The file's text, extracted by GovTribe without its formatting.
SUBJECT*
FujiFilm Imaging Equipment Preventative Maintenance Service Base and Four Option Year
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 37129 |
| SOLICITATION NUMBER* |
| 36C24922Q0334 |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| PRODUCT SERVICE CODE* |
| J065 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129
POINT OF CONTACT*
Contract Specialist Christina Lawrence Christina.Lawrence2@va.gov 615-225-3426
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
Special Notice Special Notice
DESCRIPTION
| *= Required Field |
| Special Notice |
Special Notice
Intent to Sole Source- FujiFilm Healthcare Americas Corporation The Department of Veterans Affairs intends to issue sole-source firm-fixed priced contract to FujiFilm Healthcare Americas Corporation 81 Hartwell Ave STE 300 Lexington, Massachusetts 02421-3160.
A sole source procurement will be issued to FujiFilm Healthcare Americas Corporation because they are the only vendor capable of fully performing the service and software updates for the below equipment. Due to the specialized nature of the work, it must be conducted by personnel with a high level of training and qualifications. Software updates and remote monitoring are available only through Fujifilm directly, as the author/owner of these codes. This procurement is being conducted in accordance with FAR Part 6.302-1 Only One Responsible Source and No Other Supplies or Services will satisfy agency requirements. The NAICS code is 811219 and has a size standard of $22 Million for this procurement.
Period of Performance: 10/01/2022-09/30/2027
SCOPE OF WORK:
The James H. Quillen VA Healthcare System (VAHCS) has a requirement for a service contract on FujiFilm Healthcare Americas Corporation, Radiology equipment, which shall provide routine preventative and corrective maintenance in order to ensure optimal working condition and lessen the likelihood of down time. The equipment listed below in the 1. EQUIPMENT section. All parts, labor and travel during normal business hours (8:30AM-5PM Local Time M-F), 24x7 / 365 phone support by a Certified Technical Support Engineer, one (1) preventative maintenance inspection and calibration (if applicable) per service agreement year, unless otherwise specified in FSMU Service Manual. During the annual PM, FMSU will update the Fujifilm application software to the latest version that the Operating System and PC hardware will support. FMSU does not install Microsoft Operating Systems patches or Antivirus software. If a new software version requires a new operating system or PC hardware, customer can elect to purchase at then current pricing for these items. One-hour phone response and a four-hour on-site response time for hard down systems within 150 miles of FMSU personnel. This contract is Base Plus Four, to be in effect no later than October 1, 2022, and will expire September 30, 2027.
It is required that service personnel are factory trained and certified on the FujiFilm Healthcare Americas Corporation, the equipment listed below in the 1. EQUIPMENT section. Training and certification documentation must be provided to the Contracting Officer’s Representative (COR), listed in section 2. DEFINITIONS/ACRONYMS, upon execution of the contract and requested by the COR. This documentation is to remain on file with the COR.
1. EQUIPMENT:
Equipment to be serviced and/or maintained includes, but is not limited to: (Equipment is located at the James H. Quillen VA Medical Center, Mountain Home, TN)
| Equipment Description |
| Serial Number |
| VISONARY Suite (no Panels) |
| MP95AA98A001 |
| VISONARY Tube (Non-Discountable) |
| RM6D9278A001 |
| IIP/FXD Monitor |
| 721906313610.00 |
| IIP/FXD Workstation |
| MXL8382JZQ |
| COLLIMATOR N FD 11 EL |
| MPC299D85004 |
| VE FDR CH-200 F2W TOMO-S OTC |
| LZC5C5B8A005 |
| VS FDR D-EVO Advanced Bucky Table |
| MP9C4558A003 |
| VS FDR D-EVO Advanced Tilting Wall buckeye |
| MPA16648A002 |
| VS FDR DR-ID900 MP |
| 86820891 |
| VS FDR DR-ID900 MC |
| 86220562 |
| AC-3CS CONTROL CONSOLE |
| 2082125301 |
| D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i, 613 C24i |
| 96420837 |
| D-EVO I/II FDX No Fault DR-ID G35, G35i, G43i, C24i, C35i, C43i 2nd Panel |
| 96520845 |
| FDR GO without Panels (X-Ray Tube and Battery Panel Coverage Optional) |
| 41F1168B85004 |
| D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i, 613 C24i |
| 86652543 |
| COLLIMATOR N FD 11 EL |
| LZ61AC685004 |
| FDR GO (Shimadzu) Tube (Non-Discountable) |
| rm74b5a85002 |
| FDR GO (Shimadzu) Battery Coverage with Main Contract |
| N/A |
| FDR GO without Panels (X-Ray Tube and Battery Panel Coverage Optional) |
| MQ0001289005 |
| D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i, 613 C24i |
| 86952842 |
| D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i, 613 C24i 2nd Panel |
| 87050656 |
| FDR GO (Shimadzu) Tube (Non-Discountable) |
| rm74b6e88029 |
| FDR GO (Shimadzu) Battery Coverage with Main Contract |
| N/A |
| D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i, 613 C24i |
| 96290050 |
| IIP/FXD Monitor |
| B15C057432 |
| IIP/FXD Workstation |
| 2UA5041STP |
| D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i, 613 C24i |
| 87190262 |
| FDR AcSelerate Suite - Two Panel Configuration |
| 09-C0003 |
| D-EVO MC(Control Cabinet) |
| 97220975 |
| AC-3CS Control Unit |
| 26820051 |
| AC-3CS Control Console |
| 11-J0001 |
| IIP/FXD Workstation |
| MXL3470S0P |
| IIP/FXD Monitor |
| H13C011340 |
| FPD (For Wall and Table) R/Y898V 100835A |
| B120194 |
| SMNS STA LT LOAD TNT STAND |
| 5115 |
| COLLIMATOR N FD 11 EL |
| 1376 |
| RAD CM TABLE MOVING GRID |
| 5091 |
| D-EVO I/II FDX no Fault DR-ID 611 C35i, 612 C43i, 613 C24i |
| 37000280 |
| D-EVO MP (POWER SUPPLY UNIT) |
| 97190023 |
| AcSelerate Tube Only (Non-Discountable) |
| H23579/57561-Q9 |
| FDR AcSelerate Suite - Two Panel Configuration |
| 14-I0146 |
| AC-3CS Control Console |
| 14-G0004 |
| IIP/FDX Workstation |
| MXL51512PG |
| D-EVO MP (POWER SUPPLY UNIT) |
| 97190015 |
| D-EVO MC(Control Cabinet) |
| MXL8382JAZ |
| IIP/FDX Monitor |
| B15C057307 |
| COLLIMATOR N FD 11 EL |
| 6268 |
| FPD (FOR Table) ALSO 898Y-100711 |
| 5173 |
| FPD (FOR WALLSTAND) ALSO 898Y-100711 |
| 5204 |
| 371 Detector Unit |
| B120310 |
| CARBON XL SUITE CHST BKY OTC-MAN-80KW |
| 5182 |
| DR200 PATIENT STAND FOR LV E |
| 27020086 |
| AcSelerate Tube Only (Non-Discountable) |
| H236170/61444-R9 |
| E-DVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i, 613 C24i |
| 6855463 |
| FDR GO PLUS without Panels (X-ray tube & battery coverage optional) Contract Dates 1026/2022 to 9/30/2023 |
| MQ00012B1008 |
D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i , 613 C24i Contract Dates 1026/2022 to 9/30/2023 6953010
FDR GO PLUS (Shimadzu) Tube (non-discountable) Contract Dates 1026/2022 to 9/30/2023 N/A
| FDR GO PLUS (Shimadzu) Battery Coverage with main contract, Contract Dates 1026/2022 to 9/30/2023 |
| N/A |
| FDR GO PLUS without Panels (X-ray tube & battery coverage optional) Contract Dates 1026/2022 to 9/30/2023 |
| MQ00012B1006 |
D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43 , 613 C24i Contract Dates 1026/2022 to 9/30/2023 6953011
FDR GO PLUS (Shimadzu) Tube (non-discountable) Contract Dates 1026/2022 to 9/30/2023 N/A
| FDR GO PLUS (Shimadzu) Battery Coverage with main contract, Contract Dates 1026/2022 to 9/30/2023 |
| N/A |
| FDR GO PLUS without Panels (X-ray tube & battery coverage optional) Contract Dates 1026/2022 to 9/30/2023 |
| MQ00012B1005 |
D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43i , 613 C24i Contract Dates 1026/2022 to 9/30/2023 6852956
FDR GO PLUS (Shimadzu) Tube (non-discountable) Contract Dates 1026/2022 to 9/30/2023 N/A
| FDR GO PLUS (Shimadzu) Battery Coverage with main contract, Contract Dates 1026/2022 to 9/30/2023 |
| N/A |
| FDR GO PLUS without Panels (X-ray tube & battery coverage optional) |
| MQ00012B3022 |
| D-EVO I/II FDX No Fault DR-ID 611 C35i, 612 C43 , 613 C24i |
| 97090067 |
| FDR GO PLUS (Shimadzu) Tube (non-discountable) |
| N/A |
| FDR GO PLUS (Shimadzu) Battery Coverage with main contract |
| N/A |
4. CONFORMANCE STANDARDS:
Contract service shall ensure that the equipment functions in conformance with the latest published edition of NFPA-99, OSHA, includes performance standards and specifications.
5. UNSCHEDULED MAINTENANCE:
A. Contractor shall maintain the equipment in accordance with the Conformance Standards Section. The Contractor will provide repair service which may consist of calibration, cleaning, oiling, adjusting, replacing parts, (without additional cost to the Government), and maintaining the equipment, including all intervening calls necessary between regular services and calibrations. The contractor shall furnish all required parts. Parts being replaced for accidental damage, customer abuse or consumables (including but not limited to batteries) are not covered under this contract. Vendor will notify Contracting Officer to attain approval and separate PO prior to replacement.
B. The CO, COR, or designated alternate has the authority to approve/request a service call from the contractor.
6. SCHEDULED MAINTENANCE:
A. The Contractor shall perform PM service to ensure that equipment listed in the schedule performs in accordance with Section 3. CONFORMANCE STANDARDS. The contractor shall provide and utilize procedures and checklists with worksheet originals indicating work performed and actual values obtained (as applicable) provided to the COR at the completion of the PM. PM services shall include, but need not be limited to, the following:
1. Cleaning of equipment.
2. Reviewing operating system software diagnostics to ensure that the system is operating to the manufacturer’s specifications.
3. Calibrating and lubricating the equipment.
4. Performing remedial maintenance of non-emergent nature.
5. Testing and replacing faulty and worn parts and/or parts which are likely to become faulty, fail or become worn.
6. Measuring and adjusting and calibrating as necessary for optimal image quality.
7. Inspecting, and replacing where indicated, electrical wiring and cables for wear and fraying.
8. Inspecting and replacing where indicated, all mechanical components including, but not limited to: patient restraints and support devices, cables and mounting hardware, chains, belts, bearings and tracks, interlocks, clutches, motors, keyboards, and patient couches for mechanical integrity, safety, and performance.
9. Returning the equipment to the operating condition defined in Section 3. CONFORMANCE STANDARDS.
10. Providing documentation of services performed.
11. Inspecting and calibrating the hard copy image device.
PM services shall be performed in accordance with, and during the hours defined in, the preventive maintenance schedule established herein. All exceptions to the PM schedule shall be arranged and approved in advance with the COR.
Any charges for parts, services, manuals, tools, or software required to successfully complete scheduled PM are included within this contract, and it’s agreed upon price, unless specifically stated in writing otherwise.
B. The contractor shall furnish all backup documentation, including photographs of all measurements and calibrations, to ensure that the system is performing in accordance with the Conformance Standards. The following specific system operation parameters shall be surveyed, and documentation provided to the COR during the first (1st) and sixth (6th) month of the contract base period and annually thereafter during the eleventh (11th) month of each subsequent option period.
7. PARTS:
The contractor has ready access to unique and/or high mortality replacement parts. All parts supplied shall be OEM or equivalent and fully compatible with existing equipment. The contract invoice shall include all parts. The contractor shall use new or like new parts. Parts being replaced for accidental damage, customer abuse or consumables (including but not limited to batteries) are not covered under this contract. Vendor will notify Contracting Officer to attain approval and separate PO prior to replacement.
8. PERIOD OF PERFORMANCE:
Base Year:10/01/2022-09/30/2023 Option Year 1:10/01/2023-09/30/2024 Option Year 2:10/01/2024-09/30/2025 Option Year 3:10/01/2025-09/30/2026 Option Year 4:10/01/2026-09/30/2027
Other important considerations: Cite any other information that is necessary for potential respondents to understand the nature of the potential requirement or proposed acquisition.
Capability statement /information sought: Response to this announcement shall not to exceed 10 pages and should include the following information: (1) A tailored capability statement indicating the firm’s ability to provide a product and related services; (2) The respondents’ DUNS number, organization name, address, point of contact, and size and type of business (e.g., SDVOSB/VOSB, etc,) pursuant to the applicable NAICS code; (3) Information should be provided electronically in a Microsoft Word or Adobe PDF format.
This notice of intent is not a request for competitive quotes. However, interested parties may identify their interest and capability to respond to the requirement and submit quotations with the subject line "Special Notice # 36C24922Q0334 by 08:00 a.m. on 05/16/2022 to: Christina.Lawrence2@va.gov. Responses received will be evaluated; however, a determination by the Government not to compete the proposed procurement based upon responses received to this notice is solely within the discretion of the Government.
“Disclaimer and Important Notes. This notice does not obligate the Government to award a contract or otherwise pay for the information provided in response. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization’s qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or provide feedback to respondents with respect to any information submitted. After a review of the responses received, a pre-solicitation synopsis and solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation.
Confidentiality. No proprietary, classified, confidential, or sensitive information should be included in your response. The Government reserves the right to use any non-proprietary technical information in any resultant solicitation(s).”
Page 1 of
Page 1 of