36C24918R0322-009.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Design-Build to Renovate Bldg. 5, 1st Floor, Backfill Outpatient Mental Health, Project 614-17-105
Solicitation number
36C24918R0322
Issued by

About this file

36C24918R0322 S02-Solicitation Attachment-Price Schedule (Project 614-17-105)-MEMPHIS VAMC.xlsx

View the file

Other files

File Type Posted
36C24918C0199-000.docx DOCX document
36C24918R0322-00001003.zip ZIP file
36C24918R0322-00001002.pdf PDF
36C24918R0322-007.pdf PDF
36C24918R0322-005.pdf PDF
36C24918R0322-006.zip ZIP file
36C24918R0322-008.pdf PDF
36C24918R0322-001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer-Breakdown

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00$0.00$0.00$0.00$0.00
14 21 20$0.00$0.00$0.00$0.00
14 21 30$0.00$0.00$0.00$0.00
14 21 90$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

Overhead0%$0
Profit$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
Scope of Work: Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here-in and other specific tasks as further defined by this request for proposal (RFP).

Background: This design build project “Renovate 1st Floor Building 5 to Backfill for Outpatient Mental Health” will renovate approximately 4,700 square feet of vacated 1st floor space in Building 5, Clinic Annex. The 1,200 square feet of main corridor outside of this space will be included as a deductive alternate for design and construction. The vacated 1st floor spaces in Building 5 are as listed:

5201, 5202A, 5242, 5243, 5244, 5246, 5246A, 5247, 5249, 5250, 5250A, 5251, 5252 (labeled on drawings 5262), and 5253

Previous renovations of Building 5 for the Women’s Clinic, Hypertension Clinic, and the PTSD Clinic are examples of the design aesthetics to be carried through the renovation.

Performance Period: The contractor shall complete the work required under this SOW within 300 calendar days from receipt of Notice To Proceed. If the contractor proposes an earlier completion date, and the Government accepts the contractor’s proposal, the contractor’s proposed completion date shall prevail.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"Project 614-17-105 Design/Build Renovate Bldg 5 (1st Floor)-Outpatient Mental Health &"-,Bold"MEMPHIS VA MEDICAL CENTER

Deduct Alternate 1

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$100.00
10 14 00Signage$7.00$5.0066.00$78.00
10 26 00Wall and Door Protection$5.00$9.008.00$22.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00$0.00$0.00$0.00$0.00
14 21 20$0.00$0.00$0.00$0.00
14 21 30$0.00$0.00$0.00$0.00
14 21 90$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$75.00
23 05 11Common Work Results for HVAC$75.00$0.00$0.00$75.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $87.00

TOTAL MATERIALS $14.00

TAX FOR MATERIALS 6% $0.84

TOTAL EQUIPMENT$74.00
$175.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$175
TAX FOR MATERIALS$1

SUBTOTAL $176

Overhead0%$0
Profit$0

SUBTOTAL $176

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $176

Deduct Alternate 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
Deduct Alternate 1: same as Bid Item I, except delete work on the 1st main corridor from the connecting corridor double doors from Building 1 to Building 5 to the access controlled double door entry to the Specialty Clinics, the work for which includes floor abatement, doors, hardware, paint, ceilings, flooring, wall protection, lighting, and air diffusers and grilles. This does not include the work required to modify the room and entrance doorways to the renovated Mental Health spaces.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.