About this file

36C24919R0126 2 - Combined Drawings BD USP 800 Nash.pdf

View the file

Other files

File Type Posted
36C24919R0126-0005000.docx DOCX document
36C24919R0126-0004001.pdf PDF
36C24919R0126-0004000.docx DOCX document
36C24919R0126-0003000.docx DOCX document
36C24919R0126-0002001.pdf PDF
36C24919R0126-0002000.docx DOCX document
36C24919R0126-0001001.pdf PDF
36C24919R0126-0001000.docx DOCX document
36C24919R0126-006.xlsx XLSX spreadsheet
36C24919R0126-002.docx DOCX document
36C24919R0126-005.docx DOCX document
36C24919R0126-003.pdf PDF
36C24919R0126-000.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

LA

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

TRUE NORTH ARROW

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTH

PLAN

NORTH

TRUE

0 4 8 16

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT IMAGE

PROJECT LOCATION MAP

/2

/2

:2

:2

P

M

G-001

COVER SHEET

1 7DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

USP 800 PHARMACY COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

VA PROJECT #: 626-18-501 APOGEE PROJECT #: 18-263

DRAWING LIST

GENERAL

G-001 COVER SHEET 1 7

G-101 INFECTION CONTROL RISK ASSESSMENT (ICRA) 2 7

GI101 PHASE 1 PLAN 3 7

GI102 PHASE 2 PLAN 4 7

GC101 FIRST FLOOR ICRA PLAN - PHASE 1 5 7

GC102 FIRST FLOOR ICRA PLAN - PHASE 2 6 7

LS101 LIFE SAFETY PLAN 7 7

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 16

A-100 SITE PLAN 2 16

AD101 FIRST FLOOR DEMOLITION PLAN - PHASE 1 3 16

AD102 FIRST FLOOR DEMOLITION PLAN - PHASE 2 4 16

AD111 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - PHASE 1 5 16

AD112 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - PHASE 2 6 16

A-101 FIRST FLOOR PLAN 7 16

A-102 SECOND FLOOR COURTYARD PLAN 8 16

A-110 FIRST FLOOR REFLECTED CEILING PLAN 9 16

A-201 COURTYARD DUCT CHASE ELEVATION 10 16

A-401 INTERIOR ELEVATIONS 11 16

A-402 INTERIOR ELEVATIONS 12 16

A-501 MODULAR CLEAN ROOM DETAILS 13 16

A-502 PARTITION TYPES 14 16

A-601 DOOR & FINISH SCHEDULES 15 16

AI101 EQUIPMENT PLAN 16 16

FIRE PROTECTION

FX001 FIRE PROTECTION GENERAL INFORMATION 1 3

FD101 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN 2 3

FX101 FIRST FLOOR FIRE PROTECTION PLAN 3 3

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 4

PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN 2 4

PP101 FIRST FLOOR PLUMBING PLAN 3 4

PP102 FIRST FLOOR PLUMBING PLAN 4 4

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 16

MD101 PARTIAL FIRST FLOOR MECHANICAL DEMO PLAN-PHASE 1 2 16

MD102 PARTIAL FIRST FLOOR MECHANICAL DEMO PLAN-PHASE 1 3 16

MH101 FIRST FLOOR MECHANICAL PLAN- PHASE 1 4 16

MH102 PARTIAL FIRST FLOOR HVAC PLAN- PHASE 1 5 16

MD103 FIRST FLOOR MECHANICAL PLAN- PHASE 2 6 16

MH103 FIRST FLOOR MECHANICAL PLAN- PHASE 2 7 16

MH105 MECHANICAL AIR TERMINAL PLAN 8 16

MH106 ROOF HVAC PLAN 9 16

MP101 FIRST FLOOR MECHANICAL PIPING PLAN 10 16

M-501 MECHANICAL DETAILS 11 16

M-502 MECHANICAL DETAILS 12 16

M-503 MECHANICAL CONTROLS 13 16

M-601 MECHANICAL SCHEDULES 14 16

M-602 MECHANICAL SCHEDULES 15 16

M-901 ISOMETRIC VIEWS 16 16

ELECTRICAL

E-001 ELECTRICAL GENERL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 14

ED101 FIRST FLOOR POWER DEMOLITION PLAN - PHASE 1 2 14

ED102 FIRST FLOOR POWER DEMOLITION PLAN - PHASE 2 3 14

ED103 FIRST FLOOR LIGHTING DEMOLITION PLAN - PHASE 1 4 14

ED104 FIRST FLOOR LIGHTING DEMOLITION PLAN - PHASE 2 5 14

EP101 FIRST FLOOR POWER PLAN - PHASE 1 6 14

EP102 FIRST FLOOR POWER PLAN - PHASE 2 7 14

EM101 FIRST FLOOR MECHANICAL POWER PLAN - PHASE 1 8 14

EM102 ROOF MECHANICAL POWER PLAN 9 14

EL101 FIRST FLOOR LIGHTING PLAN - PHASE 1 10 14

EL102 FIRST FLOOR LIGHTING PLAN - PHASE 2 11 14

E-501 ELECTRICAL DETAILS 12 14

E-601 SINGLE LINE DIAGRAM 13 14

E-602 ELECTRICAL SCHEDULES 14 14

TECHNOLOGY

TK001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 4

TK101 FIRST FLOOR TECHNOLOGY PLAN - PHASE 1 2 4

TK102 FIRST FLOOR TECHNOLOGY PLAN - PHASE 2 3 4

TK501 TECHNOLOGY DETAILS 4 4

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOLE LEGEND, AND RISER 1 3

FA101 FIRST FLOOR FIRE ALARM PLAN- PHASE 1 2 3

FA102 FIRST FLOOR FIRE ALARM PLAN- PHASE 2 3 3

GENERAL SYMBOL LEGEND

PROJECT SITE

PROJECT LOCATION

NASHVILLE VAMC - TVHS

AREA OF WORK

DocuSign Envelope ID: FAB5837E-89FB-487F-B89D-6A06721D9204

3/29/2019

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

V .I

.F

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S

V .I

.F

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S

V .I

.F

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:2

P

M

G-101

INFECTION CONTROL RISK

ASSESSMENT (ICRA)

2 7DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

D

E

F

161514 17 18

G

R

G.1

H

I

N

OUTPATIENT

FILLING/ASSEMBLY

C1-21B

PAT. ED.

1-G134K

SEE A-102 FOR

ROOF ABOVE

PHASE 1 PHASE 2

HAC

HAC

HOOD HOOD

HOOD HOODHOOD

HOOD HOOD

HD PREP

C1-32

HD

STORAGE

G-107

BCG

G-107B

HD

BUFFER

G-107C

HD

ANTEROOM

G-107A

IV PREP

G-107G

IV PREP

G-107H

IV

ANTEROOM

G-107F

BGC

COUNTER

G-107D

HD

COUNTER

G-107E

IV

SET-UP

G-107I

PHARMACISTS

PROCESSING

AREA

I-G134A

I.P.

SUPER

I-G134F

PRO TECH

1-G134J

ELECTRICAL

CLOSET

G-104

DATA

G-103

VAULT

1-G134I

OP SUPER

1-G127B

INVESTIGATIONAL

DRUGS/COMPOUNDING

WAITING

C1-21B

CORRIDOR

C1-21A

CORRIDOR

C1-21

19 20 20.1

SEE A-100 FOR

ACCESS AREA

SEE A-100 FOR

ACCESS AREA

MALE

TOILET

G-108

FEMALE

TOILET

G-106

CHEMO

1-G134E

HIGH RISK

1-G134D

ANTE

1-G134C

IV PREP

A-G134B

PHASE 2

PHASE 1

COMPLETED

ICRA AREA

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

EXISTING 1 HR - SMOKE WALL

NEW 1 HR - SMOKE WALL

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:3

P

M

GI101

PHASE 1 PLAN

3 7DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

PHASE 1 PLAN

PHASING LEGEND

PHASE 1

1. TEMPORARILY RELOCATE (STAFF) FURNISHINGS

AND EQUIPMENT AFFECTED IN PHASE 1 TO A

SPACE DESIGNATED BY THE VA CONTRACTING

OFFICER REPRESENTATIVE (COR).

2. AREA DESIGNATED AS PHASE 1 SHALL BE CLOSED

OFF AT LIMITS OF CONSTRUCTION AND PROPER

SIGNAGE PUT UP TO CONTROL ACCESS.

3. ACCESS FROM THE NORTH CORRIDOR (C1-21) AND

AT NEW ENTRY ABOVE THE I.P. SUPER. OFFICE

(IG134F), WILL BE BLOCKED WITH TEMPORARY

WALLS AND DOORS AT DESIGNATED LOCATIONS.

THESE SHALL BE PUT UP TO CONTROL ACCESS TO

THE "CONSTRUCTION SITE" - SEE PLANS FOR

TEMPORARY BARRIERS/DUST PARTITIONS.

4. UPON THE COMPLETION OF PHASE 1 HD PREP, HD

STORAGE, BCG, HD BUFFER, HD ANTEROOM,

BCG AND HD COUNTERS, IV SET-UP, IV ANTEROOM,

AND IV PREP ROOMS 1 AND 2, SHALL BE AVAILIBLE

FOR USE. REMOVE THE TEMPORARY WALLS AND

DOORS SO ACCESS FROM THE NORTH CORRIDOR

(C1-21) INTO THE RENOVATED PHASE 1 AREA

CAN RESUME.

5. REMOVE TEMPORARY BARRIERS/DUST PARTITIONS

AND DOORS AFTER PHASE 1 WORK IS COMPLETED.

0 4 8 16

NORTH

PLAN

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

R E

F

R E

F

REF.

D

E

F

161514 17 18

G

R

G.1

H

I

N

19 20 20.1

OUTPATIENT

FILLING/ASSEMBLY

C1-21B

PAT. ED.

1-G134K

100 SF

MALE

TOILET

G-108

119 SF

FEMALE

TOILET

G-106

72 SF

HD PREP

C1-32

151 SF

HD

STORAGE

G-107

68 SF

BCG

G-107B

103 SF

HD

BUFFER

G-107C

105 SF

HD

ANTEROOM

G-107A

104 SF

BCG

COUNTER

G-107D

108 SF

HD

COUNTER

G-107E

273 SF

IV

SET-UP

G-107I

127 SF

IV

ANTEROOM

G-107F

90 SF

I.P.

SUPER

1-G134F

127 SF

SUPERVISOR

OFFICE

G-107J 131 SF

NON-STERILE

COMPOUNDING

1-G134D

392 SF

IV

STORAGE

G-107K

214 SF

PHARMACISTS

PROCESSING

AREA

1-G134A

91 SF

G-107H

IV PREP 2

91 SF

G-107G

IV PREP 1

SEE A-102 FOR

ROOF ABOVE

PHASE 1 PHASE 2

HAC

HAC

HOOD HOOD

HOOD HOOD 33 SF

HD

STORAGE

CORRIDOR

G-107L

HOOD

HOOD HOOD

PRO TECH

1-G134J

ELECTRICAL

CLOSET

G-104

DATA

G-103

VAULT

1-G134I

OP SUPER

1-G127B

INVESTIGATIONAL

DRUGS/COMPOUNDING

WAITING

C1-21B

CORRIDOR

C1-21A

CORRIDOR

C1-21

SEE A-100 FOR

ACCESS AREA

SEE A-100 FOR

ACCESS AREA

PHASE 2

PHASE 1

COMPLETED

ICRA AREA

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

EXISTING 1 HR - SMOKE WALL

NEW 1 HR - SMOKE WALL

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:3

P

M

GI102

PHASE 2 PLAN

4 7DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/8" = 1'-0"

PHASE 2 PLAN

PHASING LEGEND

PHASE 1

A. TEMPORARILY RELOCATE (STAFF) FURNISHINGS

AND EQUIPMENT AFFECTED IN PHASE 2 TO A

SPACE DESIGNATED BY THE VA CONTRACTING

OFFICER REPRESENTATIVE (COR).

B. AREA DESIGNATED AS PHASE 2 SHALL BE CLOSED

OFF AT LIMITS OF CONSTRUCTION AND PROPER

SIGNAGE PUT UP TO CONTROL ACCESS.

C. UPON THE COMPLETION OF PHASE 2 HD STORAGE

CORRIDOR, IV STORAGE, SUPERVISOR'S OFFICE,

AND, NON-STERILE COMPOUNDING, SHALL BE

AVAILIBLE FOR USE. REMOVE THE TEMPORARY

WALLS AND DOORS SO ACCESS INTO THE

RENOVATED PHASE 2 AREA CAN RESUME.

D. REMOVE TEMPORARY BARRIERS/DUST PARTITIONS

AND DOORS AFTER PHASE 2 WORK IS COMPLETED.

0 4 8 16

NORTH

PLAN

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

D

E

F

161514 17

G

R

REMOVE WALL,

CEILING, AND

FLOOR FINISHES

IN THIS AREA

CORRIDOR

C1-32

OFFICE

G-107H

OFFICE

G-107G

GROUP RM

G-107

OFFICE

G-107F

OFFICE

G-107E

OFFICE

G-107D

OFFICE

G-107C

CHEMO

1-G134E

HIGH RISK

1-G134D

ANTE

1-G134C

IV PREP

A-G134B

PHARMACISTS

PROCESSING

AREA

1-G134A

OFFICE

G-107A

OFFICE

G-107B

MALE TOILET

G-108

FEMALE

TOILET

G-106

I.P. SUPER

1-G134F

CORRIDOR

C1-21

/2

PHASE 1 PHASE 2

PRO TECH

1-G134J

ELECTRICAL

CLOSET

G-104

DATA

G-103

VAULT

1-G134I

OUTPATIENT

FILLING/ASSEMBLY

1-G134

OP SUPER

1-G127B

INVESTIGATIONAL

DRUGS/COMPOUNDING

WAITING

C1-21B

CORRIDOR

C1-21A

M

IN

IM

U

M C

L E

A R

A N

C E

EXISTING

REF.

EXISTING

REF.

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

EXISTING 1 HR - SMOKE WALL

NEW 1 HR - SMOKE WALL

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:2

P

M

GC101

FIRST FLOOR ICRA PLAN - PHASE 1

5 7DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIRST FLOOR ICRA PLAN - PHASE 1 0 2 4 8

NORTH

PLAN

A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK

IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

B. COMPLETE ALL CRITICAL BARRIERS I.E.

SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS.

C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN

WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS.

D. SEAL HOLES, PIPES, CONDUITS, AND

PUNCTURES.

E. ALL PERSONNEL ENTERING WORK SITE ARE

REQUIRED TO WEAR SHOE COVERS. SHOE

COVERS MUST BE CHANGED EACH TIME THE

WORKER EXITS THE WORK AREA.

F. ALL UTILITY CONNECTIONS WILL BE

COORDINATED WITH VA.

G. CONTRACTOR IS REQUIRED TO ENSURE FIRE

SUPPRESSION IS OPERATIONAL THROUGHOUT

THE CONSTRUCTION PERIOD.

H. CONTRACTOR TO PROVIDE PROTECTIVE

BARRIER, WARNING SIGNS AND TEMPORARY

PATHWAYS IN AREAS THAT WILL BE OPERATING

DURING THE CONSTRUCTION PHASE.

01 LIFE SAFETY ICRA BARRIER TYPE A 1-HOUR

RATED, TO DECK ABOVE, REFER TO SHEET

G-101 FOR DETAILS.

02 STICKY MAT AT ZIPPER ENTRY CONSTRUCTION

ACCESS POINT.

03 EXISTING WALL TO REMAIN AS ICRA BARRIER

UNTIL WORK IS COMPLETED.

04 SECURE DOOR OPENING DURING

CONSTRUCTION.

05 USE PORTABLE DUST EXTRACTOR AND AIR

SCRUBBER WITH HEPA FILTRATION SYSTEM.

06 CONFIGURATION/LOCATION OF WALLS TO BE

COORDINATED IN ADVANCE WITH COR AND

SAFETY. ZIPPER WALL TO MAINTAIN EXIT

REQUIREMENTS ON REST OF FLOORS. EXTEND

BARRIER TO UNDERSIDE OF DECK IF CEILING

WORK IS INVOLVED.

07 CONSTRUCT TEMPORARY RIGID ENCLOSURE

OVER EXISTING OPENINGS WITH RIGID

MATERIAL AND PLASTIC SECURED ALL AROUND

OPENING TO PREVENT ANY DUST TRANSFER

DURING CONSTRUCTION.

08 COORDINATE ALL NEW DOOR AND WALL REPAIR

ON THE CORRIDOR WITH THE C.O.R..

CONTRACTOR IS TO USE STARK WALL SYSTEM

OR APPROVED EQUAL AS TEMPORARY

ENCLOSURES IN THE CORRIDOR FOR THIS

WORK. TEMPORARY BARRIERS ARE TO BE

REMOVED WHEN WORK IS COMPLETE OR BY

THE START OF WORK WEEK AS DEFINED BY

C.O.R..

09 WINDOW WILL BE REMOVED TO FOR PRIMARY

CONTRACTOR ACCESS TO SPACE. STORE AND

REINSTALL WINDOWS AFTER CONSTRUCTION -

CONTRACTOR TO PROVIDE A SECURITY

BARRIER APPROVED BY COR.

10 PROVIDE AN EGRESS DOOR IN THE ICRA

BARRIER, WITH EGRESS HARDWARE AND

CLOSURE.

11 EXISTING REFRIGERATORS SHALL BE

RELOCATED PRIOR TO THE START OF

CONSTRUCTION. COORDINATE WITH COR.

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

D

E

F

161514 17

G

R

CHEMO

1-G134E

HIGH RISK

1-G134D

ANTE

1-G134C

IV PREP

A-G134B

PHARMACISTS

PROCESSING

AREA

1-G134A

MALE TOILET

G-108

FEMALE

TOILET

G-106

I.P. SUPER

1-G134F

CORRIDOR

C1-21

PHASE 1 PHASE 2

PRO TECH

1-G134J

ELECTRICAL

CLOSET

G-104

DATA

G-103

VAULT

1-G134I

OUTPATIENT

FILLING/ASSEMBLY

1-G134

OP SUPER

1-G127B

INVESTIGATIONAL

DRUGS/COMPOUNDING

WAITING

C1-21B

CORRIDOR

C1-21A

HD PREP

C1-32

HD

STORAGE

G-107

BCG

G-107B

HD

BUFFER

G-107C

HD

ANTEROOM

G-107A

BCG

COUNTER

G-107D

HD

COUNTER

G-107E

IV PREP

G-107H

IV PREP

G-107G

IV

ANTEROOM

G-107F

IV

SET-UP

G-107I

ICRA WALL SHALL

NOT BLOCK

PNEUMATIC SYSTEM

PHASE 2A:

AREA SHALL BE MAINTAINED AS

PRIMARY MEANS OF ENTRY INTO SPACE

FOR PHARMACY STAFF UNTIL THE WALL OPENING

AND HD STORAGE CORRIDOR ARE COMPLETE.

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

EXISTING 1 HR - SMOKE WALL

NEW 1 HR - SMOKE WALL

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:3

P

M

GC102

FIRST FLOOR ICRA PLAN - PHASE 2

6 7DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIRST FLOOR ICRA PLAN - PHASE 2

01 LIFE SAFETY ICRA BARRIER TYPE A 1-HOUR RATED,

TO DECK ABOVE, REFER TO SHEET G-101 FOR

DETAILS.

02 STICKY MAT AT ZIPPER ENTRY CONSTRUCTION

ACCESS POINT.

03 EXISTING WALL TO REMAIN AS ICRA BARRIER UNTIL

WORK IS COMPLETED.

04 SECURE DOOR OPENING DURING CONSTRUCTION.

05 USE PORTABLE DUST EXTRACTOR AND AIR

SCRUBBER WITH HEPA FILTRATION SYSTEM.

06 CONFIGURATION/LOCATION OF WALLS TO BE

COORDINATED IN ADVANCE WITH COR AND SAFETY.

ZIPPER WALL TO MAINTAIN EXIT REQUIREMENTS ON

REST OF FLOORS. EXTEND BARRIER TO UNDERSIDE

OF DECK IF CEILING WORK IS INVOLVED.

07 CONSTRUCT TEMPORARY RIGID ENCLOSURE OVER

EXISTING OPENINGS WITH RIGID MATERIAL AND

PLASTIC SECURED ALL AROUND OPENING TO

PREVENT ANY DUST TRANSFER DURING

CONSTRUCTION.

08 COORDINATE ALL NEW DOOR AND WALL REPAIR ON

THE CORRIDOR WITH THE C.O.R.. CONTRACTOR IS

TO USE STARK WALL SYSTEM OR APPROVED EQUAL

AS TEMPORARY ENCLOSURES IN THE CORRIDOR

FOR THIS WORK. TEMPORARY BARRIERS ARE TO BE

REMOVED WHEN WORK IS COMPLETE OR BY THE

START OF WORK WEEK AS DEFINED BY C.O.R..

09 WINDOW TO BE REMOVED FOR PRIMARY

CONTRACTOR ACCESS TO SPACE. STORE AND

REINSTALL WINDOWS AFTER CONSTRUCTION -

CONTRACTOR TO PROVIDE A SECURITY BARRIER

APPROVED BY COR.

10 PROVIDE AN EGRESS DOOR IN THE ICRA BARRIER,

WITH EGRESS HARDWARE AND CLOSURE.

A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK

IS BEING DONE TO PREVENT CONTAMINATION

OF DUCT SYSTEM.

B. COMPLETE ALL CRITICAL BARRIERS I.E.

SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH PLASTIC

COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS.

C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN

WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS.

D. SEAL HOLES, PIPES, CONDUITS, AND

PUNCTURES.

E. ALL PERSONNEL ENTERING WORK SITE ARE

REQUIRED TO WEAR SHOE COVERS. SHOE

COVERS MUST BE CHANGED EACH TIME THE

WORKER EXITS THE WORK AREA.

F. ALL UTILITY CONNECTIONS WILL BE

COORDINATED WITH VA.

G. CONTRACTOR IS REQUIRED TO ENSURE FIRE

SUPPRESSION IS OPERATIONAL THROUGHOUT

THE CONSTRUCTION PERIOD.

H. CONTRACTOR TO PROVIDE PROTECTIVE

BARRIER, WARNING SIGNS AND TEMPORARY

PATHWAYS IN AREAS THAT WILL BE OPERATING

DURING THE CONSTRUCTION PHASE.

0 2 4 8

NORTH

PLAN

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

HD PREP

C1-32

HD

STORAGE

G-107

BCG

G-107B

HD

BUFFER

G-107C

HD

ANTEROOM

G-107A

BCG

COUNTER

G-107D

HD

COUNTER

G-107E

IV PREP

G-107G

IV PREP

G-107H

IV

ANTEROOM

G-107F

IV

SET-UP

G-107I

I.P.

SUPER

1-G134F

SUPERVISOR

OFFICE

G-107J

NON-STERILE

COMPOUNDING

1-G134D

IV

STORAGE

G-107K

HD

STORAGE

CORRIDOR

G-107L

COMMON PATH OF TRAVEL

DISTANCE: 90' 6"

PATH TO EXIT

DISTANCE: 90' - 11"

D

E

F

161514 17

G

R

MALE TOILET

G-108 FEMALE

TOILET

G-106

PHARMACISTS

PROCESSING

AREA

1-G134A

VAULT

1-G134I

PRO TECH

1-G134J

ELECTRICAL

CLOSET

G-104

DATA

G-103

WAITING

C1-21B

OUTPATIENT

FILLING/ASSEMBLY

1-G134

OP SUPER

1-G127B INVESTIGATIONAL

DRUGS/COMPOUNDING

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

EXISTING 1 HR - SMOKE WALL

NEW 1 HR - SMOKE WALL

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:2

:3

P

M

LS101

LIFE SAFETY PLAN

7 7DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIRST FLOOR LIFE SAFETY PLAN 0 4 8 16

NORTH

PLAN

EGRESS PATH "A"

PATH ID 90' - 6"

EGRESS PATH "B"

PATH ID 50' - 4"

Gross Area

FIRST

FLOOR 2252 SQ. FT.

NEW SMOKE COMPARTMENT:

10,530 SQ. FT.

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

COR CONTRACT OFFICER

REPRESENTATIVE

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

IDPH ILLINOIS DEPARTMENT OF

PUBLIC HEALTH

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

DEMOLITION KEYNOTE

WINDOW TYPE

TOILET ACCESSORY

WALL TYPE

ROOF PITCH SYMBOL

DOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

-1

GENERAL NOTES

1. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR

CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF

CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE

SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND

SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN

NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE,

INTEGRATED AND UNIFIED WHOLE.

2. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY

SPECIFIC ARCHITECT AND/OR ENGINEERING DISCIPLINES ARE COMPLEMENTARY;

ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO

BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN

INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN

EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR

INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES

ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR

INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE

THE BETTER QUALITY OR GREATER QUANTITY OF WORK.

3. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED

PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR

ORDERING MATERIAL. NOTIFY THE COR OF ANY DISCREPANCY DISCOVERED. THE

CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND

DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST

BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR

PRIOR TO PROCEEDING WITH THE WORK.

4. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES

BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.

5. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR

REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR

DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.

6. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.

7. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE

RESPONSIBLE FOR COMPLYING AND INSTALLING THEIR RESPECTIVE WORK AND

SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS,

SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR SHALL

FURNISH ALL NECESSARY PERMITS. CONTRACTORS SHALL FOLLOW AND OBEY ALL

FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY REGULATIONS AND

HAZARDOUS WASTE LAWS, ETC.

8. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE

OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS

(DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.) INDICATE THE GENERAL SCOPE OF

THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS

OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR

STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS

DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE

NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF

THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE

INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL

ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK.

ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL

PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY

IS INDICATED IN THE SPECIFICATIONS.

9. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

10. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-

MOUNTED ITEMS: CONTRACTOR TO PROVIDE SUPPLEMENTAL FRAMING AT WALL

OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS

REQUIRED FOR COMPLETION OF THE WORK.

11. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE THE WORK OF TRADES PRIOR

TO THE START OF CONSTRUCTION.

12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING OR FINISHED FACE OF

EXISTING WALL SURFACE. INSTALL ALL WORK IN ACCORDANCE WITH CURRENT

APPLICABLE CODES, PUBLISHED STANDARDS, AND ACCEPTABLE CONSTRUCTION

STANDARDS.

DEMOLITION NOTES

1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL

WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS

FOR DETAILED REQUIREMENTS.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF

DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.

3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL

CENTER GROUNDS.

4. PATCH WALL OPENING SHALL MATCH THE INTEGRITY OF ADJACENT CONSTRUCTION

UNLESS INDICATED OTHERWISE.

5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION

OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION,

PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.

6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES

GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE COMPLETION

OF THE PROJECT.

7. REFER TO THE ELECTRICAL AND MECHANICAL DRAWINGS FOR FURTHER

INFORMATION REGARDING REMOVAL AND RE-INSTALLATION OF ELECTRICAL AND

MECHANICAL FIXTURES.

8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE

IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA.

NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS

AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.

9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN

ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR

CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES

OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR THAT ARE NOT

IDENTIFIED. SHALL BE REPORTED TO THE CONTRACTING OFFICER.

LEVER OPERATING

CONTROLLED

SOAP DISPENSER

CLEAR

TYPICAL LAVATORY AND

MIRROR

1'-3" 1'-3"

M

IN

M A

X

M

A X

M

A X6

A

.F .F

W H

E R

E H

.C

A C

C E

S S

R E

Q 'D

OF DOOR WIDTH WHEN

ON WALL BEYOND

DOOR

TOWEL BAR

ACCESSIBLE

ROBE/COAT HOOK

ROBE/COAT

HOOK

COAT RACK / COAT HOOKTOILET ACCESSORIES

6"

T

Y P

M A

X

WALL MOUNTED TACKBOARD

AND MARKERBOARD

WALL MOUNTED LECTURE UNIT

BOARD

4'-0" MAX TO

HIGHEST OPERABLE

POINT - IF FIRE

EXTINGUISHER

OVER 40 LBS

3'-6" MAX HT.

FIRE EXTINGUISHER

CABINET

ELECTRICAL CABINET

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL

MOP BASIN

MOP SHELF

TYPICAL JANITORS CLOSET

FIRE ALARM

CHIME WITH

VISUAL

ALARM LIGHT

FIRE ALARM

PULL STATION

FIRE ALARM

ANNUNCIATOR

FIRE ALARM

MISC. WALL DEVICES

T O

B O

T T

O M

O F

R

E F

L E

C T

IV

E

S

U R

F A

C E

O F

M

IR

R

O R

CLOCK

NURSE

CALL

DOME

LIGHT

CLOCK OUTLET

CLOCK & NURSE CALL DEVICES

WALL PROTECTION

CORNERGUARD

PAPER TOWEL DISPENSER/

WASTE RECEPTICLE

HAND DRYER

PAPER TOWEL

DISPENSER

2'-0" AT SIDEWALLS

AT COUNTER SINKS

1'-6" AT SIDEWALLS

AT LAVATORY

INTERCOM

STATION

INTERCOM

MASTER

STATION

INTERCOM

WALL

OUTLET

INTERCOM STATION

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4

:3

P

M

A-001

ARCHITECTURAL SYMBOLS,

ABBREVIATIONS AND NOTES

1 16DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

ABBREVIATIONS

ARCHITECTURAL SYMBOL LEGENDSTANDARD MOUNTING HEIGHTS

DocuSign Envelope ID: CE926718-2171-4194-978E-CA70152B168F

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

TL-0848

38-1472HD

CPU15

-3

DP

-3

DP

-3

DP

38-3060DU

38-2442TP

38-2418PD1

18011811

2,408 NSF

100 NSF

98 NSF

98 NSF

100 NSF

100 NSF

101 NSF

148 NSF

102 NSF114 NSF

216 NSF

28 NSF

211 NSF

562 NSF

786 NSF

326 NSF

GRADE

EXPANSION JOINT BELOW

E J

E J

A R E A WA Y

HAC

COURTYARD-A

C R O S S OV E R B R I D G E

COURTYARD-B

(FUTURE FLOOR)

BASEMENT FLOOR ROOF

F R NO-11

ROOF

BASEMENT

ROOF

BASEMENT ROOF

RAMP

I

H

G

F

E

D

C

K

J

L

M

N

N

M

L

K

J

H

P

R

G

F

E

D

C

B

28272625

161514131211

16 181714 20191513121 2 3 4 5 6 7 8 9 10 114.1 4.2 5.1 8.1 13.1 15.1 16.1 16.2 17.1

G.1

2322212120

E

D

C

A

1 2 3 4 5 6 7 8 9 10 11

A

B

17 / 21

20.1

I

H

G

F

E

D

C

K

J

L

M

N

N

M

L

K

J

H

P

R

G

F

E

D

C

B

28272625

161514131211

16 181714 20191513121 2 3 4 5 6 7 8 9 10 114.1 4.2 5.1 8.1 13.1 15.1 16.1 16.2 17.1

G.1

2322212120

E

D

C

A

1 2 3 4 5 6 7 8 9 10 11

A

B

17 / 21

20.1

A-107

E-103E

D-101A

A-120

D-111

B-120A

B-118A

C-102A

C-106C

D-114J

D-116

A-126

D-101K

D-101L

E-103

C1-15

C1-14

C1-13C1-12C1-11

E-102

E-104

E-103D

E-103F

E-103C

E-101

E-109

E-109A E-105

E-107

E-106

P-9

E-108

C1-10

D-122

D-121

C1-9

D-120

C1-25

1F-C3

1F-C41F-C5

1F-C2

1F-C1

F-118

1F-C61F-C9

1F-C11

1F-C7

F-108F-108A

F-109

F-110

F-150

F-111F-112F-149F-113F-114F-148

1F-C8

F-121

F-120

F-115

F-116

F-117F-119AF-119

F-122

F-127F-137

F-144

1F-C10

F-147F-146F-145F-123F-144A

F-124

F-125

F-126F-128

F-129

F-130

F-131F-143F-132F-133

F-142

F-137A

F-134

F-135

F-136

F-138

F-136AF-138A

F-2

1F-C12 F-139

F-141

F-140

F-140A

D-119A

D-119

F-155

F-154

F-154A

F-153

F-151A

F-152F-151

F-1

FS-1FS-2

C1-15A

C1-15C C1-23

D-101J

D-101I

D-101H

D-101F

D-101

D-101L

D-101M

D-101N

D-101O

D-125

D-123

D-124

D-126D

D-126C

D-101P

D-126B

D-126E

D-126

D-126A

D-101Q

D-127

D-129

D-128

D-128A

NO 6

D-130

D-130A

C1-15B

D-101T

D-101R

D-101S

S-1

S-2

D-101B

D-101G

D-101E

D-101D

D-101C

D-102C

D-102D

D-102

D-102B

D-102A

D-103

D-104

C1-24

D-117A

C1-12

D-117

D-117B

D-117C

D-114S

D-114T

D-114U

D-114V

D-114W

D-114X

D-113Y

D-115

D-108

D-109

NO 4

C1-23AC1-7

C1-12A

C1-15

D-114

D-114A

D-115A

D-114OD-114N

D-114PD-114M

D-114Q

D-114R

D-114L

D-114KD-114I

F-106F-107

D-114H

D-114G

D-113F

D-113E

D-114D

D-114C

D-114B

D-113

D-112

D-110D-113E

D-113D D-113C

D-113BD-113AD-113H

D-113G

D-113F

C1-17

E-101A

E-103A E-103B

B-110C

NO 8

B-110B

B-110A

B-110

B-108

B-109

B-104

B-107B-106

B-104A

B-105

C1-16

B-101F

B-101E

B-101D

B-101C

B-101

B-101A

B-101B

B-103

B-102

C1-15D

P-5 P-4P-3

B-127

NO 7

C1-6

C1-6B

C1-7 C1-7

C1-22C

C1-22

C1-22A

C1-22B

A-136B

A-136A

A-136

A-133

A-132

A-131 A-133A

A-140

A-140A

A-130

A-129

A-139 A-128

A-138A-137

A-127

C1-22B

A-126L

A-126K

A-126J

A-126I

A-126H

A-134

A-135

A-125

A-124

A-126G

A-123

A-122

A-126F

A-126E

A-126D

A-126C

A-119

A-126B

A-126A

A-119L

A-119K

A-119J

A-119I

A-119H

A-121

A-119G

A-119F

A-119E

A-119D

A-119C

A-119B

A-119A

C1-9

C1-8

C1-8

C1-6A

A-109

A-108D

A-108B

A-108

A-108A

A-110B

A-110A

A-110

A-118

A-118A

A-117

A-116 A-115

A-112

A-113

A-114

C1-6

C1-4

A-107B

A-107R

A-107SA-107T

A-107A

A-107C A-107D

A-107QA-107PA-107O

A-107N

A-107M

A-107L

S-1

NO 3

A-107EA-107FA-107G

A-107HA-107I

A-107J

A-107K

C1-1B

B-125

B-124

B-122

B-123

B-123A

B-126

C1-20B

C1-20

B-112

B-111

B-115B-116B-117B-118B-119

B-114F

B-121

B-120E B-120F

B-120

B-120D B-120C B-120B

C1-19

B-114E

B-114D

B-114G

C1-18

C-104

C-101 C-102 C-103 C-104A C-104B

C-104T

C-104C C-104D C-104E C-104F

C-104G

NO 9

C-104H

C-104I

C-104J

C-104L

C-104M

C-104K

C-104NC-104O

C-104P

C-104Q

C-104SC-104R

C-105C-106A

C-106B

C-106D

C-106

C-107

C-108A

C-108

C-108B

C1-21AC1-21

NO 10

NO 1

P-6

P-7

C1-2C1-4

P-8

A-102A-103 A-104

A-106 A-105

A-101

A-101E

A-101D

A-101C

A-101B

G-110

G-111 G-112

G-109

G-109K

G-103 G-104

G-105G

C1-32

G-107

G-107D

G-107C

G-107B

G-107A

G-106

G-107G

G-107H

G-108

G-109A

G-109B

G-109C

G-109D

G-109E

G-109F

G-107EG-107FG-109G

G-109HG-109I

G-109L

G-109J

C1-3B

C1-3

C1-3AG-121P

G-121O

G-121N

G-121M

G-121 G-120 G-119

G-118

G-121A G-117

G-121C G-121B G-116

G-121D G-115

G-121E G-114

G-113 G-121F

G-121GG-121HG-121I

G-121K

G-121L

G-121J

C1-5D

C1-5C

C1-5B

C1-5

G-163

G-162

A-101A

NO 2

G-161

G-144

G-143

G-145

G-145AG-145B

G-146

G-147

G-142

G-148

G-149

G-150

G-154

G-153

G-152

G-151

G-160G-159G-158G-157

G-156

G-155

G-155A

G-141A

G-141

G-140

G-124 G-122G-123

G-125G-126

G-127

G-124F

G-124A G-124B G-124C

G-124D

G-124E

G-128

G-129G-130G-131

G-132G-133G-134G-135G-136G-137G-138G-139

C1-30

1-G127C

1-G134K

1-G105I

1-G105J

1-G105E

1-G105A

1-G105C

1-G105D

1-G127P

1-G127E

1-G127I

1-G127

C1-21C

1-G127L

1-G127D

1-G127H

1-G127Q

1-G105B

1-G105J

1-G105F

1-G105

1-G127M

C1-21B

1-G133

1-G127A

1-G105H

1-G127K

D-137D

D-136V D-136U D-136S

D-136T

D-136F

D-136N

D-136C

D-136D

D-136B

D-137C

D-137J

D-136E

D-137B

D-136W

D-136GD-136O

D-136Q

D-136P

D-136M

D-137A

D-137E

D-136

D-137I D-137H D-137G

D-137F

D-136R

D-136A

CD1-1

C D

-2

CD1-3

C D

-4

D-137

03 08

D-000

D-000 D-000

C1-5

C1-6B

A-108C

C1-7A

C1-12D

C1-12C

42"

48"

