This document is a Statement of Work for a construction project to build a reinforced concrete pad for an oxygen tank system at the James A. Haley Veterans' Hospital in Tampa, Florida (Project #673-14-858). The project involves removing the existing 6-inch reinforced concrete pad and chain-link fence from the oxygen and nitrous oxide gas storage area, then constructing a new 12-inch reinforced concrete pad with a 7-foot-0-inch chain-link fence topped with 1-foot barbwire. The contractor must temporarily relocate the nitrous oxide manifold cylinders off the existing pad during demolition and later secure the existing nitrous oxide manifold to the new pad.

The work scope includes coordination with the VA for removal of the existing oxygen system and temporary oxygen supply provisions prior to demolition. The contractor is responsible for verifying all existing conditions and dimensions, with any deviations from contract documents requiring immediate written notification to the Contracting Officer Representative (COR). The new concrete pad will measure 36 feet by 30 feet with an 8-foot extension, incorporating #6 rebar at 18-inch spacing both longitudinally and transversely, positioned over 4 inches of crushed stone and a compacted subgrade. The project documentation includes detailed site plans, existing and new site conditions drawings, dimensions, cross-sectional details, and specifications for materials and construction standards that the contractor must follow in accordance with all applicable codes and industry standards.

View the file

Other files

File Type Posted
36C24826Q0759 0005.docx DOCX document
D.3 Medical Gas by Location - updated Copy.xlsx XLSX spreadsheet
D.5 9000 Gallon main tank label.jpeg JPEG file
D.6 NARA RM Contract Language Clause.docx DOCX document
D.7 Questions and Answers.pdf PDF
36C24826Q0759 0004.docx DOCX document
36C24826Q0759 0003.docx DOCX document
36C24826Q0759 0002.docx DOCX document
36C24826Q0759 0001.docx DOCX document
D.1 James Haley Map.pdf PDF
D.3 Medical Gas by Location.pdf PDF
36C24826Q0759 Tampa Bulk Oxygen and Medical Gas.pdf PDF
D.2 Attachment A. Manufacturing Facilites.pdf PDF
36C24826Q0759_1.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

t h

S

T R

E E

T h.

R

E E

T

R E

E T

L I

V I

N G

S T

O N

A V

E N

U E

R O

WHARTLINE BUS

UNIVERSITY

NORTH TRANSFER

STATION

CONVENIENCE

STORE

POND

POND WOODED

AREA

DRAINAGE CANAL/DITCH

131st AVENUE th

S T

R E

E T

JAMES A. HALEY VETERANS' HOSPITAL

TAMPA, FLORIDA

CONSTRUCT PAD FOR OXYGEN TANK

PROJECT #673-14-858

CONSTRUCT PAD FOR

OXYGEN TANK

COVER, STATEMENT OF

WORK, SITE MAP, AND

INDEX

STATEMENT OF WORK:

INDEX OF DRAWINGS:

PROJECT AREA

SITE MAP:

CONSTRUCT PAD FOR

OXYGEN TANK

EXISTING SITE CONDITIONS

AND DEMO

GENERAL DEMOLITION NOTES

1. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND

DIMENSIONS WITHIN THE CONTRACT LIMITS AND NOTIFY

THE COR IMMEDIATELY IN WRITING OF ANY DEVIATION

FROM CONTRACT DOCUMENTS NECESSITATED BY FIELD

CONDITIONS OR ITEMS NOT COVERED.

2. ALL MATERIALS AND ITEMS REMOVED BY CONTRACTOR,

UNLESS OTHERWISE NOTED, BECOME HIS PROPERTY AND

ARE TO TO BE REMOVED FROM THE SITE.

3. REBUILD ANY AREAS TO REMAIN THAT HAVE BEEN

DISTURBED BY DEMOLITION.

4. VA SHALL COORDINATE WITH VENDOR FOR EXISTING

OXYGEN SYSTEM REMOVAL, AND TEMPORARY OXYGEN

SUPPLY, PRIOR TO DEMOLITION.

DEMOLITION KEY NOTES

CONTRACTOR SHALL COORDINATE WITH THE VA FOR

REMOVAL PRIOR TO DEMOLITION.

CONTRACTOR SHALL RELOCATE NITROGEN CYLINDERS OFF

PAD PRIOR TO PAD DEMOLITION. COR SHALL PROVIDE

DIRECTIONS ON LOCATION.

SITE PLAN TEMPORARY

PAD

KEY NOTES

CONTRACTOR SHALL LOCATE THE OXYGEN ALARM PANEL

IN BUILDING 2, AND PROVIDE WIRING FROM THE PANEL TO

THE TEMPORARY PAD, SUSPENDED ABOVE THE ALLEY.

CONTRACTOR SHALL LOCATE AVAILABLE POWER SOURCES

TO INSTALL 120V RECEPTACLE.

NEW SITE PLAN

GENERAL DEMOLITION NOTES

1. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND

DIMENSIONS WITHIN THE CONTRACT LIMITS AND NOTIFY

THE COR IMMEDIATELY IN WRITING OF ANY DEVIATION

FROM CONTRACT DOCUMENTS NECESSITATED BY FIELD

CONDITIONS OR ITEMS NOT COVERED.

2. CONTRACTOR SHALL REVIEW ALL ITEMS TO BE

DEMOLISHED WITH THE COR TO IDENTIFY ANY ITEMS TO

BE SALVAGED PRIOR TO START OF DEMOLITION.

3. ALL MATERIALS AND ITEMS REMOVED BY CONTRACTOR,

UNLESS OTHERWISE NOTED, BECOME HIS PROPERTY AND

ARE TO TO BE REMOVED FROM THE SITE.

4. REBUILD ANY AREAS TO REMAIN THAT HAVE BEEN

DISTURBED BY DEMOLITION.

CONSTRUCTION KEY NOTES

CONSTRUCT NEW 12" REINFORCED CONCRETE PAD,

REFER TO DETAILS ON AS-102.

CONSTRUCT NEW 7'-0" CHAIN LINK FENCE WITH 1'-0"

BARBWIRE AT TOP.

SECURE EXISTING NITROUS OXIDE MANIFOLD TO NEW

PAD.

NEW PAD DIMENSIONS

AND DETAIL

GENERAL CONSTRUCTION NOTES: