36C24824Q0397 ATTACHMENT B- PWS Fuel Tanks System Testing Maintenance and Repair.pdf
PDF 397 KB Posted
- Solicitation number
- 36C24824Q0397
About this file
This is a request for quotation for fuel storage tank system testing, maintenance, and repair services. The Department of Veterans Affairs Network Contracting Office 8 is seeking these services for VA Caribbean Healthcare System facilities in Puerto Rico. The associated NAICS code is 541380 and small business size standard is $19 million. The requirement includes inspection, cleaning, testing, maintenance and repair of underground and aboveground storage tanks, fuel supply piping, and associated equipment. The performance period is expected to be one base year starting in February 2024 with four one-year option periods. The solicitation is set aside for veteran-owned small businesses or alternatively other small businesses, with priority to HUBZone and 8(a) firms. Quotes are due by February 5, 2024 and must include acceptance of solicitation provisions and terms or note any exceptions. Evaluation will be based on a comparative assessment of quotes.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24824Q0397 ATTACHMENT B – PWS
PERFORMANCE WORK STATEMENT (PWS)
FUEL TANKS SYSTEM TESTING, MAINTENANCE & REPAIR SERVICES
SECTION I
1.0 GENERAL: This Performance Work Statement (PWS) sets forth the contract performance requirements for the compliance inspections, testing, monitoring, product pumping/hauling, fuel removal and tank cleaning, painting, repair of Government owned/Government–operated fuel storage tank system. The fuel storage tank system comprises of aboveground storage tanks, underground storage tanks and associated fuel supply piping system at VA Caribbean Healthcare System (VACHS) facilities in San Juan Medical Center, Ponce Outpatient Clinic (POPC), Mayaguez Outpatient Clinic (MOPC) and Carolina Warehouse. The fuel storage and distribution systems provide diesel, gasoline and ethanol fuel to 24 hours per day, seven day per week, 365 days per year basis facilities operations such as steam generation plants, government vehicle fleet fuel station and emergency standby power.
2.0 SCOPE: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, management services necessary to perform inspections and testing to Aboveground Storage Tank (ASTs) and Underground Storage Tanks (USTs) as required in this Performance Work Statement. The contractor shall perform to the standards in this contract. The Contractor shall abide by all laws, rules and regulations applicable to fuel storage tanks operations. All services must comply with the Performance Work Statement (PWS) and all applicable federal, Puerto Rico laws and regulations.
3.0 BACKGROUND: The VACHS is committed to the protection of the environment and compliance with all applicable environmental protection laws. The VACHS facilities have a Fuel Storage Tank Management program in place to address operation and maintenance, monitoring, record-keeping requirements & procedures; and organizational mechanisms designed to prevent or limit accidental release of petroleum, oil and lubricants (POL) to surface water, groundwater, or soils.
4.0 OBJECTIVES: General performance objectives includes
• Ensure functionality and operability of the fuel storage and distribution system at
VACHS facilities.
• Be in full compliance with inspections, testing and UST and AST operations as required by the US Environmental Protection Agency (USEPA) and Puerto Rico Department of Natural Resources and Environment (PRDNER) Storage Tank Regulations and Spill Prevention Control and Countermeasures (SPCC) Rules and Regulations.
• Protect the natural resources and environment while maintaining mission essential facilities operations such as emergency generators, steam generator plants, and vehicle fleet activities.
5.0 DESCRIPTION OF SERVICES. The Contractor shall provide all labor, equipment, transportation, tools, supervision, and other items and services necessary to provide inspection, cleaning, testing, calibration, maintenance, and repair of underground storage tanks (USTs) with auxiliary equipment and systems in VA Caribbean Healthcare System facilities. The Contractor shall provide the activities necessary to ensure ten (10) USTs and twenty-eight (28) ASTs at VACHS are in compliance with UST regulations and AST regulations. These activities include performing the required tests, inspections, maintenance, and repairs (as needed) to ensure UST/AST compliance. The VACHS USTs tank capacity ranges from 15,000 to 20,000 gallons; and from 225 gallons to 10,000 gallons for ASTs.
The contractor shall provide annual third-party compliance inspection, monthly inspections, cathodic protection testing and maintenance, lid painting, signs and labels, automatic tank gauge (ATG) monitor maintenance, routine maintenance, and all required reports. The contractor shall provide the COR with documented recommendations for proper operation of systems after inspection if required. The Contractor shall coordinate worksite activities with all applicable personnel to ensure the protection of human health and the environment, the prevention of damage to property, utilities, materials, supplies, equipment, and the avoidance of work interruptions. The Contractor shall provide physical security to work areas with security equipment and personnel.
5.1 PERIOD OF PERFORMANCE: The proposed contract action is anticipated to be issued as a Firm-Fixed price award. This contract will be comprised of a base year and
(4) option years. The performance period for the base year will be of twelve months beginning on the date of award, and option years will be of twelve months each, thereafter, issued at the discretion of the Government.
5.2 BASIC SERVICES
5.2.1 The contractor shall provide basic services to ASTs/USTs and auxiliary equipment/systems in order to maintain them in a functional, capable, safe, efficient and economical condition. Required USTs, ASTs and auxiliary equipment/systems under this contract are listed in Technical Exhibit 1. The contractor shall conduct testing, maintenance, repairs, cleanup, treatment and provide supporting services for environmental documentation including but not limited to permitting, training, etc. to AST/USTs and auxiliary equipment under this contract. Contractor must have experience working Veeder Root ATG system and Tracer Assembler/Building Automated System and have previously prepared environmental documentation for regulatory agencies submittals. The contractor shall provide the recognized industry standard maintenance procedures. The following work tasks are requirements to be performed under this PWS.
5.2.2. Fuel Quality Inspections: The contractor shall conduct quarterly inspections to determine the fuel quality at fuel storage tanks at VACHS San Juan Medical Center, Satellite Clinics in Ponce & Mayaguez; and Carolina Warehouse. These inspections will be conducted monthly to adequately assess the fuel quality at storage facilities as required by The Joint Commission (TJC) EC 02.05.07 EP 8 and the National Protection Fire Agency (NFPA) 110 Standard for Standby Generator Fuel Testing in Public Facilities.
The inspection will include at a minimum determination of sediment, water, and/or particulates accumulation, visual/odor presence, observations, and fuel treatment recommendations. Contractor shall demonstrate proficiency and experience on fuel treatment and monitoring of fuel storage facilities.
5.2.3 Fuel Treatment Requirements: The Contractor shall conduct fuel treatment to remove contaminants present (e.g., water, sediments, particulates, bacteria etc.), if necessary, a fuel sample may be collected to determine if additional treatment are still required. Fuel oil/water separator and filtration process are the preferred treatment methods along with the VACHS approved product to reduce bacteria growth and water/sediment accumulation. Fuel treatment inspection report will be prepared with colored photographs and information documenting presence of water, particles, sediments accumulation and any corrective actions, samples collected and implemented treatment. Monthly UST/AST Fuel Quality Checklist and Fuel Quality Treatment Log will be prepared and maintained by the Contractor to document tasks under this section.
Contractor is required to prepare fuel quality monitoring and treatment procedure for government evaluation prior to be implemented at VACHS sites. If fuel/product water waste is generated from fuel filtration and treatment process, waste shall be collected by Contractor and transferred to the Government for proper storage and disposal. The Contractor shall also handle/comply with federal, state, and local requirement for any task involving the transportation of contaminated materials to VACHS San Juan facility.
5.2.4 Pressurized Tests: The Contractor shall perform annual Line Lightness Tests (LTT) and annual Precision Tank Tightness tests (TTT) (volumetric tests, ullage tests pressurized Tightness Tests) to the Fuel Storage System units listed on Technical Exhibit
1. The Contractor shall be responsible for ensuring that all equipment is properly calibrated prior to beginning a test. Any test equipment not properly calibrated shall be replaced with calibrated equipment prior to performing any test. The Contractor shall validate the test data and report certified results to the COR.
• Aboveground Storage Tank (AST) Tank Tightness Tests (TTT) San Juan, Ponce, and Carolina Warehouse
• Aboveground Storage Tank (AST) Line Tightness Tests (LTT) San Juan, Ponce, and Carolina Warehouse
• Underground Storage Tank (UST) Tank Tightness Tests (TTT) San Juan
• Underground Storage Tank (UST) Line Tightness Tests (LTT) San Juan
If tanks do not have access ports to be tested by pressurized test, then an inspection report must be issued to document the tank has structural integrity and no leakage.
5.2.5 Annual Testing: The Contractor shall conduct annual testing for mechanical leak detectors, overfill prevention devices e.g., automatic shut-off devices, and spill prevention systems including but not limited to spill buckets and tank sump containers. ASTs/USTs and auxiliary equipment, including but not limited to those listed in Technical Exhibit 2.
5.2.6 Compliance Inspection. Contractor shall provide all labor, equipment, tools, supervision, to perform inspections repairs, monitoring, and documentation. The Contractor shall conduct monthly compliance inspections to all UST and ASTs, associated piping to insure proper functionally of equipment. The Contractor shall also perform recurring, systematic, and periodic maintenance as required to maintain ASTs/USTs and auxiliary equipment, including but not limited to those listed in Technical Exhibit 2. USTs, ASTs and their auxiliary equipment/systems listed in Technical Exhibit 1 shall be inspected on a monthly basis and tested in accordance with the manufacturer’s recommendations/instructions, recognized industry standards and USEPA and PRDNER UST regulations. The minimum required work elements are listed in Technical Exhibit 3 of this PWS.
