ATTACHMENT E PWS Rev. 01 07-17-2025.docx

DOCX document 40 KB Posted

Attached to
R799--FY25: Network Engineer Support Services Federal contract opportunity
Solicitation number
36C24825Q0978
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This Performance Work Statement (PWS) details Network Engineer III Services for the Orlando Veterans Affairs Healthcare System (OVAHCS). The contract will provide network engineering support for the 1.2 million square foot VA Medical Center at Lake Nona and its 14 affiliated locations across central Florida, focusing on the Industrial Control Systems (ICS) network. The period of performance consists of one 12-month base period with four 12-month option periods, with work primarily performed Monday through Friday during standard business hours, with potential weekend and holiday requirements.

Key technical requirements include maintaining and configuring network infrastructure, designing LAN and wireless networking environments, managing multi-site network operations, supporting industrial control network systems, and ensuring compliance with NIST security standards. The contractor must provide a Network Engineer with a minimum of 10 years of experience, Tier II clearance eligibility, Cisco networking expertise, and ISC2 certification. Specific deliverables include monthly infrastructure activity reports, a project management plan, and telecommunications room configuration documentation, with the initial submissions due between September 18-25, 2025. The solicitation number is 36C24825Q0978 and is issued by the Department of Veterans Affairs Veterans Health Administration.

View the file

Other files for this federal contract opportunity

Other files attached to R799--FY25: Network Engineer Support Services, newest first.
File Type Posted
ATTACHMENT I WAGE DETERMINATION Rev.01 08-21-2025.docx DOCX document
ATTACHMENT H ADDENDUM to FAR 52.212-1 Rev.02 08-21-2025.docx DOCX document
36C24825Q0978 0004.docx DOCX document
ATTACHMENT G PWS Rev.02 08-21-2025.docx DOCX document
36C24825Q0978 0003.docx DOCX document
36C24825Q0978 0002.docx DOCX document
36C24825Q0978 0001.docx DOCX document
ATTACHMENT F ADDENDUM to FAR 52.212-1 Rev.01 07-17-2025.docx DOCX document
ATTACHMENT D RESPONSES TO KTR QUESTIONS.docx DOCX document
ATTACHMENT C VA HANDBOOK 6500.6 CONTRACT SECURITY.pdf PDF
36C24825Q0978.docx DOCX document
ATTACHMENT B RECORDS MANAGEMENT LANGUAGE FOR CONTRACTS.pdf PDF
ATTACHMENT A CONTRACTOR QUESTIONS.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E

?.## PERFORMANCE WORK STATEMENT Rev 01. 07-17-2025

Network Engineer III Services The Orlando Veterans Affairs Healthcare System (OVAHCS)

I. GENERAL: This is a non-personal services contract to provide Network Engineer services for OVAHCS. The Government shall not exercise any supervision or control over the Contractor’s personnel performing the services herein. Such service provider shall be accountable solely to the Contractor, who in turn is responsible to the Government. During the performance of this contract, the functions being performed shall not be changed or expanded to become inherently governmental.

II. BACKGROUND: The Orlando VA Medical Center (OVAMC) at Lake Nona is furnished with state-of-the-art technology. The 1.2 million square foot facility is one of the largest hospital within Veterans Affairs (VA). The facility also includes the Simulation Learning Education and Research Network, which is a high-technology, immersive environment that uses simulation to train VA medical personnel. Facility Management Services (FMS) Industrial Control Systems (ICS) network is an air gapped secure network that is not on the Office of Information and Technology (OIT) network, medical network or any other Veterans Affairs (VA) supported network. OIT doesn’t support or manage the network components, devices and end-point. OVAMC is committed to providing our patients with the highest quality of care in an environment that is safe. We do this by focusing on continuous process improvement of our technological infrastructure.

III. PERIOD OF PERFORMANCE: The period of performance will consist of one base period of 12 months and four 12 months option periods.

IV. PLACE OF PERFORMANCE: The majority of the work will be at OVAMC, 13800 Veterans Way, Orlando, FL 32827. This location is comprised of thirteen (14) buildings. Occasional local travel to affiliate locations for on-site support may be necessary. Associates costs, including but not limited to per diem, lodging, meals and mileage will not be reimbursed for travel to any locations outlined herein. The ICS network is extended to OVAMC affiliate locations listed below:

a. Table 1.

Locations (# of bldgs.)
Addresses
Orlando VAMC Lake Baldwin (20 bldgs.)
5201 Raymond St., Orlando FL 32803
Lakemont Campus (1 bldg.)
2500 S. Lakemont Ave., Orlando, FL 32814
Tavares Community Based outpatient Clinic (CBOC) (1 bldg.)
1390 E. Burleigh Blvd., Tavares, FL 32778
Kissimmee CBOC (1 bldg.)
701 Union Street, Kissimmee, FL 34741
Clermont CBOC (1 bldg.)
3200 Citrus Tower Boulevard, Clermont, FL 34711
Deltona CBOC (1 bldg.)
1200 Deltona Blvd., Deltona, FL 32725
Daytona Beach VA Clinic (1 bldg.)
1776 North Williamson Blvd., Daytona Beach, FL 32117
Westside Pavilion VA Clinic (UMHS Annex) (1 bldg.)
1821 Business Park Blvd., Daytona Beach, FL. 32114
Port Orange VA Clinic (Veterans Wellness Recovery Program) (1 bldg.)
3731 South Clyde Morris Blvd., Port Orange, FL 32129
Viera VA Healthcare Center (2 bldgs.)
2900 Veterans Way., Viera, FL 32940
Palm Ba VA Clinic (1 bldg.)
5200 Babcock St., Northeast suite 101., Palm Bay, FL 32904

V. OPERATION HOURS: The Contractor shall perform work, Monday through Friday from 7:30 a.m. through 11:30 a.m. and 12:30 p.m. through 4:30 p.m. local time. There will be instances where the Contractor must work on weekends and holidays. Two-weeks prior to weekends and holiday work, the Contracting Officer Representative (COR) will communicate by emailing the Contractor with the dates, start and stop time for work to be performed. Within 24-hours of the COR’s request for weekends and holiday work, the Contractor shall confirm receipt of the COR’s request in writing by email.

VI. FEDERAL HOLIDAYS: Unless the COR requests for holiday work, the Contractor shall not perform services on federal holidays, or when the Government facility closes due to local or national emergencies, administrative closings, or similar government-directed facility closings. Government shutdowns occur when the Government refuses passage of key bills, resulting in the cession of some or all operations by the Government. If VA is affected by a Government shutdown during the period of performance, the Contractor will be informed by the Contracting Officer (CO) when services are to be provided. The following Federal Holidays are observed by the Government.

a. Table 2.

Holidays

Dates
Months
New Year’s Day
1st
January
Martin Luther King Jr.’s Birthday
3rd Monday
January
President’s Day
3rd Monday
February
Memorial Day
Last Monday
May
Juneteenth
19th
June
Independence Day
4th
July
Labor Day
1st Monday
September
Columbus Day
2nd Monday
October
Veterans Day
11th
November
Thanksgiving Day
4th Thursday
November
Christmas Day
25th
December

VII. SCOPE OF WORK: The Contractor shall provide all resources necessary to accomplish the scope of work herein. The Contractor shall be a highly trained and experienced Network Engineer to satisfy the following responsibilities:

a. The Contractor shall maintain a thorough understanding of the basics behind the internet and its working (Domain Name System (DNS), Security, Internet Protocol (IP) Routing, Hypertext Transfer Protocol (HTTP), Virtual Private Network (VPN), Email Routing).

b. The Contractor shall design, set up and configure Local Area Network (LAN) switching environments.

c. The Contractor shall design, setup and configure LAN wireless networking that supports secured access.

d. The Contractor shall lead the design of multi-server environments including IP address schemes, DNS, Windows Internet Name Service (WINS), Ether-Channel (Bonding).

e. The Contractor shall have the capability to support introducing new remote sites to the network without any redesign.

f. The Contractor shall design, implement, and support interconnections between all OVAHCS sites.

g. The Contractor shall perform maintenance on the Industrial Control Network (ICN).

h. The Contractor shall maintain multi-site network operations and software applications, operating systems and regular maintenance for the Orlando VA Health Care System (OVAHCS).

i. The Contractor shall manage assigned project and program components to deliver service in accordance with the written task assigned for each projects.

j. The Contractor shall respond to ICN inquiries from staff, administrators, service providers, site personnel and outside vendors.

k. The Contractor shall troubleshoot malfunctions of network hardware, software applications, IP telephone and security systems to resolve operational issues to restore services.

l. The Contractor shall oversee the configuration and installation of Industrial Control Network (ICN).

m. The Contractor shall provide documentation for the Telecommunication Room configurations concerning ICN.

n. The Contractor shall manage and maintain all IP space that relates to ICN devices throughout OVAHCS.

o. The Contractor shall coordinate and document all new system installs for ICN, Subject Matter Expert (SME) on the 6550-process assisting CO, COR and end-user.

p. The Contractor shall attend project related meetings.

q. The Contractor shall manage enterprise network architecture, routing, routed, metro-e LAN’s and Virtual Routing and Forwarding (VRF’s).

r. The Contractor shall support hardware and software for Close Circuit Television (CCTV) and Access Control Systems.

s. The Contractor shall develop project plans for migrations and approval for work.

t. The Contractor shall work with other Contractors for a Media Access Control (MAC), ICN related equipment moves, adds or changes.

u. The Contractor shall maintain technical documentation on the ICN for new facilities.

v. The Contractor shall verify compliance with National Institute of Standards and Technology (NIST) 800 SP 800-171 Rev. 3, Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations | CSRC, VA policies, and security standards.

w. The Contractor shall provide support for the display desktops that are connected within the ICN Network.

x. The Contractor shall provide ICN support for the AMAG system.

y. The Contractor shall provide ICN support for the CCTV, Metasys Building Automated System known as JCI, and storage devices.

z. The Contractor shall migrate JCI network equipment to the VA Office Of Information and Technology (OIT).

aa. The Contractor shall provide escort/testing for Contractors working on projects related to the ICN to meet assign project requirements and quality of work.

ab. The Contractor shall develop detailed implementation plans to accommodate network growth.

ac. Table 3. List of Equipment

Equipment

Quantity
Remarks
Cisco Switches
200
Refer to PWS Deliverable #3 at paragraph IX.
Servers
0
N/A
Firewall
0
N/A
Workstations
0
N/A
Monitors
0
Refer to PWS Deliverable #3 at paragraph IX
Virtual Machines
0
N/A
Network Devices
4,000 estimate
Based on changes to the ICN Network

VIII. CERTIFICATIONS/EXPERIENCE REQUIREMENTS OF NETWORK ENGINEER: The Contractor key personnel must be able to meet the requirement for a favorable Tier II clearance, have a minimum of ten (10) years’ experience in the installation of information technology infrastructure configuration and maintenance of network infrastructure equipment. The substitution of Contractor’s key personnel must have equal or better experience/qualifications and must complete the onboarding qualification process. At no time must there be a gap in service during the key personnel substitution. Contractor key personnel shall also have the following technical competency:

a. Technical, analytical and personal skills.

b. Knowledge of Cisco Virtual Routing and Forwarding (VRF-lite) configuration.

c. Ability to communicate in an understandable, polite, and friendly manner, both written and verbal.

d. Knowledge, configuration, and maintenance of Cisco 6509, 6500 series data center equipment.

e. Knowledge, configuration, and maintenance of Cisco Catalyst 4000, 3000 access layer switches.

f. Knowledge, configuration and maintain Cisco Wireless Local Area Network (WLAN) systems 5500 series controllers, 3000 series access points (AP).

g. Cisco Access Control Server (ACS) 802.1X end point administration.

h. Conducts core services installs and management of Virtual LAN’s (VLAN) enterprise wide.

i. Performs life cycle management of all network assets.

j. Manages enterprise network architecture, routing, routed, metro-e LAN’s and VRF’s.

k. 10 years of Cisco experience.

l. Knowledge of wireless controllers.

m. ISC2 Certified Information Systems Security Professional.

IX. DELIVERABLES: The Contractor shall provide the below deliverables no later than the dates listed below. The COR shall be notified by the Contractor as it becomes apparent that scheduled deliverables will be late. The notification shall be in writing and must include the rationale for the expected date of the deliverable(s) and the project impact due to late deliverables.

a. Table 4.

Deliverables

Due Dates
Send to
Format
Deliverable #1: Contractor shall provide written reports of all Infrastructure activities related to the information technology projects at OVAMC and its affiliate locations.
No later than September 18, 2025.
COR
Pdf by email.
Deliverable #2 : Contractor shall provide a draft Project Management Plan (PMP) for review and completeness.
The initial copy is due no later than September18, 2025, and the final copy no later than October 9th, 2025.
COR
Word docx for Initial copy, pdf for final copy.
Deliverable #3: Contractor shall provide documentation for the Telecommunication Rooms configurations concerning ICN.
Initial documentation must be submitted no later than September 25, 2025, and Monthly thereafter no later than the 3rd workday of the month.
COR
Pdf by email.

XI. TRAINING REQUIREMENTS: The Contractor shall attend and complete all VA training listed in table 4.

a. Table 5.

VA Training Frequency

How to Communicate Effectively With Veterans With Dementia
Initially and annually thereafter
Insider Threat Awareness and Reporting Training
Initially and annually thereafter
OIT Training to Access Data Center and Telecommunication Rooms
Initially
Privacy and Information Security Awareness and Rules of Behavior
Initially and annually thereafter
Record Management for Everyone
Initially and annually thereafter
VA Privacy and HIPPA Training
Initially and annually thereafter
Wandering and Missing Patient
Initially and annually thereafter

XII. REPORTS: The Contractor shall submit monthly written progress reports of all completed work for the preceding month and work to be accomplished for the subsequent month. The report shall be submitted to the COR no later than the 3rd workday of each month. All documents or reports produced by the Contractor shall be suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

a. The report shall include resolved issues, existing issues, and a statement explaining how issues were resolved and when existing issues will be resolved.

b. The Contractor shall provide monthly reports for the Telecommunication Rooms configuration concerning ICN.

c. The Contractor shall test/monitor network integrity and performance, and report monthly updates.

d. The Contractor shall provide monthly PMP report.

e. The COR may communicate verbally to the Contractor’s personnel on a weekly and or monthly basis to introduce and or respond to new ICN issues.

XIII. SPECIAL ACQUISITION REQUIREMENTS: Contractor personnel attending meetings, answering Government telephones, and working in other situation where their Contractor status is not obvious to third parties shall identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials.

XIV. GOVERNMENT-FURNISHED EQUIPMENT (GFE): Contractor shall use reasonable care to avoid damaging existing equipment and buildings on the Government installation. If the Contractor’s failure to use reasonable care causes damage to any of the below listed property, the Contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.

a. Shared Office space at OVAMC Lake Nona.

b. Desk.

c. Chair.

d. Wireless Drill and Miscellaneous hand tools.

e. Cable Test Equipment.

f. Laptop – Use only for the ICN.

g. Computer Monitors (3ea).

h. OIT Desktop Computer.

XV. PAYMENT DOCUMENTATION AND PROCESS: Contractor’s payment will be based on receipt of proper invoice and satisfactory contract performance. A proper invoice must include items described at FAR 32.905. Part 32 - Contract Financing | Acquisition.GOV.

XVI. PERFORMANCE REQUIREMENT SUMMARY (PRS): The PRS is a performance indicator that is used to measure the acceptable quality levels that must be met, method of surveillance, and incentives, and how these measures will define the success of our program. These performance standards may be used by the COR to record the Contractor’s performance assessment report (CPARS). The performance standards below will be measured accordingly:

a. Table 6.

PRS#
PWS Paragraph
Performance Standards
Acceptable Quality Level
Method of Surveillance
Incentive (Positive &/or Negative) CPARS Reporting
1
V. Hours of Operation.
Perform work, Monday through Friday from 7:30 a.m. through 11:30 a.m. and 12:30 p.m. through 4:30 p.m. local time.
98%
COR
Positive CPARS

Negative CPARS

2
VIII. Network Engineer Certifications.
Maintain ICS2 certification.
100%
COR
Positive CPARS

Negative CPARS

3
XI. Training Requirements.
Complete all training within the required time frame.
100%
COR
Positive CPARS

Negative CPARS

4
XII. Reports.
Provide monthly reports in accordance with PWS.
95%
COR
Positive CPARS

Negative CPARS

5
XV. Payment Documentation and Process.
Proper invoicing and satisfactory contract performance.
98%
COR
Positive CPARS

Negative CPARS

File details come from the government source that posted it. Updated .