This document outlines the technical proposal preparation instructions for a design-build project solicitation from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. Offerors must submit documentation including a cover page, table of contents, signed SF1442 form, experience modification rate form, limitation on subcontracting certification, verification of annual VETS-4212 form, current VetCert SDVOSB certification, and completed FAR and VAAR provisions. The technical proposal package must include a cover page, table of contents, responses for three evaluation factors: technical approach (30 page max), experience (no page limit), and past performance (no page limit). Offerors must also submit completed experience information sheets and past performance questionnaires. The related federal contract opportunity is for solicitation number 36C24824R0053 to create a new prosthetics lab at the Viera facility for approximately $5-10 million.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE ONE – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS

1. PHASE ONE – TECHNICAL PROPOSAL PREPARATION INSTRUCTIONS: The following must be included in the offeror’s proposal:

PHASE ONE – 1st PACKAGE:

a) Cover Page with: Phase One - Design Build Project, Solicitation Number, Project Title and Project Number, Company Information (Principal points of contact, email, address, phone numbers (including area code), SAM Unique Entity Identification number, Cage code, etc.).

b) Table of Contents

c) Signed SF 1442 by the SDVOSB, with Blocks 14-20C completed including acknowledgement of any Amendments issued for Phase One. A signed copy of each amendment (if applicable) is required with submission of the Phase One proposal.

d) Completed Experience Modification Rate (EMR) Form. (Attachment Three (3))

e) Completed Limitation on Subcontracting Certification. (See section 4.10, pages 44-45, VAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting-Certificate of Compliance for Services and Construction (JAN 2023) (Deviation))

f) Verification of the annual form VETS-4212, Federal Contractor Veterans’ Employment Report. (Refer to paragraph 17 above from the General Proposal Information Section, page 65)

g) Copy of current VetCert SDVOSB certification.

h) Contractor shall ensure that all FAR and VAAR provisions and clauses with fill-ins are completed and return with the technical proposal.

PHASE ONE – 2nd PACKAGE (TECHNICAL PROPOSAL):

a) Cover Page with: Phase One - Design Build Project, Solicitation Number, Project Title and Project Number, Company Information (Principal points of contact, email, address, phone numbers (including area code), SAM Unique Entity Identification number, Cage code, etc.)

b) Table of Contents

c) Required Submittals for Factor 1 – Technical Approach (30 Pages Max)

d) Required Submittals for Factor 2 – Experience (No Page Limit)

e) Completed Experience Information Sheets. (Attachment Five (5))

f) Required Submittals for Factor 3 – Past Performance (No Page Limit)

i) Completed Past Performance Questionnaires. (Attachment Four (4))