This document contains a maintenance schedule for reverse osmosis water systems at various Department of Veterans Affairs medical centers. It lists the locations and models of reverse osmosis and water softening equipment, along with required monthly, quarterly, and annual maintenance tasks. Maintenance includes changing filters, resin, and storage tanks, as well as inspections, tests, sanitization, and repairs. The schedule also specifies salt delivery requirements totaling 2,904 bags for Lake Nona and 780 bags for Lake Baldwin medical centers over the next year. The related federal contract opportunity is for reverse osmosis water system maintenance services under solicitation number 36C24822Q0751 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT F GOVERNMENT RESPONSE AMENDMENT 0001.docx | DOCX document | |
| 36C24822Q0751 0001.docx | DOCX document | |
| ATTACHMENT G PRICE COST SCHEDULE AMENDMENT 0001.docx | DOCX document | |
| ATTACHMENT E PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| ATTACHMENT D CONTRACTOR REQUEST FOR INFORMATION.docx | DOCX document | |
| ATTACHMENT C AAMI TIR34 2014 r2017.pdf | ||
| 36C24822Q0751_1.docx | DOCX document | |
| WAGE DETERMINATION.docx | DOCX document | |
| ATTACHMENT B MAINTENANCE SCHEDULE.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maintenance Schedule
| Facility | Location Room# | Equipment | Model# | Serial# | Description | MONTHLY: 1. Change Pre-Filters & Resin 2. Change DI Exchange Tanks 3. Carbon & Water Softener Inspections | Monthly TIR 34 AAMI Tests | QUARTERLY Utility Water AAMI TIR 34 and Standard | QUARTERLY Critical Water AAMI TIR 34 | QUARTERLY Endotoxin Critical Water AAMI TIR 34 | QUARTERLY Bacteria Critical Water AAMI TIR 34 | SEMI-ANNUALLY: 1. Change Sub Micron Filter | ANNUALLY: 1. Repair/Maintain UV Lite 2. Loop Disinfect RO System 3. Sanitization | |
| OVAMC Lake Nona | Bldg. 1 | |||||||||||||
| 0E306-01 | Culligan Water | 1020677 | V1147366 | Vacuum head 48.1 cubic feet metal tanks. (3 EA) | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | ||
| OVAMC Lake Nona | Bldg. 2 1H301-02 | Culligan Reverse Osmosis System | 7F0S4-316-2.5F-6P-PE | V11442927 | Electronic unit, 1500 gallons water storage tank. | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | |
| OVAMC Lake Nona | Bldg. 2 1H301-02 | Culligan Water Softener System | 1021126 | VP11005165 | Vacuum head 42.4 cubic feet depth tanks (3 EA), Electronic head 29.4 cubic feet softener tanks (4 EA)., and Vacuum head 29.4 cubic feet carbon vacuum tanks (3 EA). | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | |
| OVAMC Lake Nona | Bldg. 2 3K912A-02 | Ameriwater Reverse Osmosis System | HCR02 | 50060 | Enclosed reverse osmosis mini-unit, 5 gallons water storage tank. | 1,2,3 | 1 EA | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | |
| OVAMC Lake Nona | Bldg. 5 | |||||||||||||
| 1B402-05 | Culligan Water Softener System | HI-FLO 3E | VP11000605 | Electronic head 7.56 cubic feet softener tanks (2 EA). | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | ||
| OVAMC Lake Nona | Bldg. 7 | |||||||||||||
| 1A112-07 | Culligan Water Softener System | GBE, CTM | 1028037 | Electronic head 7.56 cubic feet softener tanks (2 EA). | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | ||
| OVAMC Lake Nona | Bldg. 9 | |||||||||||||
| 1B203-09 | Culligan Water Softener System | HI-FLO 3E | VP11000603 | Electronic head 7.56 cubic feet softener tanks (2 EA). | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | ||
| OVAMC Lake Nona | Bldg. 11 | |||||||||||||
| 1A0607 | Culligan Water Softener System | HI-FLO 3E | 02286042-021511-0008 | Electronic head 7.56 cubic feet softener tanks (2 EA). | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | ||
| OVAMC Lake Nona | Bldg. 13 | |||||||||||||
| 1C120-13 | Marlo Water Softener System | MGT-210-2-TW/ADD NORK W/SALT | EP-150210-001-1 | Electronic head 15.71 cubic feet softener tanks (2 EA). | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | ||
| OVAMC Lake Nona | Bldg. 14 Fisher House Mechanical Room | Culligan Water Softener System | 1028301 | VC20474071 | Electronic 5.5 cubic feet softener tank (1 EA) | 3 | 0 | 0 | 0 | 0 | 0 | Yes | 1,2,3 |
| OVAMC Lake Baldwin | Bldg. 500 | |||||||||||||
| M-Deck | Ameriwater Reverse Osmosis System | HC-20157 | 50150 | Enclosed RO mini-unit, 55 & 500 gallons water storage tanks. | 1,2,3 | 1 EA | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | ||
| OVAMC Lake Baldwin | Bldg. 500 | |||||||||||||
| M-Deck | Culligan Water Softener System | 1024393 | VL17269003 | Electronic head, 12.43 cubic feet softener tanks (2 EA). | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 | ||
| OVAMC Lake Baldwin | Bldg. 502 02-502 | Nalco Water Softener System | Ultra-Treat MD-9000 | 262635 | Electronic head 5.79 cubic feet water softener tanks (2 EA). | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 |
| Viera VA Healthcare Center | Bldg. 1 | |||||||||||
| C409 | Getinge Reverse Osmosis System | M-4800 | 94800204 | Enclosed RO mini-unit, 55 gallons water storage tanks. | 1,2,3 | 1 EA | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 |
| Viera VA Healthcare Center | Bldg. 1 | |||||||||||
| C409 | Culligan Water Softener System | HWB. CTM 2.0 | VC21547053 VC21547066 | Electronic 9.57 cubic feet softener tank (2 EA) | 1,2,3 | 0 | 1 EA | 1 EA | 1 EA | 1 EA | Yes | 1,2,3 |
Coarse Premium Solar Salt
| Delivery Locations | Apr-22 | May-22 | Jun-22 | Jul-22 | Aug-22 | Sep-22 | Oct-22 | Nov-22 | Dec-22 | Jan-23 | Feb-23 | Mar-23 | Total |
| OVAMC Lake Nona: Building# 7. Central Energy Plant, Main Hospital Building# 2, Mechanical Room (MR), Building# 1, Clinic MR, Building# 13 Sim Learn Center MR, Building# 9, Domiciliary MR and Building# 11, Community Living Center | 242 | 242 | 242 | 242 | 242 | 242 | 242 | 242 | 242 | 242 | 242 | 242 | 2904 |
| OVAMC Lake Baldwin | 65 | 65 | 65 | 65 | 65 | 65 | 65 | 65 | 65 | 65 | 65 | 65 | 780 |
| Viera VA Healthcare Center | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
The Contractor must evaluate the amount of salt needed per location during the base performance period and ensuing option periods. Salts must be stored on pallets.