SON_B24_Boiler DRAFT.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C24826Q0906
About this file
This is a Statement of Need (SON) for the procurement, installation, and startup of a commercial hot water boiler for Building 24 at Bay Pines VA Medical Center in Bay Pines, Florida. The boiler will serve as the primary heating source for the HVAC re-heating system to replace the current unit that is beyond economical repair. The contractor must supply all labor, materials, hardware, accessories, and supervision for purchase, delivery, installation, and factory startup, with the latter consisting of one post-delivery meeting with a qualified representative to explain utility connections and one post-connection visit by a factory-certified representative to commission the system. Power, gas, water, vent, and supply air connections will be provided by others.
The boiler must meet specific technical specifications including dimensions not exceeding 36 inches long by 30 inches wide by 48 inches high, a 500,000 BTU rating with 10-to-1 turndown capability (50,000 BTU minimum), natural gas operation, 120V single-phase power, 97% minimum thermal efficiency, and 1034 kPa design pressure. Required components include a BACnet/MSTP building automation system card, condensate neutralization kit, boiler pump with 2-inch flange connection, magnetic filter assembly, CO/gas detector with automatic gas shutoff and audible alarm, two emergency power-off switches (one at boiler and one at room entry), and a replaceable combustion air filter. All accessories must be from the boiler manufacturer or approved in writing by the manufacturer. Delivery must occur within 90 days of purchase order processing during standard business hours (Monday-Friday, 0800-1630), with final factory startup within 90 days of placement. The contractor must ensure compliance with ASME BPVC sections, OSHA, NFPA 85, NFPA 70, and VA safety and health requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24826Q0906.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF NEED
GENERAL: The purpose of this Statement of Need (SON) is to procure, set in place and start up a hot water boiler in the B24 basement for the heating hot water system at the Bay Pines VAMC, 10000 Bay Pines Blvd, Bay Pines, FL 33744.
BACKGROUND: The B24 hot water boiler serves as the primary heating source for the HVAC’s re-heating system and is broken beyond economical repair.
PURPOSE: This SON defines the requirements for the procurement, placement and start up of hot water boiler.
SCOPE: Contractor shall supply all labor, materials, hardware, accessories, and supervision to purchase, deliver, set in place and provide factory startup of a hot water boiler for the building 24 HVAC system. Factory startup shall consist of one on site meeting post delivery with qualified person to fully understand utility connection process and one onsite visit post connection of utilities for powering up the system with a factory certified representative to fully commission the system including all purchased accessories. Connection of power, gas, water, vent and supply air will be by others. Delivery and start up dates shall be determined post award of the contract. Start up
CHARACTERISTICS FOR BUILDING 24 HOT WATER BOILER: Due to limited space configurations, the size of the boiler shall be no more than 36” L x 30” W & 48” H to fit in the space.
· Boiler shall be rated for commercial use
· Boiler shall be 500,000 BTU with turn down capability to 50,000 BTU (10 to 1 turn down ratio minimum)
· Boiler shall run off natural gas
· Boiler shall be powered by 120V 1 PH power
· Boiler shall be rated for being installed indoors and have combustion and vent connection points.
· Boiler shall have internal programming capacity to schedule off hours operation
· Boiler shall have a BACnet / MSTP card for connection to BAS for monitoring and controlling
· Boiler shall be supplied with a condensate neutralization kit
· Boiler shall be supplied with a ½ hp boiler pump with 2” flange connection
· Boiler shall be supplied with a magnetic filter assembly with 2 inch NPT connections
· Boiler shall be provided with a CO / GAS detector that shuts off Gas supply valve and provides an audible alarm. Wiring diagram shall be provided for this.
· Boiler shall be provided with 2 Emergency power off switches (one that will be mounted at Boiler and one remote at entry door to room) that shuts boiler off and closes gas valve. Wiring diagram shall be provided for this.
· Boiler shall have a factory installed combustion air filter that is replaceable.
· All accessories (items that boiler shall be supplied with or provided with) shall not be unapproved aftermarket products. They shall be of the same manufacturer as the boiler or approved for use with that boiler in writing from boiler company.
SALIENT CHARACTERISTICS:
· Performance: Minimum Efficiency at Required Maximum Output: 97% thermal efficiency.
· Design Pressure: Shall equal the ASME-stamped maximum allowable working pressure of 1034 kPa (150 psig).
REGULATORY: The contractor shall be responsible to ensure that all contractor employees follow guidelines set forth by ASME BPVC Section II, ASME BPVC Section IV, ASME BPVC Section VII, and ASME BPVC Section IX. Comply with OSHA, NFPA 85, NFPA 70, and the Department of Veterans Affairs Safety and Health Requirements, and security procedures at this facility. Smoking is not permitted on campus.
DELIVERABLES: All items to be delivered/placed within 90 days of purchase order processing and order placement. Final startup by factory qualified representative will be 90 days after boiler has been placed. Deliveries shall be scheduled during working hours: Monday through Friday from 0800-1630. Bay Pines VAMC, B24, 10000 Bay Pines Blvd, Bay Pines, Fl 33744.