ATTACHMENT 3 Drawings - Emergency Power Circuits.pdf

PDF 10 MB Posted

Attached to
J061--Electrical Repair Medium Voltage Circuits Federal contract opportunity
Solicitation number
36C24822Q0388
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This attachment provides drawings related to a federal contract solicitation for electrical repair work. The solicitation number 36C24822Q0388 was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 to replace existing failed equipment with new conductors, splices and terminations in order to restore emergency power to critical infrastructure. Drawings outlining the required emergency power circuits are provided to assist contractors in preparing responses for this opportunity, which involves conducting medium voltage electrical repairs.

View the file

Other files for this federal contract opportunity

Other files attached to J061--Electrical Repair Medium Voltage Circuits, newest first.
File Type Posted
36C24822Q0388 0001.docx DOCX document
D.1 ATTACHMENT 1 WD 15-4553 Rev16 07-21-2021 Orange.pdf PDF
D.2 ATACHMENT 2 VAAR 852.219-77.pdf PDF
36C24822Q0388_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARALLELING SWITCHGEAR "B"

1200A

AUTOMATIC

TIE BREAKER

1200AF

120AT

52TC

200:5

1200AF

160AT

52TC

200:5

TYPICAL

FOR 4

AA

TYPICAL

FOR 4

1200A N.O.

AUTOMATIC

TIE BREAKER

1200A, 12.47KV, 3 PHASE, 3 WIRE, 36KAIC (750MVA, SECTION 2)

TYPICAL

FOR 4

1200AF

150AT

52TC

300:5

TC

300:5

1200AF

160AT

52TC

200:5

AAA

1200AF

90AT

52TC

300:5

1200AF

160AT

52TC

200:5

AA

TC

200:5

TC

200:5

1200AF

150AT

52TC

300:5

AAA

1200AF

120AT

52TC

300:5

TC

200:5

TC

1200AF

160AT

52TC

200:5

1200AF

160AT

52TC

200:5

1200A, 12.47KV, 3 PHASE, 3 WIRE, 36KAIC (750MVA, SECTION 1)

1200A, 12.47KV, 3 PHASE, 3 WIRE, 36KAIC (750MVA, SECTION 1) 1200A, 12.47KV, 3 PHASE, 3 WIRE, 36KAIC (750MVA, SECTION 2)

CONTINUOUS GROUND BUS

N1

E-EP6.002

OUC METER

CABINET #1

N4

E-EP6.004

CEP

SUBSTATION

SS-EN2

TC

200:5

TC

200:5

TC

200:5

1200AF

200AT

52TC

2250KW, 12.47KV,

3Ø, 3W

PRIME RATED

GEN "GB-1"

1200AF

200AT

1200AF

200AT

1200AF

200AT

E2

E-EP6.004

CEP

SUBSTATION

SS-EG2

1200AF

270AT

52TC

RELAY 300:5

A

1200AF

270AT

52TC

300:5

N2

E-EP6.002

OUC METER

CABINET #2

1200AF

270AT

52TC

300:5

1200AF

270AT

52TC

300:5RELAY RELAY RELAY RELAY RELAY RELAY RELAY

RELAY RELAY RELAY RELAY RELAY

RELAY RELAY RELAYRELAY

RELAY RELAY RELAY RELAY RELAY RELAY

AUTOMATIC N.O.

TIE BREAKER

AUTOMATIC N.O.

TIE BREAKER

DBG1 DBG2 DBG3 DBG5 DBG6 DBG7 DBG9-

DBG12

DBG13-

DBG16

DBG18 DBG19 DBG20 DBG21 DBG22 DBG24

GB1GB2 GB3 GB4

TBG1

DBN1 DBN2 DBN4 DBN5 DBN7 DBN8 DBN9-

DBN12

TBN1

DBN13-

DBN16

DBN19 DBN20 DBN21 DBN22 DBN23 DBN24

TC

300:5 A

RELAY

DBG4

1200AF

160AT

52TC

200:5 A

RELAY

DBG17

DBN6

A

GG G G

11 1 1

4 4 4 4

4 4 4

2250KW, 12.47KV,

3Ø, 3W

PRIME RATED

GEN "GB-2"

2250KW, 12.47KV,

3Ø, 3W

PRIME RATED

GEN "GB-3"

2250KW, 12.47KV,

3Ø, 3W

PRIME RATED

GEN "GB-4"

HOSPITAL

SUBSTATION

SS-HG1

HOSPITAL

SUBSTATION

SS-HG3

HOSPITAL

SUBSTATION

SS-HGP1

WAREHOUSE

SUBSTATION

SS-WG1

CLC

SUBSTATION

SS-NG1

HOSPITAL

SUBSTATION

SS-HG2

HOSPITAL

SUBSTATION

SS-HG3

HOSPITAL

SUBSTATION

SS-HGP2

CLC

SUBSTATION

SS-NG1

HOSPITAL

SUBSTATION

SS-HN1

HOSPITAL

SUBSTATION

SS-HN3

HOSPITAL

SUBSTATION

SS-HNP1

CLC

SUBSTATION

SS-NN1

TYPICAL

FOR 4

SPACESPACE

SPACE SPACE

300:5 A

RELAY 300:5

A

RELAY

300:5RELAY 300:5RELAY

CONTINUOUS GROUND BUS

NGR-B1

NGR-B2

NGR-B3

NGR-B4

1200AF

90AT

1200AF

90AT

1200AF

120AT

1200AF

160AT

1200AF

160AT

1200AF

150AT

200:5RELAY

GB5

G

FUTURE

2250KW, 12.47KV,

3Ø, 3W

PRIME RATED

GEN "GB-5"

SPACE6

49 9 4

1200AF

160AT

52TC

200:5

1200AF

160AT

52TC

200:5

1200AF

160AT

52TC

200:5

TC

300:5

1200AF

160AT

52TC

200:5RELAY RELAY RELAY RELAY RELAY

HOSPITAL

SUBSTATION

SS-HN2

HOSPITAL

SUBSTATION

SS-HN4

HOSPITAL

SUBSTATION

SS-HNP2

CLC

SUBSTATION

SS-NN1

1200AF

120AT

N3

E-EP6.004

CEP

SUBSTATION

SS-EN2

49 4

1200AF

160AT

52TC

200:5 A

RELAY

DBG8

E1

E-EP6.004

CEP

SUBSTATION

SS-EG2

LOAD BANK

1200AF

150AT

52TC

300:5 A

RELAY

DBG23

SPARESPARE

DBN3

1200AF

150AT

52TC

300:5RELAY

SPARE

SEE SHEET E-EP5.010 FOR ELEVATION

TCRELAY

TCRELAY

12KV 12KV 12KV 12KV 12KV

12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV

12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV 12KV

200:5

12KV

200:5

MMMMM

NORMAL DISTRIBUTION SWITCHGEAR "B"

TC

RELAY 600:5

1200AF

540AT

1200AF

540AT

52TC

600:5RELAY

SEE SHEET E-EP5.011 FOR ELEVATION

UB1 UB2

MM

DBN18DBN17

1200AF

150AT

52TC

300:5RELAY

SPARE

12KV

TC

300:5RELAY

WAREHOUSE

SUBSTATION

SS-WN1

1200AF

90AT

12KV

1200AF

150AT

52TC

300:5RELAY

SPARE

12KV

A A A A A

12KV

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT/ENGINEERS:

OFFICE OF

FACILITIES

MANAGEMENT

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot

6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

BUILDING IS FULLY SPRINKLERED

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Orlando, Florida

673-950

NOTES:

SHEET NOTES:

Professional Seals:

THESE RECORD DRAWINGS HAVE BEEN PREPARED

BY THE DESIGN PROFESSIONAL BASED ON

INFORMATION FURNISHED BY OTHERS. NO FIELD

VERIFICATION OF THEIR CORRECTNESS HAS

OCCURED. THE DESIGN PROFESSIONAL CANNOT

ASSURE THE ACCURACY OR INFORMATION

INCORPORATED INTO THESE RECORD DRAWINGS.

REFER TO SUPPLEMENTAL SHOP DRAWINGS

INCLUDED WITH THE RECORD DOCUMENT SET FOR

ADDITIONAL INFORMATION.

No. Description Date

RECORD DRAWINGS 12-01-2015

29 OCTOBER, 2009 KLM EB/RLF

CENTRAL ENERGY PLANT

E-EP6.001

SINGLE LINE DIAGRAM

1 4" C - (3) #2/0 (15 KV, MV-105,TYPE EPR, SHEILDED) + (1)

#2/0 XHHW GROUND. ROUTE FEEDER BELOW FLOOR

SLAB, CONDUIT SHALL BE SCHEDULE 80 PVC.

2 SEE SHEET E-EP6.007 FOR GROUNDING REQUIREMENTS.

3 4" SCHEDULE 80 PVC CONDUIT FOR FUTURE USE. SEE

SHEET E-ES1.008 FOR ROUTING.

4 (3) #4/0 (15KV, MV-105, TYPE EPR, SHIELDED) + (1) #4/0

XHHW GROUND. ROUTE CONDUCTORS THROUGH THE 5"

CONCRETE ENCASED DUCT BANK AND MANHOLE

SYSTEM. REFER TO SITE PLANS FOR DUCT BANK

LAYOUT.

5 4" C - (3) #1 (15KV, MV-105, TYPE EPR,SHIELDED) + (1) #1

XHHW GROUND. ROUTE FEEDER BELOW FLOOR SLAB,

CONDUIT SHALL BE SCHEDULE 80 PVC.

6 FULLY EQUIPPED SPACE INCLUDING CRADLE, RELAY,

CONTROL WIRING AND ALL COMPONENTS AS REQUIRED

TO RECEIVE FUTURE CIRCUIT BREAKER.

7 NEUTRAL GROUNDING RESISTOR RATED FOR 8,000V LINE

TO GROUND, 10A CONTINUOUS DUTY, 800 OHMS, NEMA

TYPE 3R ENCLOSURE. SEE SHEET E-EP6.007 FOR

CONNECTIONS.

8 ALL OF THE CIRCUIT BREAKERS IN THIS SWITCHGEAR

ARE AUTOMATICALLY CONTROLLED FROM THE

GENERATOR PARALLELING SWITCHGEAR MASTER

CONTROLLER SERVING SYSTEM "B". SEE 1/E-EP5.014

FOR CONTROL WIRING CONNECTION DIAGRAM.

9 (3) #1/0 (15KV, MV-105, TYPE EPR, SHIELDED) + (1) #1/0

XHHW GROUND. ROUTE CONDUCTORS THROUGH THE 5"

CONCRETE ENCASED DUCT BANK AND MANHOLE

SYSTEM. REFER TO SITE PLANS FOR DUCT BANK

LAYOUT.

10 TO LOAD BANK, SEE SHEET EP6.002 FOR CONTINUATION.

11 4" C - (3) #4/0 (15 KV, MV-105,TYPE EPR, SHEILDED) + (1)

#4/0 XHHW GROUND. ROUTE FEEDER BELOW FLOOR

SLAB, CONDUIT SHALL BE SCHEDULE 80 PVC.

A.

B.

KEY NOTES:

THIS PACKAGE REQUIRES WORK WITHIN EACH BUILDING ON

THE CAMPUS. EXTEND THE MEDIUM VOLTAGE

CONDUCTORS TO THE SUBSTATIONS INDICATED. PROVIDE

MEDIUM VOLTAGE CABLE TERMINATIONS IN ACCORDANCE

WITH THE SPECIFICATIONS. THE CONDUCTORS SHALL BE

ROUTED THROUGH THE CONCRETE ENCASED DUCT BANKS

FROM THE CENTRAL ENERGY PLANT TO EACH BUILDING,

REFER TO THE SITE PLANS FOR THE DUCT BANK ROUTING.

IN MULTI-STORY BUILDINGS WHERE SUBSTATION(S) ARE

LOCATED ON THE UPPER FLOORS (CLINIC, HOSPITAL AND

DOMICILIARY), THE CONDUCTORS SHALL BE ROUTED

THROUGH THE RISER CONDUITS THAT WILL BE PROVIDED

UNDER THE SPECIFIC BUILDING PACKAGE.

REFER TO SHEET E-EP6.006 FOR CAMPUS WIDE

SUBSTATION CONNECTION DIAGRAM.

REFER TO SITE PLANS FOR LOCATIONS OF SUBSTATIONS IN

THE CLINIC, HOSPITAL, WAREHOUSE, PARKING GARAGE,

DOM AND CLC BUILDINGS.

C.

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

A ,E

• C li .5

• C

.5

"' • C

B 0 u C • • C

N

C

N

D ..

E ..

,E

• C

.5

• .a

·i

• ~ 0

F 15 ,E

• C

.5 " • " • " ~o

• C

REF -· LINE

COMMUNITY

LIVING

CENTER

COMMUNITY

LIVING

CENTER

m

V') La.J I

V') La.J I

La.J

EI..EC1RIC

ROOM 1M10

COMMUNICATIONS --<

ROOM 1M05

//::-:=x:z~~ .. , X \,/\ )(\.+\

I )( 'x,,..\./\ ){~•~ ,x \, \ ,( .:\ ..

• )'$s_ .. ~_>,✓xx..x\ 1 t\.

\~~,K\\AI '\.~ x'\,X I l, rel ,,/1 ~

COMMUNITY

LIVING

CENTER

,1/ .,,., &,No. Description Date CONSULTANTS:

RECORD DRAWINGS 12-01-2015

VA FORM 08-6231, OCT 1978

1 2

COM ~6J NITY

LIV l"'~G

CENT\

SS-NN1

4 5 6

--o------i I I

Drawing Title r-A_R_C_H_IT_EC_T_/E_NG_I_NE_E_R_S: ________ --,CENTRALENERGYPLANT r-TH_E_S_E-RE_C_O_R_D-DRA_W_IN_G_S_H-AV_E_B_E_EN___ I ........ E B ELECTRICAL SITE PLAN Professional Seals:

PREPAREDBYTHEDESIGNPROFESSIONALBASED j t • rr- LLERBE ~E .. CKET Approved:ProI·ectDirector ON INFORMATION FURNISHED BY OTHERS. NO

FIELD VERIFICATION OF THEIR CORRECTNESS HAS

OCCURRED. THE DESIGN PROFESSIONAL CANNOT "\

ASSURE THE ACCURACY OR INFORMATION

INCORPORATED INTO THESE RECORD DRAWINGS.

REFER TO SUPPLEMENTAL SHOP DRAWINGS

INCLUDED WITH THE RECORD DOCUMENT SET

FOR ADDITIONAL INFORMATION.

A JOINT VENTURE

145 Lincoln Avenue \ii/inter Park, Florida 32789 407 647 1039

1001 G Street,NW, Suite 1000 Wash iri-:;iton, D.C. 20001

2D2 654 9300

6 7

8 9

C: 1:::0

NOTES:

KEY NOTES: Q z .(Tl ..., E-ES1 .01 ~ E-ES1.012 1. ROUTE THE MEDIUM VOLTAGE CONDUCTORS

SERVING THE CLC SUBSTATION "SS-NN1" THOUGH

I lt--------<o I-

• 1-

THIS DUCT BANK. REFER TO ONE-LINE DIAGRAMS

FOR CONDUCTOR REQUIREMENTS.

2. ROUTE THE MEDIUM VOLTAGE CONDUCTORS

SERVING THE CLC SUBSTATION "SS-NG1" THOUGH

THIS DUCT BANK. REFER TO ONE-LINE DIAGRAMS

FOR CONDUCTOR REQUIREMENTS.

3. ROUTE THE GENERATOR CONTROL CONDUCTORS

SERVING THE TERMINAL CABINET "N-TC1" THROUGH

THIS DUCT BANK. REFER TO SHEETS E-EP5.OO1

AND E -EP5.OO2 FOR WIRING REQUIREMENTS.

4. PULL BOX PROVIDED UNDER THE SITE AND

UTILITIES CONSTRUCTION PACKAGE 1A.

5. CONDUIT PROVIDED UNDER THE SITE AND UTILITIES

CONSTRUCTION PACKAGE 1A. CONDUIT IS FOR

TEMPORARY ORLANDO UTILITIES COMMISSION (OUC)

PRIMARY FEEDERS.

