S05 - Amendment 0004 - Questions and Answers .pdf

PDF 68 KB Posted

Attached to
Project 614-18-115, Renovate Operating Rooms
Solicitation number
36C24922R0015
Issued by

About this file

This document provides answers to questions regarding Solicitation Number 36C24922R0015 for the Project 614-18-115 to Renovate Operating Rooms at the Department of Veterans Affairs Medical Center in Memphis TN. The contractor shall provide all necessary tools, labor, materials, equipment, permits, license, supervision, and quality control to complete the renovation in accordance with the drawings and specifications. Stainless steel corner guards are to be installed on all exposed corners at 6 inches above the finished floor in Operating Rooms OR-1 through OR-8 and in corridors BW3-3, BW3-1, BW3-2, BW3-3, BE3-5, CW3-1, CW3-3, and CW3-4 as indicated on drawing A601 Room Finish Schedule and Signage Floor Plan.

View the file

Other files

File Type Posted
S06 - Amendment 0006.pdf PDF
S05 - Amendment 0006 - Question and Answer.pdf PDF
S06 - Amendment 0005.pdf PDF
S05 - A0005 Amendment - Pre-bid Addendum 2022 10 06.pdf PDF
S06 - Amendment 0004.pdf PDF
S06 - Amendment 0003 - 614-18-115 - Renovate Operating Rooms Memphis VA.pdf PDF
S05 - Amendment 0003 - Attachment 3 - Site Visit Sign in Sheet - 614-18-115.pdf PDF
S05 - Amendment 0003 - Attachment 2 - Pre-bid Addendum.pdf PDF
S05 - Amendment 0003 - Attachment 1 - Questions and Answers - 614-18-115.pdf PDF
S06 - Amendment 0002 - Time Extension 10-7-2022.pdf PDF
S06 - Amendment 0001 - 614-18-115 - Renovate Operating Rooms - Memphis Tennessee.pdf PDF
S02 - Attachment 8 - Drawing Equipment.pdf PDF
S02 - Attachment 9 - Drawing Structural.pdf PDF
S02 - Solicitation - 36C24922R0015 - 614-18-115.pdf PDF
S02 - Attachment 2 - Contractor Safety and Environmental Record Evaluation Form.pdf PDF
S02 - Attachment 14 - Wage Determination - Shelby County - TN20220200 05-06-2022.pdf PDF
S02 - Attachment 5 - Combined Spec Vol 2.pdf PDF
S02 - Attachment 3 - Past Performance Questionnaire.pdf PDF
S02 - Attachment 13 - Drawing Electrical and Fire Alarm.pdf PDF
S02 - Attachment 1 - Pricing Schedule - Renovate Operating Rooms Memphis.xlsx XLSX spreadsheet
S02 - Attachment 10 - Drawing Fire Protection.pdf PDF
S02 - Attachment 12 - Drawing Plumbing.pdf PDF
S02 - Attachment 11 - Drawing Mechanical.pdf PDF
S02 - Attachment 6 - Drawing G001-003.pdf PDF
S02 - Attachment 7 - Drawing Architectural.pdf PDF
S02 - Attachment 4 - Combined Spec Vol 1.pdf PDF
S03-(Presolicitation Notice) 36C24922R0015.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

1. RFI Question number 42 states to look at sheet A103.1 for Corner Guard locations. The plan set doesn’t have a A103.1 sheet, are we to assume there are no corner guards in phase 3?

Answer - The corner guard requirements appear to have been incorporated with the finish plans. See drawing A601 Room Finish Schedule and Signage Floor Plan table “Basis of Design.”

STAINLESS STEEL CORNER GUARDS TO BE INSTALLED ON ALL EXPOSED CORNERS AT 6” A.F.F. IN

OPERATING ROOMS OR-1 THRU OR-8 AND IN CORRIDOR BW3-3 AND CORRIDOR BW3-1, BW3-2,

BW3-3, BE3-5, CW3-1, CW3-3, & CW3-4