S02 - Attachment 1 - Drawings.pdf
PDF 10 MB Posted
- Solicitation number
- 36C24922B0001
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs to restore the AHU-10 heating and cooling system at the VA medical center in Louisville, Kentucky. The contractor shall demolish existing structures, prepare the site for construction, and furnish all labor, materials, and work required according to the drawings and specifications to restore air handling units 5 through 7. The solicitation number for the pre-solicitation opportunity is 36C24922B0001. The contractor must completely prepare the site, including demolition of current structures, to allow for continued building operations during the project to replace the AHU-10 system serving operating rooms 5 through 7.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
* C.O.R. = CONTRACTING OFFICER'S REPRESENTATIVE.
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.
2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE C.O.R.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR
ORIGINAL CONDITION AT THE END OF THE PROJECT.
6. MAINTAIN THE BUILDING IN A WEATHERTIGHT CONDITION AT ALL TIMES.
7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.
8. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.
9. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.
10. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK. THE WEIGHT AND COST OF DISPOSAL FOR ALL CONTROLLED SUBSTANCES SUCH AS LEAD AND ASBESTOS SHALL BE TRACKED AND REPORTED. THE GENERAL CONTRACTOR SHALL NOT USE THE VA
TRASH COMPACTOR.
11. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER
DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.
12. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION LIGHTING.
13. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL
CONSTRUCTION.
14. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH
SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
15. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH. USE ONE FIRE STOPPING SYSTEM FOR ALL SUB-CONTRACTORS.
16. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
17. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING
UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
18. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE RATING BY THE END OF
CONSTRUCTION OPERATIONS FOR EACH DAY.
19. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL
MEMBERS ARE NOT DAMAGED.
G E N E R A L N O T E S F O R E X I S T I N G F A C I L I T I E S :
* C.O.R. = CONTRACTING OFFICER'S REPRESENTATIVE.
1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES, RULES, ORDINANCES AND REGULATIONS INCLUDING THE AMERICAN DISABILITIES ACT (ADA), ARCHITECTURAL BARRIERS ACT(ABA), THE VA BARRIER FREE DESIGN GUIDELINES AND THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) GUIDELINES.
2. THE C.O.R. SHALL WORK WITH THE CONTRACTOR TO PROVIDE ACCESS TO TEMPORARY SERVICES REQUIRED TO PROVIDE THE WORK INDICATED. SEE SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS FOR ADDITIONAL REQUIREMENTS ON TEMPORARY ACCESS TO VA UTILITIES.
3. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE SPECIFICATIONS, INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, AND MATERIAL AND CONSTRUCTION PROVISIONS, WHICH APPLY TO MATERIALS OR CONSTRUCTION METHODS REQUIRED BY THIS PROJECT.
4. PRIOR TO BIDDING, THE GENERAL CONTRACTOR SHALL VISIT THE SITE, EXAMINE, AND ACCEPT ALL EXISTING CONDITIONS. DATES FOR SITE VISITS WILL BE POSTED IN THE CONTRACT DOCUMENTS AS POSTED ON THE FEDERAL BUSINESS OPPORTUNITIES WEBPAGE FOR THIS PROJECT. UNSCHEDULED VISITS WILL NOT BE ALLOWED.
5. VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE FABRICATING ANY MATERIALS.
6. IT IS THE INTENT OF THE DOCUMENTS TO INDICATE COMPLETE AND OPERATIONAL SYSTEMS (I.E. STRUCTURAL, HVAC, PLUMBING, ELECTRICAL) THE CONTRACTOR SHALL PROVIDE THE SYSTEMS AS OPERATIONAL SYSTEMS WHICH COMPLY WITH APPLICABLE CODES AND REGULATIONS. THIS NOTE SHALL BE LIMITED TO THE SYSTEMS AS INDICATED BY THE DOCUMENTS AND SHALL NOT INCLUDE CHANGES TO THE SYSTEMS WHICH ALTER INDICATED CAPACITIES, OPERATIONAL CHARACTERISTICS.
7. THE GENERAL CONTRACTOR SHALL VERIFY THE SIZES OF ALL EQUIPMENT OR FIXTURES TO BE INSTALLED IN THE BUILDING THROUGH THE SUBMITTAL PROCESS, AND SHALL MAKE SPECIAL PROVISIONS FOR INSTALLATION OF ANY EQUIPMENT WHICH IS TOO LARGE TO FIT THROUGH A FINISHED OPENING.
8. ALL CONTRACTORS SHALL BE RESPONSIBLE TO PATCH AND REPAIR ALL SURFACES WHERE EXISTING CONSTRUCTION IS REMOVED OR DISTURBED BY WORK UNDER THEIR
CONTRACT.
9. ALL SUSPENDED ITEMS SUCH AS CEILINGS, DUCTS, PIPES, CONDUITS, SHALL BE SUSPENDED (ATTACHED) DIRECTLY TO STRUCTURE AND SHALL NOT BE ATTACHED OR ANCHORED
TO EXISTING PLASTER, ACOUSTIC TILE.
10. NEW PENETRATIONS SUCH AS DUCTS, CONDUITS, PIPING, ELECTRICAL OUTLETS, LIGHT SWITCHES, RECESSED DEVICES OR ITEMS, HOLES, VOIDS, CRACKS IN MODIFIED AND NEW CORRIDOR WALLS, SMOKE PARTITIONS, FIRE RATED PARTITIONS, AND FLOOR SLABS SHALL BE SEALED TO PREVENT PASSAGE OF ANY SMOKE, FLAME, GASES. AS INDICATED IN
THE CONTRACT DOCUMENTS.
11. WHERE NEW CONSTRUCTION REQUIRES CORE DRILLING THROUGH EXISTING STRUCTURAL CONCRETE FLOOR SLABS, AND WALLS THE CONTRACTOR SHALL COORDINATE HIS DRILLING WORK TO AVOID DRILLING INTO A STRUCTURAL ELEMENT, INCLUDING JOISTS, BEAMS, COLUMN.
12. WHERE NEW CONSTRUCTION MATERIAL AND EQUIPMENT IS INDICATED TO BE INSTALLED IN EXISTING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS FOR PROPER FIT AND FOR ACCESS INTO THE BUILDING PRIOR TO SHOP DRAWING SUBMITTAL, ORDERING AND DELIVERING TO THE SITE.
13. FOR INFECTION CONTROL REASONS, WORK CONDUCTED IN THE CORRIDOR THAT DOES NOT GENERATE DUST MAY ONLY REMOVE UP TO 16 SQUARE FEET OF CEILING TILE AT ONCE. AS LONG AS THIS STANDARD IS FOLLOWED NEGATIVE AIR AND BARRIERS ARE NOT REQUIRED BY THE INFECTION CONTROL NURSES. IF DUST IS GENERATED AND GREATER THAN 16 SF OF CEILING TILES ARE DISTURBED AT ONCE THEN THE WORK AREA SHALL BE SEALED OFF WITH 6 MIL FIRE RETARDANT POLYETHYLENE AND NEGATIVE AIR PROVIDED.
MAINTAIN 5' MINIMUM ACCESS IN CORRIDORS AT ALL TIMES. CLEAN THOROUGHLY PRIOR TO COMPLETION OF A GIVEN WORK AREA BY HEPA VACUUM AND WET MOP. REFER TO
SPECIFICATION 01 35 26 FOR ADDITIONAL INFORMATION.
