36C24919R0126-004.pdf
PDF 19 MB Posted
- Solicitation number
- 36C24919R0126
About this file
36C24919R0126 2 - Combined Drawings BD USP 800 Nash.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24919R0126-0005000.docx | DOCX document | |
| 36C24919R0126-0004001.pdf | ||
| 36C24919R0126-0004000.docx | DOCX document | |
| 36C24919R0126-0003000.docx | DOCX document | |
| 36C24919R0126-0002001.pdf | ||
| 36C24919R0126-0002000.docx | DOCX document | |
| 36C24919R0126-0001001.pdf | ||
| 36C24919R0126-0001000.docx | DOCX document | |
| 36C24919R0126-006.xlsx | XLSX spreadsheet | |
| 36C24919R0126-002.docx | DOCX document | |
| 36C24919R0126-005.docx | DOCX document | |
| 36C24919R0126-003.pdf | ||
| 36C24919R0126-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT IMAGE
PROJECT LOCATION MAP
/2
/2
:2
:2
P
M
G-001
COVER SHEET
1 7DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
USP 800 PHARMACY COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
VA PROJECT #: 626-18-501 APOGEE PROJECT #: 18-263
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 7
G-101 INFECTION CONTROL RISK ASSESSMENT (ICRA) 2 7
GI101 PHASE 1 PLAN 3 7
GI102 PHASE 2 PLAN 4 7
GC101 FIRST FLOOR ICRA PLAN - PHASE 1 5 7
GC102 FIRST FLOOR ICRA PLAN - PHASE 2 6 7
LS101 LIFE SAFETY PLAN 7 7
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 16
A-100 SITE PLAN 2 16
AD101 FIRST FLOOR DEMOLITION PLAN - PHASE 1 3 16
AD102 FIRST FLOOR DEMOLITION PLAN - PHASE 2 4 16
AD111 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - PHASE 1 5 16
AD112 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - PHASE 2 6 16
A-101 FIRST FLOOR PLAN 7 16
A-102 SECOND FLOOR COURTYARD PLAN 8 16
A-110 FIRST FLOOR REFLECTED CEILING PLAN 9 16
A-201 COURTYARD DUCT CHASE ELEVATION 10 16
A-401 INTERIOR ELEVATIONS 11 16
A-402 INTERIOR ELEVATIONS 12 16
A-501 MODULAR CLEAN ROOM DETAILS 13 16
A-502 PARTITION TYPES 14 16
A-601 DOOR & FINISH SCHEDULES 15 16
AI101 EQUIPMENT PLAN 16 16
FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL INFORMATION 1 3
FD101 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN 2 3
FX101 FIRST FLOOR FIRE PROTECTION PLAN 3 3
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 4
PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN 2 4
PP101 FIRST FLOOR PLUMBING PLAN 3 4
PP102 FIRST FLOOR PLUMBING PLAN 4 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 16
MD101 PARTIAL FIRST FLOOR MECHANICAL DEMO PLAN-PHASE 1 2 16
MD102 PARTIAL FIRST FLOOR MECHANICAL DEMO PLAN-PHASE 1 3 16
MH101 FIRST FLOOR MECHANICAL PLAN- PHASE 1 4 16
MH102 PARTIAL FIRST FLOOR HVAC PLAN- PHASE 1 5 16
MD103 FIRST FLOOR MECHANICAL PLAN- PHASE 2 6 16
MH103 FIRST FLOOR MECHANICAL PLAN- PHASE 2 7 16
MH105 MECHANICAL AIR TERMINAL PLAN 8 16
MH106 ROOF HVAC PLAN 9 16
MP101 FIRST FLOOR MECHANICAL PIPING PLAN 10 16
M-501 MECHANICAL DETAILS 11 16
M-502 MECHANICAL DETAILS 12 16
M-503 MECHANICAL CONTROLS 13 16
M-601 MECHANICAL SCHEDULES 14 16
M-602 MECHANICAL SCHEDULES 15 16
M-901 ISOMETRIC VIEWS 16 16
ELECTRICAL
E-001 ELECTRICAL GENERL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 14
ED101 FIRST FLOOR POWER DEMOLITION PLAN - PHASE 1 2 14
ED102 FIRST FLOOR POWER DEMOLITION PLAN - PHASE 2 3 14
ED103 FIRST FLOOR LIGHTING DEMOLITION PLAN - PHASE 1 4 14
ED104 FIRST FLOOR LIGHTING DEMOLITION PLAN - PHASE 2 5 14
EP101 FIRST FLOOR POWER PLAN - PHASE 1 6 14
EP102 FIRST FLOOR POWER PLAN - PHASE 2 7 14
EM101 FIRST FLOOR MECHANICAL POWER PLAN - PHASE 1 8 14
EM102 ROOF MECHANICAL POWER PLAN 9 14
EL101 FIRST FLOOR LIGHTING PLAN - PHASE 1 10 14
EL102 FIRST FLOOR LIGHTING PLAN - PHASE 2 11 14
E-501 ELECTRICAL DETAILS 12 14
E-601 SINGLE LINE DIAGRAM 13 14
E-602 ELECTRICAL SCHEDULES 14 14
TECHNOLOGY
TK001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 4
TK101 FIRST FLOOR TECHNOLOGY PLAN - PHASE 1 2 4
TK102 FIRST FLOOR TECHNOLOGY PLAN - PHASE 2 3 4
TK501 TECHNOLOGY DETAILS 4 4
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER 1 3
FA101 FIRST FLOOR FIRE ALARM PLAN- PHASE 1 2 3
FA102 FIRST FLOOR FIRE ALARM PLAN- PHASE 2 3 3
GENERAL SYMBOL LEGEND
PROJECT SITE
PROJECT LOCATION
NASHVILLE VAMC - TVHS
AREA OF WORK
DocuSign Envelope ID: FAB5837E-89FB-487F-B89D-6A06721D9204
3/29/2019
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
V .I
.F
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S
V .I
.F
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S
V .I
.F
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:2
P
M
G-101
INFECTION CONTROL RISK
ASSESSMENT (ICRA)
2 7DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
D
E
F
161514 17 18
G
R
G.1
H
I
N
OUTPATIENT
FILLING/ASSEMBLY
C1-21B
PAT. ED.
1-G134K
SEE A-102 FOR
ROOF ABOVE
PHASE 1 PHASE 2
HAC
HAC
HOOD HOOD
HOOD HOODHOOD
HOOD HOOD
HD PREP
C1-32
HD
STORAGE
G-107
BCG
G-107B
HD
BUFFER
G-107C
HD
ANTEROOM
G-107A
IV PREP
G-107G
IV PREP
G-107H
IV
ANTEROOM
G-107F
BGC
COUNTER
G-107D
HD
COUNTER
G-107E
IV
SET-UP
G-107I
PHARMACISTS
PROCESSING
AREA
I-G134A
I.P.
SUPER
I-G134F
PRO TECH
1-G134J
ELECTRICAL
CLOSET
G-104
DATA
G-103
VAULT
1-G134I
OP SUPER
1-G127B
INVESTIGATIONAL
DRUGS/COMPOUNDING
WAITING
C1-21B
CORRIDOR
C1-21A
CORRIDOR
C1-21
19 20 20.1
SEE A-100 FOR
ACCESS AREA
SEE A-100 FOR
ACCESS AREA
MALE
TOILET
G-108
FEMALE
TOILET
G-106
CHEMO
1-G134E
HIGH RISK
1-G134D
ANTE
1-G134C
IV PREP
A-G134B
PHASE 2
PHASE 1
COMPLETED
ICRA AREA
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
EXISTING 1 HR - SMOKE WALL
NEW 1 HR - SMOKE WALL
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:3
P
M
GI101
PHASE 1 PLAN
3 7DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
PHASE 1 PLAN
PHASING LEGEND
PHASE 1
1. TEMPORARILY RELOCATE (STAFF) FURNISHINGS
AND EQUIPMENT AFFECTED IN PHASE 1 TO A
SPACE DESIGNATED BY THE VA CONTRACTING
OFFICER REPRESENTATIVE (COR).
2. AREA DESIGNATED AS PHASE 1 SHALL BE CLOSED
OFF AT LIMITS OF CONSTRUCTION AND PROPER
SIGNAGE PUT UP TO CONTROL ACCESS.
3. ACCESS FROM THE NORTH CORRIDOR (C1-21) AND
AT NEW ENTRY ABOVE THE I.P. SUPER. OFFICE
(IG134F), WILL BE BLOCKED WITH TEMPORARY
WALLS AND DOORS AT DESIGNATED LOCATIONS.
THESE SHALL BE PUT UP TO CONTROL ACCESS TO
THE "CONSTRUCTION SITE" - SEE PLANS FOR
TEMPORARY BARRIERS/DUST PARTITIONS.
4. UPON THE COMPLETION OF PHASE 1 HD PREP, HD
STORAGE, BCG, HD BUFFER, HD ANTEROOM,
BCG AND HD COUNTERS, IV SET-UP, IV ANTEROOM,
AND IV PREP ROOMS 1 AND 2, SHALL BE AVAILIBLE
FOR USE. REMOVE THE TEMPORARY WALLS AND
DOORS SO ACCESS FROM THE NORTH CORRIDOR
(C1-21) INTO THE RENOVATED PHASE 1 AREA
CAN RESUME.
5. REMOVE TEMPORARY BARRIERS/DUST PARTITIONS
AND DOORS AFTER PHASE 1 WORK IS COMPLETED.
0 4 8 16
NORTH
PLAN
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
R E
F
R E
F
REF.
D
E
F
161514 17 18
G
R
G.1
H
I
N
19 20 20.1
OUTPATIENT
FILLING/ASSEMBLY
C1-21B
PAT. ED.
1-G134K
100 SF
MALE
TOILET
G-108
119 SF
FEMALE
TOILET
G-106
72 SF
HD PREP
C1-32
151 SF
HD
STORAGE
G-107
68 SF
BCG
G-107B
103 SF
HD
BUFFER
G-107C
105 SF
HD
ANTEROOM
G-107A
104 SF
BCG
COUNTER
G-107D
108 SF
HD
COUNTER
G-107E
273 SF
IV
SET-UP
G-107I
127 SF
IV
ANTEROOM
G-107F
90 SF
I.P.
SUPER
1-G134F
127 SF
SUPERVISOR
OFFICE
G-107J 131 SF
NON-STERILE
COMPOUNDING
1-G134D
392 SF
IV
STORAGE
G-107K
214 SF
PHARMACISTS
PROCESSING
AREA
1-G134A
91 SF
G-107H
IV PREP 2
91 SF
G-107G
IV PREP 1
SEE A-102 FOR
ROOF ABOVE
PHASE 1 PHASE 2
HAC
HAC
HOOD HOOD
HOOD HOOD 33 SF
HD
STORAGE
CORRIDOR
G-107L
HOOD
HOOD HOOD
PRO TECH
1-G134J
ELECTRICAL
CLOSET
G-104
DATA
G-103
VAULT
1-G134I
OP SUPER
1-G127B
INVESTIGATIONAL
DRUGS/COMPOUNDING
WAITING
C1-21B
CORRIDOR
C1-21A
CORRIDOR
C1-21
SEE A-100 FOR
ACCESS AREA
SEE A-100 FOR
ACCESS AREA
PHASE 2
PHASE 1
COMPLETED
ICRA AREA
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
EXISTING 1 HR - SMOKE WALL
NEW 1 HR - SMOKE WALL
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:3
P
M
GI102
PHASE 2 PLAN
4 7DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
PHASE 2 PLAN
PHASING LEGEND
PHASE 1
A. TEMPORARILY RELOCATE (STAFF) FURNISHINGS
AND EQUIPMENT AFFECTED IN PHASE 2 TO A
SPACE DESIGNATED BY THE VA CONTRACTING
OFFICER REPRESENTATIVE (COR).
B. AREA DESIGNATED AS PHASE 2 SHALL BE CLOSED
OFF AT LIMITS OF CONSTRUCTION AND PROPER
SIGNAGE PUT UP TO CONTROL ACCESS.
C. UPON THE COMPLETION OF PHASE 2 HD STORAGE
CORRIDOR, IV STORAGE, SUPERVISOR'S OFFICE,
AND, NON-STERILE COMPOUNDING, SHALL BE
AVAILIBLE FOR USE. REMOVE THE TEMPORARY
WALLS AND DOORS SO ACCESS INTO THE
RENOVATED PHASE 2 AREA CAN RESUME.
D. REMOVE TEMPORARY BARRIERS/DUST PARTITIONS
AND DOORS AFTER PHASE 2 WORK IS COMPLETED.
0 4 8 16
NORTH
PLAN
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
D
E
F
161514 17
G
R
REMOVE WALL,
CEILING, AND
FLOOR FINISHES
IN THIS AREA
CORRIDOR
C1-32
OFFICE
G-107H
OFFICE
G-107G
GROUP RM
G-107
OFFICE
G-107F
OFFICE
G-107E
OFFICE
G-107D
OFFICE
G-107C
CHEMO
1-G134E
HIGH RISK
1-G134D
ANTE
1-G134C
IV PREP
A-G134B
PHARMACISTS
PROCESSING
AREA
1-G134A
OFFICE
G-107A
OFFICE
G-107B
MALE TOILET
G-108
FEMALE
TOILET
G-106
I.P. SUPER
1-G134F
CORRIDOR
C1-21
/2
PHASE 1 PHASE 2
PRO TECH
1-G134J
ELECTRICAL
CLOSET
G-104
DATA
G-103
VAULT
1-G134I
OUTPATIENT
FILLING/ASSEMBLY
1-G134
OP SUPER
1-G127B
INVESTIGATIONAL
DRUGS/COMPOUNDING
WAITING
C1-21B
CORRIDOR
C1-21A
M
IN
IM
U
M C
L E
A R
A N
C E
EXISTING
REF.
EXISTING
REF.
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
EXISTING 1 HR - SMOKE WALL
NEW 1 HR - SMOKE WALL
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:2
P
M
GC101
FIRST FLOOR ICRA PLAN - PHASE 1
5 7DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIRST FLOOR ICRA PLAN - PHASE 1 0 2 4 8
NORTH
PLAN
A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK
IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
B. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
D. SEAL HOLES, PIPES, CONDUITS, AND
PUNCTURES.
E. ALL PERSONNEL ENTERING WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
F. ALL UTILITY CONNECTIONS WILL BE
COORDINATED WITH VA.
G. CONTRACTOR IS REQUIRED TO ENSURE FIRE
SUPPRESSION IS OPERATIONAL THROUGHOUT
THE CONSTRUCTION PERIOD.
H. CONTRACTOR TO PROVIDE PROTECTIVE
BARRIER, WARNING SIGNS AND TEMPORARY
PATHWAYS IN AREAS THAT WILL BE OPERATING
DURING THE CONSTRUCTION PHASE.
01 LIFE SAFETY ICRA BARRIER TYPE A 1-HOUR
RATED, TO DECK ABOVE, REFER TO SHEET
G-101 FOR DETAILS.
02 STICKY MAT AT ZIPPER ENTRY CONSTRUCTION
ACCESS POINT.
03 EXISTING WALL TO REMAIN AS ICRA BARRIER
UNTIL WORK IS COMPLETED.
04 SECURE DOOR OPENING DURING
CONSTRUCTION.
05 USE PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM.
06 CONFIGURATION/LOCATION OF WALLS TO BE
COORDINATED IN ADVANCE WITH COR AND
SAFETY. ZIPPER WALL TO MAINTAIN EXIT
REQUIREMENTS ON REST OF FLOORS. EXTEND
BARRIER TO UNDERSIDE OF DECK IF CEILING
WORK IS INVOLVED.
07 CONSTRUCT TEMPORARY RIGID ENCLOSURE
OVER EXISTING OPENINGS WITH RIGID
MATERIAL AND PLASTIC SECURED ALL AROUND
OPENING TO PREVENT ANY DUST TRANSFER
DURING CONSTRUCTION.
08 COORDINATE ALL NEW DOOR AND WALL REPAIR
ON THE CORRIDOR WITH THE C.O.R..
CONTRACTOR IS TO USE STARK WALL SYSTEM
OR APPROVED EQUAL AS TEMPORARY
ENCLOSURES IN THE CORRIDOR FOR THIS
WORK. TEMPORARY BARRIERS ARE TO BE
REMOVED WHEN WORK IS COMPLETE OR BY
THE START OF WORK WEEK AS DEFINED BY
C.O.R..
09 WINDOW WILL BE REMOVED TO FOR PRIMARY
CONTRACTOR ACCESS TO SPACE. STORE AND
REINSTALL WINDOWS AFTER CONSTRUCTION -
CONTRACTOR TO PROVIDE A SECURITY
BARRIER APPROVED BY COR.
10 PROVIDE AN EGRESS DOOR IN THE ICRA
BARRIER, WITH EGRESS HARDWARE AND
CLOSURE.
11 EXISTING REFRIGERATORS SHALL BE
RELOCATED PRIOR TO THE START OF
CONSTRUCTION. COORDINATE WITH COR.
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
D
E
F
161514 17
G
R
CHEMO
1-G134E
HIGH RISK
1-G134D
ANTE
1-G134C
IV PREP
A-G134B
PHARMACISTS
PROCESSING
AREA
1-G134A
MALE TOILET
G-108
FEMALE
TOILET
G-106
I.P. SUPER
1-G134F
CORRIDOR
C1-21
PHASE 1 PHASE 2
PRO TECH
1-G134J
ELECTRICAL
CLOSET
G-104
DATA
G-103
VAULT
1-G134I
OUTPATIENT
FILLING/ASSEMBLY
1-G134
OP SUPER
1-G127B
INVESTIGATIONAL
DRUGS/COMPOUNDING
WAITING
C1-21B
CORRIDOR
C1-21A
HD PREP
C1-32
HD
STORAGE
G-107
BCG
G-107B
HD
BUFFER
G-107C
HD
ANTEROOM
G-107A
BCG
COUNTER
G-107D
HD
COUNTER
G-107E
IV PREP
G-107H
IV PREP
G-107G
IV
ANTEROOM
G-107F
IV
SET-UP
G-107I
ICRA WALL SHALL
NOT BLOCK
PNEUMATIC SYSTEM
PHASE 2A:
AREA SHALL BE MAINTAINED AS
PRIMARY MEANS OF ENTRY INTO SPACE
FOR PHARMACY STAFF UNTIL THE WALL OPENING
AND HD STORAGE CORRIDOR ARE COMPLETE.
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
EXISTING 1 HR - SMOKE WALL
NEW 1 HR - SMOKE WALL
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:3
P
M
GC102
FIRST FLOOR ICRA PLAN - PHASE 2
6 7DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIRST FLOOR ICRA PLAN - PHASE 2
01 LIFE SAFETY ICRA BARRIER TYPE A 1-HOUR RATED,
TO DECK ABOVE, REFER TO SHEET G-101 FOR
DETAILS.
02 STICKY MAT AT ZIPPER ENTRY CONSTRUCTION
ACCESS POINT.
03 EXISTING WALL TO REMAIN AS ICRA BARRIER UNTIL
WORK IS COMPLETED.
04 SECURE DOOR OPENING DURING CONSTRUCTION.
05 USE PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM.
06 CONFIGURATION/LOCATION OF WALLS TO BE
COORDINATED IN ADVANCE WITH COR AND SAFETY.
ZIPPER WALL TO MAINTAIN EXIT REQUIREMENTS ON
REST OF FLOORS. EXTEND BARRIER TO UNDERSIDE
OF DECK IF CEILING WORK IS INVOLVED.
07 CONSTRUCT TEMPORARY RIGID ENCLOSURE OVER
EXISTING OPENINGS WITH RIGID MATERIAL AND
PLASTIC SECURED ALL AROUND OPENING TO
PREVENT ANY DUST TRANSFER DURING
CONSTRUCTION.
08 COORDINATE ALL NEW DOOR AND WALL REPAIR ON
THE CORRIDOR WITH THE C.O.R.. CONTRACTOR IS
TO USE STARK WALL SYSTEM OR APPROVED EQUAL
AS TEMPORARY ENCLOSURES IN THE CORRIDOR
FOR THIS WORK. TEMPORARY BARRIERS ARE TO BE
REMOVED WHEN WORK IS COMPLETE OR BY THE
START OF WORK WEEK AS DEFINED BY C.O.R..
09 WINDOW TO BE REMOVED FOR PRIMARY
CONTRACTOR ACCESS TO SPACE. STORE AND
REINSTALL WINDOWS AFTER CONSTRUCTION -
CONTRACTOR TO PROVIDE A SECURITY BARRIER
APPROVED BY COR.
10 PROVIDE AN EGRESS DOOR IN THE ICRA BARRIER,
WITH EGRESS HARDWARE AND CLOSURE.
A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK
IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
B. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
D. SEAL HOLES, PIPES, CONDUITS, AND
PUNCTURES.
E. ALL PERSONNEL ENTERING WORK SITE ARE
REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE
WORKER EXITS THE WORK AREA.
F. ALL UTILITY CONNECTIONS WILL BE
COORDINATED WITH VA.
G. CONTRACTOR IS REQUIRED TO ENSURE FIRE
SUPPRESSION IS OPERATIONAL THROUGHOUT
THE CONSTRUCTION PERIOD.
H. CONTRACTOR TO PROVIDE PROTECTIVE
BARRIER, WARNING SIGNS AND TEMPORARY
PATHWAYS IN AREAS THAT WILL BE OPERATING
DURING THE CONSTRUCTION PHASE.
0 2 4 8
NORTH
PLAN
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
HD PREP
C1-32
HD
STORAGE
G-107
BCG
G-107B
HD
BUFFER
G-107C
HD
ANTEROOM
G-107A
BCG
COUNTER
G-107D
HD
COUNTER
G-107E
IV PREP
G-107G
IV PREP
G-107H
IV
ANTEROOM
G-107F
IV
SET-UP
G-107I
I.P.
SUPER
1-G134F
SUPERVISOR
OFFICE
G-107J
NON-STERILE
COMPOUNDING
1-G134D
IV
STORAGE
G-107K
HD
STORAGE
CORRIDOR
G-107L
COMMON PATH OF TRAVEL
DISTANCE: 90' 6"
PATH TO EXIT
DISTANCE: 90' - 11"
D
E
F
161514 17
G
R
MALE TOILET
G-108 FEMALE
TOILET
G-106
PHARMACISTS
PROCESSING
AREA
1-G134A
VAULT
1-G134I
PRO TECH
1-G134J
ELECTRICAL
CLOSET
G-104
DATA
G-103
WAITING
C1-21B
OUTPATIENT
FILLING/ASSEMBLY
1-G134
OP SUPER
1-G127B INVESTIGATIONAL
DRUGS/COMPOUNDING
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
EXISTING 1 HR - SMOKE WALL
NEW 1 HR - SMOKE WALL
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:2
:3
P
M
LS101
LIFE SAFETY PLAN
7 7DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN 0 4 8 16
NORTH
PLAN
EGRESS PATH "A"
PATH ID 90' - 6"
EGRESS PATH "B"
PATH ID 50' - 4"
Gross Area
FIRST
FLOOR 2252 SQ. FT.
