Solicitation 36C24922R0091 09122022.pdf

PDF 637 KB Posted

Attached to
Y1DA--36C249-22-AP-3684 - 626A4-21-101 - Renovate & Expand PMRS
Solicitation number
36C24922R0091
Issued by

About this file

This federal contract opportunity notice provides details for an upcoming solicitation requesting proposals for construction services. The project involves renovating and expanding Physical Medicine Rehabilitation Services at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The construction budget is between $2 million and $5 million, and the NAICS code is 236220 for commercial and institutional building construction. The opportunity is 100% set aside for verified Service-Disabled Veteran-Owned Small Businesses. Proposals are due on or around August 24, 2022. Offerors must be verified as SDVOSBs by the VA's Center for Veterans Enterprise by the time proposals are submitted.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24922R0091

X

09-12-2022

626-23-1-4275-0001

626A4-21-101

90C

Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129

Department of Veterans Affairs Network Contracting Office (NCO) 9 1639 Medical Center Parkway, Ste 400 c/o: Vance Rosebush, CS Murfreesboro TN 37129

Vance Rosebush (615) 225-5975

Project 626A4-21-101 - Renovate and Expand Physical Medicine and Rehabilitation Services (PMRS) Alvin C. York VA Medical Center, BLDG 5 Ground Floor 3400 Lebanon Pike Murfreesboro, TN 37130

NAICS Code 236220 is applicable to this project. The small business size standard is $39.5M. The PSC is Y1DA.

The Magnitude of Construction is between $2,000,000 and $5,000,000.

A scheduled site visit will be held on 09-22-2022, at 2:00PM CT at the Alvin C. York VA Medical Center. All participants attending will meet at the Alvin C. York VA Medical Center, BLDG 5. All attendees are to RSVP with the Contract Specialist at vance.rosebush@va.gov, at least 24 hours prior to arrival.

To obtain clarifications and/or additional information concerning the contract requirement, specifications, and/or drawings, submit a written Request for Information (RFI) via email to the Contract Specialist, Vance Rosebush at vance.rosebush@va.gov. RFI's must be specific in identifying section, paragraph, and page number.

Questions received after 1:00PM, CT 09-28-2022, will not be answered unless it is determined to be in the best interest of the Government as deemed by the Contracting Officer. All questions must be submitted in writing only.

In accordance with P.L. 109-461, this acquisition is 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns. To be eligible to receive an award under this solicitation, the SDVOSB contractor must be listed and viewable in the Vetbiz Registry located at www.vip.vetbiz.va.gov at the time of offers due and at time of the award. Offerors are advised that the fast-track reverification program ended September 30, 2012. Consequently, offerors in reverification status will not be eligible to submit offers for this project. In accordance with FAR 52.204-7 System for Award Management (SAM), all prospective offerors must have an active SAM's registration at the time of offer submission.

Project will be procured under FAR 15.101-2 Lowest Price Technically Acceptable. Evaluation factors are listed in the solicitation.

Submit one (1) electronic copy of proposals on or before the due date/time in block 13 to vance.rosebush@va.gov.

Submit one (1) electronic copy of an original completed andsigned SF24 Bid Bond. Any missing element of the offeror's submission could render the offeror ineligible and their bid will not be considered.

Ten (10) 360

X X 52.211-10

X 10

1 1 PM CST

10-14-2022

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Base Offer: ___________________

Alternate 1: ____________________ Alternate 2: ____________________ Alternate 3: ____________________

90C

Department of Veterans Affairs Network Contracting Office - 9 1639 Medical Center Parkway, Ste 400 c/o: Vance Rosebush, Contract Specialist Murfreesboro TN 37129

90C FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 Invoice must be submitted electronically

Setup 1-877-489-6135

Robert Pritchard

VA-VHA-2020-21A9358B

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 STATEMENT OF WORK

A.4 IMPORTANT SUBMISSION INFORMATION

A.5 EVALUATION PROCESS – PROPOSAL PREPARATION – INSTRUCTION TO

OFFERORS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

2.2 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE I (MAY 2014)

AND ALTERNATE II (JUN 2009)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

2.7 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.10 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (JAN

2017)

2.11 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)

2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.13 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE

ACQUISITION PLAN (SEP 2019)

2.14 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) ..31

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)

3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (FEB 2021)

GENERAL CONDITIONS

4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (JUN 2020)

4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.3 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER

COVERED ENTITIES (JUL 2018)

4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.5 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984) ALTERNATE I (APR 1984)

4.6 52.211-13 TIME EXTENSIONS (SEPT 2000)

4.7 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS (JAN 2021) ALTERNATE I (JAN 2021)

4.8 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(NOV 2020)

4.9 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

4.10 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

4.11 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)

4.12 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT

FOR EPA-DESIGNATED ITEMS (MAY 2008)

4.13 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.14 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.15 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)

4.16 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND

COMPLIANCE (JUL 2018)

4.17 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021)

(DEVIATION)

4.18 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.21 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

ALTERNATE I (APR 2019)

4.23 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.24 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.25 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN

2008)

4.26 MANDATORY WRITTEN DISCLOSURES

4.27 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.28 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.29 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.30 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)

4.31 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..75

ATTACHMENTS

A.3 STATEMENT OF WORK

A. GENERAL INFORMATION

1. Title of Project: Project# 626A4-21-101 “Renovate and Expand PMRS”

2. Scope of Work: The contractor shall furnish all labor, material, equipment, and supervision necessary to completely prepare site for building operations including demolition and removal of existing structures and furnish labor and materials and perform work for subject project as required by the drawings and specifications at the Tennessee Valley Healthcare System, VA Medical Center, 3400 Lebanon Road, Murfreesboro, TN 37129 in accordance with the specifications and drawings.

3. Statement of bid item(s):

Base Bid includes all work described in SOW, Drawings and Specifications.

Bid Alternate 1: Same as Base Bid except eliminate… No finishes in room G18.

Install new door into room and paint the existing frame. Also add new signage.

Bid Alternate 2: Same as Bid Alternate NO. 1 except eliminate. No work in corridor.

Work to stop at intersection between G-30 and G-31.

Bid Alternate 3: Same as Bid Alternate NO. 2 except eliminate replacement of windows. Update sealant and caulking around the windows and touch up paint on the frames and replace sills.

4. Period of Performance: 360 calendar days from the issuance of the Notice to Proceed.

B. GENERAL REQUIREMENTS

1. All work including materials will be warranted for a period of one year unless otherwise indicate in specifications.

2. Normal working hours are Monday thru Friday from 7 a.m. to 4:30 p.m.

3. Contractor will be required to work some nights and or weekends to perform this work and maintain functionality of affected areas, and to minimize disruptions to the Medical Centers operations. Weekend and evening work shall be identified on the project schedule submitted by the contractor and approved by the VA before work begins.

4. Contractor is required to submit a phasing plan in writing prior to construction.

5. See specifications for additional requirements.

END STATEMENT OF WORK

A.4 IMPORTANT SUBMISSION INFORMATION

SOLICITATION MATERIALS: All solicitation materials consisting of drawings, specifications, contract forms, Amendments, and other documents will be posted to the Contract Opportunities Government website located at https://sam.gov/. Enter “36C24922R0091” into the search box to access the solicitation materials. This is the only official location where these documents can be obtained and where updates are posted. No “hard copy” solicitation materials are available.

SOLICITATION SUBMISSION: The following documents must be included in the solicitation submission in the formats as stated:

- One (1) electronic copy of an original, fully completed and signed and dated SF 1442 Offer page, acknowledgment of all amendments issued by completing block 19 of the SF1442 and providing them with the SF 1442 Offer page; prices online item(s) listed on the Price/Cost Schedule; completed Representations and Certifications section (FAR 52.204-8, 52.209-5 (Deviation), and 52.209-7); and fully completed Contractor Experience Modification Rate (EMR) Certification documents.

- One (1) electronic copy of an original completed and signed SF 24 Bid Bond or other allowable Bid Security. Any missing elements of the bid bond submission could render the offeror ineligible and their offer will not be considered.

