DB Install Parking Garage RFIs (002).pdf

PDF 121 KB Posted

Attached to
Y1LZ--FY21: NRM Tier 2 (Proj: 675-21-110) Install Parking Garage Guidance Sytem
Solicitation number
36C24821R0131
Issued by

About this file

This document contains a request for information (RFI) and related federal contract opportunity notice. The RFI pertains to a project to install new parking guidance systems at the Lake Nona VA Medical Center in Orlando, Florida. The contractor will evaluate current infrastructure, replace all defective appliances, install single space sensors in two parking garages, remove overhead sensors, utilize existing in-ground loops and communication points, reuse and install parking signage displaying available spaces, provide additional aisle displays, and provide a software to monitor the garages. The contract value is estimated between $1,000,000 to $5,000,000. Responses to the subsequent solicitation will be due on July 20, 2021 and posted on beta.SAM.gov. The opportunity is set aside for service-disabled veteran-owned small businesses and issued by the Department of Veterans Affairs VISN 8 Network Contracting Office.

View the file

Other files

File Type Posted
LN Parking Comm 3.pdf PDF
LN Parking Comm 4.pdf PDF
BP3 Drawings Parking Garage - fragment.pdf PDF
LN Parking Comm 7.pdf PDF
LN Parking Communications 2.pdf PDF
LN Parking Comm 8.pdf PDF
LN Parking Comm 6.pdf PDF
36C24821R0131 0001.pdf PDF
LN Parking Communications 1.pdf PDF
LN Parking Comm 5.pdf PDF
Attachment 7 - Wage Determination.pdf PDF
Attachment 1 - East Garage.pdf PDF
Attachment 6 - EMR.docx DOCX document
Solicitation For 36C24821R0131.pdf PDF
Attachment 4 - Price Matrix.xlsx XLSX spreadsheet
Attachment 8 - LOS Solicitation Version.doc DOC document
Attchment 5 - Past Performance.pdf PDF
Attachment 2 - West Garage.pdf PDF
Attachment 3 - Specialized Experience Form.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DB Install Parking Garage RFIs Answered 675-21-110 08/02/2021

RFI NBR Question/ Response

Company Submitted By

Dated Received

1. Question: Page 61 of 68 (Item C - Phase One – 2nd Technical Proposal) indicates letters of commitment are part of required Factor 1 - Technical Approach evaluation items. These letters are mentioned again in Phase Two requirements. Please confirm if offerors are required to provide in Phase One or Phase Two.

N/A 7/27/21

VA Response: CO Will reply

2. Question: Page 61 of 68 (Item C - Phase One – 2nd Technical Proposal) indicates copies of licensing are part of evaluation items for Factor 1 – Technical Approach. Please clarify the appropriate section within Factor 1, for inclusion of licensing documents.

N/A 7/26/21

VA Response: CO Will Reply

3. Question: Proposal submission requirements indicate responses are due by the date and time listed in Block 13A of the SF1442. Upon review, the SF1442 includes a date to submit, but does not include a time to submit responses.

Please confirm the date and time proposals must be submitted.

VA Response: 8/6/2021 at 1PM.

4. Question: Please confirm that sensors shall be installed over each individual parking space.

VA Response: Sensors required over each parking space.

5 Question: Please confirm that sensors shall not be installed down the middle of the drive aisle to monitor multiple parking spaces with one sensor.

VA Response: No sensors down drive aisles. All sensors to be installed over individual parking spaces.

6 Question: Please confirm whether parking signage outside of the garage is currently equipped with outdoor rated enclosures.

675-21-110 08/02/2021

VA Response: Confirm.

7 Question: Please clarify if a full time SSHO is required for this project.

VA Response: Project requires a full-time superintendent.

8 Question: Please confirm that the existing communication infrastructure can support the requests of the solicitation and no new communication infrastructure will need to be established.

9 Question: Please confirm that the existing power infrastructure can support the requests of the solicitation and no new power will need to be established.

VA Response: Additional power infrastructure may be required dependent upon final design.

10 Question: Please clarify how many additional 3-digit aisle displays will be required.

VA Response: Minimum of two on level 4A, other units may be required as necessary.

11 Question: Please confirm the only new displays to be installed will be in the drive aisles.

12 Question: Please clarify if the VA is to retain the existing appliances upon removal or if these will be the responsibility of the contractor to recycle or dispose of.

VA Response: Contractor to dispose of.

13 Question: The solicitation requests that the software/system shall have the ability to store capacity information. Please clarify if this is storage is to be cloud-based technology or will an onsite storage device be required.

675-21-110 08/02/2021 VA Response: Onsite storage.

Question: Please provide electrical drawings for the parking garages in scope and their associated panel schedules.

VA Response: Attached

15 Question: Please provide data communication drawings for the parking garages in scope.

VA Response: Attached

16 Question: Must the requirement to be "a State of Florida Certified/licensed General Contractor" be met solely by Prime contractor or can a subcontractor/member of the project management/delivery team, who is fully certified and licensed as a General Contractor in the State of Florida, fulfill this requirement?

N/A 7/21/21

VA Response: Subcontractor may meet requirement.