This life safety plan documents the fire protection requirements for the Sousley Campus of the Lexington VA Medical Center. It includes drawings of multiple buildings identifying fire barriers, occupancy classifications, egress routes, and fire safety equipment. The plan covers over 20 buildings totaling nearly 800,000 square feet. Occupancies include medical, residential, office, industrial and more. Fire barriers include 3-hour, 2-hour and 1-hour rated walls. Egress components include multiple stairwells, smoke compartments and fire alarms. The drawings specify the locations of fire pumps, sprinklers, extinguishers and other fire protection systems. This comprehensive life safety plan establishes the fire code requirements for all structures on the Sousley Campus to ensure protection of patients, staff and visitors in the event of a fire emergency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24922Q0558 0001.docx | DOCX document | |
| 36C24922Q0558.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHEELCHAIR
RAMP
1NOT IN
SCOPE 3
29 17
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
COVER SHEET
LS-0.00
7/ 8/
:4
1:
P M
TO BUILDING 3
MORTUARY FREEZER
CORRIDOR
C-G-1-3
CLOSET
PASSAGE
8 CLOSET
10 MECH
OFFICE
1 CORRIDOR
C-G-1-2
WAITING
STORAGE
HAC
4A
CORRIDOR
C-G-1-1
AMBULANCE
ENTRANCE
LOCKER
ROOM
2B
SQUAD
ROOM
2A
VESTIBULE
2D
HOLDING
CELL
2C
ELECTRICAL MENS
TOILET
4 SUB-BASEMENT
MECH
ELEVATOR
ENTRY
STAIR
NO-2
ELEVATOR
REF.
ELEVATOR
LOBBY
ENTRY
RECEPTION
16A BID ITEM 2
TEAM EVAL/ GAIT
CORRIDOR
C-G-1-4 BID ITEM 4
BID ITEM 5
PT. TOILET
LOCKSMITH
PHARMACY
CONSULT
WOMENS
TOILET
POLICE
SUPERVISOR
PCS
Timekeepers
VISN 9
CONTRACTING
MED
RECORD
TECHNICIAN
31C
SERVER
RM
EC
WAITING
RECEPTION
PURCHASING
DRAW
STATION
16D 16C
TOILET
LAB
16B BREAK ROOM
OFFICE
19 UP
ELECTRICAL
STORAGE
EXAM 1
ST TOILET
23A
STORAGE
25A
EXAM 2
BID ITEM 3
EXAM 3
FABRICATION LAB
26A
MED
ADMINISTRATIVE
FILES
EQUIPMENT
26B
RESTORATION
LAB
STAIR 1
STAIR 2
STAIR 3
STORAGE
DRAW
STATION
11969 SQ FT
ZONE 1-G-A
BUSINESS / INDUSTRIAL /
STORAGE OCCUPANCY
INCOMING H2O
BUILDING 1
TO BUILDING 3
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 1
GROUND FLOOR
LS-1.0G
7/ 8/
:4
2:
11602 SQ FT
ZONE 1-1-A
BUSINESS OCCUPANCY
PATIENT
ADVOCATE
125 VIST
CO-ORDINATOR
OFFICE
CORRIDOR
C-1-1-1
OEF / OIF
OFFICE
PIPE
SPACE
OFFICE
STAIR
OFFICE
ASSOCIATE
DIRECTOR`S
OFFICE
SECRETARIES
COPY
RM
TOILET
CHIEF
POLICE
TOILET
122A
FIRE
PIPE
STORAGE
DEPUTY
CHIEF VA
POLICE
122 ELEVATOR
OFFICE
118A
ELEVATOR
ELEVATOR
LOBBY
MEN`S
TOILET
PIPE
SPACE
CORRIDOR
C-1-1-4
DIRECTOR`S
OFFICE
OFFICE
STAFF
TOILET
H.A.C.
OFFICE
HAC
CORRIDOR
C-1-1-5
VA
POLICE
PHOTO ID
FINGERPRINTING
ASST POLICE PGM
SUPPORT
ADMINISTRATIVE
OFCR.
TEL &
DATA
LOBBY
STAFF
TOILET
142A
RECEPTION
CHIEF, SOCIAL WORK
OFFICE
OFFICE
CONFERENCE
RM
108 PATIENT
TOILET
140A
RADIOLOGY
RM
TRANSCRIPTION
CLOSET
SOCIAL WORK
ADMINISTRATION
WAITING
CORRIDOR
C-1-1-2
CORRIDOR
C-1-1-3
TOILET
TOILET
146A
HAC
STOR
145 STORAGE
VASCULAR
LAB
EC
PATIENT
TOILET
137A
STOR
RADIOLOGY
RM
WOMEN VET
PGM MGR
OFFICE
TELE
HEALTH
132 ENTRY
RADIOLOGY
RM
PATIENT
TOILET
134A
STOR
STOR
136A
FILE
STORAGE
NO.
WOMEN`S
TOILET
STAIR
NO.
STAIR
NO.3
FILM
READING
PI
PE
SP
AC
E
ADMINISTRATION
STAIR 1
STAIR 2
STAIR 3
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 1
FLOOR 1
LS-1.01
7/ 8/
:4
2:
BREAK
RM
200A
OFFICE
BREAK
RM
CORRIDOR
201-01
OFFICE
STAIR
NO-1
EXAM
RM -4
206A
EXAM
RM -3
OFFICE
213A
EXAM
RM -6
212A
EXAM
RM -5
EXAM
RM -2
TOILET
204A RN EXAM
RM -1
ELEVATOR
RN
TOILET
202A
PUBLIC
TOILET
TOILET
206B
TOILET
212B
TELEPHONE
CARE
CORRIDOR
206-01
SOILED
UTILITY
STORAGE
HAC
CLEAN
UTILITY
WEIGH
M/C
EXAM
RM -9
220 TOILET
220A
WAITING
RM
TEAM
ASST
WHLCHR
STORAGE
EXAM
RM -7
CORRIDOR
205-01
RECEPTION
(3) CHECK
IN/OUT
MEDICATION
CLEAN
LINEN
EXAM
RM -15
TOILET
214A
217 235 TOILET
236A
CORRIDOR
204-01
STORAGE
EC
CORRIDOR
202-01
STORAGE
226A
NOURISH
WEIGH
M/C
IT
CLOSET
OFFICE
EXAM
RM -18
231 TOILET
231A
EXAM
RM -17
WOMENS
HEALTH
CORRIDOR
203-01
WAITING RM
EQUIP
STORAGE
LOCKER
RM
ELEVATOR
WORK
RM
STAIR
NO-2 STAIR
NO-3
TOILET
251A
TOILET
248A
NURSE
MGR
OFFICE
TOILET
247B
SOILED
UTILITY
HAC
TOILET
241B
EXAM
RM -13
EXAM
RM -14
241A
GROUP
ROOM
EXAM
RM -11
EXAM
RM -12
247A
CONFERENCE
EXAM
RM -8
NURSE
CHECK
IN
NURSE
CHECK
IN
EXAM
RM -16
11322 SQ FT
ZONE 1-2-A
STAIR 1
STAIR 2
STAIR 3
SCALE: 1/8" = 1'-0"
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 1
FLOOR 2
LS-1.02
7/ 8/
:4
2:
OFFICE
301A PURCHASING
OFFICE
301B
OFFICE
302 OFFICE
301C
STAIR
EXAM
307A
STAFF
OFFICE
314D
EXAM
PRIMARY
CARE
EXAM
313A
EXAM
TREATMENT
RM
PHARMACY
SPECIALIST
305A
PRIMARY
CARE
EXAM RM
305 WEIGH
MIC
SPD
STAFF
OFFICE
314C
IN-CLINIC
TOILET
313B
STAFF
OFFICE
314B
HAC
SOILED
UTILITY
CLEAN
UTILITY
310 POD
MED
COMPUTER WKSTNS (2)
314A
CORRIDOR
305-01
STAFF
WORK
RM
EC
VITALS
321A
EXAM
WAITING
SOCIAL
WORKER
OFFICE
326A
TESTING
EQUIP
EXAM
EXAM
CORRIDOR
304-01
STAFF
TOILET
315A
(NIC)
FRIG
STAFF
BREAK
SOCIAL
WORKER
OFFICE
TESTING
EQUIP
TESTING
RM
338A
EXAM
STORAGE
CORR.
302-01
REF.
CLEAN
UTIL.
LOCKER
RM
338B
STAFF
TOILET
340A
MICRO
STAFF
BREAK
TRAVEL-PAY
PHONE
RECEPTION
CHECK
IN/OUT
OPTOMETRY
EXAM
RM
CLEAN
UTILITY
307B
FIRE
EXTINGUISHER CORRIDOR
301-01
TESTING
EQUIP
OPTIC
NERVE
IMAGING
IT
CLOSET
THERAPY
TRAINING
RM
PRE
PATIENT
WORK-UP-1
SCREENING
RM
333A
EXAM
CORRIDOR
303-01
STAFF
OFFICES
342 OFFICE
342D
NO
ELEVATOR
EMPL-HLTH/MED/
PROCEDURE
LOBBY
ELEVATOR
PUBLIC
TOILET
352A
WAITING
352 EXAM
349C
EXAM-6
349B
343C
EXAM-3
343B
OFFICE
342C
OFFICE
342B
EXAM-1
EXAM-2
343A
SECT
CHF
OFFICE
342A
STAIR
STAIR
NO
2 NO
EXAM-4
EXAM-5
349A
IN-CLINIC
PT TOILET
C O
R R
ID
O
R
PRIMARY CARE EYE CLINIC
11310 SQ FT
ZONE 1-3-A
STAIR 3
CLINICAL
DISINFECT.
AREA
SCALE: 1/8" = 1'-0"
FLOOR 3
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 1
FLOOR 3
LS-1.03
7/ 8/
:4
2:
7383 SQ FT
ZONE 1-4-A
MECHANICAL
ROOM
STAIR
NO-1
TELEPHONE
CARE
PIPE
SPACE
401A
ROOF
ROOF OF 3RD FLOOR CORRIDOR
C-4-1-1
WOMENS
TOILET
402B
SOCIAL
WORKER
OFFICE
402A
TOILET
404A
SOCIAL
WORKER
OFFICE
PS
402A
MECH RM
CORRIDOR
C-4-1-1
OFFICE
ELEVATOR
ELEVATOR
LOBBY
ELEVATOR
STORAGE
PODIATRY
EXAM
STAIR
NO 2 PODIATRY
SECTION
CHIEF
413C
TOILET
408A
PODIATRY
EXAM
MEDS
MENS
TOILET
412A
EC
413B
MED FOSTER
CARE OFFICE
413A
ROOF
ROOF OF 3RD FLOOR
TELEPHONE
CARE
BREAK
RM
SOCIAL
WORKER
OFFICE
SOCIAL
WORK
SUPV
OFFICE
OFFICE
OFFICE
OFFICE
422 WAITING
RM
RECEPTIONIST
IT CLOSET
PODIATRY
RM
PODIATRY
RM
PODIATRY
RM
STORAGE
RM
PODIATRY
RM
PODIATRY
CONFERENCE
RM
414A
PIPE
SPACE
STAIR
NO 3
FOYER
PODIATRIST
OFFICE
413B
ROOF
ROOF OF 3RD FLOOR
ROOF
ROOF OF 3RD FLOOR
PODIATRY
CLINIC
STAIR 1
STAIR 2
STAIR 3
AHU
ELEVATOR
MACHINE
ROOM
4123 SQ FT
ZONE 1-P-A
INDUSTRIAL OCCUPANCY
SCALE: 1/8" = 1'-0"
PENTHOUSE
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 1
FLOOR 4 & PENTHOUSE
LS-1.4.P
SCALE: 1/8" = 1'-0"
FLOOR 4
7/ 8/
:4
2:
VACANT
STOR
CANTEEN
STORAGE
CORRIDOR
C-G-2-2
TRAVEL
OFFICE
OFFICE /
STORAGE
CAFETERIA -
RETAIL
ELEVATOR
ELEVATOR
MECH RM
ATM
18 UP
STAIR
LOBBY
CORRIDOR
C-G-2-1
STORAGE
10A
KITCHEN
HAC
9A
3A
BOILER
HAC
TOILET
OFFICE
STORAGE
5C
CORRIDOR
C-G-2-3
OFFICE
5B
STORAGE
5D
OFFICE
5A
WAITING
TO BUILDING 17
TO BUILDING 3
EMS
8036 SQ FT
ZONE 2-G-A
BUSINESS / STORAGE
OCCUPANCY
STAIR 2
STAIR 1
BUILDING 2
TO BUILDING 3
TO BUILDING 17
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 2
GROUND FLOOR
LS-2.0G
7/ 8/
:4
2:
7957 SQ FT
ZONE 2-1-A
STAFF
CHIEF,
ACCT
STAFF
OFFICE
ACCNT (4)
CORRIDOR
STAFF
OFFICE
PAYROLL
(2)
126A
TOILET
OFFICE
STAFF
OFFICE
PAYROLL
STORAGE
COPIER
FILE
STORAGE
OFFICE ASST
CHIEF FISCAL
CHIEF
OFFICE
FISCAL
ANALYST
CONFERENCE
RM
CORRIDOR
101-02
HAC
STAIR
HALL
NO
OFFICE
OFFICE
CORRIDOR
103-02
OFFICE
OFFICE
104A
TOILET
STAFF
OFFICE
FEE
BASIS
STAFF
OFFICE
MCCR/MCCF
106A
BUDGET
ANALYST
OFFICE
STAFF
OFFICE
AUDITOR
STAFF
OFFICE
UTIL REV
NURSE
WOMEN'S
RESTROOM
OFFICE
STAFF
BREAK
RM
STORAGE
101A
IT
BUDGET
ANALYST
CLOSET
ELEVATOR
STAIR
#1 101-02
CORRIDOR
102-02
STAFF
OFFICE
FEE
STORAGE
106B
BASIS
TO BUILDING 3
STAIR 1
STAIR 2
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 2
FLOOR 1
LS-2.01
7/ 8/
:4
2:
8102 SQ FT
ZONE 2-2-A
OFFICE
225C
223A TOILET
CORRIDOR
202-02
OFFICE
STAFF
BREAK
RM
CONFERENCE
RM
CORRIDOR
201-02
HAC
OFFICE
STAIR
-2 202-02
TOILET
OFFICE
CORRIDOR
203-02
COPIER
STORAGE
PRINTER/
FAX
OFFICE
MENS
OFFICE
RESTROOM
211 RECEPTION/ADMIN
WAITING
201 OFFICE
201C
(NIC)
FRIG OFFICE
OFFICE
ASST
CHIEF
ELEVATOR
IT
CLOSET
220 229ASSISTANT
CHIEF
STAIR
-1
201-02
229A
COPIER/FAX
ALCOVE
201A OFFICE
CHIEF
ENG
201B
TOILET
205 204A
OFFICE
206ACONFERENCE
206C
OFFICE
206B
TO BUILDING 3
OFFICE
SECRETARY
ENGINEERING
SERVICES
PLAN
ROOM
CONFERENCE
ROOM
DOWN
8941 SQ FT
ZONE 2-A-A
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 2
FLOOR 2 & ATTIC
LS-2.2-A
SCALE: 1/8" = 1'-0"
ATTIC
7/ 8/
:4
2:
21502 SQ FT
ZONE 3-G-A
BUSINESS / STORAGE /
INDUSTRIAL OCCUPANCY
TO BUILDING 2
OFFICE
13C
BREAK
RM
13D
STORAGE
HALLWAY
STORAGE
16C
OVERHEAD DOOR
REPRODUCTION
SUPPLIES
13B
REPRODUCTION
13A
LOADING
DOCK
11A
OVERHEAD DOOR
STAIR
NO
1 ELEVATOR-2
WALK-IN
REFR
OVERHEAD DOOR
RECEIVING
CONC
PLATFORM
TRANSFORMER
RM
STORAGE
SUBSISTENCE
STORAGE
SUPPLY
REFRIG
PUMP
RM
3A
FOOD
STORAGE
STORAGE
HAC
5A
DAIRY
REFR
18 REFR AND AIR COND
REPAIR SHOP
LOBBY
SUPV
OFFICE
REFR
MECH
RM
SVC
RM
STORAGE
19A MECH
RM
INGREDIENT CONTROL
INGREDIENT
CONTROL
HAC
CCR
REFR
15A
RM
FREEZER
15B
FOOD
STORAGE
15D STORAGE
16A
STORAGE
16B
ELEVATOR
ELEVATOR
MECHANICAL
ROOM
16C
ELEVATOR-3 ELEVATOR
TO BUILDING 1
ELEVATOR-1
TRANSPORTATION
HALL
PHARMACY
STORAGE
32 GENERAL
MED
STORAGE
29B
GARAGE
MECHANICS
OFFICE
31A
OVERHEAD DOOR OVERHEAD DOOR OVERHEAD DOOR
MECHANICAL
TO BUILDING 4
STORAGE
30 26A
TOILET
29A
BREAK
RM
ELEVATOR
MECH RM
REFR
NON
FOOD
STORAGE
TOILET
20A
STAIR
PASSAGEWAY
NO
LOCKER
IT CLOSET
24A
STAIR 3
STAIR 1
BUILDING 3
TO BUILDING 2
TO BUILDING 1
TO BUILDING 4
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 3
GROUND FLOOR
LS-3.G
7/ 8/
:4
2:
15897 SQ FT
ZONE 3-1-A
BUSINESS / STORAGE
OCCUPANCY
AUTO
FILE
KITCHEN
ROOF
ROOF
ROOF
ROOF
ROOF
STAIR UP
RA
MP
D N
RAMP DN
ROOF
UP
SCULLERY
ELEVATOR
WAITING
100A
FOOD
PRODUCTION
STOR.
100Q
CORRIDOR
C-1-3-1
CORRIDOR
C-1-3-1
LOBBY
TEL AND DATA
CLOSET
131A
ELEVATOR
NO
WORK
STATION
CONFERENCE
RM
100L
RECEPTION
100B
HALL
100U
STORAGE
100V
MALE
TOILET
100S
FEMALE
TOILET
100R
STOR.
100C
HVAC
RM
100D
STOR.
100E
CLERK
100F
OFFICE W C
ASST
100G
STORE
100HCLASSIF
SPECIALIST
100J
STAFF
SPECIALIST
100K
OFFICE
100M
OFFICE
100N
OFFICE
100X
OFFICE
100Y
CHIEF
DIETETIC
SVC
STORAGE
105A
SECY/
WAITING
ASST CHIEF
DIETETIC SVC
TOILET
CONFERENCE
RM
CLERICAL
LOBBY
CHIEF
ADMIN
SECTION
CHIEF FOOD
PRODUCTION
SVC
ELEVATOR
NO 2
STAIR
NO 1
FOOD
PRODUCTION
HAC
SOIL CART PARKING
DISHWASHING &
SOILED DISH
COLLECTION
CLEAN DISH
STORAGE
CORRIDOR
C-1-3-2
CART WASH
CENTER
114FOOD
PRODUCTION
OFFICE
CORRIDOR
C-1-3-3
ELECTRICAL
CLOSET
HAC
THERMALIZER
TRAY
MAKE-UP
CART
COOLER
PREFABRICATED
PREPARED
FOOD
STORAGE
COOLER
PREFABRICATED
TRAY-LINE
SUPVS
ELEVATOR
NO
INFO
CENTER
STAIR
NO 3
TO BUILDING 1
STAIR 1
STAIR 3
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 3
FLOOR 1
LS-3.1
7/ 8/
:4
2:
996 SQ FT
ZONE 3-M-A
ROOF BELOW
ROOF BELOW
ROOF BEL0W
CONNECTING
CORRIDOR
C-2
CORRIDOR
206 CORRIDOR
CORRIDOR
NON-VA CARE
HAS
CUBICLES
CONFERENCE
OFFICE
VAULT
STAIR
NO
CONNECTING
CORRIDOR
C-2-3
TEL AND DATA
CLOSET
222A
ELEVATOR
NO
STORE
RX
RECEIVING
AND FILLING
OUTPATIENT
DISPENSING
EMS
WOMENS
TOILET
MENS
TOILET
OFFICE
OFFICE
ASST. CHIEF CITC
HAS
212A
CHIEF CITC
HAS
CLERK
DN
OFFICE OF
CHIEF
101A
OFFICE OF
ASST CHIEF
101B
EMP RELATIONS
ASST
STAIR
EMP
RELATIONS
SPECIALIST
101C
MECHANICAL
STAIR
NO 1
DN
ROOF
5774 SQ FT
ZONE 3-2-A
554 SQ FT
ZONE 3-2-B
ELEVATOR
MACHINE
ROOM
CUBICLES
STAIR 3
STAIR 1
SCALE: 1/8" = 1'-0"
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 3
FLOOR 2 & MEZZANINE
LS-3.2-M
SCALE: 1/8" = 1'-0"
MEZZANINE
7/ 8/
:4
2:
5445 SQ FT
ZONE 3-A-A
STAIR 3
ATTIC
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 3
ATTIC
LS-3.A
7/ 8/
:4
2:
4025 SQ FT
ZONE 4-G-A
NURSING
EDUCATION
CLASS RM-B
CUBILCES
11C
MC
RM 11B
NURSING EDUCATION
CLASSRM-A
STAIR - 1
11A
CORRIDOR
STORAGE
TO BUILDING 3
CORRIDOR
CG-4-4
CORRIDOR
CG-4-2
CORRIDOR
CG-4-1
WOMENS
TOILET
UNION
OFFICE
STORAGE
OPEN
OFFICE
OFFICE
CORRIDOR
CG-4-3
ELECTRICAL RM
MECHANICAL
ROOM
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 4
GROUND FLOOR
LS-4.0G
7/ 8/
:4
3:
4021 SQ FT
ZONE 4-1-A
MECHANICAL ROOM
AR ROOM
104A
CORRIDOR
C-1-4-1
HAC
106 107
STAIR
NO. 2
STAIR
NO. 1
DATA
AUDITORIUM
TO BUILDING 3 CORRIDOR
C-1-4-2
MEN`S
TOILET
STORAGE
IT
STAGE
CLOSET
102A
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 4
FLOOR 1
LS-4.01
7/ 8/
:4
3:
556 SQ FT
ZONE 4-A-A
CORRIDOR
C-2-4-1 STAIR
NO 2
STORAGE RM
ATTIC
OPEN TO BOILER
ROOM BELOW
UP TO
ATTIC
DN
919 SQ FT
ZONE 4-2-A
SCALE: 1/2" = 1'-0"
ATTIC
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 4
FLOOR 2 & ATTIC
LS-4.2-A
SCALE: 1/2" = 1'-0"
FLOOR 2
7/ 8/
:4
3:
10577 SQ FT
ZONE 16-G-A
EXERCISE RM
PIPE/CRAWL
SPACE
TOILET
12-E
STAIR 1
ELECTRICAL
ROOM
STAIR 2 STOR.
12-B
OFFICE
12-C
STAIR
NO-1
OFFICE
10B OFFICE
10A STAIR
NO-2
FLEX
12-D
FCQ
16A
TO BUILDING 17 CORRIDOR
C-G-16-1
TO BUILDING 29
IT CLOSET
6B STORAGE
OFFICE
5A
MALE
TOILET
ELEVATOR
NO-2
STAFF
TOILET
VACANT
2 PUMP RM
1A
LOBBY
ELEVATOR
NO-1
OFFICE
14B
REHAB
CLINIC
13-A
STOR.
13-C
OFFICE
13-B
OFFICE
COPY
14A
STORAGE
6A
13-G
13-E
RECEPTION
13-D
HALL
LOBBY
13-F
OFFICE
5 13-J
13-K
EXAM RM
13-I
13-L
WHEELCHAIR
RAMP
OFFICE
5E
OFFICE
5B
MECHANICAL ROOM
OFFICE
5C
OFFICE
5D
STORAGE
09C
RECEPTION
09B
UTILITY
09D
TY
P
TA9
TOILET
09G
BLOOD DRAW 1
09E
BLOOD DRAW 2
09F
LAB
09H
PASSAGE
09A
WAITING
09A
BLOOD DRAW 3
09L
BLOOD DRAW 4
09K
TOILET
09J
SUPERVISOR OFFICE
09I
TY
P
OFFICE
14B
OFFICE
EXAM RM
EXAM RM
EXAM RM
OFFICE
EXAM RM
EXAM RM
13-H
STOR.
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 16
GROUND FLOOR
LS-16.G
7/ 8/
:4
3:
14490 SQ FT
ZONE 16-1-A
EXAM
117 A
EXAM
117 B
EXAM
117 C
WAITING RM
SEATS 44
EXAM
135 C
EXAM
135 B
EXAM
135 A
TOILET
117 D
118 TOILET
119 A
INTER-
VIEW RM
126 A
HALL
H103
TREATMENT
STAIR 1
UTILITY
EXAM
STAIR
S101
EXAM
HAC
TOILET
121A
STAFF
EXAM
WORK RM
TOILET
DUCT
CHASE
RECEPTION
WHEEL
CHAIR
STORAGE
VITAL
STATICTICS
HAC
HALL
H102
MED
CART
IT CLOSET
115 A
WORK RM
TOILET
TOILET
114 C
HALL
H104
EXAM
TOILET
131 A
STAIR
S102
UTILITY
INTER-
VIEW RM
126 B
HALL
H105
TREATMENT
TOILET
135 D
TOILET
133 A
EXAM
136 A
CLN
LINEN
EXAM
TOILET
107 A
TOILET
106 A
EXAM
114 A OFFICE
EXAM
ELEVATOR
E102
104 A TOILET
ELEVATOR
LOBBY
ELEVATOR
E101 EXAM
NITROGEN
CYLINDER
EXAM
MED
TOILET
145 A
EXAM
137 A
OFFICE
OFFICE
HALL
H106
EXAM
114 B EXAM
137 B
HALL
H101
STAFF
LOUNGE
EXAM
TOILET
113 A
TOILET
111 A
TOILET
140 A
TOILET
138 C
TOILET
144 A
TOILET
TOILET
137 C
MEDS
EXAM
136 C
WORK
RM
136 B
EXAM
138 A
CONFERENCE RM
111 GROUP
CLINIC
STAIR 1 STAIR 2
SCALE: 1/8" = 1'-0"
FLOOR 1
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 16
FLOOR 1
LS-16.1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
7/ 8/
:4
3:
STAFF
BREAK RM
GROUP
RM
LOCKER
RM
239A
WAITING
AREA
LG GROUP
STORAGE
270B
HAC
237 TOILET
239B
TOILET
239C
PHONE
CARE
PATIENT
TOILET
270A
PATIENT
BATH RM
269A
TOILET
WORK RM
PROVIDER
INTERN
TOILET
WAITING
C OFFICE
PC-SW
STAIR
NO-1
RN WORK
STATION
214B
LPN
COUNTER
STATION
MECH
214C
MED
CART
214A
SOILED
UTILITY
EXAM 2
EXAM 1
CLOSET
COMM
CENTER
COPY/MAIL
CORRIDOR
201A
CLEAN
UTILITY
242 STOR.
POD
CLOSET
CLEAN
UTIL.
IT CLOSET
222A
WORK RM
EXAM 3
EXAM 4
EXAM 5
EXAM 6
PROCEDURE/
TREATMENT
CLOSET
207A
ELEVATOR
MED EQUIP
STORAGE
STAIR
NO-2
WAITING
PHARM D
SMALL
GROUP RM
SM GROUP
STORAGE
269A
ELEVATOR
PHARMACIST
OFFICE
HAC
C OFFICE
BH-SW
N MGR
OFFICE
PROVIDER
WORKROOM
TEL
EXAM
EXAM 2
TOILET
211A
CONFERENCE
EXAM 2
EXAM 3
SOILED
POD
RN
WORKER
226A
EXAM 3
LPN
WORKER
226 EXAM 4
STAFF
TOLIET
POD 1
RN
254A
EXAM 4
259 LPN
WORKERS
RM
MED
CART
226B
SOILED
HOLDING
EXAM 5
P
TOILET
230A
EXAM
TREATMENT
PROCEDURE
TREATMENT
PROCEDURE
EXAM
EXAM 7
EXAM 6
EXAM 5
P
TO
IL
ET
258A
SOILED
HOLDING
MED
CART
254B
14556 SQ FT
ZONE 16-2-A
STAIR 1 STAIR 2
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 16
FLOOR 2
LS-16.2
7/ 8/
:4
3:
STAIR
10683 SQ FT
ZONE 16-A-A
ATTIC
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 16
ATTIC
LS-16.A
7/ 8/
:4
3:
TO BUILDING 16
CONFERENCE RM
FF:VCT
MECH
10A
FF:CONCRETE
STAIR
NO. 3
FF:VCT
TO BUILDING 25
CLOSET
10B
FF:VCT
STAIR
NO 1
FF:VCT
DENTAL CLINIC
INFORMATION
MANAGEMENT
STAIR 3
STAIR 2
STAIR 1
12847 SQ FT
ZONE 17-G-A
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 17
GROUND FLOOR
LS-17.G
7/ 8/
:4
3:
13186 SQ FT
ZONE 17-1-A
STAIR
DN
LOCKED COULD NOT VERIFY
STORE
STAIR
WOMENS
TOILET
OPEN OFFICE SPACE
OUTPATIENT
NUTRITION
STAIR 3 STAIR 1
17-1-002
17-1-002
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 17
FLOOR 1
LS-17.1
7/ 8/
:4
3:
DN
UP
microwave
Mach Ice
W D
AREA
EMERG MGR
OFFICE
FF:VCT
DIETITIAN
OFFICE
FF:VCT
13583 SQ FT
ZONE 17-2-A
STAIR 3
SCALE: 1/8" = 1'-0"
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 17
FLOOR 2
LS-17.2
7/ 8/
:4
3:
STAIR
9756 SQ FT
ZONE 17-A-A
SCALE: 1/8" = 1'-0"
ATTIC
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 17
ATTIC
LS-17.A
7/ 8/
:4
3:
ACTIVITY
ROOM
OFFICE
VERA
OFFICE
VERA
OFFICE
VERA
27 MEDICAL RECORD
STORAGE
OFFICE
VERA
ENTRY
CLOSET
24A
CLOSET
CLOSET
OFFICE
VERA
CORRIDOR
C-G-25-2 OFFICE
VERA
OFFICE
18A S01
IT CLOSET
PHARMACIST
19A
BREAK ROOM
TOILET
OFFICE
TRANSFORMER
RM
CLOSET
CORRIDOR
C-G-25-1
CORRIDOR
C-G-25-1
CLOSET
34A
CORRIDOR
C-G-25-3 CORRIDOR
MEN`S
STAFF
TOILET
WOMEN`S
STAFF TOILET
STORAGE
REHAB/DENTAL
S02
HALL
CONFERENCE
ROOM
7 CHIEF OF
CLINICAL
PSYCHOLOGY
MHC
PHARMACIST
TESTING/
INTERVIEW
ELEVATOR
E02
E. T. STUDY RM
3 ELEVATOR
LOBBY
ELEVATOR
MECH RM
SECY`S
PSYCHOLOGY
SVC
STORAGE
1A
ELEVATOR
E01
DAV
VACO HR &
Virutal OI&T
CLOSET
39A
WORK
RM
CONTINUES TO BLDG. 17
OFFICE
SOCIAL
WORK SVC
MECH RM
BELOW
OFFICE
SECY
CORRIDOR
C-G-25-4
OFFICE
CHIEF OF
COUNSELING
PSYCHOLOGY
VACO
Occ-Health
MECH ROOM
44A
OFFICE
GROUP RM
BREAK RM
OFFICE
OFFICE
CORRIDOR
C-G-25-4
OFFICE
OFFICE
OFFICE
OFFICE
STAIR 1 STAIR 2
15780 SQ FT
ZONE 25-G-A
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 25
GROUND FLOOR
LS-25.G
7/ 8/
:4
4:
15919 SQ FT
ZONE 25-1-A
C. OFF SW
135 C. OFF
C. OFF MD
C. OFF MD
MEN'S
WAITING
MHC
CORRIDOR
C. OFF MD
132 C. OFF
INT/RESID
TOIL (H.C.)
C. OFF SW
SOCIAL
WORKER
TOIL (H.C.)
HAC
C. OFF
PSYCH
STAIR
NO 1 IT
CLOSET
C. OFF
PSYCH
C. OFF
NURSE
PRACT
SOCIAL
WORKER
WOMEN'S
WAITING
104 MHC
ENTRY 2
MHC COMM
CTR
ADMIN
MGR.
COPY/MAIL
PCT ENTRY
TOIL
C. OFF
PSYCH
MHC
CORRIDOR
PCT
CORRIDOR
TOIL
(H.C.)
STAIR
NO
C. OFF
STOR.
113A
C. OFF
PSYCH
116 STAFF TOIL
(H.C.)
PHARM 'D'
C. OFF
C. OFF
PSYCH
OFFICE
FPE C.
OFF
FPE TEST
ELEVATOR ELEVATOR PROG
ASST
PCT
TEST STOR
105B
STAFF TOIL
(H.C.)
FPE CONF
105A
SHOTS RN
EXAM
STOR.
157A
C. OFF
INTERN
MHC
CORRIDOR PCT
CORRIDOR
C. OFF
PSYCH
OFFICE
ASST BUS.
MGMT OFF
141A
CLO
141B
WAITING
SUPPORT
ASST
STAFF
TOIL
HAC
C. OFF
MHC
ENTRY
C. OFF
165 C. OFF
C. OFF
PCT
CORRIDOR
C. OFF
C. OFF
169 C. OFF
C. OFF
C. OFF
PSYCH
TEST
C.
OFF
LARGE GROUP
(SEAT 30)
LARGE GROUP
(SEAT 24)
TOIL (H.C.)
TOIL (H.C.)
TOIL
(H.C.)
STAFF TOIL
(H.C.)
122A
STAFF TOIL
(H.C.)
158A
TOIL (H.C.)
SMALL GROUP
(SEAT 12)
STAFF BREAK
CONF.
STAFF BREAK
CONF.
SMALL GROUP
(SEAT 12)
STAIR 1
STAIR 2
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 25
FLOOR 1
LS-25.1
7/ 8/
:4
4:
EXAM
212E EXAM
212D OFFICE
226C
EXAM
212F
OFFICE
219C2
EXAM
212C
OFFICE
226B
EXAM
212G
OFFICE
226D
EXAM
212B OFFICE
219D
OFFICE
219B
BEDROOM
219C OFFICE
219C1
CORRIDOR
C-2-25-2
EXAM
212H EXAM
212A
PIPE
SPACE
CLOSET
217B
IT
S01
MEN`S
TOILET
PIPE
SPACE
KITCHEN
210A
STAFF
TOILET
210A
CORRIDOR
C-2-25-4
CORRIDOR
C-2-25-1 CORRIDOR
C-2-25-1
STOR
228A
STOR
CONF
DOCTOR`S
OFFICE
CONFERENCE/TREATMENT
RM
COPY/FAX
201D
SOCIAL
WORKER
OFFICE
201C
SOCIAL
WORKER
OFFICE
201B
EXAM
206 OFFICE
RECEPTION
HALL
201 BREAK
RM
201A
OFFICE
ELEVATOR
E02
ELEVATOR
LOBBY
ELEVATOR
E01
NOURISHMENT
STATION
OFFICE
CLOSET
EXAM
WAITING
CLOSET
217C
MENS
TOILET
OFFICE
219E
STAFF
CLOSET
217A
P.
S.
MENS
TOILET
H.A.C.
PIPE
SPACE
STORE
228B
A.T.U.
NURSE
MGR
OFFICE
H.A.C.
SOCIAL
WORKER
OFFICE
OFFICE
UTILITY
S02
CORRIDOR
C-2-25-4
MEN`S
TOILET
OFFICE
219A
PIPE
SPACE
OFFICE
226E
OFFICE
226A
PSYCHOLOGY
OFFICE
ALCOHOL
REHAB.
COUNSELOR
DOCTOR`S
OFFICE
OFFICE
OFFICE
208A
QUIET
RM
230A
OFFICE
208H
NURSE
STATION
230E
STOR
208B
OFFICE
230B
OFFICE
208G
OFFICE
208C
DAYROOM
OFFICE
208F
OFFICE
208D
OFFICE
230C
OPEN
OFFICE
AREA
208D
COMPUTER
LAB
230D
15873 SQ FT
ZONE 25-2-A
STAIR 1 STAIR 2
SCALE: 1/8" = 1'-0"
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 25
FLOOR 2
LS-25.2
7/ 8/
:4
4:
11366 SQ FT
ZONE 25-A-A
SCALE: 1/8" = 1'-0"
ATTIC
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 25
ATTIC
LS-25.A
7/ 8/
:4
4:
EXISTING HEALTH
CARE OCCUPANCY
6287 SQ FT
ZONE 27-G-A
TO BUILDING 28
EXISTING HEALTH
CARE OCCUPANCY
8186 SQ FT
ZONE 27-G-B
SUITE 01
1853 SQ FT
SUITE 02
3200 SQ FT
SUITE 03
1504 SQ FT
SUITE 04
3011 SQ FT
STAIR 1 STAIR 2
STAIR 4STAIR 3
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 27
GROUND FLOOR
LS-27.G
7/ 8/
:4
4:
6111 SQ FT
ZONE 27-1-A
EXISTING HEALTH
CARE OCCUPANCY
6123 SQ FT
ZONE 27-1-C
EXISTING HEALTH
CARE OCCUPANCY
2599 SQ FT
ZONE 27-1-B
STAIR 1 STAIR 2
STAIR 4STAIR 3
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 27
FLOOR 1
LS-27.1
7/ 8/
:4
4:
6111 SQ FT
ZONE 27-2-A
EXISTING HEALTH
CARE OCCUPANCY
6123 SQ FT
ZONE 27-2-C
EXISTING HEALTH
CARE OCCUPANCY
2599 SQ FT
ZONE 27-2-B
STAIR 1 STAIR 2
STAIR 4STAIR 3
SCALE: 1/8" = 1'-0"
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 27
FLOOR 2
LS-27.2
7/ 8/
:4
4:
10640 SQ FT
ZONE 27-A-A
SCALE: 1/8" = 1'-0"
ATTIC
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 27
ATTIC
LS-27.A
7/ 8/
:4
4:
W
HE
EL
CH
AI
R
RA
MP
NAVE
EC
22A
EC
20A
ELEVATOR
LOBBY
1B
HAC
STAFF
MENS
TOILET
CORRIDOR
C-G-28-1
CORRIDOR
C-G-28-2
CORRIDOR
C-G-28-3
SOILED
LINEN
OFFICE
5B
MEETING
AREA
5C
CLOSET
5D
CLOSET
5E
FOYER
5F
CHAPEL
CHAPLAINS
OFFICE
5A
2A
IT CLOSET
1A
ENTRY
VOLUNTARY
STORAGE
PUMP
RM
SURGICAL PACK
15A
STORAGE
15ESEW AREASTORAGE
15F
UNIFORM STORAGE
VOLUNTARY SERVICES
FITTING RM
15D
EC
16ELEVATOR
NO 2
ELEVATOR
NO 1
VOLUNTEER
HOME RESPITE
PGM
17A
HALL
OFFICE
15C
BREAK RM
15B
STORAGE
VOLUNTARY SVC OFFICE
OFFICE
12A
SUPPLY
CLOSET
12B
STAIR
NO 2
ENGINEERING
SECY/
WAITING
CHIEFS
OFFICE
12C
EMS TRAINING ROOM
TOILET/
SHOWER
11A
TOILET/
SHOWER
10A
R T CLINIC
STORAGE
BIOMED
STORAGE
9A
BIOMED
STORAGE
CHAPLAIN
UTILITY
ROOMMENS TOILET
7A
OFFICE
7B
OFFICE
7C
STORAGE
STAIR
NO 1
EC
21A
VOLUNTEER
HOME RESPITE
PGM
16128 SQ FT
ZONE 28-G-A
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 28
GROUND FLOOR
LS-28.G
7/ 8/
:4
4:
15811 SQ FT
ZONE 28-1-A
FD
FD
FD
FD
OPERATORY,
ENDODONTICS
1A192
SOUND SUITE
1A127
CONTROL
1A128
ELECTRICAL
1A131
SOUND SUITE
1A126
CONTROL
1A125
SOUND SUITE
1A124
CONTROL
1A123
CLOSET
1A120A
CORRIDOR
1A122
CORRIDOR
1A121
CRASH CART
1A133
MENS TOILET
1A132
WOMENS TOILET
1A136
RECYCLING AREA
1A137
TREATMENT
1A151
TREATMENT
1A150
TREATMENT
1A149
TREATMENT
1A148
TREATMENT
1A147
OFFICE
1A146
VESTIBULAR
1A145
STORAGE
1A142
CORRIDOR
1A138
STAIR 1
1A120
CLEAN
UTILITY
1A152
HAC
1A135
SOILED
UTILITY
1A134
TECH TREATMENT
1A153
HEARING AID
REPAIR
1A154
TECH TREATMENT
1A155
IT CLOSET
1A156
BREAK ROOM
1A157
CONFERENCE
1A158
CORRIDOR
1A115
CORRIDOR
1A102
TREATMENT
1A119
TREATMENT
1A118
A.O. OFFICE
1A117
CHIEF OF
SERVICE
1A116
RECEPTION
1A105
CHART AREA
1A114
TREATMENT
1A107
ABR
1A108SPEECH
TREATMENT
1A113
SPEECH
TREATMENT
1A112
SPEECH
TREATMENT
1A109
SPEECH
TREATMENT
1A110
SPEECH
TREATMENT
1A111
CORRIDOR
1A106
CHECK-IN
1A103
WAITING
1A101
VESTIBULE
1A100
WOMEN
1A195
MENS
1A194
CHILDREN PLAY
AREA
1A101A
X-RAY/
PANOGRAPHIC
1A161
OPERATORY,
SPECIAL NEEDS
1A191
OFFICE
1A187
ASST. CHIEF'S
OFFICE
1A190
A.O. OFFICE
1A189
DENTAL CHIEF
OFFICE
1A188
OPERATORY
1A186
ELECTRICAL
1A185
CORRIDOR
1A184
MENS TOILET
1A183
WOMENS TOILET
1A179
CLEAN UTILITY
1A164
STAIR 2
1A193
SOILED UTILITY
1A181
HAC
1A180
OPERATORY
1A178
OPERATORY
1A177
OPERATORY
1A176
MEDICATION
ROOM
1A166
OPERATORY
1A167
OPERATORY
1A168
OPERATORY
1A175OPERATORY
1A169
OPERATORY
1A174
REMOTE LAB
1A170
OFFICE
1A171
RESIDENCY
DIRECTOR OFFICE
1A172
CORRIDOR
1A165
FVC
SOUND SUITE
1A129
CONTROL
1A130
CLOSET
1A173
S1 1A159
P1 1A160
TREATMENT
1A141A
TREATMENT
1A141B
ALCOVE
1A140
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 28
FLOOR 1
LS-28.1
7/ 8/
:4
4:
15610 SQ FT
ZONE 28-2-A
FD
FD
FD
FD
PRIVATE
OFFICE
1A221
OFFICE
1A220
PROSTHETIC
1A222
PROSTHETIC
1A219
PROSTHETIC
1A218
HYGIENIST
1A217
PROSTHETIC
1A223
ELECTRICAL
1A224
CORRIDOR
1A216
CORRIDOR
1A215
CRASH CART
1A226
MENS TOILET
1A225
SOILED
UTILITY
1A227
HAC
1A228
WOMENS TOILET
1A229
CLEAN
UTILITY
1A241
MEDICATION
ROOM
1A230
OPERATORY
1A240
OPERATORY
1A239
OPERATORY
1A231
ORAL SURGERY
1A233
ORAL RECOVERY
1A238
ORAL RECOVERY
1A237ORAL SURGERY
1A234
OFFICE
1A235
PRIVATE OFFICE
1A236
CORRIDOR
1A232
STAIR 1
1A214
CORRIDOR
1A202
STERILIZATION
1A211
X-RAY /
COMPUTERIZED
TOMOGRAPHY
1A242
STERILIZATION
OFFICE
1A244
RECYCLING AREA
1A243
WOMENS
TOILET
1A246 IT CLOSET
1A247
MENS TOILET
1A245
WAITING
1A200
RECEPTION
1A201
WAITING
1A200
CORRIDOR
1A202
GENERAL LAB
1A207
PORCELAIN
LAB
1A208
LAB OFFICE
SPACE
1A208A
DENTISTS
LAB
1A206
STORAGE
1A205
SOILED
UTILITY
1A204 BIOMED
1A282 WOMENS
LOCKERS
1A281
MENS LOCKERS
1A276
STAIR 2
1A275
CLEAN UTILITY
1A253
STORAGE
1A255
OPERATORY
1A256
OPERATORY
1A257
OPERATORY
1A258
REMOTE LAB
1A259
OFFICE
1A260
PRIVATE
OFFICE
1A261
OPERATORY,
SPECIAL NEEDS
1A262
OPERATORY,
SPECIAL NEEDS
1A263
CORRIDOR
1A254
OPERATORY
1A264
OPERATORY
1A265
OPERATORY
1A266
WOMENS TOILET
1A267
MENS TOILET
1A271
SOILED
UTILITY
1A269
HAC
1A268
CORRIDOR
1A202
CRASH
CART
1A270
ELECTRICAL
1A272
SWING SPACE
1A273
FVC
FVC
FVC
BREAK ROOM
1A251
X-RAY/
PANOGRAPHIC
1A250
SOILED
EQUIPMENT
DROP-OFF
1A213PPE AREA
1A212
SHOWER
1A213A
RO WATER
1A244A
SHOWER
1A279
SHOWER
1A278
MENS TOILET
1A277
WOMENS TOILET
1A280
REMOTE
LAB
1A220A
TO ATTIC
(ZONE 9)
TO ATTIC
(ZONE 8)
S1 1A248
P1 1A249
SCALE: 1/8" = 1'-0"
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 28
FLOOR 2
LS-28.2
7/ 8/
:4
5:
11762 SQ FT
ZONE 28-A-A
SCALE: 1/8" = 1'-0"
ATTIC
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 28
ATTIC
LS-28.A
7/ 8/
:4
5:
16694 SQ FT
ZONE 29-G-A
C O
N
TI
N U
ES
T
O B
LD
G
9' O
.H .D
.R
9' O
.H .D
.R 9'
O .H
.D .R
CONTINUES TO BLDG 16 7B
OFFICE
14D
PHARMACY
OFFICE
11D
CONFERENCE
RM
14E
OFFICE
11E
14C
CORRIDOR
C-G-29-4
OFFICE
OFFICE
14F
OFFICE
11B
OFFICE
6D
OFFICE
11A
KITCHEN
14A
7C
OFFICE
6C RECREATION
THERAPY
TOILET
7D
STAIR
NO-1
CORRIDOR
C-G-29-1
OFFICE
6B STORAGE
5B TOILET
5C
MALE
TOILET
VISN DSS
OFFICE
2A
EXTENDED
CARE
2B
ELEVATOR
MECH RM
VISN DSS
OFFICE
2C
KITCHEN
6A
1B
IT CLOSET
VISN DSS
OFFICE
2B
ELEVATOR
NO-2
1A ELEVATOR
NO-1
STORAGE
19A
TOILET
EMS
STORAGE
SOILED
OFFICE
9A
REGIONAL
COUNSEL
OFFICE
OFFICE
OFFICE
10A
COPY
11G
BREAK
RM
11F
STAIR
NO-2
OFFICE
CORRIDOR
C-G-29-2
TOILET
OFFICE
14B
CONFERENCE
RM
7A
13A
EXAM
RM
11C
17A
KITCHEN
RECREATION
CORRIDOR
C-G-29-3
STAIR 1 STAIR 2
SCALE: 1/8" = 1'-0"
GROUND FLOOR
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 29
GROUND FLOOR
LS-29.G
7/ 8/
:4
5:
EXISTING LARGE RESIDENTIAL
BOARD AND CARE
16154 SQ FT
ZONE 29-1-A
3-BED
3-BED
PATIENT RM
110D
PATIENT RM
110C
3-BED
PATIENT RM
128D
1-BED
PATIENT RM
128E
TOILET TOILET
4-BED
CORRIDOR
C-1-29-5
TOILET TOILET
BARBER
110E
1-BED
PATIENT RM
110A
CLEAN
LINEN
WORKHAC
1-BED
CONFERENCE
RM
STAIR
NO-1
WASHER/
DRYER
PIPE CHASE
108A
CORRIDOR
C-1-29-1
OFFICE
CORRIDOR
C-1-29-4
3-BED
OFFICE
OFFICE
PATIENT RM
TOILET 3-BED
PATIENT RM
OXYGEN
STORAGE
STAFF
TOILET
137A
KITCHEN
105E
WEIGHT
ROOM
WORK
AREA
OFFICE
105A
CONFERENCE
RM
2-BED
PATIENT RM
133F
2-BED
PATIENT RM
STAFF
TOILET
138A
IT CLOSET
134A
ELEVATOR
NO-2
FOYER
ELEVATOR
NO-1
BREAK
RM
OFFICE
OFFICE
STORAGE
STORAGE
STAFF
TOILET
139A
CORRIDOR
REFRESHMENT
RM
PATIENT RM
VISITOR
LOUNGE
2-BED
PATIENT RM
STAFF
RESTROOM
TOILET
STORAGE
CLEAN
SPD
SUPPLIES
CORRIDOR
C-1-29-2 NURSE
STATION
SOCIAL
WORKER
OFFICE
OFFICE
EMS
EMS
STAIR
NO-2
CORRIDOR
C-1-29-3
LAUNDRY
TOILET
TOILET
PIPE
CHASE
120A
1-BED
MED ROOM
PATIENT RM
128I
PATIENT RM
110B
PATIENT
DINING RM
TOILET
TOILET
128F
3-BED
PATIENT RM
128B
3-BED
PATIENT RM
128G
OFFICE
OFFICE
105B
CORRIDOR
DAY
RM
TOILET
133C
TOILET
1-BED
PATIENT RM
105C
2-BED
PATIENT RM
133D
2-BED
PATIENT RM
133B
GROUP
RM
GROUP
RM
105D 133C
STAIR 2STAIR 1
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 29
FLOOR 1
LS-29.1
7/ 8/
:4
5:
16314 SQ FT
ZONE 29-2-A
STAIR 1 STAIR 2
PATIENT
BED RM
PATIENT BED
RM
216C
231C
PATIENT
BED RM
216D
PATIENT
BED RM
216B
DINING RM
224C PATIENT
BED RM
231D
PATIENT
BED RM
231B
PATIENT
BED RM
216E
PATIENT
BED RM
216A
STORAGE
STAIR
NO-1RESTROOM
PIPE CHASE
214A
RESTROOM
(DRESSING)
213A
CORRIDOR
C-2-29-1
TOILET
RESTROOM
(DRESSING)
213 CORRIDOR
C-2-29-4
PATIENT RM
ELEC MECH
RM
208 VIP OFFICE
201A
STORAGE
VISITORS
LOUNGE
PATIENT
BED RM
GROUP RM
201B
STORAGELOGISTICS
LOGISTICS
LOGISTICS
FEMALE
TOILET
LOUNGE
IT CLOSET
239A
ELEVATOR
NO-2 CORRIDOR
ELEVATOR
NO-1
OFFICE
OFFICE
OFFICE
STORAGE
CORRIDOR
C-2-29-3
OFFICE
STORAGE
LAUNDRY
PATIENT
BED RM
BED RM
220 221
KITCHEN
SUPPLY
PIPE CHASE
232A
CORRIDOR
C-2-29-1 TOILET
234A
TOILET
225A
CORRIDOR
C-2-29-2
222A
RESTROOM
NURSE
OFFICE
MED
RM
OFFICE
OFFICE
HAC
STAIR
NO-2
STORAGE
RESTROOM
224B STORAGE
224A
PATIENT
BED RM
231E
PATIENT
BED RM
231A
STORAGE
PATIENT
BED RM
210D
PATIENT RM
(VISITOR)
237D
CRAFT
RM
210C
DAY RM
PATIENT BED
RM
237C
DAY RM
PATIENT
RM
ACTIVITY
RM
210B
237B
GROUP RM
210A
EXERCISE RM
237A
SCALE: 1/8" = 1'-0"
FLOOR 2
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 29
FLOOR 2
LS-29.2
7/ 8/
:4
5:
11599 SQ FT
ZONE 29-A-A
SCALE: 1/8" = 1'-0"
ATTIC
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 29
ATTIC
LS-29.A
7/ 8/
:4
5:
6317 SQ FT
ZONE 201-1-A
NEW HEALTH
CARE OCCUPANCY
STOR.
BEDROOM
RESIDENT A-2
BEDROOM
RESIDENT A-1
BEDROOM
RESIDENT A-3
BEDROOM
RESIDENT A-4
SPECIAL CARE
BEDROOM B-1
BEDROOM
RESIDENT A-7
BEDROOM
RESIDENT A-8
BEDROOM
RESIDENT A-6
BEDROOM
RESIDENT A-5
BEDROOM
RESIDENT A-9
BATHING
VEST. QUIET
PANTRY
KITCHEN
LIVING
DINING
OX
COOLER
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ELEC.
LOUNGE
BATH A-1 BATH A-8
BATH A-2
BATH A-3
BATH A-4 BATH A-5
BATH A-6
BATH A-7
BATH B-1
BATH B-2
OX
PUBLIC
TOILET
EQUIPMENT
HAC
CLINICAL
LAUNDRY
CLEAN
LINEN
SOILED
HOLDING
SUPPLIESPANTRY
BIO MED
MECHOIT
MORGUE
MED
GAS
STOR.
4189 SQ FT
ZONE 201-1-B
NEW HEALTH
CARE OCCUPANCY
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 201
FLOOR 1
LS-201-1
THIS LIFE SAFETY PLAN DOCUMENTS
FIRE RATED BEARING WALLS AS
REQUIRED BY THE BUILDING CODE.
THE LIFE SAFETY CODE DOES NOT
REQUIRE FIRE RATED CORRIDOR
WALLS IN THIS OCCUPANCY.
7/ 8/
:4
6:
6317 SQ FT
ZONE 201-1-B
NEW HEALTH
CARE OCCUPANCY
4192 SQ FT
ZONE 201-1-A
NEW HEALTH
CARE OCCUPANCY
STORAGE
BEDROOM
RESIDENT A-2
BEDROOM
RESIDENT A-1
BEDROOM
RESIDENT A-3
BEDROOM
RESIDENT A-4
SPECIAL CARE
BEDROOM B-1
BEDROOM
RESIDENT A-7
BEDROOM
RESIDENT A-8
BEDROOM
RESIDENT A-6
BEDROOM
RESIDENT A-5
SPECIAL CARE
BEDROOM B-2
BATHING
VEST.
QUIET
PANTRY
KITCHEN
LIVING
DINING
OX
SALONCORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ELEC.
LOUNGE
BATH A-1BATH A-8
BATH A-2
BATH A-3
BATH A-4BATH A-5
BATH A-6
BATH A-7
BATH B-1BATH B-2
OX
PUBLIC
TOILET
EQUIPMENT
HAC
CLINICAL
LAUNDRY
CLEAN
LINEN
SOILED
HOLDING
SUPPLIES PANTRY
BIO
MED
MECH OIT
STOR.
STOR.
STOR.
SCALE: 1/8" = 1'-0"
FLOOR 1
LEGEND
BUILDING SEPARATION
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
SMOKE RESISTIVE CORRIDOR WALL
EXIT
NON-PATIENT CARE OCCUPANCIES
HAZARDOUS AREA
NON-SLEEPING SUITE
NON-PATIENT SUITE
HORIZONTAL BARRIER TRANSFER
FIRE ALARM CONTROL PANEL
FIRE PUMP
TRASH CHUTE
SLEEPING SUITE
NON-SPRNKLER PROTECTED AREA
FP
LINEN CHUTE
TC
LC
FACP
OUTPATIENT OCCUPANCY
ADJACENT BUILDING
PROJECT TITLE
VA
M
C
- L
EX
IN
GT
ON
SO
US
LE
Y
CA
M
PU
S
LE
XI
NG
TO
N, K
EN
TU
CK
Y
DRAWING NUMBER
SHEET TITLE
PREPARED BY:
J. O'CONNELL
DATE: 6/27/2022
FINAL
LIFE SAFETY PLAN
BUILDING 202
FLOOR 1
LS-202-1
THIS LIFE SAFETY PLAN DOCUMENTS
FIRE RATED BEARING WALLS AS
REQUIRED BY THE BUILDING CODE.
THE LIFE SAFETY CODE DOES NOT
REQUIRE FIRE RATED CORRIDOR
WALLS IN THIS OCCUPANCY.