This is a pricing template for the base offer cost breakdown on a Design Build project to remove and replace a nurse call system at the Thomas H. Corey VA Medical Center in West Palm Beach, Florida. The template is structured using the 16 CSI MasterFormat divisions, requiring offerors to itemize all labor costs, material costs, and total costs by division. Divisions covered include General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, and Transportation.

The template requires offerors to calculate subtotals for division costs and then apply overhead, profit, and bond percentages to arrive at the total base offer cost. The solicitation (36C24826R0094) is for a firm fixed price Design Build contract with a project magnitude between $5,000,000 and $10,000,000, a 365-day period of performance, and is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The solicitation was posted on April 20, 2026, with Requests for Information due April 27, 2026, and proposals due May 11, 2026. The contracting office is the Department of Veterans Affairs Network Contracting Office 8, with Stacy Figlinski serving as the Contracting Officer.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis