36C24818Q0161-00001001.docx
DOCX document 18 KB Posted
- Solicitation number
- 36C24818Q0161
About this file
36C24818Q0161 00001 S05 ATTACHMENT A Contractor Questions _ Comments.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24818A0012-000.docx | DOCX document | |
| 36C24818A0011-000.docx | DOCX document | |
| 36C24818A0006-000.docx | DOCX document | |
| 36C24818A0003-000.docx | DOCX document | |
| 36C24818Q0161-00002000.docx | DOCX document | |
| 36C24818Q0161-00001002.docx | DOCX document | |
| 36C24818Q0161-00001000.docx | DOCX document | |
| 36C24818Q0161-003.docx | DOCX document | |
| 36C24818Q0161-002.docx | DOCX document | |
| 36C24818Q0161-004.docx | DOCX document | |
| 36C24818Q0161-001.docx | DOCX document | |
| 36C24818Q0161-005.pdf | ||
| 36C24818Q0161-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTES No. 36C24818Q0161 Multi-Campus Mold/Asbestos Remediation Comments/Questions
| No. |
| REFERENCE |
(PWS, SOW,
CLIN Structure, etc.)
| COMMENT(s)/QUESTION(s) |
| GOVERNMENT RESPONSE |
CLIN 0001
For the interior metal to be abated, will either an interior or exterior wall/surface be demolished to gain access to this metal work?
Refer to revised CLIN structure (CLIN 0002 and 0026).
| 2 |
| CLIN 0002 |
Does this project include the removal of asbestos or just asbestos material that has mold on its surface?
Refer to revised CLIN structure (CLIN 0003 through 0020 and CLIN 0027 through 0044). This This is a Blanket Purchase Agreement (BPA) which the Contractor agrees on a Firm Fixed Price for future requirements. Each project has its own unique requirement which may or may not present asbestos. In cases where asbestos may be present, the BPA price will represent the cost to remove suspected-infested material and asbestos.
| 3 |
| CLIN 0003 |
| Does this statement “Installment of HEPA vacuum HVAC diffusers” mean that during the work process the area will be kept under negative pressure using hepa air filtration units? If this is not the case a further detailed explanation of hepa vacuum HVAC diffusers system is required. |
| After each site visit, the Contractor will determine if HEPA vacuum diffusers are needed. In the case where the installment of HEPA vacuum is needed, this clin will represent the cost per unit. |
| 4 |
| CLIN 0005 |
| Does the unit CO mean Each (EA)? |
| The unit “CO” means Container. If CO is not the correct “unit of issue” per industry standards, please provide the correct unit with your quote. |
| 5 |
| RFQ Section 3 - IICRC |
| If we include our state qualifications for the company and our CIH for mold and asbestos remediation. Which we feel will meet the IICRC requirements, will this be satisfactory? |
ESA South meets all qualifications for building dry out procedures and insulation of materials to prevent water intrusion.
No, IICRC (ANSI) requirements will need to be met as a minimum.
| 6 |
| SOW |
| Will Lead Based Paint Testing be required within the projects? |
| No lead base paint testing will be required. |