36C24819Q1160-002.pdf

PDF 76 KB Posted

Attached to
Service: Boiler Natural Gas Rebuild
Solicitation number
36C24819Q1160
Issued by

About this file

36C24819Q1160 Attachment B.pdf

View the file

Other files

File Type Posted
36C24819Q1160-000.docx DOCX document
36C24819Q1160-001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lake City VA Medical Center

Statement of Work

Background: The Lake City VA Medical Center in Lake City, Florida has a Boiler Plant with three Superior Fire Tube Boilers. There are three Natural Gas Pressure Regulators in the Plant. One for each Boiler. The regulators are fast acting regulators that are not performing properly. These regulators need to be rebuilt to ensure that they are fast acting natural gas pressure regulators.

Objective: Rebuild and test operate three existing 2” Fisher 1098 EGR Size 70 Dual

Pilot fast acting Natural Gas Pressure Regulators.

Scope of Work: Coordinate all work with the Contracting Officers Representative

(COR). Rebuild the spare Natural gas Pressure Regulator provided by VA Staff.

Perform the following work on #1 Boiler

• Ensure the Boiler is locked out and cooled down

• Remove the Boiler Natural gas Pressure Regulator

• Install the recently rebuilt Natural Gas Regulator in the piping to the Boiler

• Test the Natural Gas Pressure Regulator for proper operation.

• Send the removed Natural Gas Pressure Regulator out for overhaul.

Perform the following work on #2 Boiler

• Remove the Boiler Natural gas Pressure Regulator

• Install the recently rebuilt Natural Gas Regulator in the piping to the Boiler

• Test the Natural Gas Pressure Regulator for proper operation.

• Send the removed Natural Gas Pressure Regulator out for overhaul.

Perform the following work on #3 Boiler

• Remove the Boiler Natural gas Pressure Regulator

• Install the recently rebuilt Natural Gas Regulator in the piping to the Boiler

• Test the Natural Gas Pressure Regulator for proper operation

• Provide any and all documentation to the COR.

Qualifications/Certifications: The contractor shall be qualified and have the required levels of professional and technical experience to perform the work required by this statement of work.

Safety Regulations: All OSHA safety regulations shall be observed during the project.

• The VA Safety Officer shall have full authority to see that the contractor obeys all safety rules and regulations relative to the fulfillment of this project.

• Provide the necessary barricades/signage where required.

Scheduling and Hours of Work: All work in areas involved shall be scheduled with the

Contracting Officers Representative.

Lake City VA Medical Center

Statement of Work

Evaluation/Selection Factor: The project must be performed by a contractor that has the capability and capacity to perform the job. Technical expertise, past performance and, cost are always a consideration.