36C24825Q0400 0002.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C24825Q0400
About this file
This document is an Amendment (Amendment 0002) to a solicitation for the Exterior Glass Panel Replacement project at the Lee County VA Health Care Clinic. The amendment extends the offer receipt deadline to April 1, 2025, at 10 AM EDT and provides clarifying questions and answers about the project. The solicitation is a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside, specifically for replacing 34 broken glass panels at the facility.
Key project details include contractor responsibilities for removing and reinstalling existing sunshade devices, matching glass color as closely as possible to the original discontinued tint, and protecting the site during installation. The contractor must provide a 12"x12" glass sample meeting contract specifications and a warranty for glass and installation. The project is administered by the Department of Veterans Affairs Network Contracting Office 8, located in Bay Pines, Florida, and requires contractors to be registered in the System for Award Management (SAM) and VetCert databases.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix B.pdf | ||
| East End Windows.pdf | ||
| Records Management Contract Language.pdf | ||
| 36C24825Q0400 0001.docx | DOCX document | |
| Windows_Picture.pdf | ||
| App A PO Comments-Contractor on Site Training Not Required.pdf | ||
| 36C24825Q0400_1.docx | DOCX document | |
| Attachment A - Quoters Self Performance Worksheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-25-2025 516-25-2-5309-0119 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 10,000 Bay Pines Blvd Bay Pines
FL
33744 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) C.W. Bill Young VA Medical Center 10000 Bay Pines Blvd.
Bay Pines
FL
33744 To all Offerors/Bidders
36C24825Q0400 03-11-2025
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-01-2025 10AM EDT 516-3650162-5309-854100-2580 010055590 X The purpose of Amendment 0002 is to extend the closing due date and to provide Questions and Answers (see next page).
Cindy Smith Contracting Officer 36C24825Q0400
AMENDMENT 0002
Lee County VA Health Care Clinic Exterior Glass Panel Replacement
QUESTIONS AND ANSWERS
1. Question: Sunshade Removal/Reinstallation: Are there existing sunshade devices (architectural fins, brise-soleils, etc.) installed over or adjacent to the glass panels? If so, will their removal and reinstallation be required as part of this contract, or will this be handled by the VA or another contractor?
Answer: Contractor is responsible for removing and replacing existing sunshade devices (architectural fins, brise-soleils, etc.) as part of this contract.
2. Question: Color Matching and Glass Tint: The proposal indicates that the existing Caribbean glass tint is discontinued, and the replacement (Pilkington Blue-Green) may result in a visible mismatch. Will the VA require color/tint matching across adjacent panes for visual uniformity? Or is the replacement of only the 34 broken panels, regardless of visual difference, acceptable?
Answer: The VA acknowledges the current glass color is obsolete; match the color as close as possible to the original color.
3. Question: Site Access and Lift Equipment Usage: Will a designated staging area or lift access path be provided, or are there any known access limitations (e.g., landscaping, walkways, underground utilities) that could affect equipment positioning?
Answer: Equipment path will be designated by VA. Contractor is responsible for protecting the grass, bushes, trees, building from damage. Any damage caused by the Contractor is the Contractor’s responsibility to repair and/or replace.
4. Question: As-Built Documentation / Submittals: Question: Will the contractor be required to submit shop drawings, glass samples, or final as-built documentation for review and approval?
Answer: Contractor shall provide a glass sample, 12”x12”, meeting specifications provided in the contract. No shop drawings, no As-Built documentation required. Warranty for glass and installation required.
File details come from the government source that posted it. Updated .