Subject: Class Deviation from the Federal Acquisition Regulation to Eliminate Hard Copy Original Documents, Signatures, Notarization, Seals on Bonds, and Other Seals for Certain Contract Requirements.

1. Purpose. To issue a class deviation in accordance with Federal Acquisition Regulation (FAR) 1.404, to allow greater flexibility by eliminating the requirement for hard copy original documents, original signatures, notarization, seals on bonds, and other scenarios confronting the acquisition workforce in connection with the Coronavirus Disease 2019 (COVID-19) pandemic.

2. FAR Parts Impacted. FAR parts 28, 32, 42, and 52.

3. Effective Date. Immediately.

4. Expiration Date. This deviation expires when incorporated into the FAR or otherwise or rescinded.

5. Applicability. This class deviation applies to all VA contracting activities.

6. Exception. None.

7. Background. The deviation is issued in response to the COVID-19 national emergency, as authorized by the Civilian Agency Acquisition Council (CAAC) letter 2020- 04, dated May 1, 2020.

a. Current FAR Policy. In certain situations, the FAR requires hard copy original documents, original signatures, notarization, and seals on bonds.

https://sam.gov/

b. Need for Deviation. In response to the COVID-19 national emergency, agencies are encouraged to issue FAR deviations to eliminate the requirements discussed herein.

c. New Policy. Contracting officers shall use the attached deviation FAR text as follows:

(1) When obtaining financial protection against losses under contracts per FAR part 28:

28.101-3(c) allowing the use of electronic means is moved to an added section at 28.002 to apply the same flexibilities to all of part 28;

28.106-1 adding an exception to stamping a corporate seal on bonds;

28.106-8 allowing a signed statement by the contractor that the payment is due and owed;

28.203(b) not requiring the Standard Form 28 to be sworn and notarized;

28.203-5 allowing a written authorization of the release signed by the surety saying that it approves of such release;

52.228-11, Pledges of Assets (Aug 2018) (DEVIATION APR 2020), not requiring the Standard Form 28 to be sworn and notarized, in place of 52.228-11, Pledges of Assets (Aug 2018);

52.228-15, Performance and Payment Bonds – Construction (OCT 2010) (DEVIATION APR 2020), not requiring the seal when executing the standard forms required by the clause; and

52.228-16, Performance and Payment Bonds – Other than Construction (NOV 2006) (DEVIATION APR 2020), not requiring the seal when executing the standard forms required by the clause.

(2) When processing assignment of claims per FAR subpart 32.8:

32.802(e) allowing the use of a copy of the assignment instrument; and

32.805(a), (b), (c), and (e) allowing the use of electronically signed documents and a copy of the assignment instrument.

(3) When executing novation agreements and change-of-name agreements per FAR part 42:

42.1204(f) allowing the use of a copy of the documents;

42.1204(i) not requiring a seal on the Novation Agreement; and

42.1205(b) not requiring a seal on the Change-of-Name Agreement.

FEDERAL HOLIDAYS: Federal law (5 U.S.C. 6103) establishes the following public holidays for Federal employees: New Year’s Day, Birthday of Martin Luther King, Jr., Washington’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. Please note that most Federal employees work on a Monday through Friday schedule. For these employees, when a holiday falls on a non-workday -- Saturday or Sunday -- the holiday usually is observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday).

ALL CONTRACTORS ARE REQUIRED TO COMPLETE:

• VA Privacy Training for employees with access to VA computer systems or VA sensitive information.

• VA Talent Management System (TMS) training course VA10176 provides the mandatory Privacy Training requirements for any contractor with access to VA computer systems or VA sensitive information.

• VA Privacy Training for employees without access to VA computer systems or VA sensitive information.

• VA Talent Management System (TMS) training course VA20939 provides the mandatory Privacy Training requirements for any contractor without access to VA computer systems or VA sensitive information.

• Each employee self-enrolls for a profile on the VA TMS by visiting https://www.tms.va.gov/plateau/user/login.jsp. Once there, employees should follow the steps below to create a profile, launch the mandatory training, and complete the content prior to starting work at VA.

