- Project # 596A4-CSI-102 Design-Build to Renovate Areas (Site Prep) for High Tech/ High Cost Equipment.
- Solicitation number
- 36C24918R0402
About this file
36C24918R0402 S02-Solicitation Attachment-Price Schedule (Project 596A4-CSI-201).xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24918C0222-000.docx | DOCX document | |
| 36C24918R0402-0002001.pdf | ||
| 36C24918R0402-0002004.dwg | DWG drawing | |
| 36C24918R0402-0002002.pdf | ||
| 36C24918R0402-0002005.dwg | DWG drawing | |
| 36C24918R0402-0002006.dwg | DWG drawing | |
| 36C24918R0402-0002003.dwg | DWG drawing | |
| 36C24918R0402-0002000.docx | DOCX document | |
| 36C24918R0402-0001002.pdf | ||
| 36C24918R0402-0001000.docx | DOCX document | |
| 36C24918R0402-0001006.dwg | DWG drawing | |
| 36C24918R0402-0001004.dwg | DWG drawing | |
| 36C24918R0402-0001007.dwg | DWG drawing | |
| 36C24918R0402-0001005.dwg | DWG drawing | |
| 36C24918R0402-0001003.pdf | ||
| 36C24918R0402-0001001.pdf | ||
| 36C24918R0402-006.pdf | ||
| 36C24918R0402-008.pdf | ||
| 36C24918R0402-004.pdf | ||
| 36C24918R0402-009.pdf | ||
| 36C24918R0402-014.pdf | ||
| 36C24918R0402-011.pdf | ||
| 36C24918R0402-002.pdf | ||
| 36C24918R0402-005.pdf | ||
| 36C24918R0402-012.pdf | ||
| 36C24918R0402-001.docx | DOCX document | |
| 36C24918R0402-007.pdf | ||
| 36C24918R0402-003.pdf | ||
| 36C24918R0402-010.pdf | ||
| 36C24918R0402-000.docx | DOCX document |
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offer-Breakdown
| JOB NAME: TBD LOCATION: TBD | Solicitation Number | Project Title | Solicitation Number | Project Number | Proposal Date | |
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | LINE TOTALS | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 | ||||
| Infection Control Walls | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Submittal Process | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Supervision | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Demolition | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Dumpsters | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Job-site Office Equipment | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Safety & First Aid-ICRA | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Final Cleaning | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Punchlist/Closeout | $0.00 | $0.00 | $0.00 | $0.00 | ||
| DIVISION 2 | SITE WORK | $0.00 | ||||
| 02 41 00 | Demolition | $0.00 | ||||
| DIVISION 6 | WOOD, PLASTICS AND COMPOSITES | $0.00 | ||||
| 06 06 00 | Translucent Resin Panel System | $0.00 | $0.00 | $ - 0 | $0.00 | |
| 06 20 00 | Finish Carpentry | |||||
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 | ||||
| 07 72 00 | Roof Accessories | |||||
| 07 84 00 | Firestopping | |||||
| 07 92 00 | Joint Sealants | |||||
| DIVISION 9 | FINISHES | $0.00 | ||||
| 09 06 00 | Schedule for Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 51 00 | Acoustical Ceilings | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 16 | Resilient Sheet Flooring | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 65 19 | Resilient Tile Flooring | $0.00 | $0.00 | $0.00 | ||
| 09 91 00 | Painting | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 10 | ACCESSORIES | $100.00 | ||||
| 10 14 00 | Signage | $7.00 | $5.00 | 66.00 | $78.00 | |
| 10 26 00 | Wall and Door Protection | $5.00 | $9.00 | 8.00 | $22.00 | |
| DIVISION 14 | CONVEYING EQUIPMENT | $0.00 | ||||
| 14 21 00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 20 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 30 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 14 21 90 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Division 21 | FIRE SUPPRESSION | $0.00 | ||||
| 21 13 13 | Wet-Pipe Sprinkler Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 22 16 | Non Struct Metal Framing | $0.00 | $0.00 | $0.00 | $0.00 | |
| 09 29 00 | Gypsum Board | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 23 | HEATING, VENTILATING AND AIR CONDITIONING (HVAC) | $75.00 | ||||
| 23 05 11 | Common Work Results for HVAC | $75.00 | $0.00 | $0.00 | $75.00 | |
| 23 05 12 | General Motor Requirements for HVAC and Steam Generation Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 07 11 | HVAC and Boiler Plant Insulation | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 23 00 | Refrigerant Piping | $0.00 | $0.00 | $0.00 | $0.00 | |
| 23 81 00 | Decentralized VRF Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 26 | ELECTRICAL | $0.00 | ||||
| 26 05 11 | Requirements for Electrical Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 05 33 | Raceways and Boxes for Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 24 16 | Panelboards | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 27 26 | Wiring Devices | $0.00 | $0.00 | $0.00 | $0.00 | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 27 | COMMUNICATIONS | $0.00 | ||||
| 27 05 11 | Requirements for Communications Installations | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 26 | Grounding and Bonding for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| 27 05 33 | Raceways and Boxes for Communications Systems | $0.00 | $0.00 | $0.00 | $0.00 | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 | ||||
| 28 31 00 | Fire Detection and Alarm | $0.00 | $0.00 | $0.00 | $0.00 |
TOTALS
TOTAL LABOR $87.00
TOTAL MATERIALS $14.00
TAX FOR MATERIALS 6% $0.84
| TOTAL EQUIPMENT | $74.00 | |
| $175.00 | ||
| TOTAL SUB |
DIVISION GRAND TOTALS
| DIVISION GRAND TOTALS | $175 |
| TAX FOR MATERIALS | $1 |
SUBTOTAL $176
| Overhead | 0% | $0 |
| Profit | $0 |
SUBTOTAL $176
| BOND/FEE | 0% | $0 |
| PERMITS/LICENSES | $0 |
GRAND TOTAL $176
| Offer Item | INSTRUCTIONS |
| 1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror. | |
| Scope of Work: Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here-in and other specific tasks as further defined by this request for proposal (RFP). |
Provide all labor, materials, tools and construction equipment, and design-build services necessary for design and construction of a project described herein and other specific tasks as further defined by this request for proposal (RFP). Moderate to heavy construction will be anticipated. Site Preps CD and LD FY18 designs and constructs architectural, MEP, fire protection, nurse call, patient lift, general carpentry, radiation exposure standards, infection control, asbestos, and structural components to six (6) existing individual rooms containing various radiology equipment. The radiology equipment being replaced has been purchased on separate contracts. These separate contracts also include costs for removal of old equipment and installation of like size and parameter new equipment. The contractor will be responsible for coordinating schedules with each individual OEM for installation and removal of the equipment. Each individual room with a detailed work scope follows in sections 2 through 6 of the SOW; individual OEM attachments are found within the attachments of the solicitation.
Performance Period: The contractor shall complete the work required under this SOW within 180 calendar days from receipt of Notice To Proceed.
2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;
3. Divisions must still be listed even if not applicable to the construction requirement;
4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.
&"-,Bold"Project 596A4-CSI-102 Design/Build Renovate Site Prep Areas for HC/HT Equipment &"-,Bold"LEXINGTON VA MEDICAL CENTER