The Contractor shall maintain all signs, labels and painting of tank areas such as pipes, manholes, lids, vents, secondary containments, bollards, stairs, storage tanks to meet the requirements of American Petroleum Institute (API), Steel Tank Institute (STI) National Fire Protection Agency (NFPA) and all other Department of Veterans Affairs (DVA), federal, state or local codes and regulations. All materials required to maintain signs, labels, and painting shall be parts as stated in section 9.
The Fuel Maintenance Program is established to ensure safe and operational performance of storage facilities. Minimum requirements of maintenance work and frequency are described in Technical Exhibit 3. The Contractor shall conduct tests to UST/AST facilities and associated piping system under cathodic protection and/or isolation by coating/painting to determine whether the protection is adequate as per requirements listed and frequency on Attachment 1. The corrosion protection system must be certified by competent authority and/or a corrosion expert in accordance with section 5.2.9. The Contractor shall be responsible for ensuring that all equipment is properly calibrated prior to beginning a test. Any test equipment not properly calibrated shall be replaced with calibrated equipment prior to performing any test. The Contractor shall validate the test data and report certified results to the COR.
5.2.6.1 Walkthrough Inspections. Walkthrough inspections shall include to draw off collected water from inside the containment sumps and secondary containment;
document overall operational site conditions; and removal of debris from spill buckets; fill and monitoring ports; inspection of tank, piping and dispensing pumps when applicable.
Any deficiencies noted during the inspections must be inform immediately to the COR and reported them in accordance with paragraph 5.3. All supplies necessary for the proper routine maintenance of tanks shall be approved by the COR or designee and supplied by the Contractor.
5.2.7 Tank Inspection/Cleaning Requirements. The Contractor shall clean and inspect all ASTs/USTs under this contract, to include associated fuel connecting pipes and filters/separators/strainers in accordance with accepted commercial practices. This service shall be provided as necessary. After completing cleaning of each tank, a visual inspection shall be conducted jointly with the contractor and the COR. If any deficiencies are found during the inspection, the Contractor shall correct them and conduct a re-inspection at no additional charge to the Government. After acceptance of tank cleaning by the Government, the Contractor shall pump all usable gasoline or diesel fuel oil back into the tank. A commercial standard pressure test of the system shall be performed, and written certification of the results will be furnished to the Government.
5.3 REPORTS
5.3.1 Task Coordination and Task Performance Report. The Contractor shall visit the COR’s office after 7:00 am on each scheduled performance day in order to confirm the performance schedule between the COR and the Contractor. The Contractor shall provide performance reports and shall submit them within five (5) days of completion to the COR by email after completion of each task. Refer to Technical Exhibit 2 for deliverables. At a minimum, Performance report shall include the following information:
(1) Installation name
(2) Tank number
(3) Date and time work performed.
(4) Licensed technician performed the service.
(5) Description and method of service performed.
(6) Inspection, testing, calibration and/or maintenance data
(7) Conditions of serviced equipment and/or systems
(8) Signature of Contractor Representative
5.3.2 Deficiency Report. When any deficiencies are identified on ASTs/USTs and/or auxiliary equipment and systems under this contract, the contractor shall inform the COR or designee immediately via verbal or written notification email or by phone. The Contractor shall visit the work location within 24 hours, survey the repair, and provide the CO and COR an estimated price for the repair. The Contractor shall commence repair work after approval from the CO. Repairs should be accomplished within two (2) business days unless otherwise approved by the CO. For same day repairs, the Contractor shall contact the CO with a description of the services to be performed, estimated labor hours, and the price for the parts being replaced for CO approval prior to performance. All repair services shall be in accordance with normal commercial practices for this type of industry.
The Contractor shall submit the deficiency report to the COR within five (5) days. The deficiency report shall include at a minimum the following information:
(1) Installation name
(2) Tank number and equipment/system name
(3) Date of failure
(4) Description of failure (picture, drawings, etc.)
(5) Justification (if repair is not accomplished)
(6) Description of repair work (drawings, pictures, etc.)
(7) Material list (description of article, quantity, catalogue-cut, pictures, etc.) for repair
(8) Proposed repair schedule
(9) Cost estimate
(10) Submission date of the report
5.3.3 Annual Schedule. The Contractor shall submit an annual schedule to the COR for approval within fifteen (15) days of contract award, and at the beginning of each option year. The annual schedule shall show the order in which the Contractor proposes to perform the inspection, cleaning, testing, calibration and maintenance services, the dates on which the Contractor will start each work element, and the scheduled date for completion of each element.
6.0 RECORDS: The Contractor shall be responsible for creating, maintaining government required records that are specifically cited in this PWS or required by the provisions of a mandatory directive listed in Technical Exhibit 2, Applicable Publications and Forms. The Contractor shall provide the original record or a reproducible copy of any such record within five (5) working days of receipt of the request. The records of inspections shall be kept and made available to the Government throughout the contract performance period.
It must specify areas to be inspected on either scheduled or unscheduled basis, how often the inspections will be accomplished to include the titles of the individuals who shall perform the inspection. The documentation shall be made available to the Government after contract completion until any claims under this contract have been settled.
7.0 REGULATORY FRAMEWORK. Puerto Rico Department of Natural Resources and Environment (PRDNER) Underground Storage Tanks Regulations, and United States Environmental Protection Agency (USEPA) 40 Code of Federal Register (CFR) 280, Underground Storage Tank Regulations are the state and federal compliance requirements for USTs and associated piping that store petroleum and hazardous substances and USEPA 40 CFR 112 for Spill Prevention and Countermeasures Control (SPCC) regulations. The Contractor is responsible for being knowledgeable of and adhering to the following documents, policies, rules and regulations:
• Federal Energy Policy Act (EPAct) Requirements,
• Underground Storage Tank Federal (40 CFR Part 280)
• Puerto Rico Department of Natural Resources and Environment UST
Regulations,
• All related AST/UST policies and manufacturer’s instructions.
• Spill Prevention Control and Countermeasures (SPCC) Regulations (40
CFR 112).
7.1 The Contractor shall perform services in accordance with all applicable U.S. Federal, Puerto Rico laws and regulations as well as the guidelines from the Department of Veterans Affairs (DVA). All services performed under this contract shall be performed in accordance with accepted industry standard, such as the American National Standards Institute (ANSI), American Petroleum Institute (API), National Fire Protection Agency (NFPA), Petroleum Equipment Institute (PEI), and any standards applicable to services from this industry.
8.0 OVER & ABOVE. Major repairs costing over $3,000.00 such as tank equipment upgrades, tank cleanings, parts, materials and coating application for steel tanks shall all be considered over & above services. These services shall be processed via supplemental agreement prior to performance. Once approved by the CO, a mutually agreed upon completion date will be established.
9.0 EMERGENCY SERVICES. The Contractor shall perform emergency response to situations arising from fuel storage activities. The Contractor shall perform emergency repairs to facilities, systems, improvements, or utilities damaged in the course of executing the contract requirements. Emergency service calls will be classified as emergency at the discretion of the CO. Generally, emergency calls consist of correcting failures that constitute an immediate danger to personnel; threaten to damage property and the environment and/or threaten to disrupt activity operations. Urgent service calls will be classified as urgent at the discretion of the CO. Generally, urgent calls consist of providing services or correcting failures which do not immediately threaten personnel, property, or activity missions, but will soon inconvenience and/or affect the health or wellbeing of personnel, and lead to property damage and to the environment. Routine service calls will be classified as routine when the work does not qualify as an emergency or urgent call.
The Contractor shall respond accordingly for emergency and urgent calls. A log shall be maintained of all service calls received; a description of the problem or requested work, date and time received location name and number. The contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements with regard to established time limits and quality standards. Upon notification by the CO, the Contractor shall perform emergency or special event grounds maintenance required in areas covered under this contract. Upon notification of an emergency, the contract manager shall respond within one (1) hour to meet with the CO, COR or designee for that particular emergency to initiate emergency services. Upon receiving direction by the CO, COR or designee for the specific emergency, contractor personnel shall begin emergency work within two (2) hours.
10.0 SAFETY AND HEALTH STANDARDS. The Contractor shall coordinate worksite access with COR to ensure the protection of human health of employees and the environment, the prevention of damage to property, utilities, materials, supplies, and equipment, and the avoidance of work interruptions. For these purposes, the Contractor shall comply with Occupational Safety and Health Standards Act (OSHA) regulations. The Contractor shall initiate and maintain programs to comply with OSHA provisions concerning handling of potentially hazardous substances as it pertains to fuel storage, flammable, and combustible liquids (OSHA §1910.106 standards) and confined spaces requirements (OSHA §1910.146 and §1926 Subpart AAA).
11.0 OPERATIONS IMPACT MISSION. If during the evaluation of the AST/UST system it is found that components require repairs or replacement, the Contractor shall notify to the COR the required time for these repairs or replacement, to allow Government to adequately allocated resources and adjust their facility operations. If an AST/UST system needs to be out of service or temporary shutdown, this determination shall be determined by the Government and the Contractor after evaluation all existing conditions. It is essential that VACHS operations must not be affected and therefore the AST/UST system must be operational at all times unless unforeseen conditions are presented.
12.0 Public Laws and Statutes. The Contractor shall comply with the issue or version (including all changes and amendments) of federal, state and local environmental statutes and regulations in effect throughout the life of the contract including, the applicable portions of the documents cited within the contract.
12.1 Environmental Protection Planning Requirements. The basic contracting requirements are as follows: 1) Provide and maintain environmental protection as required, during the life of the contract, 2) Plan for provide environmental protection measure to control pollution that develops during normal construction activities or project execution, 3) Plan for provide environmental protection measures required to correct conditions that develop during the construction of permanent or temporary features associated with the project, and 4) Comply with federal, state and local regulations pertaining to the environment including, but not limited to, water, air, and ground pollution.
12.2 Environment Protection Planning. The Contractor shall be required to demonstrate that they can comply with all applicable environmental laws and regulations.
It is his responsibility to ensure environmental compliance requirements are properly identified and addressed during the provision of these services.
12.3 Spills. The Contractor shall take all necessary precautions to prevent spills of hazardous materials to include oils and hazardous waste. In the event of a spill, the Contractor shall immediately notify VACHS Operations Control Center at 787-641-7582 ext. 110264. The Contractor shall ensure that the applicable requirements of federal and state regulations spill provisions are complied with. The Contractor shall also have on hand the necessary resources (absorbent pads, booms, spill absorbent materials, drain plugs, etc.) to properly respond to and clean up any spill caused by their operations. Any direction from the CO or COR concerning a spill or release that is required to protect human health or the environment shall be immediately and properly executed.
12.4 Releases to Waterways. Discharges of any petroleum, oil and lubricants, hazardous material, sewage, or other regulated substances to waterways, including storm drains, ditches or similar contrivances are strictly prohibited. Contractor shall employ all necessary measures to preclude contamination of waterways from the site.
13.0 GENERAL INFORMATION
13.1. Contract Manager. The Contractor shall provide a contract manager who shall be responsible for the performance of these services. The name of this person, and an alternate(s) who shall act for the Contractor when the manager is absent, shall be designated in writing to the CO. The contract manager or alternate shall have full authority to act for the contractor on all matters relating to this contract.
13.2 The contract manager or alternate shall be available Monday thru Friday from 7:30 AM – 4:00PM to discuss problem areas with COR. The contract manager shall provide an emergency contact number for an emergency situation.
13.3. Contractor Employees. The contractor is required to provide employees who have at least (five) 5 years of experience in the similar work of this requirement. The Contractor personnel shall also possess the following listed certificates/licenses at for the life of the contract:
(1) Petroleum Mechanic
(2) Inspection/Testing Engineer or Technician for Underground Storage Tanks
(3) Electrical License
(4) Certified Cathodic Protection Technician
The Contractor shall keep its employees trained and certified in order to properly perform tasks requiring certification. The Contractor shall ensure all employee certifications are submitted to CO for proper recording of training upon submittal of offer/quote and upon execution of subsequent option period on the date of award.
13.3.1 Competent Authority and/or Corrosion Expert. Corrosion expert means a person who, by reason of thorough knowledge of the physical sciences and the principles of engineering and mathematics acquired by a professional education and related practical experience, is qualified to engage in the practice of corrosion control on buried or submerged metal piping systems and metal tanks. Such technician must be accredited or certified by National Association of Corrosion Engineers (NACE) or a competent the industry standard authorities. Corrosion Experts shall possess appropriate certification or licensing that includes education and experience in corrosion control of buried or submerged metal piping systems and metal tanks.
13.4 Removal of Contractor’s Employees. The CO may require that the contractor remove from the Government job any of his/her employees who endanger persons or property, or whose continued employment under this contract is inconsistent with the interests of military security.
14.0 Security Danger Warning, Accident Prevention, Fire Prevention and Fire Protection Requirements. The Contractor shall comply with all pertinent requirements of the OSHA, NFPA and DVA Directives Policies whichever is more stringent, to ensure compliance by all subcontractors.
14.1 The Contractor shall not commence services at the work site until an Accident Prevention Plan and a Job Hazard Analysis are submitted for review and approved by the COR. Both documents are to be provided in writing no later than ten days after award.
14.2 Hazardous Materials. All hazardous materials must be contained and stored in the appropriate storage containers and/or cabinets. The Contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. The Contractor shall comply with environmental and hazardous materials storage and handling requirements and maintain current Safety Data Sheets (SDS).
15.0 QUALITY CONTROL PROGRAM (QCP): The Contractor shall coordinate, report, and ensure the timely completion of the work specified in this PWS. This encompasses the planning, coordination, technical direction, and surveillance of all activities necessary to execute all work.
a) The Contractor shall provide the overall management effort required to integrate technical and programmatic functions.
b) The Contractor shall ensure the technical excellence, cost effectiveness, and timeliness of all required work and deliverable products.
The Contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which he or she assures that his or her work complies with the requirement of the contract. At a minimum, the Contractor shall develop quality control procedures addressing the areas identified in Technical Exhibit 1, “Performance Requirements Summary”. QCP shall be submitted to COR and CO for review and acceptance upon award, acceptance will be provided in writing within seven days of submittal.
The Contractor shall institute and maintain a complete QCP to ensure the requirements of this contract are provided as specified. The overall goal of the QCP is to identify and correct any problems that may exist before they are identified or reported by the COR. At a minimum, the QCP shall include:
• An inspection system covering all the services required with a comprehensive checklist to be used to inspect contract performance during scheduled and unscheduled inspections and the names of the individuals who will be performing the inspections.
Provide a list of the QC inspectors to the COR. Provide a checklist which shall include every area of the operation serviced by the Contractor, as well as every task required to be performed.
• A system for identifying and correcting deficiencies and/or a pattern of deficiencies in the quality or quantity of services provided before the level of performance becomes unacceptable for the government, and COR point it out as a deficiency (refer to the Technical Exhibit No.4 Corrective Reports).
• A file for inspections conducted by the Contractor and related corrective actions.
This file should include follow-up documentation of inspections to ensure corrective action was appropriate, complete, and timely. This documentation shall be organized in a logical manner, kept current, and made available to the COR and the CO during the term of the contract, and be made available upon request. Within five (5) workdays prior to the starting date of the contract, the Contractor shall submit a copy of this program to the Contracting Officer and/or COR.
16.0 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP).
The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards of the contract. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The Government will monitor the Contractor's performance under this contract using the surveillance methods identified in the QASP. The Contractor will be given the opportunity to correct or address any adverse findings resulting from the Government’s surveillance consistent with the inspection/acceptance clause 52.212-4(a) included in the contract.
The Government will evaluate the contractor’s performance under this contract, by documenting observations and findings accordingly. When an observation indicates deficient or defective performance, the COR shall notify the Contractor’s representative of such observations. (Attachment 4, Refer to Corrective Report,)
Government verification inspections of services shall not constitute acceptance nor replace the contractor inspection or in any way relieve the contractor of any responsibility to take all actions necessary to assure highest quality of service rendered.
The Contractor shall maintain a current list of employees. The list shall include the employee’s name, Government identification number, contact information, and residence information. The list shall be validated and signed by the contractor and provided to the COR upon award and on contract anniversary date, changes in employees listed are to be informed and a revised/updated list provided within five (5) working days of the change.
Updated lists shall be provided when an employee’s status or information changes.
17.0 HOLIDAYS:
Legal holidays recognized by the Federal Government in accordance with 5 U.S.C.
6103, Executive Order 11582 and Public Law 94-97 or any other by the President of the
United States to be a national holiday, the following national holidays are observed and for the purpose of this contract is defined as "Legal Federal, official holidays" as follows:
17.1 Recognized Holidays:
New Year’s Day January 1 Martin Luther King Jr.’s Birthday Third Monday in January President’s Day Third Monday in February Good Friday Last Friday in March Memorial Day Last Monday in May Juneteenth National Independence Day June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25
Or any other day specifically declared by the President of the United States to be a national holiday.
17.2 Hours of Operation: The Contractor is responsible for conducting services between the hours 7:00 AM to 4:30 PM, Monday through Friday, with the exception of Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must maintain an adequate workforce at all times during the life of this contract, to allow the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
18.0 PLACE OF PERFORMANCE: The work to be performed under this contract will be performed at San Juan Medical Center, Ponce Outpatient Clinic (POPC), Mayaguez Outpatient Clinic (MOPC), and the VA Carolina Warehouse.
19.0 TYPE OF CONTRACT: The Government will award a Firm-Fixed-Price (FFP) contract.
20.0 STANDARD OF CONDUCT: Contractor shall require his employees to comply with the instructions, pertaining to conduct and building regulations, issues by duly appointed officials, such as the Contracting Officer Representative (COR), guards, inspectors, etc.
20.1 Appearance: The Government requires a favorable image and considers it to be a major asset of a customer service team and the employee's attitude, courtesy, and job knowledge are influential in creating a favorable image.
20.2 Neglect of duties shall not be condoned; including sleeping on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours, and refusing to render assistance or cooperate in upholding the integrity of the work site security.
20.3 Disorderly conduct: The use of abusive or offensive language, quarreling, intimidation by words, actions, or fighting shall not be condoned; also included is participation in disruptive activities which interfere with normal and efficient Government operations.
20.4 Driving at VACHS: Contractor and contractor’s employees shall obey all speed limits and traffic signs. Disobeying traffic regulations could result in magistrate court citations, which include monetary fines. Continued violations could result in being restricted from driving at the Facility.
20.5 Parking: Contractor vehicles shall be parked only in lots or areas designated by Security Office personnel, if available. The Government will not be liable for any lost, stolen, or damaged vehicles or items.
20.6 Smoking will be prohibited as VACHS is a smoke free facility, Contractor shall adhere to this policy.
20.7 Intoxicants: The Contractor shall not allow any employee (while on duty) to possess, sell, consume, or be under the influence of intoxicants, drugs, or substances that produce similar effects. The use of illegal drugs is prohibited on Federal property.
Violators will be prosecuted.
20.8 Criminal actions: Contractor’s employees may be subject to sanctions and or layoff for criminal actions, such as the following:
(a) Falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records.
(b) Unauthorized use of Government property, theft, vandalism, or immoral conduct.
(c) Unethical or improper use of official authority or credentials.
20.9 The Government reserves the right to direct the Contractor to remove any employee from the work site for failure to comply with the standards of conduct.
The Contractor shall initiate immediate action to replace such an employee to maintain continuity of services at no additional cost to the Government.
20.10 Weapons at Facility: No weapons either on one’s person or placed inside a privately-owned vehicle is allowed at the VACHS premises. If a weapon of any type is found, it will be confiscated and held as evidence. Having unauthorized weapons on a federal property is a felony, and violators will be prosecuted.
21.0 Uniforms: The Contractor shall require all his employees, including supervisors, to wear distinctive uniform clothing for ready identification. The uniform shall have the
Contractor’s name, easily identifiable, affixed in a permanent or combination as appropriate may be used for the uniform. Appropriate Personal Protective Equipment (PPE) shall be required and worn during the performance of their duties.
22.0 Supervision: The Contractor shall arrange for satisfactory supervision of the contract work. The Contractor or his designee shall be available at all times, when the contract work is in progress, to receive notices, reports or request from the CO or his representative.
22.0 Security Requirements: Contractor personnel performing work under this contract shall provide in writing to the CO at least ten (10) working days prior to the contract starting date, a list to include the names and social security numbers of all employees conducting the contract work and must maintain the level of security required for the life of the contract.
The service provider shall furnish an identifying badge, which shall include as a minimum, the person's name, the name of the service provider, and the function. Each employee shall wear the badge visible at all times.
The contractor is responsible for providing required information on personnel conducting site visits to obtain Contractor passes. This information will be coordinated with the VACHS Facilities Management Services (FMS) Environmental Regulatory Section.
Photography of any kind must be coordinated through the VACHS FMS Environmental Regulatory Section.
Under no circumstances will a Contractor or any contractor employees or subcontractors use or transfer their ID card/badge or vehicle decals (if applicable) to allow anyone else access to any are on VACHS. Failure to comply with the requirements of this section is a security violation, which could result in subsequent administrative action, including requiring the contractor to permanently remove from the project the employee committing the violation, and/or termination of the contract for default.
22.1 Physical Security: At the close of each work period, equipment, and materials shall be secured. Contractor and its employees shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract. He/she shall be responsible for any injury to himself/herself, his/her employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her employees’ fault or negligence.
Contractor shall report directly to Operations Control Center (OCC) and to the COR prior to initiate any schedule tasks. Operations Control Center telephone number is (787) 641- 7582 ext. 10264.
23.0 Safety and Special Considerations
23.1 The CO or his/her designee will notify the Contractor of any non-compliance and the Contractor shall, after receipt of such notice, immediately correct the condition to which attention has been directed. If immediate correction cannot be completed, a detailed plan of how, who and when the corrections are to take place shall be provided to COR.
23.2 Safety Requirements and Special Considerations
a. The Contractor shall take all safety precautions and safety measurement necessary to protect the lives and health of occupants of the building and user of the equipment, including the proper personal protection equipment (PPE); as applicable.
b. VISN 8, VACHS Universal Masking Program is applicable to this contract.
Universal Mask program requires every healthcare worker (HCW) to wear a healthcare face mask while in VACHS. Health care worker is defined as any person required to work at a VACHS facility including contractors, must always wear a healthcare face mask while in VACHS. VHA policy and Presidential Order requiring masks in federal buildings regardless of vaccination status, is in effect. Contractor shall comply with masking program and updates throughout the lifetime of the contract, changes to program will be made available to contractor as they become available. Masking requirement is subject to facility Director and status is disseminated to all employees, veterans, visitors and contractors via public announcements on emails, social media facility official pages, and public areas within the hospital.
c. Influenza Vaccination: Influenza vaccine “Flu Shot” is mandatory for all VHA employees and contractors as per VHA Directive 1192.0. Contractor shall provide a list of employees under contract performance with their vaccination compliance, this requirement is to be submitted annually. Employees and Contractors who are not vaccinated as per authorized exclusions on VHA Directive are to be documented as such and always required to wear healthcare face mask while on VHA premises.
24.0 ADDITIONAL SERVICES: If there are any services not listed herein that the Contractor identifies are necessary to repair the equipment described herein, the Contractor shall submit a price quote addressed to the CO for evaluation of price fair and reasonableness, and CO final approval is to be provided before any work can be performed. Such services are to be processed via supplemental agreement. The Government will pay for services rendered, complete, validated and accepted, as per statement of work. Quotes shall be submitted per occurrences and per units because the firm-fixed price contract type will be attached to those occurrences and/or units of performance.
25.0 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings, the CO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
26.0 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
SECTION II
DEFINITIONS & ACRONYMS
1.0 DEFINITIONS AND ACRONYMS:
1.1 DEFINITIONS:
1.1.2 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
1.1.3. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
1.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
1.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
1.1.6. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
1.1.7. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
1.1.8. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
1.1.9. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
1.1.10. QUALITY ASSURANCE SURVEILLANCE PROGRAM (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
1.1.11. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
1.1.12. SUBCONTRACTOR. One that enters into a contract with a prime contractor.
The Government does not have privity of contract with the subcontractor.
1.1.13. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
1.1.14. WORK WEEK. Monday through Friday, unless specified otherwise.
2.0. ACRONYMS: List acronyms used in the PWS
ANSI AMERICAN NATIONAL STANDARD INSTITUTE
API AMERICAN PETROLEUM INSTITUTE
AST ABOVEGROUND STORAGE TANK
CP CATHODIC/CORROSION PROTECTION
CFR CODE OF FEDERAL REGISTER
CO CONTRACT OFFICER
COR CONTRACT OFFICER REPRESENTATIVE
DVA DEPARTMENT VETERANS AFFAIR
ERS ENVIRONMENTAL REGULATORY SECTION
EPACT ENERGY POLICY ACT
FMS FACILITIES MANAGEMENT SERVICES
LTT LINE TIGHTNESS TEST
MOPC MAYAGUEZ OUT PATIENT CLINIC
M&R MAINTENANCE & REPAIR
NFPA NATIONAL FIRE PROTECTION AGENCY
OSHA OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION
PEI PETROLEUM EQUIPMENT INSTITUTE
POL PETROLEUM OIL AND LUBRICANTS
PRDNER PUERTO RICO DEPARTMENT NATURAL AND ENVIRONMENTAL
RESOURCES
PWS PERFORMANCE STATEMENT OF WORK
QAP QUALITY ASSURANCE PROGRAM
QCP QUALITY CONTROL PROGRAM
SPCC SPILL PREVENTION CONTROL AND COUNTERMEASURES
STI STEEL TANK INSTITUTE
TE TECHNICAL EXHIBIT
TTT TANK TIGHTNESS TEST
USEPA UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
UST UNDERGROUND STORAGE TANK
VACHS VA CARIBBEAN HEALTHCARE SYSTEM
SECTION III
APPLICABLE PUBLICATIONS
1.0. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
1.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures. The following list includes but is not limited to applicable rules and regulations to the UST/AST fuel maintenance operations.
• Federal Energy Policy Act (EPAct) Requirements,
• 40 Code of Federal Regulations (CFR) Part 280, Underground Storage
Tank
• Puerto Rico Natural Environment and Resources (PRDNER) UST
Regulations,
• USEPA, 40 CFR Part 112: Oil Pollution Prevention and Response
• Occupational Safety Health Agency (OSHA) Standard §1910.106;
Flammable and Combustible Liquids
• National Fire Protection Agency (NFPA), Uniform Fire Code,
• NFPA 30, Flammable and Combustible Liquids
• International Code Counsel (ICC), International Fire Code
• American Petroleum Institute (API), Welded Steel Tanks for Oil Storage
• Petroleum Equipment Institute (PEI),
• Underwriters Laboratories (UL) 142, Steel Aboveground Tanks for
Flammable and Combustible liquids
• UL 2080, Standard for Fire Resistant Tank for Flammable and Combustible
Liquids
• UL 2085, Standard for Protected Aboveground Tanks for Flammable and
Combustible Liquids
• Steel Tank Institute (STI) SP001, Standard for the Inspection of
Aboveground Storage Tanks
• API 652, Tank Inspection, Repair Alteration and Reconstruction
• API 570, Piping Inspection Code, Inspection, Repair, Alteration and
Rerating of In Service Piping System
• API RP 575, Inspection of Atmospheric & Low Pressure Storage Tanks
• All related UST policies and manufacturer’s instructions
• American National Standards Institute (ANSI)
PART IV
ATTACHMENT/TECHNICAL EXHIBIT LISTING
Attachment/Technical Exhibit List:
1.0 Attachment 1/Technical Exhibit 1 – Performance…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .