S05 - Amendment 0004 - Questions and Answers .pdf
PDF 68 KB Posted
- Attached to
- Project 614-18-115, Renovate Operating Rooms
- Solicitation number
- 36C24922R0015
About this file
This document provides answers to questions regarding Solicitation Number 36C24922R0015 for the Project 614-18-115 to Renovate Operating Rooms at the Department of Veterans Affairs Medical Center in Memphis TN. The contractor shall provide all necessary tools, labor, materials, equipment, permits, license, supervision, and quality control to complete the renovation in accordance with the drawings and specifications. Stainless steel corner guards are to be installed on all exposed corners at 6 inches above the finished floor in Operating Rooms OR-1 through OR-8 and in corridors BW3-3, BW3-1, BW3-2, BW3-3, BE3-5, CW3-1, CW3-3, and CW3-4 as indicated on drawing A601 Room Finish Schedule and Signage Floor Plan.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
1. RFI Question number 42 states to look at sheet A103.1 for Corner Guard locations. The plan set doesn’t have a A103.1 sheet, are we to assume there are no corner guards in phase 3?
Answer - The corner guard requirements appear to have been incorporated with the finish plans. See drawing A601 Room Finish Schedule and Signage Floor Plan table “Basis of Design.”
STAINLESS STEEL CORNER GUARDS TO BE INSTALLED ON ALL EXPOSED CORNERS AT 6” A.F.F. IN
OPERATING ROOMS OR-1 THRU OR-8 AND IN CORRIDOR BW3-3 AND CORRIDOR BW3-1, BW3-2,
BW3-3, BE3-5, CW3-1, CW3-3, & CW3-4