• Provide the COR with each employee’s printed certificate of completion from the TMS. This certificate displays the employee’s TMS User ID.

• Training must be completed annually throughout the performance of this contract.

THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at https://sam.gov for each person or business providing services under this contract. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.

VETS-4212 REPORTING REQUIREMENT: Contractors are required to submit a required annual Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year.

Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C. 4212(d). Submit this report as https://sam.gov/ soon as possible, if not already submitted, to avoid delays in the contract award process. For more information on this requirement and/or for completing the web-based reporting form, visit the following website https://www.dol.gov/agencies/vets/programs/vets4212. See FAR provision 52.222-38, Compliance with Veterans' Employment Reporting Requirements (FEB 2016) under the Representations, Certifications and Other Statements of Offerors, and FAR clause 52.222-37, Employment Reports on Veterans (FEB 2016) under the General Conditions.

SECURITY:

It is agreed that:

1. The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the contractor in the performance of this contract, are the exclusive property of the U.S.

Government and shall be submitted to the CO at the conclusion of the contract.

2. The CO will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this contract. No information shall be released by the contractor. Any request for information relating to this contract, presented to the contractor, shall be submitted to the CO for response.

3. Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO.

4. Employees shall not be on site without appropriate badge. Employees are responsible for reporting to the Engineering office with acceptable photo ID to obtain a badge.

The Engineering office, room AEG19 on the Ground Floor of Building 1. A VA approved badge shall be worn with the identification facing forward and visible above the waist. The employees may also be subject to inspection of their personal effects when entering or leaving the facility.

5. No photography or video recording of VA premises is allowed without prior authorization.

6. VA-issued keys are to remain on VA property. Keys that are checked out from the Engineering Office shall be returned each day.

7. The contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

8. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

9. VA Information Custodial Language:

• Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the https://www.dol.gov/agencies/vets/programs/vets4212 contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).

• VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor’s information systems or media storage systems to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA’s information is returned to the VA or destroyed in accordance with VA’s sanitization requirements. VA reserves the right to conduct onsite inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures follow VA directive requirements.

• Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor while performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.

• The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed.

E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall enroll in E-Verify within 30 days of the contract award date. They shall also begin using the E-Verify system to confirm that all their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54).

PRIME CONTRACTOR INFORMATION - SAFETY OR ENVIRONMENTAL VIOLATIONS AND

EXPERIENCE MODIFICATION RATING INFORMATION: All Bidders/Offerors shall submit information pertaining to their past Safety and Environmental record (using the attached EMR information/data form). The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Bidders/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, Bidder/Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc.

(NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI.

Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and Puerto Rico shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, Bidder/Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that it has assigned Bidder/Offeror a Unity Rating of 1.0.

The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.

This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

INVOICE AND PAYMENT FOR MATERIALS STORED OFF-SITE INFORMATION: The COR and the contractor/project manager (whoever will be in charge of submitting the invoice) shall meet and discuss the items listed on a draft copy of the invoice prior to submission to OB10. All items will be approved prior to submission. It is the Contracting Officer’s discretion to pay for any stored materials. This should be discussed prior to submission of the first invoice. Contract financing is not part of this contract.

REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE

ASSESSMENT SYSTEM (CPARS): As prescribed in Federal Acquisition Regulation (FAR) Part 42.15, the Department of Veterans Affairs (VA) evaluates contractor past performance on all contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS has connectivity with the Past Performance Information Retrieval System (PPIRS) database, which is available to all Federal agencies. PPIRS is the system used to collect and retrieve performance assessment reports used in source selection determinations and completed CPARS report cards transferred to PPIRS. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.

Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: www.cpars.csd.disa.mil. Help in registering can be obtained by contacting Customer Support Desk at 207-438-1690.

Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor's registered representative.

For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor's performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor's designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.

Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government's evaluation being placed on file in the database with a statement that the “contractor failed to respond.”

WARRANTY INFORMATION:

Contractor warrants that the work conforms to the specifications as is free for defects.

Warranty runs for one year from acceptance or from possession if earlier than acceptance.

Contractor shall remedy any defect including consequential damage, shall restore work damaged during warranty work and shall warranty that work for one year, five years for roofing.

Contractor must obtain and enforce sub-contractor and suppliers’ warranties.

Contractor is not responsible for Government defects.

The Contracting Officer or designated representative manages the warranty and notifies the Contractor of defects. If the Contractor does not respond, the Contracting Officer is notified and may take the following actions:

a. Notify the Contractor’s company officers in writing of the contract non-conformance

b. Send a letter to the Contractor’s bonding company; and/or

c. Repair the defect at the Contractor’s expense.

Proposals submitted that specify shorter warranty periods or different warranty terms will be deemed technically unacceptable outright and shall not be considered for award.

END OF SUBMISSION INFORMATION

A.5 EVALUATION PROCESS – PROPOSAL PREPARATION – INSTRUCTION

TO OFFERORS

This section describes the evaluation process, proposal preparation, the significant factors and sub-factors and criteria to be used in the evaluation process. This procurement action is a Lowest Price Technically Acceptable source selection process in accordance with FAR 15.101-

2. Proposals will be evaluated for acceptability, but not ranked using the non-price factors/sub-factors. In order to be considered for award, an offeror must have an “acceptable” rating in every non-price factor/sub-factor under consideration.

The Government intends to award a single contract to a qualified Service-Disabled Veteran Owned Small Business (SDVOSB) determined responsible in accordance with the Federal Acquisition Regulation (FAR), whose proposal conforms to all the requirements in this solicitation and is further determined to meet or exceed the standards of acceptability at the lowest offered price. The Government intends to evaluate proposals and award a contract without discussions with Offerors. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from both a technical and cost standpoint.

The evaluation of offers submitted in response to this Request for Proposal (RFP) solicitation will be conducted utilizing the Lowest Price Technically Acceptable (LPTA) selection process.

Utilization of this source selection process may result in not all offers being evaluated. The Contracting Officer, upon receipt of offers, will determine eligibility and compliance to the solicitation requirements. The Vendor Information Pages (VetBiz registry) will be checked to ensure that any offeror submitting a proposal to perform the work is both listed and verified. All proposals received will also be checked for an active registration in the System for Award Management (SAM). Thereafter, the Contracting Officer will review all proposals to ensure that the minimum proposal submission requirements have been met. Once these requirements have been satisfied, the Contracting Officer will select and submit for review to the Technical Evaluation Board (TEB) the technical proposal of the lowest priced offeror for consideration.

Initially, the TEB will not receive any pricing information, only the technical portion of the offeror’s proposal. The offeror’s proposal will be rated against each evaluation factor as set forth in this solicitation.

If the selected offeror’s proposal is determined to be acceptable based on the standards of acceptability, and that offeror’s price is the lowest of all offers submitted, then no further evaluation of offers shall occur, and the Contracting Officer will document these findings and proceed with the responsibility determination of the offeror. Pricing information will only be provided to the TEB upon notification to the Contracting Officer that the technical proposal as submitted meets or exceeds the acceptability standard necessary to fulfill the objective of the requirement.

Should the initial offeror’s proposal be determined to be unacceptable according to the standards of acceptability, then the TEB will be required to provide to the Contracting Officer a summary evaluation sheet that documents how the offeror’s proposal fails to meet the standards of acceptability, and request to the Contracting Officer that another selection be made for consideration of award. This process shall continue until such time that an award is made.

Offerors shall respond in writing to the evaluation factors listed below, in the same order as they appear in this solicitation document. Failure to provide all information will adversely affect the evaluation of an offer. The information contained in the technical proposal should be complete, concise, and address each factor. If information is applicable to more than one evaluation factor, it must be repeated for each factor, unless stated otherwise.

Submit electronic copy of proposals via email to the Contract Specialist, Vance Rosebush, see block 8 of the SF1442. Offerors shall submit a complete proposal (A. Technical & B. Price) to the email address below. Proposals submitted any other way than via email to vance.rosebush@va.gov will be deemed technically unacceptable outright and shall not be considered for award. Faxed and mailed offers will not be accepted.

Submit an electronic copy of an original completed and signed SF24 Bid Bond with your proposal prior to the closing date and time of October 10, 2022, at 1:00pm CST. Any missing element of the offeror’s submission could render the offeror ineligible and their bid will not be considered. Hard copy bonds are NOT REQUIRED.

Proposal Format:

The Contractor shall submit the proposal in two sections (A. Technical & B. Price). Section A.

Technical may be evaluated strictly on the merit of the material submitted, the contractor shall include NO price information in section A. Technical. Sections A. and B. will be evaluated independently.

The Contractor shall submit section A. and B. in electronic format. The electronic copy must be submitted via email to the Contract Specialist vance.rosebush@va.gov. Include page numbers and the company name in the header or footer of each page. The proposal must be submitted in Microsoft Office format. The price proposal shall be in a Microsoft Excel workbook format.

The offeror shall organize the proposal in the following format:

The written proposal including title page, detailed table of contents, preface, for section A.

Technical shall not exceed a total of 50 pages total, which is not inclusive of the solicitation and any amendments issued thereof. Text lines will be single-spaced, Microsoft Arial 12-point font.

A smaller font size for any graphics presented in a proposal is permitted if the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only.

Section B. Price shall not exceed a total of 25 pages in Arial size 12 font. Use graphic presentations where such use will contribute to the compactness and clarity of the proposal.

A page is defined as each face of an 8.5 X 11-inch sheet of paper containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. Excess pages surpassing the total of 50 pages for Section A. Technical, and 25 pages for Section B. Price, will not be reviewed by the Government. Text lines will be single-spaced. Use Microsoft Word Arial 12-point font.

mailto:vance.rosebush@va.gov mailto:vance.rosebush@va.gov.

Each section must therefore be labeled with the following:

1. Construction Company Name

2. Physical Address of the Company

3. Telephone Number

4. Email address

5. VA Project Number: Project 626A4-21-101

6. VA Project Name: Renovate and Expand Physical Medicine Rehabilitation Services

(PMRS)

7. Solicitation number: 36C24922R0091

The Technical Evaluation Board (TEB) shall evaluate the offeror’s proposal against all non-price factors/sub-factors using “ACCEPTABLE” or “UNACCEPTABLE” ratings based upon the standard of acceptability that follows each factor/sub-factor below. To obtain an “ACCEPTABLE” rating, an offeror must meet the standard of acceptability that is listed for each factor/sub-factor.

The evaluation process and criteria stated in this section will be strictly adhered to. Evaluators will make no assumptions regarding an offeror’s proposal. Therefore, an Offeror must demonstrate understanding by the thoroughness, soundness, comprehensiveness, and price reasonableness of technical approach. There will be no public opening of offers. The following evaluation factors and sub-factors will apply to this procurement:

FACTOR 1 - CONTRACTOR EXPERIENCE

An offeror must demonstrate experience in large scale medical health care facility clinical renovation construction. The Government will evaluate the offeror’s construction experience to determine if the offeror has demonstrated the ability to manage large dollar, multi-discipline projects without significant difficulty. Offerors shall identify at least two (2) medical health care facility clinical renovation construction projects exceeding $3,000,000 in magnitude for each project, which were completed within the past ten (10) years through the proposal due date.

Offerors shall provide the following information for each project:

(1) Detailed project description of scope

(2) Government or private sector engineering point of contact (POC) information

(3) Contract number

(4) Contract award value

(5) Location

(6) Contract duration - Period of Performance (POP) start date and end date

Standard for Acceptability: Offerors shall identify at least two (2) medical health care facility clinical renovation construction projects exceeding $3,000,000 in magnitude for each project, which were completed within the past ten (10) years through the proposal due date.

FACTOR 2 – PROJECT MANAGER (PM) EXPERIENCE

An offeror shall identify the proposed Project Manager (PM) for subject project. The offeror shall demonstrate the experience of the PM regarding their experience with large dollar medical health care facility clinical renovation construction projects, that exceeded $3,000,000 in magnitude for each project.

Offerors shall identify at least two (2) medical health care facility clinical renovation construction project exceeding $3,000,000 in magnitude completed within the past ten (10) years through the proposal due date in which the PM was officially assigned as PM for the project.

NOTE: The PM assignment for each listed project should have been for a duration of at least 75% of the project Period of Performance (POP). Offerors shall provide the following information for each project:

(1) Detailed project description of scope

(2) Government or private sector Engineering point of contact (POC) information

(3) Contract number

(4) Contract award value

(5) Location

(6) Contract duration - (POP) start date and end date

(7) Duration of PM assignment for each project

NOTE: In the event an offeror becomes aware that one or more PMs are no longer available to the offeror as proposed, all the same required information of replacement individual(s) shall be submitted to the Government for consideration. A written narrative explaining the reason(s) for the change must accompany the new resume. Projects identified as relevant to this project may be the same ones used in Factor 1.

Standard for Acceptability: Offerors shall identify at least two (2) medical health care facility clinical renovation construction project exceeding $3,000,000 in magnitude completed within the past ten (10) years through the proposal due date in which the PM was officially assigned as PM for the project. The PM assignment for each listed project should have been for a duration of at least 75% of the project Period of Performance (POP).

FACTOR 3 – PAST PERFORMANCE

Past performance shall be used as an evaluation factor for each experience category below within the LPTA process. Past performance shall be evaluated in accordance with FAR 15.305.

However, the comparative assessment in FAR 15.305(a)(2)(i) does not apply to LPTA.

Therefore, past performance will be rated on an “ACCEPTABLE” or “UNACCEPTABLE” basis using the ratings in the table below.

The VA will review each experience category to determine if the offeror has demonstrated the ability to manage a large scale, multi-discipline medical health care facility clinical renovation construction project without significant difficulty. To demonstrate past performance, offerors should attempt to provide at least one (1) Past Performance Questionnaire (PPQ) for each of the following categories and a short narrative with each:

(1) Contractor Experience

(2) PM Experience

NOTE: PPQs shall be sent directly to the Contracting Officer by the client(s). Projects identified as relevant to this project may be the same ones used in Factors above.

PAST PERFORMANCE EVALUATION RATINGS

RATING DESCRIPTION

ACCEPTABLE

Based on the Offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note below.)

UNACCEPTABLE

Based on the Offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

NOTE: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (SEE FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of ACCEPTABLE/UNACCEPTABLE, “unknown” shall be considered “ACCEPTABLE”.

The past performance evaluation results are an assessment of the Offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the Offeror’s record of relevant and recent past performance information that pertain to the products and/or services outlined in the solicitation requirements. The Government may also obtain past performance information through the Past Performance Information Retrieval System (PPIRS) other sources known to the Government.

PRICE: The LPTA procedure is applied to known, firm requirements, usually readily available in the commercial marketplace where a fair and reasonable price determination is based on adequate price competition among all proposals received. When sufficient competition is received and a competitive range can be established, total proposed prices will be compared, and the lowest priced proposal will be selected for technical evaluation. The Government will evaluate the lowest priced proposal for technical acceptability and may evaluate more proposals for the purposes of establishing adequate price competition in accordance with FAR 15.403- 1(c)(1). Therefore, the offered price will be reviewed to determine that the total price is fair and reasonable.

The proposed price will be analyzed for reasonableness. It may also be analyzed for the different divisions of work to be performed and consistency with the Offeror’s Technical Proposal. A detailed price breakdown is required and shall be provided on the “S02-Solicitation Attachment-Price Schedule” worksheet provided with the solicitation.

If a detailed price breakdown is not included in the Offeror’s price proposal, the contractor may be excluded from further consideration of contract award. Pricing will be evaluated in accordance with FAR 15.4 to determine reasonableness and evaluate potential performance risks. This factor will be evaluated as either reasonable or unreasonable. The Government reserves the right to cancel the subject RFP and re-solicit via another mechanism should a fair and reasonable price not be achieved, or reasonableness of price cannot be determined.

END OF EVALUATION PROCESS

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.2 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)

ALTERNATE I (MAY 2014) AND ALTERNATE II (JUN 2009)

(a) Definitions. "Bahrainian, Mexican, or Omani construction material," "commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by…