36C24919R0124-0001014.pdf

PDF 599 KB Posted

Attached to
596-19-3-5850-0009 - 596-15-104 - Repair Roofs Phase 2
Solicitation number
36C24919R0124
Issued by

About this file

36C24919R0124 0001 596-15-104 Drawings 11 of 24.pdf

View the file

Other files

File Type Posted
36C24919R0124-0004001.pdf PDF
36C24919R0124-0004000.docx DOCX document
36C24919R0124-0003000.docx DOCX document
36C24919R0124-0002000.docx DOCX document
36C24919R0124-0001007.pdf PDF
36C24919R0124-0001005.pdf PDF
36C24919R0124-0001018.pdf PDF
36C24919R0124-0001025.pdf PDF
36C24919R0124-0001000.docx DOCX document
36C24919R0124-0001015.pdf PDF
36C24919R0124-0001001.docx DOCX document
36C24919R0124-0001024.pdf PDF
36C24919R0124-0001002.xlsx XLSX spreadsheet
36C24919R0124-0001009.pdf PDF
36C24919R0124-0001011.pdf PDF
36C24919R0124-0001010.pdf PDF
36C24919R0124-0001023.pdf PDF
36C24919R0124-0001027.pdf PDF
36C24919R0124-0001006.pdf PDF
36C24919R0124-0001020.pdf PDF
36C24919R0124-0001026.pdf PDF
36C24919R0124-0001013.pdf PDF
36C24919R0124-0001012.pdf PDF
36C24919R0124-0001004.pdf PDF
36C24919R0124-0001003.pdf PDF
36C24919R0124-0001008.pdf PDF
36C24919R0124-0001022.pdf PDF
36C24919R0124-0001016.pdf PDF
36C24919R0124-0001019.pdf PDF
36C24919R0124-0001017.pdf PDF
36C24919R0124-0001021.pdf PDF
36C24919R0124-003.xlsx XLSX spreadsheet
36C24919R0124-002.docx DOCX document
36C24919R0124-001.docx DOCX document
36C24919R0124-000.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTIC PLAN - DEMOLITION KEY NOTES

ATTIC PLAN - NEW WORK KEY NOTES

ATTIC AND ROOF PLAN LEGEND &

ABBREVIATIONS

NOTE:

ATTIC FLOOR PLAN BLDG 16

A116

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

REPAIR ROOFS - PHASE TWO

LEXINGTON, KY

596-15-104

Project Director

02/15/2019 DMT MCCRevisions: Date:

File details come from the government source that posted it.