6. CONDUIT CONTINUE TO THE SUBSTATIONS. CONDUITS

PROVIDED UNDER THE CLC CONSTRUCTION PACKAGE 2

7. CONDUITS CONTINUE TO THE TRANSFER SWITCH

TERMINAL CABINET "N-TC 1 ". CONDUITS PROVIDED

UNDER THE CLC CONSTRUCTION PACKAGE 2 .

8. TEMPORARY OVERHEAD POWER POLE AND RISER

PROVIDED UNDER ANOTHER CONSTRUCTION PACKAGE .

'S

I

KEY PLAN

0 10' 20' 40' 60'

Q I I 1" = 20' -a"

BUILDING IS FULLY SPRINKLERED

Project Title

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Project Number 673-950

Building Number

::=ILO:::;:o=ti~=la=n=do:::::'=F=lo=ri=da::::,;:,,,::::=;=,==:::,;,.:==~I DrawEing ~Eumbesr 1.011 Date Checked Drawn

29 OCTOBER 2009 KLM EB/ RLF Dwg. 299 of 379

8 9

OFFICE OF

FACILITIES

MANAGEMENT

A

B

C

D

E

F

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

A ,E

• C li .5

B

N

C

N

D ..

E

F 15 ,E

• C

.5 " • " • " ~o

• C r l;;c z . (Tl

E-ES1.oo9"~-ES l .010

• 11

I • 11

-1- II

=-i- -Ji)

I

1 2 3

~&~n ~N±o~. j;;;~D~e~sc~ri·~=pt~io~n===~=~~~= ~~~JLTANITS~---------------r RECORD DRAWINGS Date CONSULTANTS.· 12-01-2015 ln=~:--:------:---:--------Professional Seals:

~~~~~:g~~~~RAWINGS HAVE BEEN ON INFORMATION EF~~~ll~~:i~~ESSIONAL BASED

FIELD VERIFICATIO OTHERS. NO

OCCURRED. THE D~S~~J~~~F~~:~~CTNESS HAS

ASSURE THE ACCURACY OR INFO AL CANNOT

INCORPORATED INT RMATION

REFER TO SUPPLEM~J~!~~HRJ~gRD DRAWINGS.

INCLUDED WITH THE RECORD RAWINGS

FOR ADDITIONAL INFORMATIOi_ocUMENT SET

VA FORM 08-6231. OCT 1978

1 2 3 4

4 5

ARCHITECT/ENGINEERS:

Ftl .F

ELLERBE BECKET

A JOINT VENTURE

l45 Lincoln Avenue \ii/i nter Park, Fl orida 32789 407 647 1039

1001 G St t . ree ,NW, Suite 1000 Wash iri-:;iton, o.c. 20001

2D2 654 9300

6 7

ELECTRICAL SITE PLAN

Approved: Project Director

6 7

8 I 9

NOTES:

KEY NOTES: Q

'S •

I o 1 o· 20· 40' 60'

Q~ I I I 1 = 20·-o·

BUILDING IS FULL y SPRINKLERED Project Title

A NEW HOSPITAL FOR ProjectNumber

VAMC ORLANDO, FLORIDA BuildingNum::, I Location

• Orlando, Florida

I Drawing Number

Date Checked Drawn E-ES1 .012 29 OCTOBER 2009 KLM EB/ RLF Dwg. 300 of 379

8 9

OFFICE OF

FACILITIES

MANAGEMENT

A

C

D

E

F

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight r l;:u z .(Tl

E-ES1 .OO~~-ES1 .007

I

"' I 15 ~: A ,E

• C

~ I li .5

I - I

• C

.5

"' • C

B 0 u C • • C

N

C

N

D ..

E ..

,E

• C

.5

• .a

·i

• ~ 0

F 15 ,E

.5 " • " • " ~o

• C

&_No. Description Date

RECORD DRAWINGS 12-01-2015

VA FORM 08-6231, OCT 1978

HOSPITAL

REF -· LIN

CONSULTANTS:

t--

Lu I

Lu

El£CTRICAL ROOM

(SECOND FLOOR) RM 2Q813

SUB-STATION SS-HNJ & SS-HN4

El£CTRICAL ROOM

(GROUND FLOOR) RM 1V811

El£CTRICAL ROOM

(SECOND FLOOR) RM 2Q811

E1£CTRICAL ROOM

(GROUND FLOOR) RM 1V809

SUB-STATION S5-HG1, SS-HG2 & H-TC1

El£CTRICAL ROOM

{SECOND FLOOR) RM 2Q809

SUB-STATION SS-HGJ

Lu I

Lu

H-TC1

SS-HG2

SS-HGJ

SS-HG1

NOTES:

KEY NOTES: Q

1. ROUTE THE MEDIUM VOLTAGE CONDUCTORS

SERVING WAREHOUSE SUBSTATION "SS-WN1"

THROUGH THIS DUCT BANK. REFER TO ONE-LINE

DIAGRAMS FOR CONDUCTOR REQUIREMENTS.

2. ROUTE THE MEDIUM VOLTAGE CONDUCTORS

SERVING WAREHOUSE SUBSTATION "SS-WG1"

THROUGH THIS DUCT BANK. REFER TO ONE-LINE

DIAGRAMS FOR CONDUCTOR REQUIREMENTS.

3. ROUTE THE GENERATOR CONTROL CONDUCTORS

SERVING WAREHOUSE TERMINAL CABINET ''W-TC1"

THROUGH THIS DUCT BANK. REFER TO E-EP5.001

AND EP5.002 FOR WIRING.

4. ROUTE THE MEDIUM VOLTAGE CONDUCTORS

SERVING HOSPITAL SUBSTATION "SS-HN 1 ",

·ss-HN3" AND ·ss-HNP1" THROUGH THIS DUCT

BANK. REFER TO ONE-LINE DIAGRAMS FOR

CONDUCTOR REQUIREMENTS.

5. ROUTE THE MEDIUM VOLTAGE CONDUCTORS

SERVING HOSPITAL SUBSTATION "SS-HG1 ",

·ss-HG3" AND "ss-HGP1" THROUGH THIS DUCT

BANK. REFER TO ONE-LINE DIAGRAMS FOR

CONDUCTOR REQUIREMENTS .

6. ROUTE THE GENERATOR CONTROL CONDUCTORS

SERVING HOSPITAL TERMINAL CABINET "H-TC1"

THROUGH THIS DUCT BANK. REFER TO E-EP5.001

AND EP5.002 FOR WIRING .

r;: - -o _Jo

PARKING

GARAGE

SS-WG1

,,--PANEL "W2BLE1"

ELECIRICAI.

ROOM 28105

LEVEL 2

LEVEL 3

ELECIRICAL

ROOM 38102

PARKING

GARAGE

LEVEL 3

ELECIRICAL

ROOM 3B101

SS-WN1

□ W-TC1

Drawing Title rA_R_C_H_IT_EC_T_/E_NG_I_NE_E_R_S: ________ ---,CENTRALENERGYPLANT r-TH-E-SE_R_E-CO_R_D-DRA_W_IN-GS_H_A-VE_B_E-EN___ I ........ E B ELECTRICAL SITE PLAN Professional Seals:

PREPAREDBYTHEDESIGNPROFESSIONALBASED j t • rr- LLERBE ~E .. CKET Approved:Pro1·ectDirector ON INFORMATION FURNISHED BY OTHERS. NO

FIELD VERIFICATION OF THEIR CORRECTNESS HAS

OCCURRED. THE DESIGN PROFESSIONAL CANNOT "

ASSURE THE ACCURACY OR INFORMATION

INCORPORATED INTO THESE RECORD DRAWINGS.

REFER TO SUPPLEMENTAL SHOP DRAWINGS

INCLUDED WITH THE RECORD DOCUMENT SET

FOR ADDITIONAL INFORMATION.

A JOINT VENTURE

145 Lincoln Avenue \ii/i nter Park, Fl orida 32789 407 647 1039

1001 G St reet,NW, Sui te 1000 Wash iri-:;iton, D.C. 20001

2D2 654 9300

6 7 l.-----7/ /I

Lu I

Lu

KEY NOTES (CONT.): Q

7. ROUTE THE MEDIUM VOLTAGE CONDUCTORS

SERVING THE CLC SUBSTATION "SS-NN 1"

THROUGH THIS DUCT BANK. REFER TO ONE-LINE

DIAGRAMS FOR CONDUCTOR REQUIREMENTS.

8. ROUTE THE MEDIUM VOLTAGE CONDUCTORS

SERVING THE CLC SUBSTATION "SS-NG1"

THROUGH THIS DUCT BANK. REFER TO ONE-LINE

DIAGRAMS FOR CONDUCTOR REQUIREMENTS .

9. ROUTE THE GENERATOR CONTROL CONDUCTORS

SERVING CLC TERMINAL "N-TC1" THROUGH THIS

DUCT BANK. REFER TO E-EP5.001 AND EP5.002

FOR WIRING.

10. ROUTE THE GENERATOR CONTROL CONDUCTORS

SERVING PARKING GARAGE STRUCTURE TERMINAL

"P-TC1" THROUGH THIS DUCT BANK. REFER TO

E-EP5.001 AND EP5.002 FOR WIRING.

11. CONDUIT PROVIDED UNDER THE SITE AND UTILITIES

CONSTRUCTION PACKAGE 1A.

12. CONDUITS CONTINUE TO THE TRANSFER SWITCH

TERMINAL CABINET "P-TC 1 ", LOCATED IN THE

PARKING GARAGE CONSTRUCTION PACKAGE 3.

13. CONDUITS CONTINUE TO THE SUBSTATION ROOMS

LOCATED ON THE THIRD FLOOR. CONDUITS ARE

PROVIDED UNDER THE WAREHOUSE CONSTRUCTION

PACKAGE 3.

14. CONDUITS CONTINUE TO THE TRANSFER SWITCH

TERMINAL CABINET ''W-TC1" LOCATED IN THE

WAREHOUSE ELECTRICAL ROOM 38101. CONDUITS

ARE PROVIDED UNDER THE PARKING GARAGE

PACKAGE 3.

15. CONDUIT CONTINUE TO THE HOSPITAL

SUBSTATIONS. CONDUIT ARE PROVIDED UNDER

THE HOSPITAL/CLINIC CONSTRUCTION PACKAGE 4.

16. CONDUITS CONTINUE TO THE TRANSFER SWITCH

TERMINAL CABINET LOCATED IN THE HOSPITAL

ELECTRICAL ROOM 1V809. CONDUITS ARE

PROVIDED UNDER THE HOSPITAL/CLINIC

CONSTRUCTION PACKAGE 4.

17. SEE SHEET E-ES1 .008 FOR CONTINUATION.

18. CAP CONDUITS FOR FUTURE EXTENSION UNDER

THE SITE LIGHTING CONSTRUCTION PACKAGE 4.

I

KEY PLAN

0 10' 20· 40'

I 1" = 20' -a"

'S

60'

I

BUILDING IS FULLY SPRINKLERED

Project Title

A NEW HOSPITAL FOR

VAMC ORLANDO, FLORIDA

Project Number

673-950

Building Number

::=ILO:::;:o=ti~=la=n=do=,=F=lo=ri=da::::,;:,,,::::=;=,==:::,;,.:==~I DrawEing ~Eumbesr 1. 007 Date Checked Drawn

29 OCTOBER 2009 KLM EB/ RLF Dwg. 295 of 379

8 9

OFFICE OF

FACILITIES

MANAGEMENT

A

B

C

D

E

F

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

VHAORLAllisD Highlight

Pages from Pkg 1B Combined Record Drawings-9.pdf
Pages from Pkg 1B Combined Record Drawings-5.pdf
Pages from Pkg 1B Combined Record Drawings-4.pdf
Pages from Pkg 1B Combined Record Drawings-2.pdf
Pages from Pkg 1B Combined Record Drawings-8.pdf
Pages from Pkg 1B Combined Record Drawings-7.pdf
Pages from Pkg 1B Combined Record Drawings-6.pdf

File details come from the government source that posted it. Updated .