This is Amendment 0003 to RFQ 36C24827Q0084, issued by the Department of Veterans Affairs Network Contracting Office 8 on November 16, 2026, for the Project Lighthouse C-CURE Installation at C.W. Bill Young VA Medical Center in Bay Pines, Florida. The amendment provides answers to five questions and two requests for information submitted by offerors regarding the security system installation project. The RFQ close date remains November 18, 2026 at 2:00 PM EST, and responses must be acknowledged according to the specified procedures on the Standard Form 30.
The amendment addresses critical technical specifications for the access control system, including payment terms (single invoice upon completion and government acceptance, not partial milestone invoicing), confirmation that Revision 3 Statement of Work is the final governing document, and detailed requirements for uninterruptible power supply (UPS) and battery backup systems supporting 46 migrated and 13 new reader positions across two controller assemblies. Key guidance includes that local DC battery systems must be sized according to manufacturer requirements and listing standards to support at least four hours of standby plus 15 minutes of access control and lock operation; that auxiliary devices may draw from the 12V logic/reader supply if capacity permits while maintaining 0.50A minimum per position for lock outputs; that REX devices must shunt door alarms only without releasing electric strikes; and that the electrified handle at corridor location 3B-C3-26 is a Corbin Russwin ML20906 (LL ML20906 626, customer part number CS176558) requiring voltage, fail mode, and current verification in power calculations. The amendment clarifies that proposed UPS packages must demonstrate compliance with manufacturer instructions, applicable listings, and runtime testing requirements but does not constitute pre-approval of specific models.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Building_111_Phase_1_Technical_Scope_Schedule.docx | DOCX document | |
| S06 - AMENDMENT - 0002.docx | DOCX document | |
| P09_Updated_SOW.docx | DOCX document | |
| 3B Side.png | PNG image | |
| 111-3A BUILDING 111 THIRD FLOOR PLAN.pdf | ||
| BLUEPRINTS.docx | DOCX document | |
| 3A side.png | PNG image | |
| 36C24827Q0084.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
11-16-2026
516-27-1-5105-0102
36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
10,000 Bay Pines Blvd Bay Pines FL 33744
36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) C.W. Bill Young VA Medical Center 10000 Bay Pines Blvd.
Bay Pines FL 33744 To all Offerors/Bidders
36C24827Q0084 11-04-2026
X
516-3670162-5105-854100-2580 010050192 x
A- The purpose of this amendment is to provide answers to questions received. See continutation page below.
B- RFQ close date remains 11/18/2026 at 2:00pm EST.
William Penhallegon Contracting Officer
CONTINUATION PAGE
Questions and Answers
1. Invoicing. Section B.1, item 3 provides for invoicing "Upon Completion and Government Acceptance." Given the 120-day performance period, will the Government consider partial invoicing at defined milestones, for example acceptance of the two controller assemblies, completion of the 46-reader migration, and final acceptance? If not, please confirm that a single invoice at final acceptance is the only payment event. Single invoice upon completion and Government acceptance.
2. Revised SOW. The Revision 3 Statement of Work attached to Amendment 0002 states: "This draft is for review and is not an issued solicitation amendment." Please confirm that Revision 3 is the governing Statement of Work for quotations due November 18, 2026. The SOW is not a draft but the final copy.
3. Will the Government accept two dedicated APC or Eaton extended-runtime UPS systems, one serving each controller cabinet, in lieu of the local DC battery systems required by R18, with corresponding revision of T09 acceptance testing?
R18 clearly permits a UPS solution with appropriately sized batteries; do not assume the batteries supplied with or fitting inside the E12S cabinets are adequate. Provide supervised batteries in a manufacturer-supported listed enclosure, sized using the required load basis, discharge curves, end voltage, aging and temperature derating, conversion losses, and charger limits. The system must support all 46 migrated and 13 new reader positions and eight ACMs across both assemblies for at least four hours of standby followed by 15 minutes of required access-control and lock operation, or longer where life-safety requirements apply. The building UPS does not replace this local battery requirement. Submit load calculations and a dimensioned battery layout under H1, use additional listed enclosures when necessary, and demonstrate service access, full-duration T09 runtime, recharge, normal charging, absence of battery faults, and restoration of standby capacity before final acceptance.
4. Will VA accept a UPS package (Eaton 9PX2000RT with external battery modules) in place of the R18 DC battery arrangement, with T09 tested on that basis?
Dawson Global Innovations — UPS The Eaton 9PX2000RT UPS with external battery modules may be submitted as an alternative for technical review. This response does not approve removing the local batteries required by R18 or change T09. Any proposed substitution must demonstrate that the complete arrangement meets the applicable manufacturer instructions, listing, supervision, sizing, and runtime requirements. The Eaton model number alone does not establish acceptance of the proposed configuration.
scDataCom
RFI-01 — Battery sizing No. The approved worst-case installed load alone cannot replace a greater full-load basis required by the manufacturer’s instructions and listing. Size the batteries using the applicable manufacturer and listing requirements, and not less than the approved worst-case installed load. Provide calculations for 32-reader capacity per assembly and the actual 59-reader allocation. The battery capacities stated in the RFI are not approved by this response.
RFI-02 — Auxiliary power REX and other auxiliary devices may be powered from the 12 V logic/reader supply if the selected devices operate throughout the required voltage range and the supply has sufficient capacity.
Maintain the R16 minimum lock-output sizing allowance of 0.50 A per position and include auxiliary loads in addition. Use higher actual loads where applicable. Do not exceed the supply or individual output ratings.
RFI-03 — Charger capacity and recharge Operation at the supply’s rated capacity may be proposed if the manufacturer supports the complete configuration, including all simultaneous connected loads and charging demand, after applicable thermal and listing derating. The stated recharge time is not approved by this response. Provide the load and charging calculations for review.
After T09, batteries may be recharged in place or replaced with fully charged compatible batteries. Restore the required standby capacity, verify normal charging, and clear battery faults before final acceptance.
RFI-04 — REX function At 3B-149, 3B-165, 3A-171, 3A-155, and 3A-107, the REX devices shall shunt the door alarm only; they shall not release the electric strikes. Egress shall be by the mechanical door handle. Verify the door hardware and approved ward and life-safety operation during the R47 review.
RFI-05 — Corridor lockset The electrified handle at 3B-C3-26 / 3A-C3-25 is a new installation. The intended hardware is a Corbin Russwin / ASSA ABLOY ML20906, identified as LL ML20906 626, customer part number CS176558. The contractor shall verify the complete configuration, including voltage, fail mode, holding current, and inrush current, and include those loads in the power calculations.