Treadmil pool 2.jpg
JPG image 110 KB Posted
- Attached to
- J079--Therapy Pool Cleaning and Maintenance Federal contract opportunity
- Solicitation number
- 36C24826Q0082
About this file
The image depicts an indoor facility with a specialized floor feature that appears to be a sunken platform with a textured metal surface, surrounded by blue and gray tiled flooring. The room includes blue seating chairs, a window to an adjacent room, and exercise equipment such as a treadmill in the background. The space seems to be part of a rehabilitation, medical, or fitness facility with a unique floor design that may be used for physical therapy or specialized training purposes. The environment looks clean, well-maintained, and designed with functionality and accessibility in mind.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VENDOR QUESTIONS and ANSWERS 36C24826Q0082 Therapy Pool and Maint.docx | DOCX document | |
| Pump Room 2.jpg | JPG image | |
| Pump Room 3.jpg | JPG image | |
| Large Pool.jpg | JPG image | |
| Pump room 1.jpg | JPG image | |
| Limitations on Subcontracting.docx | DOCX document | |
| Final SOW Pool Cleaning 7-16-24.docx | DOCX document | |
| 36C24826Q0082.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .