36C24823R0083 0001 (RFIs Respond and Site Visit Roster).docx
DOCX document 33 KB Posted
- Solicitation number
- 36C24823R0083
About this file
This amendment to a solicitation provides responses to contractor questions and attaches a site visit roster. The solicitation is for construction services to upgrade the domestic water system and increase hurricane hardening at a Department of Veterans Affairs medical center in Puerto Rico. The responses clarify that corrosion allowance should consider all tank parts in contact with water, umbrella roofs may be considered, interior cathodic protection is not required, grounding and perimeter safety systems can be fabricated from painted carbon steel or galvanized material, and a level indicator system is required. Additionally, the foundation detail was not intended to limit design and the concrete mat and piles will remain, but the tank anchorage must resist seismic and wind forces. No changes were made to the response deadline.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001 Solicitation Number: 36C24823R0083 | Upgrade Domestic Water System for Hurricane Hardening
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02/21/2023 672-19-716 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
VA
Caribbean
HCS (
Admin
Bldg #10 Calle Casia Suite #4M440 San Juan PR 00921-3201 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
VA
Caribbean
HCS (
Admin
Bldg #10 Calle Casia Suite #4M440 San Juan PR 00921-3201 To all Offerors/Bidders
36C24823R0083 02-03-2023
X X X
Project Title: Upgrade Domestic Water System for Hurricane Hardening (Construction Services)
The purpose of this Amendment 0001 to solicitation number 36C24823R0083 is to: (1) Respond to the RFIs/questions, and
(2) Provide copy of the site visit roster. The date for Request for Information (RFI) has closed.
The offer closing date for the receipt of proposals remain unchanged.
All Offerors are required to acknowledge receipt of this amendment 0001.
See Continuation Pages.
Ana G. Alvarado Contracting Officer
NCO815L3-0313
CONTINUATION PAGE
Amendment 0001 Solicitation Number: 36C24823R0083 | Upgrade Domestic Water System for Hurricane Hardening
RFIs/Question(s) and Answer(s):
| # |
| RFIs/Questions |
| Answers |
| 1. |
| At section 22 12 16 2.2B specifies a corrosion allowance (CA) of 0.1 in. Please confirm if this CA is to be considered only for tanks parts in contact with water. |
| Per AWWA D100: Corrosion allowance, if any, to be added to parts that will be in contact with water and to parts that will not be in contact with water (Sec. 3.9). |
| 2. |
| The CA, must be considered on the roof plates also? Please clarify. |
| Refer to answer #1. |
| 3. |
| Can a self-supported umbrella-type roof be considered in lieu of a supported cone roof? |
No cone roof is mentioned on specification 22 12 16. The roof type shall be per the tank's manufacturer design according the tank's capacity size.
| 4. |
| Please, confirm if a cathodic protection system is required for the tank’s interior surface. |
Because no contact the tank's surface with the soil, sit on a concrete mat, no cathodic protection is required.
| 5. |
| Can you confirm If a grounding system is required to be connected to tank? |
| Confirmed tank's grounding system. |
| 6. |
| Can you confirm if the exterior vertical ladder and the roof perimeter safety railing system can be fabricated in carbon steel and painted or galvanized painted material? |
Per spec 22 12 16 section 3.6 METALLIC COATINGS: "A. Tank members, protection shield, ladders, ladder safety cages, rigging lugs, overflow pipe and riser shall be zinc-coated (galvanized) by the hot-dip method, ASTM A123/A123M. Bolts and similar fasteners shall be zinc-coated by the hot-dip method, ASTM A153/A153M. Hot-dip galvanized surfaces abraded or burned off by welding operations shall be repaired with zinc repair compound in stick or powder form, applied in accordance with the manufacturer's printed instructions."
| 7. |
| Is a liquid level indicator system required for the tank? Which type of level indicator do you require? |
The tank manufacturer will furnish an Aluminum Level Board indicator similar to Shand & Jurs 92302 with a transmitter similar to Shand & Jurs MCG2420. Refer to spec. 22 12 16 section 2.6 for more information.
| # |
| RFIs/Questions |
| Answers |
| 8. |
| Section 1 on drawing sheet S-303 shows the typical tank floor section, which basically corresponds to a type 6 foundation, and states that the design of the connection of the tank shell to the foundation is by the tank manufacturer. Type 6 tanks utilize a steel base ring shell embedded into the concrete foundation which also serves as the tank bottom. However, per ASCE 7-16, for type 6 tanks, the overturning ratio, J, as determined by AWWA D100-11, shall not exceed 0.785. The J ratio relates to the seismic loading and is a criterion used to determine if the tank requires mechanical anchorage. A value of less than 0.785 indicates that the tank wall will not experience uplift and does not need anchorage. Conversely, a J ratio greater than 1.54 requires the tank to be mechanically anchored. Ratios between the |
two values may or may not require mechanical anchorage depending on other factors. Essentially, the ASCE is requiring embedded shell steel tanks not to be used in areas where uplift occurs due to seismic activity as there is a risk of the shell separating from the concrete tank bottom during a seismic event. The preliminary design of this tank shows that the overturning ratio J is around 1.6, which indicates that the tank is not stable against overturning and hence mechanical anchorage must be provided to resist seismic loading. For most applications, Venergy will design our water tanks to use foundations types 1 through 5. With foundation types 1 through 5, the storage tank will include a steel bottom which structurally ties into the tank shell creating a one uniform structure. Please, consult with the project designers to revise the foundation construction.
The detail mentioned was not intended to limit the contractor or direct the contractor to a Type 6 tank. The referenced detail was simply meant to direct the contractor’s delegated tank designer to design the tank base anchorage to resist the code required seismic and wind forces as required. The concrete mat and piles are required and will remain unchanged.
See attached document: Site Visit 02-10-2023 Roster (1 page).
Amendment 0001 to Solicitation No. 36C24823R0083: Respond to RFIs/Questions and provide a copy of the site visit roster.
- - - End Amendment 0001 - - -