This document contains questions and answers related to a solicitation for renovations to Building 160 at the Mountain Home VA Medical Center. The solicitation seeks to renovate approximately 4,400 square feet on the fourth floor of the building for mental health services. Bids were due on March 22, 2021 at 12:00 PM Central Time. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the contracting agency. The responses provide clarification that the work is to be completed as a single phase project without tax exemptions. Design documents in AutoCAD rather than Revit are available, and as-builts of existing areas may be requested. Details regarding seismic bracing and fire suppression notes are referenced.

View the file

Other files

File Type Posted
S06-SOLICITATION - 36C24921B0004 - AMENDMENT 4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 621-21-1-5200-0007 621-19-100 Department of Veterans Affairs Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 To all Offerors/Bidders

36C24921B0004 02-16-2021

X X x

BID OPENING - 03-22-2021 @ 12PM CENTRAL

621-36x0162-5200-854200-3223 23NR9JC09 x The purpose of this amendment is to answer questions from the RFIs and extend bid opening.

The bid opening has been extended until March 22, 2021 at 12:00 PM CT.

Teresa Rogofsky Contracting Officer

RFI QUESTIONS FOR PROJECT - 36C24921B0004

PROJECT #621-19-100 – Renovate Building 160 Question 1: The RFP states that we are to "submit a written RFI utilizing the RFI Form attached to this solicitation," however there was no RFI Form attached with the Solicitation. Can you please provide the referenced RFI form?

Answer: In absence of the referenced RFI form, bidder/offeror may submit RFI’s on a word document form or by way of email.

Question 2: When are RFI’s due?

Answer: The due date for RFI’s was Friday, February 26, 2021 by COB.

Question 3: As there will be no in-person bid opening for this project, can the CO or COR provide a conference line number to call into, so bidders can listen to the bid opening? This has been done in other VISNs and has worked well.

Answer: The information below provides access to the Seal Bid Opening:

Microsoft Teams meeting Join on your computer or mobile app Click here to join the meeting Or call in (audio only) +1 872-701-0185,,418166190# United States, Chicago Phone Conference ID: 418 166 190# Question 4: Can we submit our bid via email, if we mail the original hardcopy Bid Bond prior to the due date?

Answer: Yes, bids can be submitted via email and the original hardcopy bid bond mailed prior to due date. Please make sure they arrive by the due date and time.

Question 5: Can non-technical RFIs be answered early in the bidding period for planning purposes?

Answer: Yes.

Question 6: How many days should be included / anticipated for the government to review RFIs.

Answer: All RFI Q & A will be answered and uploaded as soon as the requested information has been received and uploaded to the solicitation as an amendment.

Question 7: Is this project tax exempt, and will the CO/COR provide the necessary tax-exempt certificates?

Answer: This project is not tax exempt. FAR clause 52.229-3 applies to this project. All federal, state and local taxes should be included in the proposal.

Question 8: Will owner provide 3-D Revit model for use by GC?

Answer: The project is not designed in Revit; it is designed in AutoCAD. For presentation, the project renderings shown in drawings were prepared by an external graphics designer; not a Revit model. The designer typically does not provide AutoCAD plans to the GC due to proprietary nature of the design and the structural details. However, the contractor may use PDF’s and mark over them.

Question 9: Will Owner require GC’s to develop 3-D coordination models?

Answer: The project is not designed in a 3D Revit model.

Question 10: Will owner be providing as-built documentation of existing structures during the bidding period?

Answer: The VA may provide the as-builts upon request; however, the as-built conditions of the Bldg. 160 4th Floor N-Side are included/incorporated as shown in the current design documents as existing.

Question 11: Please provide seismic bracing details for pipe and systems support?

Answer: Seismic Restraint is per specification 13 05 41 and throughout specifications. Also reference G-003 Code Criteria and notes, A-572 of the drawing set for additional seismic details as well as F-001 Fire Suppression Note 24.

Question 12: For planning the preliminary project schedule, can you please provide an anticipated award date?

Answer: We will not be able to provide the anticipated award date for this project.

Question 13: Phasing Clarification: The Drawings show that the area on the 4th floor is to be completed in two phases, however, the Bid Schedule in the RFP states "Note that any and all references to project phasing shall be disregarded. This project is intended to be completed in total without any phasing of work." Please confirm that the entire project area will available to the contractor, unoccupied at the time of NTP, and that there are no phasing requirements.

Answer: The project area will be available in totality with NO phasing requirement.

Question 14: Confirm offer due date?

Answer: Bids are due now on March 22, 2021 at 12 PM CT.