36C24818Q0161-00001002.docx

DOCX document 24 KB Posted

Attached to
Services: Multiple BPAs for VISN 8 Mold/Asbestos Remediation Services
Solicitation number
36C24818Q0161
Issued by

About this file

36C24818Q0161 00001 PRICE-COST SCHEDULE 36C24818Q0161 Rev-1.docx

View the file

Other files

File Type Posted
36C24818A0012-000.docx DOCX document
36C24818A0011-000.docx DOCX document
36C24818A0006-000.docx DOCX document
36C24818A0003-000.docx DOCX document
36C24818Q0161-00002000.docx DOCX document
36C24818Q0161-00001001.docx DOCX document
36C24818Q0161-00001000.docx DOCX document
36C24818Q0161-003.docx DOCX document
36C24818Q0161-002.docx DOCX document
36C24818Q0161-004.docx DOCX document
36C24818Q0161-001.docx DOCX document
36C24818Q0161-005.pdf PDF
36C24818Q0161-000.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

?.## PRICE/COST SCHEDULE

CLINS 0001 – 0024: Price/Cost Schedule for locations in the State of Florida.

CLINS 0025 – 0048: Price/Cost Schedule for locations within VA Caribbean Healthcare System.

The Government does not guarantee that it will place any orders under this BPA. This BPA ordering period begins on February 15, 2018 through February 14, 2023.

ORDERING PERIOD: February 15, 2018 through February 14, 2023.

CLIN
DESCRIPTION
“ESTIMATED” Units
UNIT
UNIT PRICE
0001
Contractor shall provide all labor, equipment and material for the removal of suspected-infested material and mold growth from concrete or block walls, and ceilings.
50,000
SF
0002
Contractor shall provide all labor, equipment and material for demolishing interior or exterior wall/surface to gain access to metal work.
50,000
SF
0003
Surfacing Materials: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
0-500
SF
0004
Surfacing Materials: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
500 or greater
SF
0005
Thermal System Insulation: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
0-500
LF
0006
Thermal System Insulation: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
500 or greater
LF
0007
Drywall Systems (wallboard/joint compound): Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
0-500
SF
0008
Drywall Systems (wallboard/joint compound): Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
500 or greater
SF
0009
Vinyl Asbestos Floor Tile/Mastic: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
0-500
SF
0010
Vinyl Asbestos Floor Tile/Mastic: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
500 or greater
SF
0011
Daily Air Monitoring/Clearance Air Monitoring (PCM Analysis): Contractor shall provide daily air monitoring within existing mold containment areas.
1
Per Day
0012
Surfacing Materials: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
0-500
SF
0013
Surfacing Materials: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
500 or greater
SF
0014
Thermal System Insulation: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
0-500
LF
0015
Thermal System Insulation: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
500 or greater
LF
0016
Drywall Systems (wallboard/joint compound): Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
0-500
SF
0017
Drywall Systems (wallboard/joint compound): Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
500 or greater
SF
0018
Vinyl Asbestos Floor Tile/Mastic: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
0-500
SF
0019
Vinyl Asbestos Floor Tile/Mastic: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
500 or greater
0020
Daily Air Monitoring/Clearance Air Monitoring (PCM Analysis): Contractor shall provide daily air monitoring for standalone asbestos removal projects.
Per Day
EA
0021
Installment of HEPA vacuum HVAC diffusers.
200
EA
0022
Contractor shall provide the disposal of all debris including bags, dumpster, and transportation for all demo of any suspected contaminated mold.
500
CY
0023
On-site storage: Contractor shall provide onsite storage unit in the event contents need to be removed from the building/room to complete mitigation/remediation
10
CO
0024
This CLIN shall be for all work designated by the Contracting Officer as an emergency service. This CLIN shall include work outside of regular working hours. CLIN 0001 through 0005 shall not be utilized with this CLIN on the same task order and shall be a stand-alone CLIN. The contractor shall arrive on site no later than two (2) hours after issuance of oral order by Contracting Officer to review project scope. Within one (1) hour after site visit ending, contractor shall submit the marked-up floor layout drawing of area(s) outlining scope of work to the Contracting Officer. Within two (2) hours of government approval of layout drawing, work shall commence on site. Oral orders arising because of an emergency shall be confirmed by issuance of a written Task Order within five (5) business days.
20,000
SF

CLINS 0025 through 0048 represents the Price/Cost Schedule for locations within VA Caribbean Healthcare System

0025
Contractor shall provide all labor, equipment and material for the removal of suspected-infested material and mold growth from concrete or block walls, and ceilings.
50,000
SF
0026
Contractor shall provide all labor, equipment and material for demolishing interior or exterior wall/surface to gain access to metal work.
50,000
SF
0027
Surfacing Materials: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
0-500
SF
0028
Surfacing Materials: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
500 or greater
SF
0029
Thermal System Insulation: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
0-500
LF
0030
Thermal System Insulation: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
500 or greater
LF
0031
Drywall Systems (wallboard/joint compound): Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
0-500
SF
0032
Drywall Systems (wallboard/joint compound): Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
500 or greater
SF
0033
Vinyl Asbestos Floor Tile/Mastic: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
0-500
SF
0034
Vinyl Asbestos Floor Tile/Mastic: Contractor shall provide all labor, equipment and material for asbestos removal within existing mold containment areas.
500 or greater
SF
0035
Daily Air Monitoring/Clearance Air Monitoring (PCM Analysis): Contractor shall provide daily air monitoring within existing mold containment areas.
1
Per Day
0036
Surfacing Materials: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
0-500
SF
0037
Surfacing Materials: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
500 or greater
SF
0038
Thermal System Insulation: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
0-500
LF
0039
Thermal System Insulation: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
500 or greater
LF
0040
Drywall Systems (wallboard/joint compound): Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
0-500
SF
0041
Drywall Systems (wallboard/joint compound): Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
500 or greater
SF
0042
Vinyl Asbestos Floor Tile/Mastic: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
0-500
SF
0043
Vinyl Asbestos Floor Tile/Mastic: Contractor shall provide all labor, equipment and material for standalone asbestos removal projects.
500 or greater
0044
Daily Air Monitoring/Clearance Air Monitoring (PCM Analysis): Contractor shall provide daily air monitoring for standalone asbestos removal projects.
Per Day
EA
0045
Installment of HEPA vacuum HVAC diffusers.
200
EA
0046
Contractor shall provide the disposal of all debris including bags, dumpster, and transportation for all demo of any suspected contaminated mold.
500
CY
0047
On-site storage: Contractor shall provide onsite storage unit in the event contents need to be removed from the building/room to complete mitigation/remediation
10
CO
0048
This CLIN shall be for all work designated by the Contracting Officer as an emergency service. This CLIN shall include work outside of regular working hours. CLIN 0001 through 0005 shall not be utilized with this CLIN on the same task order and shall be a stand-alone CLIN. The contractor shall arrive on site no later than two (2) hours after issuance of oral order by Contracting Officer to review project scope. Within one (1) hour after site visit ending, contractor shall submit the marked-up floor layout drawing of area(s) outlining scope of work to the Contracting Officer. Within two (2) hours of government approval of layout drawing, work shall commence on site. Oral orders arising because of an emergency shall be confirmed by issuance of a written Task Order within five (5) business days.
20,000
SF

TOTAL AMOUNT:

File details come from the government source that posted it.