This is an amendment (0001) responding to Request for Information (RFI) questions for solicitation 36C24825R0023, which is for replacing Boiler #2 and correcting deficiencies at the boiler plant at VA Caribbean Healthcare System in San Juan, PR. The amendment was issued on January 15, 2024, with proposals due January 29, 2025, at 3:30 PM AST.
The amendment clarifies that fuel for the temporary/rental boiler will be provided by the VA facility, the rental unit should be fire tube per specifications (with alternatives considered based on market availability), and weekly preventive maintenance requirements apply to the rental unit only. Additionally, no new SCADA workstation is required, with utility monitoring to be done via local displays in the operator's room. The contractor is responsible for any roof repairs needed after new penetrations, with roofing materials to be approved by VA during submittals evaluation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24825R0023 Amendment 0001
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 01-15-2024 672-20-602 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) VA Caribbean HCS (Admin Bldg) #10 Calle Casia Suite #4M440 San Juan PR 00921-3201 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
VA
Caribbean HCS (Admin Bldg) #10 Calle Casia Suite #4M440 San Juan PR 00921-3201 To all Offerors/Bidders
36C24825R0023 12-23-2024
X X X Project Title: Replace Boiler #2 and Correct Deficiencies at Boiler Plant (Construction Services)
The purpose of this amendment is to respond to RFIs. The proposals due date of 01-29-2025 @ 3:30PM (AST) remain unchanged. The date for RFI has closed.
All Offerors are required to acknowledge receipt of this amendment.
See continuation of page for RFI responses.
Ana G. Alvarado Contracting Officer
NCO815L3-0313
SF30, BLOCK 14, AMENDMENT CONTINUATION PAGE:
VETERANS AFFAIRS CARIBBEAN HEALTHCARE SYSTEM
REPLACE BOILER #2 AND CORRECT DEFICIENCIES AT BOILER PLANT (PROJ: 672-20-602)
SOL #: 36C24825R0023 | REQUEST FOR INFORMATION RESPONSES
1. Does the contractor have to provide the fuel to the rented/temporary boiler?
Government Response: Fuel shall be provided by the facility (VA).
2. The rented boiler must be fire tube, or it can be with other specifications that meet the 350 HP? (i.e. water-tube) Government Response: The rented unit shall be fire tube per specifications. However, depending on market availability, alternatives shall be considered by the facility. Deviations from specifications shall be submitted to VA for approval.
3. The weekly preventive maintenance (SOW Item II.C.1.xii) applies to the rented boiler? Applies to the existing boiler? Applies to the new boiler?
Government Response: Stated Preventive Maintenance is for the rental unit.
4. A SCADA workstation must be provided by the offeror or will be connected to an existing boiler SCADA?
Government response: No new SCADA workstation shall be provided. Monitoring of utilities shall be done by local displays at the operator’s room.
5. The repairs after the new roof penetrations must be corrected by the offeror?
Government response: Roof repairs, if damaged, shall be performed by the offeror. Roofing materials shall be submitted to VA for approval during submittals evaluation.