS$0
TAX FOR MATERIALS1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD8%$0
PROFIT8%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;
$0
SUBTOTAL
BOND/FEE3%$03. Divisions must still be listed even if not applicable to the construction requirement;
PERMITS/LICENSES

GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9

File details come from the government source that posted it. Updated .