36C24919R0052-0003001.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
36C249-19-AP-0821 Project 626A4-16-301 Comply with Legionella Directive
Solicitation number
36C24919R0052
Issued by

About this file

36C24919R0052 0003 S02-Contractor Price Schedule (breakout).xlsx

View the file

Other files

File Type Posted
36C24919R0052-0004000.docx DOCX document
36C24919R0052-0003000.docx DOCX document
36C24919R0052-0002000.docx DOCX document
36C24919R0052-0001000.docx DOCX document
36C24919R0052-004.pdf PDF
36C24919R0052-002.xlsx XLSX spreadsheet
36C24919R0052-005.pdf PDF
36C24919R0052-003.pdf PDF
36C24919R0052-000.docx DOCX document
36C24919R0052-001.pdf PDF
36C24919R0052_1.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown

JOB NAME: 614-17-128 Repair and replace sidewalks LOCATION: Memphis VAMC BID DATE:
TOTAL $582,387.87$0
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTSUB-CONTRACTOR*LINE TOTALSCOMMENTS
DIVISION 1GENERAL REQUIREMENTS$0.00
13526Infection Control Walls$0.00$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00$0.00$0.00$0.00$0.00
02 82 11Traditional Asbestos Abatement$0.00$0.00$0.00$0.00$0.00
DIVISION 3CONCRETE$0.00
03 30 53Cast in Place Concrete (9 plumbing patches)$0.00$0.00XX$0.00
DIVISION 4MASONRY$0.00
DIVISION 5STEEL$0.00
DIVISION 6CARPENTRY$0.00
06 10 00Rough Carpentry$0.00$0.00XX$0.00
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 21 13Thermal InsulationXXXX$0.00
07 84 00FirestoppingXXXX$0.00
07 92 00Joint SealantsXXXX$0.00
DIVISION 8DOORS AND WINDOWS$0.00
08 11 13Hollow Metal Frames$0.00$0.00XX$0.00
08 14 00Interior Wood DoorsXXXX$0.00
08 31 13Access Doors and FramesXXXX$0.00
08 41 13Alum Framed Entrance and StorefrontsXXX$0.00$0.00
08 56 19Pass Windows (2 each)$0.00$0.00XX$0.00
08 71 00Door HardwareXXXX$0.00
08 80 00GlazingXXXX$0.00
DIVISION 9FINISHES$0.00
09 05 16Subsurface Prep for Floor Finishingx$0.00$0.00$0.00$0.00
09 06 00Schedule for FinishesXXXX$0.00
09 22 16Non Struct Metal Framing$0.00$0.00XX$0.00
09 29 00Gypsum BoardXXXX$0.00
09 30 13Ceramic/Porcelain Tile$0.00$0.00XX$0.00
09 51 00Acoustical CeilingsXXXX$0.00
09 65 13Resil Base and AccessXXXX$0.00
09 65 16Resilient Sheet FlooringXXXX$0.00
09 90 00Painting$0.00$0.00XX$0.00
DIVISION 10ACCESSORIES$0.00
10 14 00Signage$0.00$0.00XX$0.00
10 21 23Cubicle Curtain Tracks$0.00$0.00XX$0.00
10 26 00Wall and Door Protection$0.00$0.00XX$0.00
10 28 00Toilet Bath and Laundry Access$0.00$0.00XX$0.00
10 44 13Fire Ext Cabinets$0.00$0.00XX$0.00
DIVISION 11$0.00
DIVISION 12$0.00
12 31 00Manuf Metal Casework$0.00$0.00XX$0.00
12 32 00Manuf Wood Casework$0.00$0.00XX$0.00
12 36 00CountertopsXXX0$0.00
DIVISION 13$0.00
DIV 21‐23MECHANICAL$0.00
DIV 21Fire Protection$0.00$0.00XX$0.00
DIV 22Plumbing$0.00$0.00XX$0.00
DIV 22HVACXXXX$0.00
DIV 22ControlsXXX$0.00$0.00
DIV 22T&B$0.00$0.00XX$0.00
DIV 23Heating, Ventilating, and Air ConditioningXXXX$0.00
DIV 25Integrated Automation
DIV 26ELECTRICAL$5.00
ElectricalXXX$5.00$5.00
Fire AlarmXXXX$0.00
Other…XXXX$0.00
DIV 27
DIV 28ELECTRONIC SAFETY AND SECURITY
DIV 31$0.00
DIV 32
DIV 33
DIV 34
DIV 48

TOTALS

TOTAL LABOR WITH BURDEN$0.00
LABOR BURDEN $0.00 In Pricing
6.00%
TOTAL MATERIALS WITH TAX$0.00
MATERIALS TAX
$0.00
TOTAL EQUIPMENT$0.00
TOTAL SUB$0.00
LABOR$0
MATERIAL$0
EQUIPMENT$0
SUB$0*Need to provide subcontractor breakdown

SUBTOTAL $0

OVERHEAD1.00%$0
PROFIT1.00%$0

SUBTOTAL $0

BOND/FEE 1.03% $0

GRAND TOTAL$0
Bid/Proposal Amount

Sheet3

File details come from the government source that posted it.