NURSE STATION

TELE

ELECTRICAL CLOSET

ELECTRICAL

ELECTRICAL CLOSET

TELE CLOSET

CLOSET

CLOSET

CLOSET

DATA CLOSET

STORAGE

WAITING

WAITING

FEMALE LOCKER

FEMALE TOILET

EMERGENCY GENERATOR RM

BOILER

RM BELOW

MEZZANINE

CHIEF

OPERATIONS

LOCKERS

DINING AREA

CORRIDOR

CORRIDOR

CORRIDORCORRIDORCORRIDOR

RETAIL STORAGE

GENERAL

STORAGE

KITCHEN

ELECTRICAL CLOSET

FOOD SVC AREA

CANTEEN

FOOD

STORAGE AREA

HAC

STORAGE

MALE TOILET

FEMALE TOILET

ELEVATOR

FAN

RM-7

MECH RM

STORAGE

CORRIDOR

FAN RM-13

CANTEEN STORAGE

SMOKING RM

ACRE GEN RM

DIETETIC FREEZER

CORRIDOR

FILE STORAGE

CORRIDOR

CORRIDOR

CORRIDORCORRIDOR

POD

VESTIBULE

CORRIDOR

ELEVATOR LOBBY

POD A

WAITING

CORRIDORCORRIDOR

CORRIDOR

CORRIDOR

PROCEDUREPROCEDURE

EXAM RM

EXAM RM

STORAGE

EXAM RMEXAM RMCLERKEXAM RMEXAM RMCART STORAGE

CORRIDOR

EXAM RM

EXAM RM

EXAM RM

EXAM RM

MED AND TREATMENTCLERKEXAM RM

EXAM RM

POD B

WAITING

POD C

WAITING

CART STORAGE

CORRIDOR

CLEANCLERKEXAM RMEXAM RMSTORAGE

EXAM RM

EXAM RM

EXAM RMEXAM RM

EXAM RM

EXAM RM

EXAM RMCLERKEXAM RMEXAM RM

STORAGE

OFFICE

EXAM RM

EXAM RM

ENDOSCOPY

STORAGE

TOILETSOILED

STAIR

DUCT SHAFT

CORRIDOR

JANITOR CLOSET

MULTI-PURPOSE

ELECTRICAL CLOSET

TELE CLOSET

DUCT SHAFT

MECH RM

MECH RM

PIPE CHASE

HAC

ELECTRICAL CLOSET

TELE CLOSET

OFFICE

DUCT SHAFT

DATA CLOSET

FEMALE TOILETMALE TOILET

STAIR

DUCT

SHAFT

ELEVATORELEVATOR

CORRIDOR

CORRIDOR

CORRIDOR

MALE TOILET

MALE LOCKER

SALAD PREPARATION

FOOD STORAGE

COOKS ISLAND

CENTRAL TRAY AREA

REFR

REFR

ELECTRICAL CLOSET

HAC

REPRODUCTION

PHARMACY MAIL RM

EMS STORAGE

OFFICE

GUN VAULT

DRY STORAGE

OFFICE

OFFICE

VESTIBULE

SECURITY

DISHWASHER

DETECTIVE

OFFICE

SECY

CHIEF

SECURITY

STAIR

CLERICAL

SAFE

CHIEF

SVC

LOBBY

CORRIDOR

STORAGE

CART

WASH

ELEVATOR

ELEVATOR

DIETICIAN

REFR

TELE

CLOSET

SUB-STATION KITCHEN EQUIP 1D

SCULLERY AND CARTS

SUPERINTEND

CHIEF

SECY

CLERK

STORAGE

TELE CLOSET

ELECTRICAL CLOSET 1D3

CORRIDOR

TOILET

CORRIDOR

TREATMENT

PHARMACY

EXAM RM

EXAM RM

EXAM RM

1D1

EXAM RM

EXAM RM

EXAM RM

MALE

TOILET

HAC

FEMALE

PATIENT

TOILET

STAIR

CORRIDORCORRIDOR

EMERGENCY VESTIBULE

CORRIDOR

ENTRY CORRIDOR

CORRIDOR

WORK STATION

WAITING

CHECK-IN

CHASE

EXAM RMEXAM RM

EXAM RMEXAM RM

SPD

TOILET

EXAM RM

TOILETTOILET

FEMALE TOILETMALE TOILET

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

SUPPLY

EXAM RM

TRIAGE

VESTIBULE

CHECK-IN

CORRIDOR

ER EMERGENCY STORAGE

PHONE CARETOILET

EXAM RM EXAM RM

EXAM RM

STRETCHER/

WHEELCHAIR

ALCOVE

CLERK

EXAM RM

EXAM RM

CORRIDOR

VENDING MACHS

HAC STORAGE

CHANCEL

STAIR

ROBE RM

CHAPEL

MULTI-PURPOSE

WOMEN VETS

MULTI-PURPOSE

ELECTRICAL CLOSET

TELE CLOSET

KITCHEN

DETAILS CLERK

CORRIDOR

HALL

OFFICE

OFFICE

OFFICE

OFFICE

WAITING

OFFICE

OFFICE

OFFICE MACH

TOILET

TOILET

ELEVATOR LOBBY

ELEVATOR

ELEVATORELEVATOR

LINEN

1B

STAIR

PIPE CHASE

CORRIDOR

CORRIDOR

CORRIDOR CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

DARK RM CYSTO

CONTROL

TOILET

CYSTOSCOPY RM

CYSTOSCOPY RM

DRESSING

DRESSING

TOILET

SECURITY MONITOR

TOILET

PATIENT TOILET

PATIENT TOILET

OFFICE

MED

PREPARATION

NURSE

TREATMENT

ORTHO

OFFICE

PHYSICIAN

G U

OFFICE

PHYSICIAN

NURSE

CORRIDOR

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

STERILE SUPPLY

SOILED UTILITY

HAC

LAB

RECEPTION

WORKCLEAN

UTILITY

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

WAITING

TOILET

PROCUREMENT

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

MED PREPARATION

NURSE TREATMENT

SOILED UTILITY

WORK

RECEPTION

HAC

EXAM RM

EXAM RM

EXAM AND

TREATMENT RM

EXAM AND

TREATMENT RM

CAST RM

CORRIDOR

CORRIDOR

CORRIDOR

TRIAGE

VESTIBULE

CORRIDOR

WAITING

EQ. PARK

DOCTOR

SLEEP RMTOILET

SYST.

CLO.

TOILET

TOILET

SPECIMEN COLLECTION

WAITING AREA

EXAM/TREAT

CONFERENCE RM

DATA CLOSET

OFFICE

1A1 ELECTRICAL

CLOSET

1A ELECTRICAL

CLOSET

MALE TOILET

CORRIDOR

CORRIDOR

MULTIPURPOSE

EXAM

CONSULT

SECLUSIONPSYCHIATRY TREATMENT

MEDS

SPD

TREATMENT

CLEAN LINEN

MORGUE GARAGE

LIFE SUPPORT

TREATMENT

ELEVATOR

STAIR

ANTE

TREATMENT

ROOM 5

SOILED

UTILITY

EXG.

PAT./

SHWR.

AHU-4

ELEVATOR LOBBY

MALE TOILET

OFFICE

OFFICE

RADIO

EQUIP RM

PAGING

EQUIP RM

FEMALE TOILET

CORRIDOR

CORRIDOR

FEMALE TOILET

MALE TOILET

OFFICEOFFICEOFFICEOFFICEOFFICE

STORAGE

OFFICE

STORAGE OFFICE

WORK RM

OFFICE SECY OFFICE

CORRIDOR

OFFICE

OFFICE

CONFERENCE RM

CORRIDOR

CORRIDOR

SECY OFFICE

OFFICE OFFICE OFFICE OFFICE OFFICE

RECEPTION/WAITING

OFFICE OFFICE OFFICE OFFICE

TOILET

STAIR

STORAGE

OFFICE

OFFICE

TOILET

CLOSET

DIRECTOR

ASST

DIRECTOR

ADMIN

CONFERENCE

CLOSET

KITCHEN

TOILETTOILET

CONFERENCE RMSUPPORT

ELECTRICAL CLOSET

LINEN

CHUTE

ELECTRICAL CLOSET

WORK AREA

CHIEF

ACCOUNT

CHIEF

WAITING

OFFICE

CORRIDORCORRIDOR

STAIR

STAIR

ELEVATOR

ELEVATOR

CORRIDORCORRIDOR

STORAGE

ELEVATOR

OFFICEOFFICE

OFFICE

OFFICE

OFFICE

CLERK AND

SECY WAITING

OFFICE

OFFICE

OFFICE

OFFICE

WAITING

LOBBY AREA

RECEPTION CLERICAL

TELE

AND

SIGNAL

ELECTRICAL

TELEPHONE ALCOVE

BUSINESS OFFICE

OFFICE

DATAELECTRICAL CLOSET

OFFICE

CORRIDOR

GROUP RM

OFFICE

OFFICE

OFFICE

OFFICE

FEMALE TOILET

OFFICE

OFFICE

MALE TOILET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICEOFFICEOFFICE

OFFICEOFFICE

CLOSET

OFFICEENTRY

CORRIDOR

CORRIDOR

TRAINING ALCOVE

CLOSET

BARE AND ENG LAB

RECEPTION/CONTROL CLERK

STORAGE

WAITING

FEMALE TOILET

MALE

TOILET

BENEFIT OFFICE

THERAPY BENEFIT OFFICE

THERAPY THERAPY BENEFIT OFFICE

SPEECH LAB BENEFIT OFFICE

STAFF OFFICE BENEFIT OFFICE

FIRE SAFETY

AND CONTROL

GROUP THERAPY

A

OFFICESECYCHIEF

EXAM RM

EXAM RM

CONTROL RM

EXAM

RM RM

CONTROL RM

INSTRUMENT

CALIBRATION

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

ORAL

DIAGNOSIS

EXAM

OPERATIONS

PATIENT

INTERVIEW

TOILET

STAIR

ORAL

DIAGNOSIS

EXAM

OPERATIONS

GENERAL

TREATMENT

OPERATIONS

EMPLOYEE LOUNGE

CONTROL

X-RAY

AREA

X-RAY

AREA

OFFICE RM

CLEAN CARTS SPD

DENTAL

PROSTHETIC

LABORATORY

ORAL

SURGY

ORAL

SURGY

ORAL

SURGY

RECOVERY

INSTRUMENT

PREPARATION/STERILE

STORAGE

STORAGE

GENERAL

TREATMENT

OPERATIONS

GENERAL

TREATMENT

OPERATIONS

GENERAL

TREATMENT

OPERATIONS

GENERAL

TREATMENT

OPERATIONS

SOILED SPD CARTS

MALE

EMPLOYEE

LOCKERS

TOILET

TOILET

FEMALE

EMPLOYEE

LOCKERS

HAC

WAITING AREA PATIENT TOILETPATIENT TOILET

PHONESIGNAL

ELECTRICAL CLOSET

ASST

CHIEF

RECEPTION SECY CHIEF

CLOSET

RESIDENCY TRAINING

AUXILIARY

TRAINING

RESIDENCY TRAINEES CLASS RM

STORAGE CLOSETLINEN RM

PREVENTIVE DENTISTRY RMPREVENTIVE DENTAL HYGIENEPREVENTIVE DENTAL HYGIENE

GENERAL

TREATMENT

OPERATIONS

GENERAL

TREATMENT

OPERATIONS

GENERAL

TREATMENT

OPERATIONS

GENERAL

TREATMENT

OPERATIONS

GENERAL

TREATMENT

OPERATIONS

CORRIDOR

DRUG CNTRL PRG MGR

PAT. ED.

VAULT

LEAD TECHS

CHEMO

PHARMACISTS

PROCESSING

AREA

ANTE

HIGH RISK

ASSOC CHIEF

RESIDENT'S CUBICLES

MULTI-PURPOSE

AGENT CASHIER

WAITING

ADMIN

STUDENT CUBICLES

TRAVEL

TEACH COORD

IV PREP

PRO TECH

I.P. SUPER

OUTPATIENT

FILLING/ASSEMBLY

CHIEF

WAITING

FAN RM #17

LIBRARY / DRUG INFO

OP SUPER

CONF.

TLT

EXAM 10 EXAM 9 EXAM 8

TOILET

EXAM 7

EXAM 4

EXAM 2

DOCTORS' GROUP

GROUP ROOM

X-RAY

TLT

EXAM 3

DR GROUP

EXAM 11

SPDEXAM 5

NURSE WORK

EXAM 6

EXAM 12

NURSE WRKRM

CNTRL/SCHEDULING

CHECK-IN

EXAM 16 EXAM 15 EXAM 14

EXAM 13

(POLY-TRAUMA)

SOIL UTIL

EXAM 1

CORRIDOR

C O

R R

ID

O

R

CORRIDOR

C O

R R

ID

O

R

CORRIDOR

WAITING AREA

WAITING AREA

CLERKS EXAM 1

EXAM 2

EXAM 3

EXAM 4

EXAM 5

EXAM 6

CLEAN UTILITY

RESTROOM

EXAM 7

EXAM 8

SOILED

HOLDING

OOOO

EXERCISE PHYSIOLOGY LAB

PULMANARY FUNCTION LAB

TREATMENT

ROOM 4

TREATMENT

ROOM 3

ROOM 2

NEG ISOL

ANTE

ROOM 1

NEG ISOL

CORRIDOR

TREATMENT

TREATMENT

CORRIDOR

CORRIDOR

EXAM RM

printers

DN

D NU P

U P

LOCKERS

PAT.

TLT. W/

SHOWER

PROJECT

LOCATION

FENCED CONSTRUCTION,

MATERIALS STAGING AREA,

VERIFY WITH C.O.R.

REMOVE TREES, OR

PROTECT AS NEEDED

REMOVE SHRUBS AND

STORE FOR RE-PLANTING

AFTER CONSTRUCTION IS

FINISHED.

PROTECT BOLLARDS

DURING CONSTRUCTION/

DEMOLITION

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4

:3

P

M

A-100

SITE PLAN

2 16DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1" = 30'-0"

SITE PLAN - FIRST FLOOR

0 3015 60

NORTH

PLAN

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

REMOVE WALL,

CEILING AND

FLOOR FINISHES

IN THIS AREA

CORRIDOR

C1-32

OFFICE

G-107H

OFFICE

G-107G

GROUP RM

G-107

OFFICE

G-107F

OFFICE

G-107E

OFFICE

G-107D

OFFICE

G-107C

CHEMO

1-G134E

HIGH RISK

1-G134D

ANTE

1-G134C

IV PREP

A-G134B

PHARMACISTS

PROCESSING

AREA

1-G134A

OFFICE

G-107A

OFFICE

G-107B

MALE TOILET

G-108

FEMALE

TOILET

G-106

I.P. SUPER

1-G134F

CORRIDOR

C1-21

/2

D

E

F

161514 17

G

R

PHASE 1 PHASE 2

PRO TECH

1-G134J

ELECTRICAL

CLOSET

G-104

DATA

G-103

VAULT

1-G134I

OUTPATIENT

FILLING/ASSEMBLY

1-G134

OP SUPER

1-G127B

INVESTIGATIONAL

DRUGS/COMPOUNDING

WAITING

C1-21B

CORRIDOR

C1-21A

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

EXISTING 1 HR - SMOKE WALL

NEW 1 HR - SMOKE WALL

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4

:0

P

M

AD101

FIRST FLOOR DEMOLITION PLAN -

PHASE 1

3 16DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

Scale: 1/4" = 1'-0"

FIRST FLOOR DEMOLITION PLAN - PHASE 1 0 4 8 16

NORTH

PLAN

LEGEND:

EXISTING

DEMOLISHED

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

1. COORDINATE PHASING LIMITS AS SHOWN ON

GC101.

2. ALL CEILINGS IN LIMIT OF WORK TO BE REMOVED.

3. REFER TO MECHANICAL, ELECTRICAL, PLUMBING

AND FIRE PROTECTION DRAWINGS FOR

ADDITIONAL NOTES AND LOCATION OF

ADDITIONAL ITEMS TO BE REMOVED.

4. BEFORE BEGINNING WORK, THE CONTRACTOR

SHALL PROVIDE ALL NECESSARY SAFEGUARDS

TO MAINTAIN ALL PARTS OF THE PROJECT IN A

SAFE CONDITION AT ALL TIMES DURING THE

PROCESS OF CONSTRUCTION AND TO PROTECT

FROM DAMAGE OF THOSE PORTIONS OF THE

EXISTING BUILDING WHICH ARE TO REMAIN.

CONTRACTOR SHALL REPAIR DAMAGES CAUSED

BY DEMOLITION WORK.

5. WHERE DEMOLITION IS INDICATED ON THE

DRAWINGS, OR REQUIRED FOR INSTALLATION OF

NEW CONSTRUCTION, REMOVE EXISTING

CONSTRUCTION AS REQUIRED TO PERFORM THE

WORK INDICATED. REMOVE SETTING BEDS AND

INFILL FLUSHED WITH ADJACENT CONCRETE

SLAB.

6. PATCH ALL HOLES IN WALLS, FLOORS, CEILING,

AND OTHER PARTS OF THE STRUCTURE

AFFECTED BY THIS CONTRACT. HOLES SHALL BE

FILLED, SEALED, PAINTED, CAULKED, OR

PLUGGED NEATLY WITH ORIGINAL TYPE OF

MATERIALS TO MATCH THE EXISTING PART OF

THE STRUCTURE AFFECTED.

7. THE DEMOLITION PLAN DRAWINGS ARE INTENDED

TO SHOW THE GENERAL CONDITIONS, WHICH ARE

EXPECTED TO OCCUR. VERIFY ALL CONDITIONS

BEFORE PROCEEDING WITH THE DEMOLITION

WORK IN ANY AREA, DEMOLITION OF DOORS,

WINDOWS, CABINETRY, FINISHES, PARTITIONS, OR

ANY OTHER NON-STRUCTURAL ITEMS REPORT

SUCH DIFFERENCES TO THE COR AND SECURE

INSTRUCTIONS BEFORE PROCEEDING IN THE

AFFECTED AREA.

8. REMOVE ALL FURNISHINGS AND EQUIPMENT

BEFORE START OF ANY DEMOLITION WORK.

COORDINATE DISPOSAL, STORAGE, SALVAGE,

AND/OR RE-USE WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL NECESSARY

BARRICADES AND OTHER FORMS OF

PROTECTION AS REQUIRED TO PROTECT

PERSONNEL, OTHER TENANTS, AND THE

GENERAL PUBLIC FROM INJURY DUE TO

DEMOLITION WORK.

10. CONTRACTOR SHALL ENSURE THAT DEMOLITION

WORK DOES NOT INTERFERE WITH OR PROHIBIT

THE CONTINUING OCCUPATION OF THE ADJACENT

BUILDING OPERATIONS. THIS INCLUDES, BUT IS

NOT LIMITED TO THE SELECTIVE DEMOLITION OF

PARTITIONS, ELECTIRCAL, PLUMBING, FIRE-

PROTECTION, AND MECHANICAL SYSTEMS.

CONTRACTOR SHALL INFORM OWNER (THROUGH

THE COR) A MINIMUM OF 72 HOURS PRIOR TO

DEMOLITION ACTIVITES THAT WILL AFFECT THE

NORMAL OPERATION OF THE BUILDING.

COORDINATE A SCHEDULE WITH THE COR.

11. INTERIOR WALLS WITHIN THE LIMIT OF

CONSTRUCTION THAT ARE TO REMAIN SHALL NOT

BE DISTURBED, EXCEPT TO SCRAPE LOOSE PAINT

AND PATCH AS NECESSARY. CLEAN/RESURFACE

AND PREPARE TO RECIEVE NEW PAINT TO MATCH

ADJACENT WALLS AND FINISHES.

R

E GI H,NC

S

G O 52644

P E

N

CO

LU IT

E

NG

RG

U O

A

P ,P

R E

G I

S T

E R

E D

A R

C H I T E C T U R

A L

C O

R P

O T

I O

N

N O

R T H C A R O L

I N A

A R

LA

R

E GI H,N

C

N

E

D

M RU

P

Y

N O

R

T H C A R O L

I N A

NY

H

M

RE

G

IS

TERED ARCHITECT

REMOVE ALL WALLS,

CEILING AND FLOOR

FINISHES IN THIS AREA

IV PREP

G-107G

IV PREP

G-107H

IV

ANTEROOM

G-107F

BCG

COUNTER

G-107D

HD

ANTEROOM

G-107A

HD

BUFFER

G-107CBCG

G-107B

HD

STORAGE

G-107

HD PREP

C1-32

HD

COUNTER

G-107E

IV

SET-UP

G-107I

CHEMO

1-G134E

HIGH RISK

1-G134D

ANTE

1-G134C

IV PREP

A-G134B

PHARMACISTS

PROCESSING

AREA

1-G134A

MALE TOILET

G-108

FEMALE

TOILET

G-106

I.P. SUPER

1-G134F

CORRIDOR

C1-21

D

E

F

161514 17

PHASE 1 PHASE 2

PRO TECH

1-G134J

ELECTRICAL

CLOSET

G-104

DATA

G-103

VAULT

1-G134I

OUTPATIENT

FILLING/ASSEMBLY

1-G134

OP SUPER

1-G127B

INVESTIGATIONAL

DRUGS/COMPOUNDING

WAITING

C1-21B

CORRIDOR

C1-21A

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

EXISTING 1 HR - SMOKE WALL

NEW 1 HR - SMOKE WALL

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4

:0

P

M

AD102

FIRST FLOOR DEMOLITION PLAN -

PHASE 2

4 16DMM EGS

USP 800 PHARMACY

COMPLIANCE

1310 24th AVE S, NASHVILLE, TN 37212

04/01/2019

BID DOCUMENTS

626-18-50118-263

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

FIRST FLOOR DEMOLITION PLAN - PHASE 2 0 4 8 16

NORTH

PLAN

1. COORDINATE PHASING LIMITS AS SHOWN ON

GC101.

2. ALL CEILINGS IN LIMIT OF WORK TO BE REMOVED.

3. REFER TO MECHANICAL, ELECTRICAL, PLUMBING

AND FIRE PROTECTION DRAWINGS FOR

ADDITIONAL NOTES AND LOCATION OF

ADDITIONAL ITEMS TO BE REMOVED.

4. BEFORE BEGINNING WORK, THE CONTRACTOR

SHALL PROVIDE ALL NECESSARY SAFEGUARDS

TO MAINTAIN ALL PARTS OF THE PROJECT IN A

SAFE CONDITION AT ALL TIMES DURING THE

PROCESS OF CONSTRUCTION AND TO PROTECT

FROM DAMAGE OF THOSE PORTIONS OF THE

EXISTING BUILDING WHICH ARE TO REMAIN.

CONTRACTOR SHALL REPAIR DAMAGES CAUSED

BY DEMOLITION WORK.

5. WHERE DEMOLITION IS INDICATED ON THE

DRAWINGS, OR REQUIRED FOR INSTALLATION OF

NEW CONSTRUCTION, REMOVE EXISTING

CONSTRUCTION AS REQUIRED TO PERFORM THE

WORK INDICATED. REMOVE SETTING BEDS AND

INFILL FLUSHED WITH ADJACENT CONCRETE

SLAB.

6. PATCH ALL HOLES IN WALLS, FLOORS, CEILING,

AND OTHER PARTS OF THE STRUCTURE

AFFECTED BY THIS CONTRACT. HOLES SHALL BE

FILLED, SEALED, PAINTED, CAULKED, OR

PLUGGED NEATLY WITH ORIGINAL TYPE OF

MATERIALS TO MATCH THE EXISTING PART OF

THE STRUCTURE AFFECTED.

7. THE DEMOLITION PLAN DRAWINGS ARE INTENDED

TO SHOW THE GENERAL CONDITIONS, WHICH ARE

EXPECTED TO OCCUR. VERIFY ALL CONDITIONS

BEFORE PROCEEDING WITH THE DEMOLITION

WORK IN ANY AREA, DEMOLITION OF DOORS,

WINDOWS, CABINETRY, FINISHES, PARTITIONS, OR

ANY OTHER NON-STRUCTURAL ITEMS REPORT

SUCH DIFFERENCES TO THE COR AND SECURE

INSTRUCTIONS BEFORE PROCEEDING IN THE

AFFECTED AREA.

8. REMOVE ALL FURNISHINGS AND EQUIPMENT

BEFORE START OF ANY DEMOLITION WORK.

COORDINATE DISPOSAL, STORAGE, SALVAGE,

AND/OR RE-USE WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL NECESSARY

BARRICADES AND OTHER FORMS OF

PROTECTION AS REQUIRED TO PROTECT

PERSONNEL, OTHER TENANTS, AND THE

GENERAL PUBLIC FROM INJURY DUE TO

DEMOLITION WORK.

10. CONTRACTOR SHALL ENSURE THAT DEMOLITION

WORK DOES NOT INTERFERE WITH OR PROHIBIT

THE CONTINUING OCCUPATION OF THE ADJACENT

BUILDING OPERATIONS. THIS INCLUDES, BUT IS

NOT LIMITED TO THE SELECTIVE DEMOLITION OF

PARTITIONS, ELECTIRCAL, PLUMBING, FIRE-

PROTECTION, AND MECHANICAL SYSTEMS.

CONTRACTOR SHALL INFORM OWNER (THROUGH

THE COR) A MINIMUM OF 72 HOURS PRIOR TO

DEMOLITION ACTIVITES THAT WILL AFFECT THE

NORMAL OPERATION OF THE BUILDING.

COORDINATE A SCHEDULE WITH THE COR.

11. INTERIOR WALLS WITHIN THE LIMIT OF

CONSTRUCTION THAT ARE TO REMAIN SHALL NOT

BE DISTURBED, EXCEPT TO SCRAPE LOOSE PAINT

AND PATCH AS NECESSARY. CLEAN/RESURFACE

AND PREPARE TO RECIEVE NEW PAINT TO MATCH

ADJACENT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.