NEW SMOKE COMPARTMENT:
10,530 SQ. FT.
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
COR CONTRACT OFFICER
REPRESENTATIVE
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
IDPH ILLINOIS DEPARTMENT OF
PUBLIC HEALTH
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
WALL TYPE
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
GENERAL NOTES
1. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR
CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF
CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE
SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND
SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN
NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE,
INTEGRATED AND UNIFIED WHOLE.
2. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY
SPECIFIC ARCHITECT AND/OR ENGINEERING DISCIPLINES ARE COMPLEMENTARY;
ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO
BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN
INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN
EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR
INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES
ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR
INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE
THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
3. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED
PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR
ORDERING MATERIAL. NOTIFY THE COR OF ANY DISCREPANCY DISCOVERED. THE
CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND
DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST
BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR
PRIOR TO PROCEEDING WITH THE WORK.
4. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES
BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
5. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR
REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR
DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
6. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
7. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE
RESPONSIBLE FOR COMPLYING AND INSTALLING THEIR RESPECTIVE WORK AND
SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS,
SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL
FURNISH ALL NECESSARY PERMITS. CONTRACTORS SHALL FOLLOW AND OBEY ALL
FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND
HAZARDOUS WASTE LAWS, ETC.
8. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE
OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS
(DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF
THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS
OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR
STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS
DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE
NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF
THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE
INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL
ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK.
ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL
PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY
IS INDICATED IN THE SPECIFICATIONS.
9. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
10. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-
MOUNTED ITEMS: CONTRACTOR TO PROVIDE SUPPLEMENTAL FRAMING AT WALL
OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
11. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE THE WORK OF TRADES PRIOR
TO THE START OF CONSTRUCTION.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING OR FINISHED FACE OF
EXISTING WALL SURFACE. INSTALL ALL WORK IN ACCORDANCE WITH CURRENT
APPLICABLE CODES, PUBLISHED STANDARDS, AND ACCEPTABLE CONSTRUCTION
STANDARDS.
DEMOLITION NOTES
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL
WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS
FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF
DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL
CENTER GROUNDS.
4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION
UNLESS INDICATED OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION
OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION,
PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE COMPLETION
OF THE PROJECT.
7. REFER TO THE ELECTRICAL AND MECHANICAL DRAWINGS FOR FURTHER
INFORMATION REGARDING REMOVAL AND RE-INSTALLATION OF ELECTRICAL AND
MECHANICAL FIXTURES.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE
IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA.
NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS
AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN
ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR
CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES
OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR THAT ARE NOT
IDENTIFIED. SHALL BE REPORTED TO THE CONTRACTING OFFICER.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
CLEAR
TYPICAL LAVATORY AND
MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
M
A X6
A
.F .F
W H
E R
E H
.C
A C
C E
S S
R E
Q 'D
OF DOOR WIDTH WHEN
ON WALL BEYOND
DOOR
TOWEL BAR
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
COAT RACK / COAT HOOKTOILET ACCESSORIES
6"
T
Y P
M A
X
WALL MOUNTED TACKBOARD
AND MARKERBOARD
WALL MOUNTED LECTURE UNIT
BOARD
4'-0" MAX TO
HIGHEST OPERABLE
POINT - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" MAX HT.
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MOP BASIN
MOP SHELF
TYPICAL JANITORS CLOSET
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
MISC. WALL DEVICES
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
E
S
U R
F A
C E
O F
M
IR
R
O R
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
CLOCK & NURSE CALL DEVICES
WALL PROTECTION
CORNERGUARD
PAPER TOWEL DISPENSER/
WASTE RECEPTICLE
HAND DRYER
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
INTERCOM
STATION
INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:3
P
M
A-001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 16DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGENDSTANDARD MOUNTING HEIGHTS
DocuSign Envelope ID: CE926718-2171-4194-978E-CA70152B168F
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
TL-0848
38-1472HD
CPU15
-3
DP
-3
DP
-3
DP
38-3060DU
38-2442TP
38-2418PD1
18011811
2,408 NSF
100 NSF
98 NSF
98 NSF
100 NSF
100 NSF
101 NSF
148 NSF
102 NSF114 NSF
216 NSF
28 NSF
211 NSF
562 NSF
786 NSF
326 NSF
GRADE
EXPANSION JOINT BELOW
E J
E J
A R E A WA Y
HAC
COURTYARD-A
C R O S S OV E R B R I D G E
COURTYARD-B
(FUTURE FLOOR)
BASEMENT FLOOR ROOF
F R NO-11
ROOF
BASEMENT
ROOF
BASEMENT ROOF
RAMP
I
H
G
F
E
D
C
K
J
L
M
N
N
M
L
K
J
H
P
R
G
F
E
D
C
B
28272625
161514131211
16 181714 20191513121 2 3 4 5 6 7 8 9 10 114.1 4.2 5.1 8.1 13.1 15.1 16.1 16.2 17.1
G.1
2322212120
E
D
C
A
1 2 3 4 5 6 7 8 9 10 11
A
B
17 / 21
20.1
I
H
G
F
E
D
C
K
J
L
M
N
N
M
L
K
J
H
P
R
G
F
E
D
C
B
28272625
161514131211
16 181714 20191513121 2 3 4 5 6 7 8 9 10 114.1 4.2 5.1 8.1 13.1 15.1 16.1 16.2 17.1
G.1
2322212120
E
D
C
A
1 2 3 4 5 6 7 8 9 10 11
A
B
17 / 21
20.1
A-107
E-103E
D-101A
A-120
D-111
B-120A
B-118A
C-102A
C-106C
D-114J
D-116
A-126
D-101K
D-101L
E-103
C1-15
C1-14
C1-13C1-12C1-11
E-102
E-104
E-103D
E-103F
E-103C
E-101
E-109
E-109A E-105
E-107
E-106
P-9
E-108
C1-10
D-122
D-121
C1-9
D-120
C1-25
1F-C3
1F-C41F-C5
1F-C2
1F-C1
F-118
1F-C61F-C9
1F-C11
1F-C7
F-108F-108A
F-109
F-110
F-150
F-111F-112F-149F-113F-114F-148
1F-C8
F-121
F-120
F-115
F-116
F-117F-119AF-119
F-122
F-127F-137
F-144
1F-C10
F-147F-146F-145F-123F-144A
F-124
F-125
F-126F-128
F-129
F-130
F-131F-143F-132F-133
F-142
F-137A
F-134
F-135
F-136
F-138
F-136AF-138A
F-2
1F-C12 F-139
F-141
F-140
F-140A
D-119A
D-119
F-155
F-154
F-154A
F-153
F-151A
F-152F-151
F-1
FS-1FS-2
C1-15A
C1-15C C1-23
D-101J
D-101I
D-101H
D-101F
D-101
D-101L
D-101M
D-101N
D-101O
D-125
D-123
D-124
D-126D
D-126C
D-101P
D-126B
D-126E
D-126
D-126A
D-101Q
D-127
D-129
D-128
D-128A
NO 6
D-130
D-130A
C1-15B
D-101T
D-101R
D-101S
S-1
S-2
D-101B
D-101G
D-101E
D-101D
D-101C
D-102C
D-102D
D-102
D-102B
D-102A
D-103
D-104
C1-24
D-117A
C1-12
D-117
D-117B
D-117C
D-114S
D-114T
D-114U
D-114V
D-114W
D-114X
D-113Y
D-115
D-108
D-109
NO 4
C1-23AC1-7
C1-12A
C1-15
D-114
D-114A
D-115A
D-114OD-114N
D-114PD-114M
D-114Q
D-114R
D-114L
D-114KD-114I
F-106F-107
D-114H
D-114G
D-113F
D-113E
D-114D
D-114C
D-114B
D-113
D-112
D-110D-113E
D-113D D-113C
D-113BD-113AD-113H
D-113G
D-113F
C1-17
E-101A
E-103A E-103B
B-110C
NO 8
B-110B
B-110A
B-110
B-108
B-109
B-104
B-107B-106
B-104A
B-105
C1-16
B-101F
B-101E
B-101D
B-101C
B-101
B-101A
B-101B
B-103
B-102
C1-15D
P-5 P-4P-3
B-127
NO 7
C1-6
C1-6B
C1-7 C1-7
C1-22C
C1-22
C1-22A
C1-22B
A-136B
A-136A
A-136
A-133
A-132
A-131 A-133A
A-140
A-140A
A-130
A-129
A-139 A-128
A-138A-137
A-127
C1-22B
A-126L
A-126K
A-126J
A-126I
A-126H
A-134
A-135
A-125
A-124
A-126G
A-123
A-122
A-126F
A-126E
A-126D
A-126C
A-119
A-126B
A-126A
A-119L
A-119K
A-119J
A-119I
A-119H
A-121
A-119G
A-119F
A-119E
A-119D
A-119C
A-119B
A-119A
C1-9
C1-8
C1-8
C1-6A
A-109
A-108D
A-108B
A-108
A-108A
A-110B
A-110A
A-110
A-118
A-118A
A-117
A-116 A-115
A-112
A-113
A-114
C1-6
C1-4
A-107B
A-107R
A-107SA-107T
A-107A
A-107C A-107D
A-107QA-107PA-107O
A-107N
A-107M
A-107L
S-1
NO 3
A-107EA-107FA-107G
A-107HA-107I
A-107J
A-107K
C1-1B
B-125
B-124
B-122
B-123
B-123A
B-126
C1-20B
C1-20
B-112
B-111
B-115B-116B-117B-118B-119
B-114F
B-121
B-120E B-120F
B-120
B-120D B-120C B-120B
C1-19
B-114E
B-114D
B-114G
C1-18
C-104
C-101 C-102 C-103 C-104A C-104B
C-104T
C-104C C-104D C-104E C-104F
C-104G
NO 9
C-104H
C-104I
C-104J
C-104L
C-104M
C-104K
C-104NC-104O
C-104P
C-104Q
C-104SC-104R
C-105C-106A
C-106B
C-106D
C-106
C-107
C-108A
C-108
C-108B
C1-21AC1-21
NO 10
NO 1
P-6
P-7
C1-2C1-4
P-8
A-102A-103 A-104
A-106 A-105
A-101
A-101E
A-101D
A-101C
A-101B
G-110
G-111 G-112
G-109
G-109K
G-103 G-104
G-105G
C1-32
G-107
G-107D
G-107C
G-107B
G-107A
G-106
G-107G
G-107H
G-108
G-109A
G-109B
G-109C
G-109D
G-109E
G-109F
G-107EG-107FG-109G
G-109HG-109I
G-109L
G-109J
C1-3B
C1-3
C1-3AG-121P
G-121O
G-121N
G-121M
G-121 G-120 G-119
G-118
G-121A G-117
G-121C G-121B G-116
G-121D G-115
G-121E G-114
G-113 G-121F
G-121GG-121HG-121I
G-121K
G-121L
G-121J
C1-5D
C1-5C
C1-5B
C1-5
G-163
G-162
A-101A
NO 2
G-161
G-144
G-143
G-145
G-145AG-145B
G-146
G-147
G-142
G-148
G-149
G-150
G-154
G-153
G-152
G-151
G-160G-159G-158G-157
G-156
G-155
G-155A
G-141A
G-141
G-140
G-124 G-122G-123
G-125G-126
G-127
G-124F
G-124A G-124B G-124C
G-124D
G-124E
G-128
G-129G-130G-131
G-132G-133G-134G-135G-136G-137G-138G-139
C1-30
1-G127C
1-G134K
1-G105I
1-G105J
1-G105E
1-G105A
1-G105C
1-G105D
1-G127P
1-G127E
1-G127I
1-G127
C1-21C
1-G127L
1-G127D
1-G127H
1-G127Q
1-G105B
1-G105J
1-G105F
1-G105
1-G127M
C1-21B
1-G133
1-G127A
1-G105H
1-G127K
D-137D
D-136V D-136U D-136S
D-136T
D-136F
D-136N
D-136C
D-136D
D-136B
D-137C
D-137J
D-136E
D-137B
D-136W
D-136GD-136O
D-136Q
D-136P
D-136M
D-137A
D-137E
D-136
D-137I D-137H D-137G
D-137F
D-136R
D-136A
CD1-1
C D
-2
CD1-3
C D
-4
D-137
03 08
D-000
D-000 D-000
C1-5
C1-6B
A-108C
C1-7A
C1-12D
C1-12C
42"
48"
NURSE STATION
TELE
ELECTRICAL CLOSET
ELECTRICAL
ELECTRICAL CLOSET
TELE CLOSET
CLOSET
CLOSET
CLOSET
DATA CLOSET
STORAGE
WAITING
WAITING
FEMALE LOCKER
FEMALE TOILET
EMERGENCY GENERATOR RM
BOILER
RM BELOW
MEZZANINE
CHIEF
OPERATIONS
LOCKERS
DINING AREA
CORRIDOR
CORRIDOR
CORRIDORCORRIDORCORRIDOR
RETAIL STORAGE
GENERAL
STORAGE
KITCHEN
ELECTRICAL CLOSET
FOOD SVC AREA
CANTEEN
FOOD
STORAGE AREA
HAC
STORAGE
MALE TOILET
FEMALE TOILET
ELEVATOR
FAN
RM-7
MECH RM
STORAGE
CORRIDOR
FAN RM-13
CANTEEN STORAGE
SMOKING RM
ACRE GEN RM
DIETETIC FREEZER
CORRIDOR
FILE STORAGE
CORRIDOR
CORRIDOR
CORRIDORCORRIDOR
POD
VESTIBULE
CORRIDOR
ELEVATOR LOBBY
POD A
WAITING
CORRIDORCORRIDOR
CORRIDOR
CORRIDOR
PROCEDUREPROCEDURE
EXAM RM
EXAM RM
STORAGE
EXAM RMEXAM RMCLERKEXAM RMEXAM RMCART STORAGE
CORRIDOR
EXAM RM
EXAM RM
EXAM RM
EXAM RM
MED AND TREATMENTCLERKEXAM RM
EXAM RM
POD B
WAITING
POD C
WAITING
CART STORAGE
CORRIDOR
CLEANCLERKEXAM RMEXAM RMSTORAGE
EXAM RM
EXAM RM
EXAM RMEXAM RM
EXAM RM
EXAM RM
EXAM RMCLERKEXAM RMEXAM RM
STORAGE
OFFICE
EXAM RM
EXAM RM
ENDOSCOPY
STORAGE
TOILETSOILED
STAIR
DUCT SHAFT
CORRIDOR
JANITOR CLOSET
MULTI-PURPOSE
ELECTRICAL CLOSET
TELE CLOSET
DUCT SHAFT
MECH RM
MECH RM
PIPE CHASE
HAC
ELECTRICAL CLOSET
TELE CLOSET
OFFICE
DUCT SHAFT
DATA CLOSET
FEMALE TOILETMALE TOILET
STAIR
DUCT
SHAFT
ELEVATORELEVATOR
CORRIDOR
CORRIDOR
CORRIDOR
MALE TOILET
MALE LOCKER
SALAD PREPARATION
FOOD STORAGE
COOKS ISLAND
CENTRAL TRAY AREA
REFR
REFR
ELECTRICAL CLOSET
HAC
REPRODUCTION
PHARMACY MAIL RM
EMS STORAGE
OFFICE
GUN VAULT
DRY STORAGE
OFFICE
OFFICE
VESTIBULE
SECURITY
DISHWASHER
DETECTIVE
OFFICE
SECY
CHIEF
SECURITY
STAIR
CLERICAL
SAFE
CHIEF
SVC
LOBBY
CORRIDOR
STORAGE
CART
WASH
ELEVATOR
ELEVATOR
DIETICIAN
REFR
TELE
CLOSET
SUB-STATION KITCHEN EQUIP 1D
SCULLERY AND CARTS
SUPERINTEND
CHIEF
SECY
CLERK
STORAGE
TELE CLOSET
ELECTRICAL CLOSET 1D3
CORRIDOR
TOILET
CORRIDOR
TREATMENT
PHARMACY
EXAM RM
EXAM RM
EXAM RM
1D1
EXAM RM
EXAM RM
EXAM RM
MALE
TOILET
HAC
FEMALE
PATIENT
TOILET
STAIR
CORRIDORCORRIDOR
EMERGENCY VESTIBULE
CORRIDOR
ENTRY CORRIDOR
CORRIDOR
WORK STATION
WAITING
CHECK-IN
CHASE
EXAM RMEXAM RM
EXAM RMEXAM RM
SPD
TOILET
EXAM RM
TOILETTOILET
FEMALE TOILETMALE TOILET
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
SUPPLY
EXAM RM
TRIAGE
VESTIBULE
CHECK-IN
CORRIDOR
ER EMERGENCY STORAGE
PHONE CARETOILET
EXAM RM EXAM RM
EXAM RM
STRETCHER/
WHEELCHAIR
ALCOVE
CLERK
EXAM RM
EXAM RM
CORRIDOR
VENDING MACHS
HAC STORAGE
CHANCEL
STAIR
ROBE RM
CHAPEL
MULTI-PURPOSE
WOMEN VETS
MULTI-PURPOSE
ELECTRICAL CLOSET
TELE CLOSET
KITCHEN
DETAILS CLERK
CORRIDOR
HALL
OFFICE
OFFICE
OFFICE
OFFICE
WAITING
OFFICE
OFFICE
OFFICE MACH
TOILET
TOILET
ELEVATOR LOBBY
ELEVATOR
ELEVATORELEVATOR
LINEN
1B
STAIR
PIPE CHASE
CORRIDOR
CORRIDOR
CORRIDOR CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
DARK RM CYSTO
CONTROL
TOILET
CYSTOSCOPY RM
CYSTOSCOPY RM
DRESSING
DRESSING
TOILET
SECURITY MONITOR
TOILET
PATIENT TOILET
PATIENT TOILET
OFFICE
MED
PREPARATION
NURSE
TREATMENT
ORTHO
OFFICE
PHYSICIAN
G U
OFFICE
PHYSICIAN
NURSE
CORRIDOR
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
STERILE SUPPLY
SOILED UTILITY
HAC
LAB
RECEPTION
WORKCLEAN
UTILITY
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
WAITING
TOILET
PROCUREMENT
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
MED PREPARATION
NURSE TREATMENT
SOILED UTILITY
WORK
RECEPTION
HAC
EXAM RM
EXAM RM
EXAM AND
TREATMENT RM
EXAM AND
TREATMENT RM
CAST RM
CORRIDOR
CORRIDOR
CORRIDOR
TRIAGE
VESTIBULE
CORRIDOR
WAITING
EQ. PARK
DOCTOR
SLEEP RMTOILET
SYST.
CLO.
TOILET
TOILET
SPECIMEN COLLECTION
WAITING AREA
EXAM/TREAT
CONFERENCE RM
DATA CLOSET
OFFICE
1A1 ELECTRICAL
CLOSET
1A ELECTRICAL
CLOSET
MALE TOILET
CORRIDOR
CORRIDOR
MULTIPURPOSE
EXAM
CONSULT
SECLUSIONPSYCHIATRY TREATMENT
MEDS
SPD
TREATMENT
CLEAN LINEN
MORGUE GARAGE
LIFE SUPPORT
TREATMENT
ELEVATOR
STAIR
ANTE
TREATMENT
ROOM 5
SOILED
UTILITY
EXG.
PAT./
SHWR.
AHU-4
ELEVATOR LOBBY
MALE TOILET
OFFICE
OFFICE
RADIO
EQUIP RM
PAGING
EQUIP RM
FEMALE TOILET
CORRIDOR
CORRIDOR
FEMALE TOILET
MALE TOILET
OFFICEOFFICEOFFICEOFFICEOFFICE
STORAGE
OFFICE
STORAGE OFFICE
WORK RM
OFFICE SECY OFFICE
CORRIDOR
OFFICE
OFFICE
CONFERENCE RM
CORRIDOR
CORRIDOR
SECY OFFICE
OFFICE OFFICE OFFICE OFFICE OFFICE
RECEPTION/WAITING
OFFICE OFFICE OFFICE OFFICE
TOILET
STAIR
STORAGE
OFFICE
OFFICE
TOILET
CLOSET
DIRECTOR
ASST
DIRECTOR
ADMIN
CONFERENCE
CLOSET
KITCHEN
TOILETTOILET
CONFERENCE RMSUPPORT
ELECTRICAL CLOSET
LINEN
CHUTE
ELECTRICAL CLOSET
WORK AREA
CHIEF
ACCOUNT
CHIEF
WAITING
OFFICE
CORRIDORCORRIDOR
STAIR
STAIR
ELEVATOR
ELEVATOR
CORRIDORCORRIDOR
STORAGE
ELEVATOR
OFFICEOFFICE
OFFICE
OFFICE
OFFICE
CLERK AND
SECY WAITING
OFFICE
OFFICE
OFFICE
OFFICE
WAITING
LOBBY AREA
RECEPTION CLERICAL
TELE
AND
SIGNAL
ELECTRICAL
TELEPHONE ALCOVE
BUSINESS OFFICE
OFFICE
DATAELECTRICAL CLOSET
OFFICE
CORRIDOR
GROUP RM
OFFICE
OFFICE
OFFICE
OFFICE
FEMALE TOILET
OFFICE
OFFICE
MALE TOILET
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICEOFFICEOFFICE
OFFICEOFFICE
CLOSET
OFFICEENTRY
CORRIDOR
CORRIDOR
TRAINING ALCOVE
CLOSET
BARE AND ENG LAB
RECEPTION/CONTROL CLERK
STORAGE
WAITING
FEMALE TOILET
MALE
TOILET
BENEFIT OFFICE
THERAPY BENEFIT OFFICE
THERAPY THERAPY BENEFIT OFFICE
SPEECH LAB BENEFIT OFFICE
STAFF OFFICE BENEFIT OFFICE
FIRE SAFETY
AND CONTROL
GROUP THERAPY
A
OFFICESECYCHIEF
EXAM RM
EXAM RM
CONTROL RM
EXAM
RM RM
CONTROL RM
INSTRUMENT
CALIBRATION
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ORAL
DIAGNOSIS
EXAM
OPERATIONS
PATIENT
INTERVIEW
TOILET
STAIR
ORAL
DIAGNOSIS
EXAM
OPERATIONS
GENERAL
TREATMENT
OPERATIONS
EMPLOYEE LOUNGE
CONTROL
X-RAY
AREA
X-RAY
AREA
OFFICE RM
CLEAN CARTS SPD
DENTAL
PROSTHETIC
LABORATORY
ORAL
SURGY
ORAL
SURGY
ORAL
SURGY
RECOVERY
INSTRUMENT
PREPARATION/STERILE
STORAGE
STORAGE
GENERAL
TREATMENT
OPERATIONS
GENERAL
TREATMENT
OPERATIONS
GENERAL
TREATMENT
OPERATIONS
GENERAL
TREATMENT
OPERATIONS
SOILED SPD CARTS
MALE
EMPLOYEE
LOCKERS
TOILET
TOILET
FEMALE
EMPLOYEE
LOCKERS
HAC
WAITING AREA PATIENT TOILETPATIENT TOILET
PHONESIGNAL
ELECTRICAL CLOSET
ASST
CHIEF
RECEPTION SECY CHIEF
CLOSET
RESIDENCY TRAINING
AUXILIARY
TRAINING
RESIDENCY TRAINEES CLASS RM
STORAGE CLOSETLINEN RM
PREVENTIVE DENTISTRY RMPREVENTIVE DENTAL HYGIENEPREVENTIVE DENTAL HYGIENE
GENERAL
TREATMENT
OPERATIONS
GENERAL
TREATMENT
OPERATIONS
GENERAL
TREATMENT
OPERATIONS
GENERAL
TREATMENT
OPERATIONS
GENERAL
TREATMENT
OPERATIONS
CORRIDOR
DRUG CNTRL PRG MGR
PAT. ED.
VAULT
LEAD TECHS
CHEMO
PHARMACISTS
PROCESSING
AREA
ANTE
HIGH RISK
ASSOC CHIEF
RESIDENT'S CUBICLES
MULTI-PURPOSE
AGENT CASHIER
WAITING
ADMIN
STUDENT CUBICLES
TRAVEL
TEACH COORD
IV PREP
PRO TECH
I.P. SUPER
OUTPATIENT
FILLING/ASSEMBLY
CHIEF
WAITING
FAN RM #17
LIBRARY / DRUG INFO
OP SUPER
CONF.
TLT
EXAM 10 EXAM 9 EXAM 8
TOILET
EXAM 7
EXAM 4
EXAM 2
DOCTORS' GROUP
GROUP ROOM
X-RAY
TLT
EXAM 3
DR GROUP
EXAM 11
SPDEXAM 5
NURSE WORK
EXAM 6
EXAM 12
NURSE WRKRM
CNTRL/SCHEDULING
CHECK-IN
EXAM 16 EXAM 15 EXAM 14
EXAM 13
(POLY-TRAUMA)
SOIL UTIL
EXAM 1
CORRIDOR
C O
R R
ID
O
R
CORRIDOR
C O
R R
ID
O
R
CORRIDOR
WAITING AREA
WAITING AREA
CLERKS EXAM 1
EXAM 2
EXAM 3
EXAM 4
EXAM 5
EXAM 6
CLEAN UTILITY
RESTROOM
EXAM 7
EXAM 8
SOILED
HOLDING
OOOO
EXERCISE PHYSIOLOGY LAB
PULMANARY FUNCTION LAB
TREATMENT
ROOM 4
TREATMENT
ROOM 3
ROOM 2
NEG ISOL
ANTE
ROOM 1
NEG ISOL
CORRIDOR
TREATMENT
TREATMENT
CORRIDOR
CORRIDOR
EXAM RM
printers
DN
D NU P
U P
LOCKERS
PAT.
TLT. W/
SHOWER
PROJECT
LOCATION
FENCED CONSTRUCTION,
MATERIALS STAGING AREA,
VERIFY WITH C.O.R.
REMOVE TREES, OR
PROTECT AS NEEDED
REMOVE SHRUBS AND
STORE FOR RE-PLANTING
AFTER CONSTRUCTION IS
FINISHED.
PROTECT BOLLARDS
DURING CONSTRUCTION/
DEMOLITION
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:3
P
M
A-100
SITE PLAN
2 16DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1" = 30'-0"
SITE PLAN - FIRST FLOOR
0 3015 60
NORTH
PLAN
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
REMOVE WALL,
CEILING AND
FLOOR FINISHES
IN THIS AREA
CORRIDOR
C1-32
OFFICE
G-107H
OFFICE
G-107G
GROUP RM
G-107
OFFICE
G-107F
OFFICE
G-107E
OFFICE
G-107D
OFFICE
G-107C
CHEMO
1-G134E
HIGH RISK
1-G134D
ANTE
1-G134C
IV PREP
A-G134B
PHARMACISTS
PROCESSING
AREA
1-G134A
OFFICE
G-107A
OFFICE
G-107B
MALE TOILET
G-108
FEMALE
TOILET
G-106
I.P. SUPER
1-G134F
CORRIDOR
C1-21
/2
D
E
F
161514 17
G
R
PHASE 1 PHASE 2
PRO TECH
1-G134J
ELECTRICAL
CLOSET
G-104
DATA
G-103
VAULT
1-G134I
OUTPATIENT
FILLING/ASSEMBLY
1-G134
OP SUPER
1-G127B
INVESTIGATIONAL
DRUGS/COMPOUNDING
WAITING
C1-21B
CORRIDOR
C1-21A
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
EXISTING 1 HR - SMOKE WALL
NEW 1 HR - SMOKE WALL
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:0
P
M
AD101
FIRST FLOOR DEMOLITION PLAN -
PHASE 1
3 16DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
Scale: 1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - PHASE 1 0 4 8 16
NORTH
PLAN
LEGEND:
EXISTING
DEMOLISHED
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1. COORDINATE PHASING LIMITS AS SHOWN ON
GC101.
2. ALL CEILINGS IN LIMIT OF WORK TO BE REMOVED.
3. REFER TO MECHANICAL, ELECTRICAL, PLUMBING
AND FIRE PROTECTION DRAWINGS FOR
ADDITIONAL NOTES AND LOCATION OF
ADDITIONAL ITEMS TO BE REMOVED.
4. BEFORE BEGINNING WORK, THE CONTRACTOR
SHALL PROVIDE ALL NECESSARY SAFEGUARDS
TO MAINTAIN ALL PARTS OF THE PROJECT IN A
SAFE CONDITION AT ALL TIMES DURING THE
PROCESS OF CONSTRUCTION AND TO PROTECT
FROM DAMAGE OF THOSE PORTIONS OF THE
EXISTING BUILDING WHICH ARE TO REMAIN.
CONTRACTOR SHALL REPAIR DAMAGES CAUSED
BY DEMOLITION WORK.
5. WHERE DEMOLITION IS INDICATED ON THE
DRAWINGS, OR REQUIRED FOR INSTALLATION OF
NEW CONSTRUCTION, REMOVE EXISTING
CONSTRUCTION AS REQUIRED TO PERFORM THE
WORK INDICATED. REMOVE SETTING BEDS AND
INFILL FLUSHED WITH ADJACENT CONCRETE
SLAB.
6. PATCH ALL HOLES IN WALLS, FLOORS, CEILING,
AND OTHER PARTS OF THE STRUCTURE
AFFECTED BY THIS CONTRACT. HOLES SHALL BE
FILLED, SEALED, PAINTED, CAULKED, OR
PLUGGED NEATLY WITH ORIGINAL TYPE OF
MATERIALS TO MATCH THE EXISTING PART OF
THE STRUCTURE AFFECTED.
7. THE DEMOLITION PLAN DRAWINGS ARE INTENDED
TO SHOW THE GENERAL CONDITIONS, WHICH ARE
EXPECTED TO OCCUR. VERIFY ALL CONDITIONS
BEFORE PROCEEDING WITH THE DEMOLITION
WORK IN ANY AREA, DEMOLITION OF DOORS,
WINDOWS, CABINETRY, FINISHES, PARTITIONS, OR
ANY OTHER NON-STRUCTURAL ITEMS REPORT
SUCH DIFFERENCES TO THE COR AND SECURE
INSTRUCTIONS BEFORE PROCEEDING IN THE
AFFECTED AREA.
8. REMOVE ALL FURNISHINGS AND EQUIPMENT
BEFORE START OF ANY DEMOLITION WORK.
COORDINATE DISPOSAL, STORAGE, SALVAGE,
AND/OR RE-USE WITH THE VA COR.
9. CONTRACTOR SHALL PROVIDE ALL NECESSARY
BARRICADES AND OTHER FORMS OF
PROTECTION AS REQUIRED TO PROTECT
PERSONNEL, OTHER TENANTS, AND THE
GENERAL PUBLIC FROM INJURY DUE TO
DEMOLITION WORK.
10. CONTRACTOR SHALL ENSURE THAT DEMOLITION
WORK DOES NOT INTERFERE WITH OR PROHIBIT
THE CONTINUING OCCUPATION OF THE ADJACENT
BUILDING OPERATIONS. THIS INCLUDES, BUT IS
NOT LIMITED TO THE SELECTIVE DEMOLITION OF
PARTITIONS, ELECTIRCAL, PLUMBING, FIRE-
PROTECTION, AND MECHANICAL SYSTEMS.
CONTRACTOR SHALL INFORM OWNER (THROUGH
THE COR) A MINIMUM OF 72 HOURS PRIOR TO
DEMOLITION ACTIVITES THAT WILL AFFECT THE
NORMAL OPERATION OF THE BUILDING.
COORDINATE A SCHEDULE WITH THE COR.
11. INTERIOR WALLS WITHIN THE LIMIT OF
CONSTRUCTION THAT ARE TO REMAIN SHALL NOT
BE DISTURBED, EXCEPT TO SCRAPE LOOSE PAINT
AND PATCH AS NECESSARY. CLEAN/RESURFACE
AND PREPARE TO RECIEVE NEW PAINT TO MATCH
ADJACENT WALLS AND FINISHES.
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H,N
C
N
E
D
M RU
P
Y
N O
R
T H C A R O L
I N A
NY
H
M
RE
G
IS
TERED ARCHITECT
REMOVE ALL WALLS,
CEILING AND FLOOR
FINISHES IN THIS AREA
IV PREP
G-107G
IV PREP
G-107H
IV
ANTEROOM
G-107F
BCG
COUNTER
G-107D
HD
ANTEROOM
G-107A
HD
BUFFER
G-107CBCG
G-107B
HD
STORAGE
G-107
HD PREP
C1-32
HD
COUNTER
G-107E
IV
SET-UP
G-107I
CHEMO
1-G134E
HIGH RISK
1-G134D
ANTE
1-G134C
IV PREP
A-G134B
PHARMACISTS
PROCESSING
AREA
1-G134A
MALE TOILET
G-108
FEMALE
TOILET
G-106
I.P. SUPER
1-G134F
CORRIDOR
C1-21
D
E
F
161514 17
PHASE 1 PHASE 2
PRO TECH
1-G134J
ELECTRICAL
CLOSET
G-104
DATA
G-103
VAULT
1-G134I
OUTPATIENT
FILLING/ASSEMBLY
1-G134
OP SUPER
1-G127B
INVESTIGATIONAL
DRUGS/COMPOUNDING
WAITING
C1-21B
CORRIDOR
C1-21A
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
EXISTING 1 HR - SMOKE WALL
NEW 1 HR - SMOKE WALL
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:0
P
M
AD102
FIRST FLOOR DEMOLITION PLAN -
PHASE 2
4 16DMM EGS
USP 800 PHARMACY
COMPLIANCE
1310 24th AVE S, NASHVILLE, TN 37212
04/01/2019
BID DOCUMENTS
626-18-50118-263
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
FIRST FLOOR DEMOLITION PLAN - PHASE 2 0 4 8 16
NORTH
PLAN
1. COORDINATE PHASING LIMITS AS SHOWN ON
GC101.
2. ALL CEILINGS IN LIMIT OF WORK TO BE REMOVED.
3. REFER TO MECHANICAL, ELECTRICAL, PLUMBING
AND FIRE PROTECTION DRAWINGS FOR
ADDITIONAL NOTES AND LOCATION OF
ADDITIONAL ITEMS TO BE REMOVED.
4. BEFORE BEGINNING WORK, THE CONTRACTOR
SHALL PROVIDE ALL NECESSARY SAFEGUARDS
TO MAINTAIN ALL PARTS OF THE PROJECT IN A
SAFE CONDITION AT ALL TIMES DURING THE
PROCESS OF CONSTRUCTION AND TO PROTECT
FROM DAMAGE OF THOSE PORTIONS OF THE
EXISTING BUILDING WHICH ARE TO REMAIN.
CONTRACTOR SHALL REPAIR DAMAGES CAUSED
BY DEMOLITION WORK.
5. WHERE DEMOLITION IS INDICATED ON THE
DRAWINGS, OR REQUIRED FOR INSTALLATION OF
NEW CONSTRUCTION, REMOVE EXISTING
CONSTRUCTION AS REQUIRED TO PERFORM THE
WORK INDICATED. REMOVE SETTING BEDS AND
INFILL FLUSHED WITH ADJACENT CONCRETE
SLAB.
6. PATCH ALL HOLES IN WALLS, FLOORS, CEILING,
AND OTHER PARTS OF THE STRUCTURE
AFFECTED BY THIS CONTRACT. HOLES SHALL BE
FILLED, SEALED, PAINTED, CAULKED, OR
PLUGGED NEATLY WITH ORIGINAL TYPE OF
MATERIALS TO MATCH THE EXISTING PART OF
THE STRUCTURE AFFECTED.
7. THE DEMOLITION PLAN DRAWINGS ARE INTENDED
TO SHOW THE GENERAL CONDITIONS, WHICH ARE
EXPECTED TO OCCUR. VERIFY ALL CONDITIONS
BEFORE PROCEEDING WITH THE DEMOLITION
WORK IN ANY AREA, DEMOLITION OF DOORS,
WINDOWS, CABINETRY, FINISHES, PARTITIONS, OR
ANY OTHER NON-STRUCTURAL ITEMS REPORT
SUCH DIFFERENCES TO THE COR AND SECURE
INSTRUCTIONS BEFORE PROCEEDING IN THE
AFFECTED AREA.
8. REMOVE ALL FURNISHINGS AND EQUIPMENT
BEFORE START OF ANY DEMOLITION WORK.
COORDINATE DISPOSAL, STORAGE, SALVAGE,
AND/OR RE-USE WITH THE VA COR.
9. CONTRACTOR SHALL PROVIDE ALL NECESSARY
BARRICADES AND OTHER FORMS OF
PROTECTION AS REQUIRED TO PROTECT
PERSONNEL, OTHER TENANTS, AND THE
GENERAL PUBLIC FROM INJURY DUE TO
DEMOLITION WORK.
10. CONTRACTOR SHALL ENSURE THAT DEMOLITION
WORK DOES NOT INTERFERE WITH OR PROHIBIT
THE CONTINUING OCCUPATION OF THE ADJACENT
BUILDING OPERATIONS. THIS INCLUDES, BUT IS
NOT LIMITED TO THE SELECTIVE DEMOLITION OF
PARTITIONS, ELECTIRCAL, PLUMBING, FIRE-
PROTECTION, AND MECHANICAL SYSTEMS.
CONTRACTOR SHALL INFORM OWNER (THROUGH
THE COR) A MINIMUM OF 72 HOURS PRIOR TO
DEMOLITION ACTIVITES THAT WILL AFFECT THE
NORMAL OPERATION OF THE BUILDING.
COORDINATE A SCHEDULE WITH THE COR.
11. INTERIOR WALLS WITHIN THE LIMIT OF
CONSTRUCTION THAT ARE TO REMAIN SHALL NOT
BE DISTURBED, EXCEPT TO SCRAPE LOOSE PAINT
AND PATCH AS NECESSARY. CLEAN/RESURFACE
AND PREPARE TO RECIEVE NEW PAINT TO MATCH
ADJACENT…