G E N E R A L N O T E S F O R N E W W O R K :
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
T-691
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E
L o u is v ill e
R e s to re A
H U
-1
M E
P c a rt e r.
d a n ie l0
.r v t
/3
/2
:2
:0
A
M
GI001
COVER SHEET - SHEET INDEX
Owner
08/12/2021 PQ CD
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
CONSTRUCTION
DOCUMENTS (100%) 1
ROBLEY REX
VA MEDICAL
CENTER
RESTORE AHU-10 SYSTEMS (OR's 5 & 7)
DEPARTMENT OF VETERANS AFFAIRS
ROBLEY REX VA MEDICAL CENTER
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
GI001 COVER SHEET - SHEET INDEX
GI002 ICRA PLANS
G003 LIFE SAFETY PLAN
ARCHITECTURAL
AD144 FOURTH FLOOR DEMOLITION REFLECTED CEILING PLAN
AC144 FOURTH FLOOR REFLECTED CEILING PLAN
MECHANICAL
M001 MECHANICAL LEGEND
MD104 MECHANCIAL FOURTH FLOOR DEMOLITION
MD105 MECHANICAL FIFTH FLOOR DEMOLITION
M104 MECHANICAL FOURTH FLOOR PLAN NEW WORK
M105 MECHANICAL FIFTH FLOOR PLAN NEW WORK
M501 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
ELECTRICAL
EE001 LEGEND AND ABBREVIATIONS
ED104 ELECTRICAL FOURTH FLOOR DEMOLITION
ED105 ELECTRICAL FIFTH FLOOR DEMOLITION
EL104 ELECTRICAL FOURTH FLOOR NEW WORK
EP105 ELECTRICAL FIFTH FLOOR NEW WORK
EE601 ELECTRICAL SCHEDULES
SITE LOCATION MAP SITE MAP
# 603-20-202
800 ZORN AVE.
LOUISVILLE, KY 40206
No. Revisions: Date:
3 CONSTRUCTION DOCUMENTS 100% 08/12/2021
T M T M
INFECTION AND DUST CONTROL PLAN LEGEND
DUST MAT (2'-0" X 3'-0")
AREA NOT IN CONTRACT
AREA IN DIFFERENT PHASE
PROVIDE TEMPORARY INFECTION CONTROL / DUST CONTROL
BARRIERS AT THIS LOCATION. REMOVE AFTER CONSTRUCTION
IS COMPLETED PER PHASE INDICATED.
TEMPORARY PLASTIC SHEETING ACCORDING TO ICRA REQUIREMENTS.
DUE TO THE LOCATION OF RENOVATION WORK INDICATED (VAMC SURGERY
DEPARTMENT) CONSTRUCTION IS WITHIN THE HIGHEST INFECTION RISK CATEGORY.
THE INFECTION AND DUST CONTROL PLANS SHALL BE DISTRIBUTED AND APPLIED BY
ALL CONTRACTORS PERFORMING WORK ON THIS PROJECT.
A. REFER TO PHASING PLANS AND SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS FOR
ADDITIONAL INFECTION CONTROL INFORMATION.
B. COORDINATE ALL WORK ASSOCIATED WITH PROJECT FOLLOWING THE SITE-SPECIFIC INFECTION
CONTROL RISK ASSESSMENT PUBLISHED BY THE ROBLEY REX VAMC.
C. AREAS ADJACENT TO IMMEDIATE (PHASED) WORK AREAS WILL BE FULLY OCCUPIED AND FUNCTIONING
NORMALLY THROUGHOUT THE CONSTRUCTION PERIOD.
D. THERE WILL BE ZERO TOLERANCE FOR ANY DUST MIGRATION OUTSIDE OF THE IMMEDIATE WORK SITE
AREAS IDENTIFIED BY PHASING PLANS.
E. ALL WORK OCCURRING WITHIN THE SURGERY DEPARTMENT MUST BE PERFORMED OUTSIDE OF NORMAL
VAMC WORKING HOURS.
F. CONTRACTOR SHALL PROVIDE FOR PROFESSIONAL TERMINAL CLEANING OF PHASED WORK AREAS PRIOR
TO TURNING OVER TO THE VAMC FOR OCCUPANCY.
G. EXTERIOR DEMOLITION ACTIVITIES (INCLUDES CUTTING AND PATCHING):
a. EVALUATE EXISTING SITE CONDITIONS TO DETERMINE THE PRESENCE OF ANY OUTSIDE AIR INTAKES
WITHIN 20' OF THE PROPOSED EXTERIOR WORK.
b. IF PRESENT - DETERMINE IF THE IMPACTED EXTERIOR AREAS OF THE FACILITY CAN OPERATE
TEMPORARILY ON RECIRCULATED AIR VS. OUTSIDE AIR.
• IF FEASIBLE - SEAL OFF AIR INTAKES WITHIN 20' OF DUST GENERATING WORK.
• IF NOT FEASIBLE - ROUTINELY CHECK THE LOW-EFFICIENCY FILTER BANKS LOCATED IN LINE
WITH ADJACENT AIR INTAKE(S) AND REPLACE AS NEEDED TO REDUCE PARTICULATE BUILD-UP.
c. SEAL WINDOWS AND REDUCE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN
STAIRWELLS AND CORRIDORS) THAT MAY BE IMPACTED BY CONSTRUCTION. PAY SPECIAL ATTENTION
TO PROTECTIVE ENVIRONMENT (PE) AREAS.
H. INTERIOR DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL:
a. BARRIER SYSTEMS: PHASED AREAS OF WORK SHALL BE ISOLATED FROM ADJACENT AREAS WITH 1 -
HR. RATED DUST PARTITIONS.
b. DUST PARTITIONS TO BE METAL FRAMED WITH GYPSUM WALL BOARD ON EACH SIDE. PARTITION TO
BE CONSTRUCTED EQUAL TO UL DESIGN U465.
• IN LIEU OF SITE BUILT DUST PARTITIONS, CONTRACTOR MAY UTILIZE PRE-ENGINEERED
(MODULAR) TEMPORARY CONSTRUCTION PARTITIONS LIKE THOSE MANUFACTURED BY EDGE
GUARD PRODUCTS, 216 N. PLATT ST., BEMENT, IL 61813, TELE 217-552-5418, WEBSITE:
WWW.EDGE-GUARD.COM OR APPROVED EQUAL.
c. DUST PARTITIONS SHALL BE INSTALLED WITH A TIGHT SEAL AT FLOOR AND CEILING OR STRUCTURE ABOVE CEILING. WHERE OPERATING ROOM DEMISING WALLS ARE SHOWN TO BE EXTENDED UP TO STRUCTURE ABOVE - PROVIDE AIR TIGHT SEAL AT BOTH TOP OF EXISTING DEMISING WALL (TO BE
EXTENDED) AND AT STRUCTURE ABOVE.
• WHERE O.R. DEMISING WALL EXTENSIONS IMPACT EXISTING FIRE PROOFED STEEL STRUCTURE -
CONTRACTOR SHALL CAREFULLY REMOVE THE FIREPROOFING (ONLY) IN AREA WHERE TOP
WALL PLATE MEETS EXISTING STEEL. PATCH ANY FIREPROOFING DISTURBED BY CONSTRUCTION
ACTIVITIES WITH NEW FIRE PROOFING MATCHING EXISTING SYSTEM.
• AN INTERIM PLASTIC DUST BARRIER (MINIMUM 6-MIL THICKNESS) SHALL BE INSTALLED TO PROTECT ADJACENT AREAS WHILE THE IMPERVIOUS (1-HR. RATED) DUST PARTITION IS BEING
CONSTRUCTED.
d. ANY DUST GENERATED FROM DEMOLITION OR CONSTRUCTION ACTIVITIES SHALL BE IMMEDIATELY
CLEANED IF TRACKED OR FOUND OUTSIDE OF THE CONSTRUCTION PHASE PERIMETER.
e. CONTRACTOR PERSONNEL SHALL MONITOR DUST PARTITION CONDITION AND PERFORM
MAINTENANCE - DURING PHASED DEMOLITION AND CONSTRUCTION ACTIVITIES.
f. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, DUST PARTITIONS SHALL BE CAREFULLY
REMOVED TO MINIMIZE THE SPREAD OF DUST.
• CONTRACTOR SHALL INSTALL INTERIM PLASTIC DUST BARRIERS (MINIMUM 6-MIL THICKNESS)
PRIOR TO THE REMOVAL OF DUST PARTITIONS.
g. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY PARTITION LAYOUT. LAYOUT SHALL NOT
INTERFERE WITH HOSPITAL OPERATION.
I. TRAFFIC CONTROL:
a. PHASED SITE ACCESS SHALL HAVE DEFINED ENTRY AND EXIT PROCEDURES. EGRESS PATHS AND BE
FREE OF DEBRIS, TOOLS, EQUIPMENT, OR CONTAINERS.
b. DESIGNATED ELEVATORS SHALL ONLY BE USED DURING SCHEDULED TIME PERIODS AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. COORDINATE
ELEVATOR ACCESS WITH THE VAMC THROUGH THE COR.
c. INSTALL SIGNAGE TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREAS.
J. DEMOLITION DEBRIS:
a. ALL DEBRIS GENERATED BY PROJECT SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTING COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE THE USE OF
ELEVATORS SHARED BY PATIENTS OR STAFF. PERFORM TRANSPORT OF DEBRIS AT TIMES DIRECTED
BY THE VAMC THROUGH THE COR. IF EXTERIOR TRASH CHUTES ARE USED TO DIRECT DEBRIS
OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED AND THE CHUTE OPENING SEALED WHEN NOT IN USE. USED FILTERS SHALL BE BAGGED AND SEALED BEFORE TRANSPORTING OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT
HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE VAMC.
K. VENTILATION AND ENVIRONMENTAL CONTROLS:
a. AIR SYSTEM FLOW: DETERMINE IF CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED
AIR. ADD FILTERS AND/OR COVER RETURN GRILLS WITH FILTER MATERIAL OR PLASTIC. AIR MUST
(ONLY) FLOW IN THE DIRECTION OF CLEAN AREAS TO DIRTY AREAS.
b. NEGATIVE AIR PRESSURE: AIR WITHIN THE CONSTRUCTION AREAS (PHASES) MUST BE MAINTAINED AT NEGATIVE PRESSURE WITH RESPECT TO SURROUNDING AREAS. NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS IS ALLOWED DURING PERIODS OF VAMC OCCUPANCY OF ADJACENT AREAS. THE
NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSED PHASES SHALL EXHAUST DIRECTLY
OUTSIDE.
• DUST PARTITIONS SHALL BE OUTFITTED WITH CONTINUOUS AIR PRESSURE MONITORING
DEVICES WITH 24/7 READ OUT AND LOGGING. BASIS OF DESIGN FOR AIR PRESSURE MONITORING
DEVICE IS PHOENIX CONTROLS APM II, OR EQUAL.
L. WORKSITE CLOTHING AND CLEANING:
a. CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE
ENTERING OR LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.
COVERALLS, FOOTGEAR, AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE PHASED CONSTRUCTION AREA. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE AS AN ANTEROOM FOR
CHANGING CLOTHING AND STORING EQUIPMENT.
b. ALL EQUIPMENT, TOOLS, CARS, MATERIALS, ETC. TRANSPORTED THROUGH NORMALLY OCCUPIED
AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET MOPPING
BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
c. THE CONSTRUCTION ZONE MUST BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS. SWEEP OR HEPA-VACUUM CONSTRUCTION AREA DAILY - OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST.
ADJACENT AREAS IMPACTED BY CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE
FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE
UTILIZED TO MINIMIZE TRACKING OF DIRT AND DUST FROM CONSTRUCTION AREAS.
GENERAL INFECTION AND DUST CONTROL NOTES
PROJECT SCOPE
17.2 17.2
15.1 15.1
D.2
D.2
F.1
F.1
G.2
G.2
OR-7
B-408
OR-6
B-406
HISTO LAB
B-405
CORRIDOR
C-1 CORRIDOR
C-2
ATTENDING PHYS LOUNGE
B-410
SUB-STERILE RM
B-407
17.2 17.2
15.1 15.1
D.2
D.2
F.1
F.1
G.2
G.2
OR-7
B-408
OR-6
B-406
HISTO LAB
B-405
CORRIDOR
C-1 CORRIDOR
C-2
ATTENDING PHYS LOUNGE
B-410
SUB-STERILE RM
B-407
ROOM ELEVATION
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE
TO PUBLIC
SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER
A P
P R
O X
A
.F .F
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY
DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,
ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-
FILTER.
INDICATOR (REFER TO PLAN
& ELEVATION)
FRAMED PICTURE OF
C.O.R. WITH CONTACT
INFO
CONST. SUPERVISOR
NAME AND CELL
PHONE
CHILLER PLANT AFTER HOURS
CONTACT PHONE NUMBER FIRE
EMERGENCY DIAL 911
COMING SOON!!!
- DESCRIPTION OF NEWLY PROPOSED OCCUPANCY -
PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES
AND PROPER I.D.
THIS IS A
RESTRICTED AREA
AREA UNDER CONSTRUCTION
PAPER CADDY
ICRA, ILSM, FIRE WATCH,
MISC. FORMS
FRAMED COPY OF C.O.R.
CERTIFICATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
T-691
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E
L o u is v ill e
R e s to re A
H U
-1
M E
P c a rt e r.
d a n ie l0
.r v t
/3
/2
:2
:5
A
M
GI002
ICRA PLANS
Owner
08/12/2021 PQ CD
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
CONSTRUCTION
DOCUMENTS (100%) 1
ROBLEY REX
VA MEDICAL
CENTER
KEY PLAN - FOURTH FLOOR
1/4" = 1'-0"
FOURTH FLOOR ICRA PLAN - OR 6
1/4" = 1'-0"
FOURTH FLOOR ICRA PLAN - OR 7
D R A W I N G N O T E S :
1 SEAL DOOR IN CLOSED POSITION DURING WORK ACTIVITIES.
2 CONTRACTOR TO VERIFY O.R. DEMISING WALL EXTENDS ABOVE CEILING TO STRUCTURE ABOVE WITH METAL FRAMING AND GYPSUM BOARD. SEAL AS REQUIRED TO PREVENT AIR INFILTRATION. (TYPICAL AT EACH O.R.)
3 EXTEND FLEXIBLE DUCT FROM HEPA CART TO WINDOW IN CORRIDOR C-1. DUCT SHALL BE TIGHT TO CEILING AND DOOR FRAMES THROUGH ENTIRE RUN. VERIFY SEALANT AT DUCT PENETRATIONS THROUGH TEMPORARY WALL
CONSTRUCTION AND AT TEMPORARY WINDOW INFILL PANEL MEETS ICRA REQUIREMENTS.
4 EXTEND WALL TO STRUCTURE AS NECESSARY TO MEET INFECTION AND DUST CONTROL REQUIREMENTS AS
DEFINED IN THE GENERAL ICRA NOTES.
5 AIR PRESSURE MONITOR LOCATION. NEGATIVE AIR PRESSURE REQUIRED DURING ALL INTERIOR CONSTRUCTION
ACTIVITIES. REFER TO ELEVATION ON GI002 FOR REQUIREMENTS.
6 PROVIDE TEMPORARY ICRA RATED VESTIBULE AS NECESSARY TO MAINTAIN NEGATIVE PRESSURE IN SCOPE OF
WORK.
7 DISASSEMBLE WINDOW AS NECESSARY FOR TEMPORARY VENT CONSTRUCTION. USE NON-POROUS MATERIAL
TO INFILL WINDOW FOR TEMPORARY CONSTRUCTION.
8 MAINTAIN OPEN DOOR DURING CONSTRUCTION.
9 MAINTAIN ACCESS TO HISTO LAB DURING CONSTRUCTION.
10 PROVIDE TEMPORARY PLASTIC SHEETING AS NECESSARY FOR ICRA BARRIER INSTALLATION.
N N
4 BID DOCUMENTS 08/10/2021
DUMBWAITER
DUMBWAITER
DUMBWAITER
DUMBWAITER
FAC
FAC
FAC
FAC
STORAGE
A-458A
PATIENT
RESTROOM
A-467A
PATIENT
RESTROOM
A-480A
ELECTRICAL
CLOSET
B-413C
STORAGE
A-477
NURSE
CALL
EQUIP
A-454
TELEPHONE
CLOSET
A-455
ELECTRICAL
CLOSET
A-456
ALCOVE
MULTIPURPOSE RM
A-448
STAIR
NO
MENS
LOCKER RM
B-401
PATIENT
RESTROOM
A-466A
TOILET
B-425A
CORRIDOR
HISTO
LAB
B-405
ATTENDING
PHYS LOUNGE
B-410
HVAC
EQUIP RM
A-443
PATIENT
BED RM
A-466
SCRUB
C-403
CLEAN
UTILITY
B-427
CORRIDOR CORRIDOR
PATIENT
BED RM
A-469
PATIENT
BED RM
A-475
STORAGE
A-433
ELEVATOR
S-6
ELEVATOR
S-5
ELEVATOR
P4
ELEVATOR
P3
PIPE
CHASE
A-453D
CHIEF
SURGY SVC
A-453C
HAC
A-452
SECY SURGY
SVC
A-453A
AA SURGY
SVC
A-453B
SURGY
SVCS
A-453
ELEVATOR
P2
ELEVATOR
P1
CORRIDOR
CORRIDOR
CORRIDOR
ASU
B-413
WAITING/
RECEPTION
B-413B
TOILET
B-413B
CONSULT
B-420
ELEVATOR
P-9
ELEVATOR
P-8
ELEVATOR
P-7
LOBBY
B-419
ELECTRICAL
B-418
SUPPLY
B-413D
DARK RM
B-421A
MEDICATION
B-423A
STAIR-3
B-421
HOLDING
RM
B-423
INSTRUMENT
PREP
C-415A
CYSTOSCOPY
B-425
EQUIP
C-415A1
SUB-STERILE
B-424
CYSTOSCOPY
C-415
EQUIPMENT
C-414
STORAGE
C-413
HAC
C-412
MENS
RESTROOM
C-411
WOMENS
RESTROOM
C-410
SOILED
UTILITY
B-426
PACU
RECOVERY
B-429
STAIR-5
B-428
EQUIP
STORAGE
C-409
OR-1
C-408
SUB-STERILE
C-406A
SCRUB
C-407
OR-2
C-406
ANEST
WORK RM
C-405
OR-3
C-404
SUB-STERILE
C-402A
OR-4
C-402
EQUIP
STORAGE
C-401
OR-5
(ORTHOPEDIC)
B-417
EQ
STORAGE
RM
B-416
SUB-STERILE
B-415
BAY-1
BAY-2
BAY-3
BAY-4
BAY-5
ORSUPV
OFFICE
B-436
TELEPHONE RM
B-435A
CONTROL
DESK
B-440
ACNS
OFFICE
B-439
SUB-STERILE
RM
B-412
B-411A
STORAGE
B-411
ELEVATOR
SUB-STERILE
RM
B-407
STORAGE
B-408
OR-6
B-406
HAC
B-404
ELECTRICAL
CLOSET
B-403
MENS
DRESSING RM
B-402
CORRIDOR
OR
LOUNGE
B-438
SURGY
OFFICE
A-451
SURGY
OFFICE
A-450WOMENS
LOCKER RM
B-441
SURGICAL
STORAGE
A-449
WOMENS
RESTROOM
B-441A
DUMBWAITER
RM
A-447
B-401A
WOMENS
RESTROOM
A-445
MENS
RESTROOM
A-444
COMM
CLOSET
A-441
ELECTRICAL
CLOSET
A-440
STAIR-1
A-442
WAITING RM
A-439
SUB
STATION
A-437
CENTER
NUTRITION
A-435
ELECTRICAL
CLOSET
A-438
STAIR-2
A-434
MEDICINE
PREPARATION
RM
A-436
STAFF TOILET
A-432
PATIENT
BED RM
A-431
LINEN
A-430
ANTE
RM
A-429SUB
STATION
A-428
ELEVATOR
LOBBY
A-457
EQUIPMENT
B-435
ANEST
OFFICE
B-430
ANEST
OFFICE
B-431
A AND
MM
OFFICE
B-432
NSQIP
COORD
OFFICE
B-433
SURGY
OFFICE
B-434
CORRIDOR
NURSE
REPORT
A-461
RESTROOM
HAC
A-460
0FFICE
A-459
OFFICE
A-463A
STAFF LOCKER
A-462
NURSE STATION
A-463
STAFF
RESTRM
A-463B
MEDICATIONS
A-464
STAIR-6
A-465 PATIENT
BED RM
A-467
ALCOVE
A-468
PATIENT
RESTROOM
A-469A
PATIENT
RESTROOM
A-470A
PATIENT
BED RM
A-470
PATIENT
BED RM
A-471PATIENT
RESTROOM
A-471A
PATIENT
BED RM
A-472
ALCOVE
A-473
PATIENT
RESTROOM
A-472A
PATIENT
BED RM
A-474
PATIENT
RESTROOM
A-474A
PATIENT
RESTROOM
A-475A
SOILED
UTILITY
A-476
SUPPLY RM
A-478
PATIENT
BED RM
A-479
PATIENT
RESTROOM
A-479A
PATIENT
BED RM
A-480
PATIENT
BED RM
A-481
PATIENT
RESTROOM
A-481A
PATIENT
RESTROOM
A-482A
PATIENT
BED RM
A-482
PATIENT
BED RM
A-483
PATIENT
RESTROOM
A-483A
PATIENT
RESTROOM
A-484A
PATIENT
BED RM
A-484
PATIENT
BED RM
A-485
PATIENT
RESTROOM
A-485A
PATIENT
RESTROOM
A-486A
PATIENT BED RM
A-486
SOILED
UTILITY
A-487
NOURISHMENT
A-488
MECH RM
A-489STORAGE RM
A-490
WAITING RM
A-491
RESTROOM
A-400A
RESIDENTS
OFFICE
A-400
PATIENT
CHECK
IN/OUT
A-401
EXAM RM
A-402
EXAM RM
A-403
PATIENT
CONSULT
A-405ALCOVE
A-407
ELECTRICAL CLOSET
A-406
HVAC
EQUIP
A-408
PATIENT BED RM
A-409
ANTE RM
A-410
PATIENT
BED RM
A-411
OFFICE
A-412
A-414B
MENS
LOCKER RM
A-414A
HAC
A-413
MULTIPURPOSE RM
A-414
WOMENS
LOCKER RM
A-414c
ANTE RM
A-415
TOILET
A-414d
PATIENT
BED RM
A-416
HVAC
EQUIP RM
A-417
SOILED UTILITY RM
A-418
OFFICE
A-419
ANTE RM
A-420
PATIENT
BED RM
A-421
PATIENT
BED RM
A-422
ANTE
RM
A-403
PATIENT
BED RM
A-424
PATIENT
BED RM
A-425
ANTE
RM
A-426
A-427
LIGHT RM
B-422
FAC
CORRIDOR
TOILET
UP
DN
UP
UP
UP
TOILET
DUMBWAITER
B-413A
ZONE 04-3
ZONE 00-2
EXISTING HEALTHCARE
FULLY SPRINKLED
7,266 SQ FT
ZONE 04-1
EXISTING HEALTHCARE
FULLY SPRINKLED
7,882 SQ FT
ZONE 04-2
EXISTING HEALTHCARE
FULLY SPRINKLED
8,069 SQ FT
ZONE 04-4
EXISTING HEALTHCARE
FULLY SPRINKLED
21,133 SQ FT
ZONE 04-4
EXISTING HEALTHCARE
FULLY SPRINKLED
21,133 SQ FT
F
F
F
F
F
F
F
4 NORTH4 SOUTH
RE
CO
VE
RY
RECOVERY/OR
PATIENT
BED RM
FOURTH FLOOR PLAN
BUILDING 1
FULLY SPRINKLERED; MIXED RESPONSE TYPE
HEALTHCARE OCCUPANCY
FOURTH FLOOR PLAN
BUILDING 1
G003 7 16
Office of
Construction and Facilities
Management
Project NumberProject Title
Location
Date Checked Drawn
Drawing Number
Dwg. of
Approved: Project Director
Drawing Title
ENGINEERS
Date Revisions
Building Number
SITE NAME/ADDRESS
NUMBER
DRAFT SOC 10/26/2018
CONSULTANTS, LLC.
1520 MAIN STREET
INDIANAPOLIS, IN 46224
(317)486-5188
FIRE PROTECTION & CODE
V09-18-101
LOUISVILLE, KY
LOUISVILLE VAMC
STATEMENT OF CONDITIONS
Life Safety Assessment
KWAF12-28-2018
FP&C PROJECT #: 1937.10
FINAL SOC 12/28/2018
SYMBOLS LIST
HORIZONTAL EXIT PASSAGEWAY
EXIT
EXIT PASSAGEWAY
LINEN CHUTE
TRASH CHUTE
AREA OPEN TO CORRIDOR WITH SMOKE DETECTION
AREA OPEN TO CORRIDOR NO SMOKE DETECTION REQUIRED
EW
FAAP
FACP
FIRE EXTINGUISHER
EXIT SIGN
EMERGENCY LIGHT
FIRE ALARM STATION
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR PANEL
AUTOMATED EXTERNAL DEFIBRILLATOR
F
AED
EYEWASH STATION
SPRINKLER SYSTEM RISER
SS SHOWER STATION
EVACUATION CHAIREVC
HE
EX
EP
TC
FHV FIRE HOSE VALVE
PARTITION LEGEND
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE ZONE BARRIER
SMOKE ZONE BARRIER
1 HOUR FIRE BARRIER (HAZARDOUS ROOM ENCLOSURE)
NON-RATED SMOKE ZONE PARTITION
SMOKE RESISTIVE HAZARDOUS ROOM ENCLOSURE
HEALTH CARE OCCUPANCY CORRIDORS
SUITE DESIGNATION
LC
SUITE DESCRIPTIONS
SUITE NUMBER SUITE NAME SUITE SIZE TYPE OF SUITE
EXIT NUMBER
FOR REFERENCE ONLY
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
FIRE PROTECTION & CODE CONSULTANTS
AutoCAD SHX Text Robley Rex VA Medical Center
AutoCAD SHX Text Louisville, KY 40206
AutoCAD SHX Text 800 Zorn Avenue
AutoCAD SHX Text 6,759 Sq. Ft.
AutoCAD SHX Text
AutoCAD SHX Text
4 SOUTH SUITE
AutoCAD SHX Text
PATIENT CARE
AutoCAD SHX Text
WITH SLEEPING
AutoCAD SHX Text 8,291 Sq. Ft.
AutoCAD SHX Text
AutoCAD SHX Text
OR SUITE
AutoCAD SHX Text
NON SLEEPING
AutoCAD SHX Text
PATIENT CARE
AutoCAD SHX Text 1,856 Sq. Ft.
AutoCAD SHX Text
AutoCAD SHX Text
ASU SUITE
AutoCAD SHX Text
NON SLEEPING
AutoCAD SHX Text
PATIENT CARE
AutoCAD SHX Text 4,570 Sq. Ft.
AutoCAD SHX Text
AutoCAD SHX Text
OR 6 SUITE
AutoCAD SHX Text
NON-PATIENT CARE
D
DD
D
I
I
18.1 18.1
17.2
15.1
D.2
D.2
F.1
F.1
G.2
G.2 H.3
H.3
OR-7
B-408
SUB-STERILE RM
B-407
CORRIDOR
C-1 CORRIDOR
C-2
WORK RM
B-411
HVAC EQUIP RM
B-411A
ATTENDING PHYS LOUNGE
B-410
BAY-5
BAY-4
OR-6
B-406
HISTO LAB
B-405
PHASE 1 PHASE 2
G E N E R A L N O T E S
A. REFER TO GI001 FOR DEMOLITION AND NEW WORK GENERAL NOTES
B. DOCUMENT LOCATION OF LIGHT FIXTURES, SURGERY BOOMS, STERIS SURGERY LIGHTS, ACCESS PANELS, OUTLETS, SPRINKLERS, AND OTHER CEILING ELEMENTS PRIOR TO DEMOLITION OF CEILING. THE SAME
LAYOUT MUST BE REPLICATED IN THE NEW WORK.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR DEVICE REMOVAL AND REINSTALLATION.
D. ALL DIMENSIONS ARE TO FINISH FACE OF WALL OR TO CENTERLINE OF EQUIPMENT. ALL EXISTING DIMENSIONS ARE PLUS-OR-MINUS (±) CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SPACES PRIOR TO
START OF WORK.
PROJECT SCOPE
REFLECTED CEILING PLAN LEGEND
1' x 4' FIXTURE. UPPERCASE INDICATES TYPE PER THE FIXTURE SCHEDULE. LOWER CASE LETTER "a" INDICATES SWITCH ZONE.
OS
LC#
2' x 4' FIXTURE.
WALL MOUNTED FIXTURE.
INDUSTRIAL FIXTURE.
WALL MOUNTED FIXTURE.
EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED
RECESSED FIXTURE, DOWNLIGHT
CEILING MOUNTED OCCUPANCY SENSOR
LIGHTING CONTROLLER
2' x 2' FIXTURE.
A1 a
2' x 4' FIXTURE. SOLID FILL INDICATES FIXTURE ON LIFE
SAFETY OR EMERGENCY CIRCUIT.
(WHERE GENERATOR POWER IS NOT AVAILABLE
PROVIDE A UNIT BATTERY AT 1400 LM)
2' x 4' FIXTURE. DIAGONAL FILL INDICATES FIXTURE ON
CRITICAL CIRCUIT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
T-691
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E
L o u is v ill e
R e s to re A
H U
-1
M E
P c a rt e r.
d a n ie l0
.r v t
/3
/2
:2
:4
A
M
AD144
FOURTH FLOOR DEMOLITION
REFLECTED CEILING PLAN
Owner
08/12/2021 PQ CD
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
CONSTRUCTION
DOCUMENTS (100%) 1
ROBLEY REX
VA MEDICAL
CENTER
1/4" = 1'-0"
FOURTH FLOOR DEMOLITION REFLECTED CEILING PLAN
D R A W I N G N O T E S :
1 REMOVE GYPSUM BOARD CEILING AND ASSOCIATED SUPPORT SYSTEM UP TO STRUCTURE. COORDINATE ACCESSORY AND
DEVICE REMOVAL WITH MECHANICAL AND ELECTRICAL DRAWINGS.
2 PROTECT EXISTING MEDICAL BOOM AND MOUNT DURING CONSTRUCTION. PROTECT STRUCTURAL SUPPORTS TO DECK ABOVE.
3 REMOVE, SALVAGE, STORE AND REINSTALL EXISTING ACCESS PANEL.
4 REMOVE UNUSED SURGICAL MOUNT AND ASSOCIATED STRUCTURAL SUPPORT STEEL FROM CEILING.
5 REMOVE EXISTING AIR DEVICE.
6 SINGLE SUSPENSION, DUAL SURGERY LIGHTHEAD TO REMAIN AND BE PROTECTED DURING CEILING REPLACEMENT.
7 EXISTING SURGERY LIGHTHEAD TO REMAIN AND BE PROTECTED DURING CEILING REPLACEMENT.
KEY PLAN - FOURTH FLOOR
N
N
T
M
T M
I
I
18.1 18.1
17.2
15.1
D.2
D.2
F.1
F.1
G.2
G.2 H.3
H.3
OR-7
B-408
SUB-STERILE RM
B-407
CORRIDOR
C-1 CORRIDOR
C-2
WORK RM
B-411
HVAC EQUIP RM
B-411A
ATTENDING PHYS LOUNGE
B-410
BAY-5
BAY-4
OR-6
B-406
HISTO LAB
B-405
9' - 1"
9' - 1"
/8
/8
19' - 9" ± 19' - 2" ±
4' - 3 7/8"
/8
4' - 10 1/8" ±
2' - 2 1/4" 2' - 3 7/8"
/8
/4
9' - 3 7/8"
/4
7' - 0"
PHASE 1 PHASE 2
G E N E R A L N O T E S
A. REFER TO GI001 FOR DEMOLITION AND NEW WORK GENERAL NOTES
B. DOCUMENT LOCATION OF LIGHT FIXTURES, SURGERY BOOMS, STERIS SURGERY LIGHTS, ACCESS PANELS, OUTLETS, SPRINKLERS, AND OTHER CEILING ELEMENTS PRIOR TO DEMOLITION OF CEILING. THE SAME
LAYOUT MUST BE REPLICATED IN THE NEW WORK.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR DEVICE REMOVAL AND REINSTALLATION.
D. ALL DIMENSIONS ARE TO FINISH FACE OF WALL OR TO CENTERLINE OF EQUIPMENT. ALL EXISTING DIMENSIONS ARE PLUS-OR-MINUS (±) CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SPACES PRIOR TO
START OF WORK.
PROJECT SCOPE
REFLECTED CEILING PLAN LEGEND
1' x 4' FIXTURE. UPPERCASE INDICATES TYPE PER THE FIXTURE SCHEDULE. LOWER CASE LETTER "a" INDICATES SWITCH ZONE.
OS
LC#
2' x 4' FIXTURE.
WALL MOUNTED FIXTURE.
INDUSTRIAL FIXTURE.
WALL MOUNTED FIXTURE.
EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED
RECESSED FIXTURE, DOWNLIGHT
CEILING MOUNTED OCCUPANCY SENSOR
LIGHTING CONTROLLER
2' x 2' FIXTURE.
A1 a
2' x 4' FIXTURE. SOLID FILL INDICATES FIXTURE ON LIFE
SAFETY OR EMERGENCY CIRCUIT.
(WHERE GENERATOR POWER IS NOT AVAILABLE
PROVIDE A UNIT BATTERY AT 1400 LM)
2' x 4' FIXTURE. DIAGONAL FILL INDICATES FIXTURE ON
CRITICAL CIRCUIT.
HANGER WIRE BY OTHERS
JOINT PAPER TAPE
J-BEAD
ACOUSTICAL SEALANT AT PERIMETER
JOINTS, TYPICAL.
MOLDING ANGLE, SECURE TO WALL
WITH APROPRIATE FASTENER, TYPICAL.
DRYWALL SUSPENSION MAIN TEE
DRYWALL SUSPENSION CROSS TEE
SCREW GYPSUM BOARD INTO ANGLE MOLDING
GYPSUM BOARD PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
T-691
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E
L o u is v ill e
R e s to re A
H U
-1
M E
P c a rt e r.
d a n ie l0
.r v t
/3
/2
:2
:5
A
M
AC144
FOURTH FLOOR REFLECTED
CEILING PLAN
Owner
08/12/2021 PQ CD
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
CONSTRUCTION
DOCUMENTS (100%) 1
ROBLEY REX
VA MEDICAL
CENTER
1/4" = 1'-0"
FOURTH FLOOR REFLECTED CEILING PLAN
D R A W I N G N O T E S :
1 PROVIDE GYPSUM WALLBOARD CEILING AT HEIGHT OF PREVIOUSLY DEMOLISHED CEILING. CEILING HEIGHTS NOTED TO BE VERIFIED BY CONTRACTOR BEFORE THE START OF WORK. COORDINATE WITH MECHANICAL AND ELECTRICAL DRAWINGS FOR
CEILING ACCESSORY AND DEVICE INSTALLATION.
2 INSTALL NEW STAINLESS STEEL ACCESS PANEL IN LOCATION OF PREVIOUS OPENING.
3 INSTALL SALVAGED STAINLESS STEEL ACCESS PANEL IN LOCATION OF ORIGINAL OPENING.
KEY PLAN - FOURTH FLOOR
N
N
3" = 1'-0"
TYPICAL CEILING CONSTRUCTION
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
AB AIR BLENDER
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BIW BACKWARD INCLINED WHEEL (FAN)
BR BOTTOM REGISTER
BSC BIOLOGICAL SAFETY CABINETS
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CHW CHILLER WATER
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO2 CARBON DIOXODE
COP COEFFICIENT OF PERFORMANCE
COR CONTRACTING OFFICER REPRESENTATIVE
CR CEILING REGISTER
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECM ELECTRONICALLY COMMUTATED MOTOR
ECC ENGINEERING CONTROL CENTER
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
ABBREVIATIONS
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FE FLOW ELEMENT
FF FINAL FILTER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
HB HOSE BIBB
HC HEATING COIL
HEPA HIGH EFFICIENCY PARTICULATE AIR
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
J INTENTIALLY LEFT BLANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MRI MAGNETIC RESONANCE IMAGING
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
Pa PASCAL
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TG TRANSFER GRILLE
TR TOP REGISTER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP TYPICAL
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VSD VARIABLE SPEED DRIVE
W WATTS
Wb WET-BULB (TEMPERATURE)
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
YR YEAR
M
H4
H7
A
COLD WATER (CITY WATER)
HOT WATER
QUICK-COUPLE HOSE CONNECTOR
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
HOSE CONNECTOR
FLOW METER
DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
DUCTWORK SYMBOLS
LIMIT OF DEMOLITION
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
SQUARE 4-WAY CEILING DIFFUSERS
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
FC
10x8
FLEXIBLE CONNECTION, EQUIPMENT,
VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
FIRE DAMPER
FD
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
2 1 POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE
IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
1/24
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
TERMINAL UNIT SYMBOLS
2'x2' RADIANT CEILING PANEL
UNIT HEATER (HORIZONTAL)
AIR TERMINAL SYMBOLS
DOUBLE DUCT MIXING BOX.
TERMINAL UNIT WITH REHEAT COIL
PIPING SYMBOLS
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
VENT LINE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
HOT WATER HEATING RETURN
HPS
HPR
MPS
MPR
LPS
LPR
HWS
HWR
V
CHR
CHS
D
HW
CW
GENERAL PIPING SYMBOLS
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
FLOW ELEMENTFE
PIPE UP
PIPE DOWN
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
MANUAL AIR VENTMV
VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
CONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
MG MAGNEHLIC PRESSURE GAUGE
PDS PRESSURE DIFFERENTIAL SWITCH
A
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
T
ES END SWITCH
(FC) FAIL CLOSED
(FO) FAIL OPEN
(FLP) FAIL LAST POSITION
T STEAM TRAP
CP CONDENSATE PUMP
GENERAL SYMBOLS
ACCESS PANEL
TERMINAL UNIT W/ REHEAT COIL AND AIR DEVICE
SD
SMOKE DETECTOR
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
NOTE:
ALL SYMBOLS AND ABBREVIATIONS ARE
SUBJECT TO MODIFICATIONS ON OTHER
DRAWINGS. ALL SYMBOLS OR ABBREVIATIONS
MIGHT NOT NECESSARILY BE USED ON THIS
PROJECT.
STAINLESS STEEL DUCT
AEROSOL DUCTSEALANTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
C U s e rs
\j a c k v \D o c u m e n ts \F
F E
L o u is v ill e
R e s to re A
H U
-1
M E
P ja c k .v o lle tt e
.r v t
/2
/2
:4
:5
P
M
M001
MECHANICAL LEGEND
Owner
08/30/2021 KF KG
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
BID DOCUMENTSROBLEY REX
VA MEDICAL
CENTER
No. Revisions: Date:
0 BID DOCUMENTS 08/30/2021
08/27/2021
DN
UP
TT
I J K L M N O
12.1
O.2 Q.1 Q.3 R.1 R.2 R.3
16.1
17.1
18.1
17.2
15.1
D.2 F.1 G.2 H.3 I.1 I.2 K.1 L.1 L.2 L.3 N.1
2 2
(E)15"x10" EA(E)15"x10" EA
(E)24"x10" EA
(E)24"x10" EA
(E)12"x8" SA
(E)12"x6" SA
(E)34"x10" SA
(E)42"x12" SA
(E )4
6" x1
0" E
A (E
)3 0" x1 0"
E A
(E)12"x10" SA
(E)10"x8" SA (E)20"x10" EA
(E)20"x10" SA
(E)10"x8" SA
(E)20"x10" SA
(E )5
0" x1
0" E
A
(E)12"x10" SA
(E )6
0" x1
2" E
A
(E)40"x26" SA
(E)42"x12" SA
(E)16"x10" SA
(E)16"x10" SA
(E)28"x10" SA
(E)26"x10" EA
(E)20"x12" EA
(E)40"x14" EA
40"x18" EA (UP)
(E)48"x12" SA
(E)52"x12" SA
(E)20"x12" SA
(E)33"x12" SA
(E)32"x11" SA
(E)30"x12" EA
5 5
(E)42"x8" EA (E)26"x8" EA
1. REFER TO ARCHITECTURAL PLANS FOR PHASE IDENTIFICATION AND TEMPORARY BARRIER LOCATIONS.
2. THE AEROSEAL DUCT SEALANT WORK SHALL BE COMPLETED IN ONE WEEKEND TO ENSURE NORMAL OPERATING ROOM HOURS ARE NOT INTERRUPTED. COORDINATE WITH COR. CONTRACTOR SHALL MONITOR DUCTWORK FOR OVERSPRAY
AND SHALL BE RESPONSIBLE FOR CLEANING ANY INCIDENTAL OVERSPRAY.
PROJECT AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
C U s e rs
\j a c k v \D o c u m e n ts \F
F E
L o u is v ill e
R e s to re A
H U
-1
M E
P ja c k .v o lle tt e
.r v t
/2
/2
:4
:0
P
M
MD104
MECHANCIAL FOURTH FLOOR
DEMOLITION
Owner
08/30/2021 KF KG
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
1/8" = 1'-0"
FOURTH FLOOR PLAN - HVAC DEMOLITION
N
D R A W I N G N O T E S :
1 CLEAN SUPPLY DUCTWORK (CROSS-HATCHED) ASSOCIATED WITH AHU-10 AND APPLY DUCT SEALANT PRODUCT BY AEROSEAL. EXISTING EXHAUST DUCTWORK IS SHOWN FOR COORDINATION AND TO REPRESENT A FULLY DUCTED
SYSTEM.
2 EXISTING DUCT MOUNTED REHEAT COIL TO REMAIN. REMOVE DUCTWORK LEADING TO HEATING COIL. CLEAN COIL AND REINSTALL DUCTWORK. IF DEDUCT ALTERNATE #2 IS ACCEPTED, DO NOT REMOVE DUCTWORK LEADING TO REHEAT COIL AND UTILIZE ACCESS PANEL TO CLEAN COIL. IF DEDUCT ALTERNATE #3 IS ACCEPTED, DO NOT PERFORM THIS
WORK.
3 REMOVE EXISTING DUCTWORK AND ASSOCIATED SUPPORTS, ACCESSORIES, ETC. TO THIS POINT. PREPARE FOR
RECONNECTION IN NEW WORK.
4 REMOVE EXISTING AIR DEVICE.
5 REMOVE EXISTING AIR DEVICE AND ITS ASSOCIATED DUCTWORK BACK TO MAIN. CAP AND SEAL AIRTIGHT.
P H A S I N G G E N E R A L N O T E S:
KEY PLAN - FOURTH FLOOR
No. Revisions: Date:
N O
O.2 Q.1 Q.3 R.1 R.2
16.1
17.1
18.1
N.1
AHU-10
(E)42"x24" SA (DN)
(E)24"x24" SA (DN)
(E)66"x20" OA (UP)
PROJECT SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
C U s e rs
\j a c k v \D o c u m e n ts \F
F E
L o u is v ill e
R e s to re A
H U
-1
M E
P ja c k .v o lle tt e
.r v t
/2
/2
:4
:0
P
M
MD105
MECHANICAL FIFTH FLOOR
DEMOLITION
Owner
08/30/2021 KF KG
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
1/4" = 1'-0"
FIFTH FLOOR PLAN - HVAC DEMOLITION
N
D R A W I N G N O T E S :
1 REMOVE EXISTING HOUSED FAN, BULKHEAD WALL, MOTOR, AND ALL ASSOCIATED CONTROLS, SUPPORTS AND ACCESSORIES. REMOVE BAS POINTS AND ALARMS ASSOCIATED WITH FAN AND VFD. IF DEDUCT ALTERNATE #1 IS ACCEPTED, DO NOT REMOVE THE EXISTING HOUSED FAN AND RE-BALANCE TO FAN TO THE NEW AIRFLOWS SPECIFIED.
2 REMOVE EXISTING HEPA FILTER FROM AHU-10.
No. Revisions: Date:
DN
UP
TTT
M
T M
I J K L M N O
12.1
O.2 Q.1 Q.3 R.1 R.2 R.3
16.1
17.1
18.1
O.1
17.2
15.1
D.2 F.1 G.2
H.3 I.1 I.2 K.1 L.1 L.2 L.3 N.1
ANESTHESIA PHYSICIAN'S
OFFICE
B-431
ANESTHESIA ATTENDING
B-430
SD-2
600 CFM
SD-2
600 CFM
SD-2
515 CFM
OR-7
B-408
OR-6
B-406
SD-2
515 CFM
18"x8" SA
14"x8" SA
14"x8" SA
18"x8" SA
(E )2
4" x8
S
A
(E )2
4" x8
S
A
(E)20"x12" SA
(E)30"x12" SA
(E)33"x12" SA (E)48"x12" SA
(E)60"x12" EA
(E)50"x10" EA
(E)46"x10" EA
(E)30"x10" EA
(E)40"x26" SA (E)40"x26" SA
(E)42"x24" SA (UP)
(E)24"x24" SA (UP)
(E)20"x20" SA
(E)32"x11" SA
(E)40"x14" EA
(E)20"x26" SA
(E)52"x12" SA
(E)42"x12" SA
(E)20"x10" SA
(E)12"x10" SA
(E)20"x10" SA
(E)10"x8" SA
(E)10"x8" SA
(E)34"x10" SA
(E)28"x10" SA
(E)16"x10" SA
(E)24"x10" EA
(E)24"x10" EA
(E)12"x6" SA(E)12"x8" SA
(E)16"x10" SA
(E)12"x10" SA
(E)42"x8" EA
SPS
SPS
A AND MM OFFICE
B-432
SD-1
265 CFM
265 CFM
85 CFM
655 CFM
80 CFM
15 CFM
130 CFM
130 CFM
130 CFM
130 CFM
140 CFM
140 CFM
130 CFM
65 CFM
140 CFM
145 CFM
65 CFM
225 CFM
385 CFM
385 CFM
380 CFM
380 CFM
255 CFM
75 CFM
75 CFM
385 CFM
120 CFM
60 CFM
SUB-STERILE RM
B-412
LIGHT RM
B-422
DARK RM
B-421A
ATTENDING PHYS LOUNGE
B-410
ASU
B-413
WAITING / RECEPTION
B-413B
CONSULT
B-420
SUB-STERILE
B-415
CORRIDOR
C-5
OR-5 (ORTHOPEDIC)
B-417
HISTO LAB
B-405
CORRIDOR
C-1
SUB-STERILE RM
B-407
CORRIDOR
C-2
WORK RM
B-411
ACNS OFFICE
B-439
CORRIDOR
C-4
OR LOUNGE
B-438
20 CFM
80 CFM
75 CFM
150 CFM(E)30"x12" EA
(E)60"x12" EA
(E)48"x12" SA
(E)42"x12" SA
665 CFM
665 CFM
(E)36"x24" EA
(E)10"x15" EA
(E)26"x10" EA
(E)26"x8" EA (E)24"x26" SA
SURGY OFFICE
A-451
CORRIDOR
C-2
ELECTRICAL CLOSET
B-403
HAC
B-404
SURGY OFFICE
A-450
WOMEN'S LOCKER RM
B-441
CORRIDOR
C-3 OR SUPERVISOR / DICTATION
B-436
CONSULT RM
B-435
SURGY OFFICE
B-434
NSQIP COORD OFFICE
B-433
HOLDING RM
B-423
CYSTOSCOPY
B-425 CLEAN UTILITY
B-427
PACU RECOVERY
B-429
STAIR-3
B-421
BAY-1
BAY-2
BAY-3
BAY-4
TOILET
B-413B
EQ STORAGE RM
B-416
EQUIP STORAGE
C-401
(4 GPM) (3 GPM)
EG-2
1265 CFM
EG-1
830 CFM
1. REFER TO ARCHITECTURAL PLANS FOR PHASE IDENTIFICATION AND TEMPORARY BARRIER LOCATIONS.
2. THE AEROSEAL DUCT SEALANT WORK SHALL BE COMPLETED IN ONE WEEKEND TO ENSURE NORMAL OPERATING ROOM HOURS ARE NOT INTERRUPTED. COORDINATE WITH COR. CONTRACTOR SHALL MONITOR DUCTWORK FOR OVERSPRAY
AND SHALL BE RESPONSIBLE FOR CLEANING ANY INCIDENTAL OVERSPRAY.
PROJECT AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
C U s e rs
\j a c k v \D o c u m e n ts \F
F E
L o u is v ill e
R e s to re A
H U
-1
M E
P ja c k .v o lle tt e
.r v t
/2
/2
:4
:5
P
M
M104
MECHANICAL FOURTH FLOOR
PLAN NEW WORK
Owner
08/30/2021 KF KG
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
1/8" = 1'-0"
FOURTH FLOOR PLAN - HVAC NEW WORK
D R A W I N G N O T E S :
1 REPLACE EXISTING PNEUMATIC HEATING HOT WATER CONTROL VALVE WITH NEW DDC CONTROLS. INTEGRATE NEW CONTROLLER INTO THE CURRENT BUILDING CONTROL SYSTEM. BALANCE TO GPM INDICATED. REMOVE PNEUMATIC
THERMOSTAT AND TUBING FROM VALVE AND CAP MAIN AIR SUPPLY SERVING VALVE ACTUATOR.
2 PROVIDE NEW DUCT STATIC PRESSURE SENSOR TO CONTROL NEW SUPPLY FAN ARRAY.
3 REBALANCE EXISTING DIFFUSER TO CFM INDICATED.
4 PROVIDE NEW TEMPERATURE AND HUMIDITY SENSORS CONNECTED TO BAS SYSTEM.
P H A S I N G G E N E R A L N O T E S:
N
KEY PLAN - FOURTH FLOOR
No. Revisions: Date:
08/27/202108/27/2021
O.2 Q.1 Q.3 R.1 R.2
16.1
17.1
18.1
N.1
AHU-10
SF-10
PROJECT SCOPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
C U s e rs
\j a c k v \D o c u m e n ts \F
F E
L o u is v ill e
R e s to re A
H U
-1
M E
P ja c k .v o lle tt e
.r v t
/2
/2
:4
:5
P
M
M105
MECHANICAL FIFTH FLOOR PLAN
NEW WORK
Owner
08/30/2021 KF KG
RESTORE AHU-10 SYSTEM
(OR'S 5-7)
630-20-202
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
1/4" = 1'-0"
FIFTH FLOOR PLAN - HVAC NEW WORK
D R A W I N G N O T E S :
1 CLEAN FIN FACE OF COOLING COIL, HOT WATER PREHEAT COIL, AND HEAT RECOVERY COIL.
2 INSTALL NEW ECM FAN ARRAY. FAN MANUFACTURER TO PROVIDE BULKHEAD WALL, CONTROL PANEL, AND ALL OTHER ACCESSORIES. CONTRACTOR TO COORDINATE INSTALLATION WITH FAN MANUFACTURER. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING AIR HANDLING UNIT REQUIRED FOR FAN INSTALLATION.
PROVIDE BACNET IP GATEWAY IN CONTROL PANEL TO INTEGRATE WITH EXISTING BUILDING AUTOMATION SYSTEM. IF DEDUCT ALTERNATE #1 IS ACCEPTED, DO NOT INSTALL NEW ECM ARRAY OR CONTROLS MODIFICATIONS.
3 PROVIDE NEW FILTER FRAME AND MERV 14 FINAL FILTER.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .