36C24824Q0299 0001.docx
DOCX document 20 KB Posted
- Attached to
- J061--Requirement- Preventive Maintenance Caterpillar Facility Backup Generator Services
- Solicitation number
- 36C24824Q0299
About this file
This document is an amendment to Solicitation Number 36C24824Q0299 for Preventive Maintenance Caterpillar Facility Backup Generator Services for the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 8.
The key details are:
- The amendment extends the deadline for offer submission to 5 PM EST on 4-12-24.
- It provides a questions and answers summary, including confirmation that a site visit is not available and that the set-aside status will remain unrestricted.
- It includes a checklist for the required preventive maintenance services on the Caterpillar generator, covering tasks such as inspecting components, checking fluid levels, testing functionality, and documenting operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WDOL 2015-4573 rev 24-12-26-23.docx | DOCX document | |
| 36C24824Q0299_2.docx | DOCX document | |
| P09- Final Generators Maintenance 10-12-23.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) West Palm Beach VA Medical Center 7305 North Military Trail Palm Beach Gardens
FL
33410-6400 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) West Palm Beach VA Medical Center 7305 North Military Trail Palm Beach Gardens
FL
33410-6400 To all Offerors/Bidders
36C24824Q0299 04-10-2024
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
5 PM EST 4-12-24
X One (1) The purpose of this amendment is to provide questions-answers summary and the checklist.
The end time/date has been extended as listed above.
Questions-Request a site visit. Answer- A site visit is not currently available.
Mr. Guley, can you please provide the checklist mentioned in the Statement of Work section below? Preventive Maintenance Answer-Please see attached Question-I kindly request to inquire if it would be possible to consider changing the set-aside status of this opportunity from unrestricted to SDVOSB (Service-Disabled Veteran-Owned Small Business).
Answer- Market Research did not show that the rule of 2 could be met or that Two or more SDVOSBs would respond to a solicitation. The current solicitation will stand as it is.
I wanted to if we have to turn in person at the VA in P Beach gardens-Ans- Must submit by E-mail an attachments only.
David C. Guley
CONTINUATION PAGE
Generator PM Check List
1. Visually Inspect Radiator/Heat Exchanger for Leaks, Damage and Obstruction
2. Add coolant to Bring the Coolant to it' s Correct Level (Max 2 Gals)
3. Inspect Condition of Radiator Cap. Gasket and Sealing Surface
4. Analyze Coolant for Proper antifreeze Percentage - -30
5. Analyze Conditioner SCA Level and add Additional SCA as Needed - 2000
6. Visually Inspect Water Pump and Cooling System Gaskets for Leaks
7. Inspect Flexible Water Connections for Cracking, Leaks and Pliability
8. Re-Torque Hose Clamps
9. Inspect Pulleys for Excessive Wear
10. Inspect Belts for Cracking and Fraying
11. Check Belt Tension
12. Check Jacket Water Heater(s) for Proper Operation and Adjust Thermostat Setting
13. Add Crankcase Oil to Bring the Oil to its Correct Level (Max 2 Gals) (Change Oil and Filters for Annual PM)
14. Inspect Oil Heater for Proper Operation and Check Thermostat Sea ls
15. Visually Inspect Front and Rear of Crankshaft Seals and Lubrication System Gaskets for Leaks
16. Record Fuel Level in Main Fuel Tank
17. Stick Main Tank for Water - 0
18. Test Day Tank Pump for Proper Operation and Level
19. Test Day Tank Alarms
20. Drain Water and Sediment from Day Tank (if accessible)
21. Clean or Replace In let Filters (during annual PM only) for Day Tank
22. Clean Primary Fuel Filter (if screen type)
23. Drain Water from Water Separator
24. Operate Fuel Priming Pump and Check for Proper Operation and Leaks
25. Check the Engine' s Fuel System for Leaks
26. Inspect Flexible Fuel Lines for Cracking, Leaks and Pliability
27. Check Governor Oil Level and Add Oil as Needed
28. Inspect Steel Fuel Lines for Cracks, Leaks and Proper Line Bracket Support
29. Check and Record Battery Cells Electrolyte Specific Gravity
30. Top Off Electrolyte Level
1. 31. Check and Record Battery Charger Amperage a. Equ.. Rate: - 8.5
1. b. Float Rate: - 5.0 1.
1. 32. Check Battery Charger and Adjust Float Rate for Optimum Battery Performance and Life: a. Equ. Volts: - 29.6
1. b. Float Volts: - 28.4 1.
1. 33. Tighten Battery Cable Connections as Needed
1. 34. Clean and Apply Corrosion Inhibitor to Terminals of Only Lead Acid Batteries as Needed
1. 35. Inspect and Tighten Starter Motor Connections and Wiring
1. 36. Inspect Flexible Exhaust Coupling for Cracks and Excessive Leakage
1. 37. Visually Inspect Exterior of Exhaust Manifolds for Oil or Fuel Slobbering (signs of wet stacking)
1. 38. Inspect Exhaust Rain Protection and/or Exhaust Outlet Screening
1. 39. Drain Water in Exhaust Moisture Traps
1. 40. Inspect Exhaust Manifold(s) for Broken or Missing Hardware
1. 41. Inspect Air Filters for Plugging and Deterioration
1. 42. Test Air Cleaner Indicator
1. 43. Check All Air Intake Piping for Damage and Loose Connections
1. 44. Inspect Turbocharger for Seal Leakage and Excessive End Play Clearance (if accessible)
1. 45. Perform an Operational Check of Illumination and Safety Lamps
1. 46. Check for and Tighten Loose Terminals on the Generator Set and Generator Control Panel
1. 47. Check Tightness of Relays in the Generator Control Panel
1. 48. Inspect for Excessive Dirt Accumulation in the Control Panel and Clean as Needed
1. 49. Inspect air Cleaner Seal for Pliability and Sealing
1. 50. Check Rotor Air Gap for Correct Clearances
1. 51. Inspect rotor and Stator for Damage and Excessive Oil and/or Dirt build Up
52. Inspect Coupling and Guards for Loose or Missing Pa11s
53. Check Tightness of Generator Leads and Voltage Regulator Control wiring
54. Strap and Tape any Wiring or Generator Leads that Have rubbing or Worn Insulation
55. Inspect Brushes and Slip Rings or Rotating Rectifiers
56. Clean and Adjust Voltage Droop Potentiometer
57. Clean Crankcase Breather, Inspect Hose and Connections
58. Lubricate Fan Drive with Caterpillar Bearing Lubricant (annual PM only)
59. Lubricate Governor Linkage with Caterpillar Bearing Lubricant (annual PM only)
60. Lubricate Generator Bearing with Caterpillar Bearing Lubricant (annual PM only)
61. Inspect Generator Set Vibration Isolators and Adjust as Needed
62. Make a Walk Around Inspection of Complete Installation
63. Check for Unit On-Line Capability in Less Than Ten Seconds
64. Check and Record Battery Voltage Dip Level During Over crank Test for Minimum Voltage Required to Maintain Controls During Starting - 22.1
65. Check for Proper Cranking Termination Upon Starting
66. Check Proper Operation of Engine and Generator Instruments with Generator Running
67. Adjust Governor Control for Optimum Performance and Frequency - 60.0
68. Adjust Voltage Regulator for Proper Voltage - 482
69. Record Field Voltage During Generator No-Load Run for Base Line '0. Check and Record Alternator Voltage with Engine Running
70. Check for Abnormal Noise or Vibration
71. Check for Abnormal Exhaust Characteristics with Engine Running (signs of wet stacking)
72. Check for Proper Operation of Remote Fan Motors, Thermostats, Circulating Pumps, and Solenoid Valves
73. Check Inlet and Discharge Louvers for Proper Operation with Engine Running and Stopped
74. Check for Excessive Crankcase Blow-by with Engine Running
75. Re-Check Oil Level with Engine Running
76. Re-Check for Leaks with Engine Running
77. Test Auto-Sta rt System
78. Test Safeties and Prealarms on Control and Annunciator Pane ls
79. Take Oil Sample (after operational checks) for Caterpillar S.O.S. Program
80. Rest All Controls to Auto ma tic
81. Set Circuit Breaker to Correct Position
82. Check Fuel Valves for Correct Position
83. Check Voltage Regula tor is ON and NOT Tripped
84. Check Battery Charger is ON
85. Check Day Tank Controls are ON
86. Check Remote Radiator Fan Controls are ON
87. Check Auxiliary Water Pump Controls are ON
88. Check Jacket Wate r Heater(s) are ON
89. Check Louver Controls are ON
File details come from the government source that posted it. Updated .