36C24919R0158-035.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
36C24919R0158 - 596A4-18-106 - Repair Exterior Walls
Solicitation number
36C24919R0158
Issued by

About this file

36C24919R0158 S33-Example Contractor Price Schedule (breakout).xlsx

View the file

Other files

File Type Posted
36C24919C0204-000.docx DOCX document
36C24919R0158-0003010.pdf PDF
36C24919R0158-0003000.docx DOCX document
36C24919R0158-0003005.pdf PDF
36C24919R0158-0003008.pdf PDF
36C24919R0158-0003001.pdf PDF
36C24919R0158-0003003.pdf PDF
36C24919R0158-0003004.pdf PDF
36C24919R0158-0003002.pdf PDF
36C24919R0158-0003009.pdf PDF
36C24919R0158-0003007.pdf PDF
36C24919R0158-0003006.pdf PDF
36C24919R0158-0002000.docx DOCX document
36C24919R0158-0001001.docx DOCX document
36C24919R0158-0001004.pdf PDF
36C24919R0158-0001003.pdf PDF
36C24919R0158-0001002.docx DOCX document
36C24919R0158-0001000.docx DOCX document
36C24919R0158-044.pdf PDF
36C24919R0158-042.pdf PDF
36C24919R0158-045.pdf PDF
36C24919R0158-037.pdf PDF
36C24919R0158-038.pdf PDF
36C24919R0158-033.docx DOCX document
36C24919R0158-041.pdf PDF
36C24919R0158-034.docx DOCX document
36C24919R0158-043.pdf PDF
36C24919R0158-049.pdf PDF
36C24919R0158-040.pdf PDF
36C24919R0158-039.pdf PDF
36C24919R0158-036.pdf PDF
36C24919R0158-048.pdf PDF
36C24919R0158-050.pdf PDF
36C24919R0158-047.pdf PDF
36C24919R0158-046.pdf PDF
36C24919R0158-032.docx DOCX document
36C24919R0158-000.docx DOCX document
36C24919R0158-000.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown

JOB NAME: TBD LOCATION: Memphis VAMC BID DATE: 07/31/2019 @ 2:00PM CT
TOTAL $582,387.87
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTSUB-CONTRACTOR*LINE TOTALSCOMMENTS
DIVISION 1GENERAL REQUIREMENTS$90.00
13526Infection Control Walls$5.00$5.00$0.00$0.00$10.00
Submittal Process$5.00$5.00$0.00$0.00$10.00
Supervision$5.00$5.00$0.00$0.00$10.00
Demolition$5.00$5.00$0.00$0.00$10.00
Dumpsters$5.00$5.00$0.00$0.00$10.00
Job-site Office Equipment$5.00$5.00$0.00$0.00$10.00
Safety & First Aid-ICRA$5.00$5.00$0.00$0.00$10.00
Final Cleaning$5.00$5.00$0.00$0.00$10.00
Punchlist/Closeout$5.00$5.00$0.00$0.00$10.00
DIVISION 2SITE WORK$10.00
02 41 00DemolitionXXX$5.00$5.00
02 82 11Traditional Asbestos AbatementXXX$5.00$5.00
DIVISION 3CONCRETE$10.00
03 30 53Cast in Place Concrete (9 plumbing patches)$5.00$5.00XX$10.00
DIVISION 4MASONRY$0.00
DIVISION 5STEEL$0.00
DIVISION 6CARPENTRY$10.00
06 10 00Rough Carpentry$5.00$5.00XX$10.00
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 21 13Thermal InsulationXXXX$0.00
07 84 00FirestoppingXXXX$0.00
07 92 00Joint SealantsXXXX$0.00
DIVISION 8DOORS AND WINDOWS$25.00
08 11 13Hollow Metal Frames$5.00$5.00XX$10.00
08 14 00Interior Wood DoorsXXXX$0.00
08 31 13Access Doors and FramesXXXX$0.00
08 41 13Alum Framed Entrance and StorefrontsXXX$5.00$5.00
08 56 19Pass Windows (2 each)$5.00$5.00XX$10.00
08 71 00Door HardwareXXXX$0.00
08 80 00GlazingXXXX$0.00
DIVISION 9FINISHES$20.00
09 05 16Subsurface Prep for Floor FinishingXXX$5.00$5.00
09 06 00Schedule for FinishesXXXX$0.00
09 22 16Non Struct Metal FramingXXX$5.00$5.00
09 29 00Gypsum BoardXXXX$0.00
09 30 13Ceramic/Porcelain TileXXX$5.00$5.00
09 51 00Acoustical CeilingsXXXX$0.00
09 65 13Resil Base and AccessXXXX$0.00
09 65 16Resilient Sheet FlooringXXXX$0.00
09 90 00PaintingXXX$5.00$5.00
DIVISION 10ACCESSORIES$25.00
10 14 00Signage$5.00$5.00XX$5.00
10 21 23Cubicle Curtain Tracks$5.00$5.00XX$5.00
10 26 00Wall and Door Protection$5.00$5.00XX$5.00
10 28 00Toilet Bath and Laundry Access$5.00$5.00XX$5.00
10 44 13Fire Ext Cabinets$5.00$5.00XX$5.00
DIVISION 11$0.00
DIVISION 12$10.00
12 31 00Manuf Metal CaseworkXXX$5.00$5.00
12 32 00Manuf Wood CaseworkXXX$5.00$5.00
12 36 00CountertopsXXX0$0.00
DIVISION 13$0.00
DIV 21‐23MECHANICAL$15.00
DIV 21Fire ProtectionXXX$5.00$5.00
DIV 22PlumbingXXX$5.00$5.00
DIV 22HVACXXXX$0.00
DIV 22ControlsXXX$0.00$0.00
DIV 22T&BXXX$5.00$5.00
DIV 23Heating, Ventilating, and Air ConditioningXXXX$0.00
DIV 25Integrated Automation
DIV 26ELECTRICAL$5.00
ElectricalXXX$5.00$5.00
Fire AlarmXXXX$0.00
Other…XXXX$0.00
DIV 27
DIV 28ELECTRONIC SAFETY AND SECURITY
DIV 31$0.00
DIV 32
DIV 33
DIV 34
DIV 48

TOTALS

TOTAL LABOR WITH BURDEN$90.00
LABOR BURDEN $0.00 In Pricing
6.00%
TOTAL MATERIALS WITH TAX$90.00
MATERIALS TAX
$5.40
TOTAL EQUIPMENT$0.00
TOTAL SUB$185.40
LABOR$90
MATERIAL$90
EQUIPMENT$0
SUB$185*Need to provide subcontractor breakdown

SUBTOTAL $365

OVERHEAD9.00%$33
PROFIT4.50%$16

SUBTOTAL $415

BOND/FEE 1.03% $4

GRAND TOTAL$419
$400Bid/Proposal Amount

File details come from the government source that posted it.